EWM-Inbound Process using RF with POSC & LOSC Setup

This document outlines the configuration steps for the inbound process using RF screens in SAP S/4 HANA Embedded EWM with POSC and LOSC setup. It details the paths for configuring process-oriented and layout-oriented storage control, as well as the steps for testing the inbound process using RF in Fiori. The conclusion emphasizes the efficiency of using RF menus to complete the process without navigating multiple screens.

Uploaded by

kittu2707
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

EWM-Inbound Process using RF with POSC & LOSC Setup

This document outlines the configuration steps for the inbound process using RF screens in SAP S/4 HANA Embedded EWM with POSC and LOSC setup. It details the paths for configuring process-oriented and layout-oriented storage control, as well as the steps for testing the inbound process using RF in Fiori. The conclusion emphasizes the efficiency of using RF menus to complete the process without navigating multiple screens.

Uploaded by

kittu2707
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

EWM- Inbound Process using RF with POSC & LOSC

Setup (SAP S/4 HANA Embedded EWM)


Introduction

I am working as SAP EWM Consultant and i have enjoyed reading all the blogs posted by experts in
the area of SAP EWM.

Now I am writing my first blog post on SAP EWM for the inbound process using RF screen in SAP S/4
HANA Embedded EWM version 2020 with POSC & LOSC setup configuration steps.

Content

Configuration steps for POSC:

Path: SPRO->IMG->SCM Extended Warehouse Management->Extended Warehouse Management-


>Cross-Process Settings->Warehouse Task->Define Process-Oriented Storage Control

I am using External step “YIPW” & “YIUL” which is already present in the standard SAP

2. I define the warehouse number, select the Unloading (YIUL) step and assign the warehouse
process type T365 ( copy of Y365)

3. I define the storage process YI01(Unloading & Putaway) for my warehouse AND1
4. The external steps YIUL & YIPW are assigned to storage process YI01 and is linked to my
warehouse AND1. Unloading step is set as Auto WT creation and for Putaway product /HU
warehouse task option is selected.

This Completes the POSC setup.

Configuration in LOSC and WPT

Path : SPRO->IMG->SCM Extended Warehouse Management->Extended Warehouse Management-


>Cross-Process Settings->Warehouse Task->Define Layout-Oriented Storage Process Control

1. I define source,destination,intermediate storage types along with intermediate storage


section and intermediate storage bin and the warehouse process type T351

2. In WPT T351 we provide the Source storage type T910 ,Bin GR-zone and Storage process YI01

Test the Case using RF in FIORI


1. We select the inbound process (Purchase order and inbound delivery of ecc is already
created and distributed to SAP EWM. )

2. Receiving of Handling Units option and then Receive by Delivery

3. Enter the delivery and press enter again


4. Copy the HU from the list which was already pack before coming to EWM and press enter again
4. Verify all the details and press enter
5. Complex unloading cannot be handled by Unlo button, we go CrWT button the WT gets Created in
background and will get ticked, later click on Conf button.

6.Now we check the monitor dashboard of Fiori and there is one warehouse task created from Door
to GR Zone
7. We scan the Destination Bin by copying the destination bin and entering in the box( In the
handled RF it would be automatic)

8.Unloading and Goods Receipt would be completed as shown below and in monitor screen you can
see based on the LOSC setup the task is created to intermediate storage type and final putaway
task is in waiting status “B” and intermediate task is open.
9. I confirm the intermediate warehouse task in Monitor only and last warehouse task to final bin is
open now which i will complete it using RF as per queue generation.
10. We go through system guided option and scan the HU as shown below and enter then scan the
destination Bin and press enter

11. The final warehouse task gets completed and we can see in monitor the final status of
warehouse tasks is completed .
Conclusion: This shows via RFUI the user need not navigate to multiple screens and instead via RF
menus can user can finish the full process easily.