This document is an exam paper for the MEF 424 Energy Management course at the Birla Institute of Technology, Pilani. It includes three questions focusing on conducting an energy audit, calculating the payback period for steam pipeline insulation, and discussing the blowdown process in boilers. The exam is open book, lasts 90 minutes, and has a weightage of 25%.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
17 views1 page
Energy Management Midsem 24
This document is an exam paper for the MEF 424 Energy Management course at the Birla Institute of Technology, Pilani. It includes three questions focusing on conducting an energy audit, calculating the payback period for steam pipeline insulation, and discussing the blowdown process in boilers. The exam is open book, lasts 90 minutes, and has a weightage of 25%.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
and Science, Pilani
Birla Institute of Technology
MEF 424 Energy Management Mid Sem (Open Book) Weightage: 25% Date: 12/ 03 / 2024 Time: 90 minutes Note: State clearly assumptions you make. assumptions you make. Underline the answers and the conduct a detailed energy audit of all the Q.1. You have to campus. Explain in details hostels and the messes of the proper justifications. (10] step-by-step your action plan with insulation of a steam pipeline is to be upgraded. With Q2. The simple payback period for the following data calculate the |10] the insulation upgradation project.
Length of the steam pipeline 100 m
100 mm Bare pipe external diameter 8368 kJ/m²-hr Heat loss from the pipe with existing 25 mm insulation thickness Thickness of insulation to be added 25 mmn
Heat loss after insulation 1673.6 kl/m²-hr
upgradation Boiler efficiency 75%
GCV of coal 16736 kJ/kg
Annual operating hours 8000 hrs Cost of coal Rs. 2000/Ton Investmnent for insulation Rs. 4 lakhs upgradation
Q3 Explain why "blow down" is done in a boiler. List out