Replacing A CF1 Processor With A CF2: Haas Automation
Replacing A CF1 Processor With A CF2: Haas Automation
All
Procedure
INFORMATION:
Note: Using SW 14.XX, the CF2 processor board will not replace the video board and
the USB will not work.
GENERAL STEPS:
¾ Using a ground strap, remove 3 boards on stack.
¾ Install CF2 processor, video, and Mocon on stack.
¾ Tools
Ground wrist strap
Phillips screwdriver
1
Prepare CF2 processor before installation.
1. Check the monitor size switch and set to 10 inch monitor. (See figure 1).
C
D
2
3. Install the video board like it was previously with the floppy and video connected to
it.
A. J2 Video Data cable
B. P1 Power
C. J12 Floppy disk ribbon & J10 power cable
D. J4 & J5 Address & data buss ribbon cables
E. J13 - RS 232 (Control port 1) to another computer
D
B
Erase memory and install SW 14.XX for mills or SW 7.XX for lathes.
Note: The monitor software on the CF2 processor board will work with the SW
14.XXX used by the older machine and the video board. DO NOT CHANGE
THE MONITOR SOFTWARE.
6. Erase the memory and Install software 14.XX for mill or 7.XX for lathe to the CF2
processor.
3
7. Hold the <PRGRM/CONVRS> button while turning on the machine to see the
command line screen.
Note: While initially loading the software, the onboard USB can be used, but once
the software is running, it will not be listed in the <List Prog>, Device
Manager.
PROCEDURE COMPLETE