module divider (input clk, input [7:0] dividend, input [7:0] divisor,
output reg [7:0] quotient);
reg [7:0] remainder;
integer i;
always @(posedge clk) begin
remainder = dividend;
quotient = 0;
for (i = 0; i < 8; i = i + 1) begin
remainder = {remainder[6:0], 1'b0};
if (remainder >= divisor) begin
remainder = remainder - divisor;
quotient = {quotient[6:0], 1'b1};
end else begin
quotient = {quotient[6:0], 1'b0};
end
end
end
endmodule
module hazard_unit(input [4:0] rs1, input [4:0] rs2, input [4:0] rd,
input mem_read, output reg stall);
MITIGATION TECHNIQUES:
FinFET-based designs reduce leakage.
Advanced power grid design (mesh structure) reduces IR
drop.
Dummy poly insertion & aggressive OPC (Optical Proximity
Correction).
2. How do you handle Clock Tree Synthesis (CTS) challenges at
advanced nodes?
11. How does Clock Skew impact setup and hold timing? How do
you fix it?
Positive Skew: Helps setup time but increases hold violations.
Negative Skew: Helps hold time but increases setup violations.
FIXING CLOCK SKEW:
Useful Skew Techniques: Delay clock in non-critical paths to
balance timing.
Clock Mesh & Hybrid Clock Trees: Ensure uniform skew
distribution.
Optimized CTS (Clock Tree Synthesis): Buffers and gating
strategies to minimize skew.
Proper Placement of Clock Buffers/Inverters: Reduces clock
delay mismatches.
12. What are Metal Density Rules? Why are they critical for
advanced nodes?
METAL DENSITY RULES:
Foundries enforce minimum and maximum metal density
constraints to avoid dishing & erosion during Chemical
Mechanical Planarization (CMP).
Violating these rules causes IR drop, yield loss, and
electromigration issues.
OPTIMIZATION TECHNIQUES:
Dummy Fill Insertion: Adds non-functional metal to balance
density.
CMP-Aware Routing: Ensures uniform metal layer distribution.
Using Metal Fill Constraints in P&R Tools: Avoids overfilling and
ensures manufacturability.
13. How do you handle Metal Track Alignment issues in advanced
node layouts?
WHY IS METAL TRACK ALIGNMENT IMPORTANT?
Misaligned tracks increase resistance and IR drop.
Causes signal integrity issues due to irregular routing patterns.
SOLUTIONS:
Use Standard Track-Based Routing: Ensures uniform via and
metal alignment.
Grid-Based Placement Strategies: Aligns power/ground
networks efficiently.
Use Redundant Vias & Wider Wires: Reduces resistance
variations.
14. What is the impact of via resistance on IR Drop? How do you
mitigate it?
HIGH VIA RESISTANCE LEADS TO:
Voltage drops in power/ground nets.
Electromigration failures due to increased current density.
Timing violations due to higher RC delay.
OPTIMIZATION TECHNIQUES:
Use Multi-Via Structures: Reduces resistance per via.
Lower Resistance Metal Stack (Cu, Co, Ru): Ensures higher
conductivity.
Place Power Vias Close to Load Regions: Minimizes voltage
drop.
15. What are the key challenges in High Fanout Net Synthesis
(HFNS)?
PROBLEMS WITH HIGH FANOUT NETS:
Increased Delay: Too many sinks cause large RC delay.
High Power Consumption: Large buffers introduce leakage &
switching power loss.
Higher Skew & Unbalanced Loads: Makes timing closure
difficult.
OPTIMIZATION STRATEGIES:
Clock Tree Style Buffering: Uses H-tree or Balanced Buffer
Trees.
Break the Net into Smaller Segments: Reduces net
capacitance.
Fanout Splitting Based on Load Distribution: Ensures equal
buffer load.
16. What is the impact of Substrate Noise in Physical Design?
How do you reduce it?
SUBSTRATE NOISE SOURCES:
Switching transistors create noise coupling.
Aggressive power domains induce noise on the ground plane.
NOISE REDUCTION TECHNIQUES:
Deep N-Well Isolation: Reduces substrate coupling.
