TC-TS-01 (Title Sheet)
TC-TS-01 (Title Sheet)
APPD
PRPD
CHKD
CLIENT :
No.
PROJECT :
DATE
NAME
DATE
TITLE:
REMARKS
REVISION
REV.
Approved
TC-ST-05(Cover Sheet for Document)
(i) This sheet shall be used as cover sheet for testing & commissioning, test report and other documents(if any)
(ii) This sheet can be changed as per customer / consultant’s requirement for a specific project.
(iii) The user can introduce new category in the ‘Released for’ column.
(iv) The ‘prepared’, ‘checked’ & ‘approved’ columns provided in the top sheet shall be signed by
Testing Engineer, Engineer in-charge, Section Head respectively as per the responsibilities and
scope defined in the sectional manual.
(v) Vendor / Agency is to be referred for external agency as defined in the contract. Vendor / Agency
column shall be filled if applicable only.