0% found this document useful (0 votes)
17 views2 pages

TC-TS-01 (Title Sheet)

This document is a proprietary cover sheet for testing and commissioning reports by Larsen & Toubro Limited, ECC Division - EDRC. It outlines the usage guidelines, including the need for prior permission for any distribution or reproduction. The sheet includes sections for project details, approvals, and responsibilities of personnel involved in the documentation process.

Uploaded by

passionsaurabh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views2 pages

TC-TS-01 (Title Sheet)

This document is a proprietary cover sheet for testing and commissioning reports by Larsen & Toubro Limited, ECC Division - EDRC. It outlines the usage guidelines, including the need for prior permission for any distribution or reproduction. The sheet includes sections for project details, approvals, and responsibilities of personnel involved in the documentation process.

Uploaded by

passionsaurabh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

This document is the property of Larsen & Toubro Limited, ECC Division - EDRC and must not be passed

on to any third person or firm not authorised by us, nor be copied/made


use of in full or part by such person or firm without our prior permission writing

APPD
PRPD

CHKD
CLIENT :
No.

PROJECT :
DATE

NAME
DATE
TITLE:
REMARKS
REVISION

LARSEN & TOUBRO LIMITED


ECC DIVISION - EDRC T&C CELL
Checked

REV.
Approved
TC-ST-05(Cover Sheet for Document)
(i) This sheet shall be used as cover sheet for testing & commissioning, test report and other documents(if any)
(ii) This sheet can be changed as per customer / consultant’s requirement for a specific project.
(iii) The user can introduce new category in the ‘Released for’ column.
(iv) The ‘prepared’, ‘checked’ & ‘approved’ columns provided in the top sheet shall be signed by
Testing Engineer, Engineer in-charge, Section Head respectively as per the responsibilities and
scope defined in the sectional manual.
(v) Vendor / Agency is to be referred for external agency as defined in the contract. Vendor / Agency
column shall be filled if applicable only.

You might also like