Guard Rings & Shielding: Blocks noise from propagating.
Separated Power Domains: Avoids cross-domain interference.
Proper Floorplanning: Isolates noise-sensitive circuits from
aggressive switching regions.
17. What are the key factors in IR Drop Optimization for Power
Grid Design?
IR DROP FACTORS:
High Resistance Power Rails: Leads to voltage loss.
Insufficient Decap Cells: Causes transient IR drops.
Localized High Switching Activity: Peaks in dynamic power
demand.
OPTIMIZATION STRATEGIES:
Use Power Mesh Instead of Power Rings: Reduces resistance
across the chip.
Optimize Via Stacking: Ensures low-resistance power
connections.
Run Early IR Drop Analysis (Redhawk, Voltus): Detects
hotspots.
Use Dynamic Voltage Scaling (DVS): Adjusts power based on
real-time demand.
18. What are the best techniques to reduce Routing Congestion
in Physical Design?
CAUSES OF ROUTING CONGESTION:
Macro Placement Issues: Creates routing blockages.
Improper Cell Density: Leads to high pin density in tight
regions.
Non-Uniform Pin Distribution: Causes localized congestion.
SOLUTIONS:
Use Pre-Routing Blockages: Keeps critical regions open.
Implement Cell Spreading During Placement: Reduces high-
density areas.
Optimize Pin Access & Metal Layer Utilization: Distributes
routing demand efficiently.
Use Machine Learning-Based Congestion Prediction: AI-based
placement/routing tools optimize congestion better.
MAJOR SOURCES:
Aggressive Switching Circuits induce crosstalk.
Poor Shielding increases noise propagation.
MITIGATION STRATEGIES:
Increase Spacing Between Critical Nets to reduce capacitive
coupling.
Use Ground Shielding (GND Strip) between high-speed signals.
Apply Noise-Aware Routing Algorithms to balance signal
integrity.
22. What is the Role of Decoupling Capacitors (Decaps) in IR
Drop Reduction?
WHY DECAPS ARE NEEDED:
Transients cause voltage fluctuations → potential timing
failures.
Without decaps, local power shortages degrade performance.
OPTIMIZATION STRATEGIES:
Insert Decaps Near High-Switching Regions for better
transient response.
Use Hierarchical Power Grid Design to balance current supply.
Employ Dynamic Decap Allocation (place more in high-density
regions).
1. Your chip has passed STA (Static Timing Analysis), but during
silicon validation, it fails at high temperature. How would you
debug this?
POSSIBLE CAUSES:
High temperature increases delay (Negative Temperature
Coefficient for some paths).
Hold time failures due to different expansion rates of metal
interconnects.
IR drop & electromigration issues affect timing closure.
DEBUGGING APPROACH:
Re-run STA with Temperature-Aware Analysis – Ensure corner
cases (SS, FF) are covered.
Perform IR Drop & Electromigration Checks – Check if power
grid is robust enough.
Analyze On-Chip Variation (OCV) Impact – Apply advanced
derating techniques.
Check Silicon Debug Logs – Identify failing paths and
correlate with layout.
2. After final P&R, you notice high congestion in a few regions.
What are the best techniques to fix it?
POSSIBLE REASONS:
High pin density in critical areas.
Standard cell row misalignment leading to wasted space.
Unoptimized macro placement blocking routing channels.
DEBUGGING FIX:
Spread standard cells and increase site utilization efficiency.
Insert Buffer Islands in high fan-out nets to optimize
placement.
Use Track-Based Routing Optimization (TBRO) for better track
utilization.
Apply Metal Layer Promotion – Move critical nets to higher
metal layers.
3. Your design meets setup timing but fails hold timing in multiple
corners. What are the debugging steps?
WHY HOLD TIME FAILURES OCCUR?
Clock skew issues – Early arrival of data due to delay
variations.
Clock gating logic induced glitches.
High process variation effects in advanced nodes (<5nm).
FIXES:
Increase delay in hold failing paths using delay cells or lower
Vt cells.
Minimize clock skew using balanced clock distribution
techniques.
Apply Hold Fixing Buffers close to the capturing flip-flop.
Re-run Hold Time Analysis at Extreme Corners (e.g., SS, FF).
