0% found this document useful (0 votes)
5 views2 pages

Agregate Planning

The document outlines an aggregate production plan for a company over eight months, detailing monthly demand and production figures. It includes constraints such as overtime production, subcontracting limits, and inventory costs. The goal is to minimize total costs while meeting demand and managing inventory effectively.

Uploaded by

uouououomi7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views2 pages

Agregate Planning

The document outlines an aggregate production plan for a company over eight months, detailing monthly demand and production figures. It includes constraints such as overtime production, subcontracting limits, and inventory costs. The goal is to minimize total costs while meeting demand and managing inventory effectively.

Uploaded by

uouououomi7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

A company has aggregate plane eight months.

The data is shown in the following tables


Month 1 2 3 4 5 6 7 8
Demand 915 830 1000 815 700 610 993 746
Production/month 800 750 700 650 650 650 650 650

Other information
1- Overtime produce 10% of the regular production in that month
2- An employee can produce 10 unit per month
3- Minimum subcontract 10 units and maximum subcontract is 30 unit
4- Beginning inventory is zero and ending inventory is 11 unit
5- No part time at all

Make an aggregate plane to minimize the total cost.

Quiz #5
Setup a production plan to minimize cost using mathematical planning by producing what the
demand need in each month. The inventory carrying cost is $3 per unit per month and the
beginning inventory is 0 and ending inventory 20 units and the back order is $20/unit/period
Capacity (unit) Jan Feb Mar Apr Cost
Regular time 150 150 400 400 $100
Overtime 20 20 20 20 $125
Subcontract 100 100 40 40 $200
Demand 250 300 300 250