4. Your power grid analysis shows a severe IR drop in a specific
region. How do you address it?
ROOT CAUSES:
Insufficient via connections in the power grid.
Narrow power rails in dense logic areas.
High switching activity in localized areas.
OPTIMIZATIONS:
Increase power strap width & reduce resistance.
Insert additional vias and power tiebars for better
conductivity.
Place decoupling capacitors (decaps) near high-current
regions.
Run Dynamic Voltage Drop (DVD) Analysis for transient
response improvement.
5. Your design exhibits excessive clock skew in post-route
analysis. How do you mitigate it?
POSSIBLE REASONS:
Unbalanced clock buffers or asymmetric routing.
Varying wire capacitance in different paths.
Process variations causing delay mismatches.
FIXES:
Apply Clock Tree Restructuring – Balance clock buffer
placement.
Use Clock Mesh Architecture for uniform clock distribution.
Enable OCV-aware Clock Balancing to account for process
variations.
Implement Deskew Buffers to reduce delay mismatches.
6. Your design has a significant increase in dynamic power after
CTS. How do you fix it?
WHY DYNAMIC POWER INCREASED?
Clock tree buffers introduced excessive toggling.
High activity factor in certain regions.
Unnecessary transitions due to glitch propagation.
OPTIMIZATIONS:
Apply Clock Gating at Register Level to disable unused blocks.
Use Multi-Vt Libraries to balance power and performance.
Reduce Clock Tree Buffer Fan-out to minimize transitions.
Re-run Power Simulation with Switching Activity Annotation.
14. Your design has high delay variability across PVT corners.
How do you mitigate it?
Use AOCV & POCV Timing Models.
Apply Timing Margining for Worst-Case Paths.
Optimize Metal Stack to Reduce RC Parasitics.
15. Your chip is showing early life failures in field testing. What
might be the cause?
Perform High-Stress Aging Simulations (NBTI, HCI, TDDB).
Use Redundant Paths for Critical Logic.
Implement ECC for Memory Reliability.
16. Your design passes STA and LVS but fails in actual silicon due
to intermittent failures. How do you debug this?
POSSIBLE CAUSES:
Marginal setup/hold violations not captured in STA due to
missing pessimism in signoff models.
Electromigration (EM) or IR drop issues affecting certain paths
under real-world conditions.
Metastability in clock domain crossing (CDC) paths not
correctly constrained.
Aging effects (NBTI, HCI, TDDB) leading to degraded
transistor performance over time.
DEBUGGING APPROACH:
Re-run STA with real silicon conditions including process
variations and voltage fluctuations.
Perform Dynamic IR Drop Analysis under realistic switching
patterns.
Check EM violations in post-layout analysis and compare with
silicon failure logs.
Validate CDC paths using formal verification tools like
SpyGlass CDC.
28. Your design fails timing closure at the hold-time stage after
ECO implementation. How do you fix it?
FIXES:
Use higher drive strength cells in critical hold paths.
Optimize clock buffer insertion to balance hold violations.
Apply local hold-fixing buffers instead of global changes.
15. Tell me about a time when you had to debug a critical design
issue under high pressure. How did you handle it?
During my FPGA-based AI accelerator project, a severe setup
timing violation appeared in post-layout STA. With the deadline
approaching, I quickly analyzed the critical path, optimized logic
placement, and applied retiming techniques. By staying calm and
systematically debugging, I resolved the issue within 24 hours,
meeting the project deadline.
16. Have you ever disagreed with a senior engineer or manager
on a VLSI design decision? How did you handle it?
Yes, during my internship, I suggested an alternative clock gating
method that my manager initially dismissed. Instead of arguing, I
ran a power analysis and demonstrated a 12% reduction in dynamic
power. With data-backed evidence, my approach was
implemented in the final design.
17. How do you manage the trade-off between power,
performance, and area (PPA) in a VLSI project?
I analyze design constraints and prioritize based on project goals.
In a low-power IoT chip, I minimized power using multi-threshold
libraries and clock gating while ensuring acceptable performance.
By balancing trade-offs early in RTL design, I avoided costly
optimizations later in PnR.
18. Can you share a time when you successfully handled an
unexpected last-minute design change?
In a recent project, a late requirement to add a parity bit in
memory storage came just before tape-out. Instead of a full
redesign, I utilized spare logic elements to integrate the feature
efficiently. By thinking creatively, I met the new requirement
without delaying the timeline.
19. Have you ever mentored or trained a junior team member?
How did you ensure their success?
Yes, I guided a junior engineer in learning UVM for verification. I
provided structured learning materials, assigned small debugging
tasks, and reviewed their testbench. By giving them hands-on
experience and constructive feedback, they quickly became
proficient in writing reusable UVM sequences.
20. How do you ensure clear and effective communication within
a VLSI design team?
I maintain detailed design documentation, use structured email
updates, and schedule regular design reviews. In my last project,
this helped avoid miscommunication when multiple engineers were
working on different design blocks.
21. Describe a time when you had to deliver a VLSI project with
incomplete specifications. How did you manage it?
In my FPGA accelerator project, memory bandwidth requirements
were unclear initially. I built a flexible architecture that could
support multiple configurations. By keeping the design adaptable,
we avoided major rework when final specifications were provided.
22. What is the most complex debugging challenge you’ve faced,
and how did you resolve it?
I encountered a metastability issue causing random failures in a
high-speed interface. I identified the problem by using signal
tapping and waveforms, then redesigned the synchronizer using a
double-flop technique, ensuring reliable data transfer across clock
domains.
23. How do you handle multiple conflicting priorities in a VLSI
design cycle?
I assess project criticality and impact first. During my internship, I
had to optimize both timing and power simultaneously. I prioritized
timing-critical paths first, then used power-aware synthesis to
reduce power while maintaining timing constraints
24. What is your approach when reviewing another engineer’s
RTL design?
I check for coding best practices, area efficiency, and timing
friendliness. I also verify that the design is synthesizable, follows
the naming convention, and is compatible with verification
testbenches. This structured approach helps catch errors early.
25. Describe a situation where you had to make a design decision
without complete data.
In a high-speed SERDES design, I had to choose between a PLL-
based and DLL-based clocking scheme. Due to missing process
variation data, I performed a preliminary Monte Carlo analysis
using estimated parameters. The choice of PLL was later validated
as the right decision.
26. How do you handle burnout when working on intense VLSI
design cycles?
I manage my workload by setting realistic milestones and taking
short breaks to maintain productivity. I also discuss workload
distribution with my team to avoid excessive stress during tape-out
phases.
27. Have you ever had to convince a team to adopt a new VLSI
tool or methodology? How did you do it?
Yes, I proposed using OpenSTA for static timing analysis in a
resource-constrained project. I demonstrated its accuracy by
comparing results with commercial tools and showed how it
improved debugging speed. The team adopted it, saving licensing
costs.
28. What steps do you take to ensure a first-pass silicon success?
I rigorously verify RTL with UVM testbenches, run pre-silicon
validation with FPGA prototyping, and ensure that DRC/LVS
checks are clean. Also, I work closely with foundry teams to
validate process variations before finalizing the layout.
29. What do you think is the biggest challenge facing the
semiconductor industry today?
The biggest challenge is balancing power efficiency with
computational demands, especially in AI accelerators and IoT
devices. Innovations in advanced node scaling, 3D stacking, and
near-threshold computing are addressing this, but new
methodologies are needed to bridge the gap between hardware
constraints and software demands.
30. Have you ever had to escalate an issue to higher
management in a VLSI project? How did you do it effectively?
Yes, in a tape-out phase, I discovered a last-minute hold violation
in a critical timing path that was initially overlooked. Since fixing it
required layout changes, I first gathered simulation and STA
reports as concrete proof of the issue. Then, I communicated the
problem to my lead with clear data-backed explanations and
proposed two possible solutions: (1) a quick fix with ECO changes,
or (2) a more extensive fix requiring additional layout iterations. By
presenting the risks and trade-offs clearly, I helped management
make an informed decision without unnecessary delays, ensuring
that the issue was resolved before final tape-out.
Excellence in World class
VLSI Training & Placements
+91- 9182280927