DFMEA - Sample
DFMEA - Sample
Electrical Noise
EMC
Electrical Noise
Battery (+ve)
EMC
Electrical Noise
EMC
Battery (+ve)
Output Signal
Electrical Noise
EMC
Ignition Supply
Electrical Noise
EMC
Seat Occcupancy
NOISE FACTORS
NOISE 1: Piece to Piece NOISE 2:Wear and tear NOISE 3: Customer Usage (Serviceability) NOISE 4: External Environment NOISE 5: System Interaction
P3) Variation in housing height dimensions(27.5)(E1.1) CU3) High/ low mounting/ mating force (E1.1) SI3) Relay output short to ground(E4.2)
7) Operating Environment
8) Ground
CF11) Mating coupler/ pin configuration details are to be mentioned in drawing and customer approval to be taken (CU1) Not In DTPL Scope
CF14) Design to be protected against seat occupancy signal short to ground by providing signal conditioning circuitry (SI1). Not In DTPL Scope
CF15) Design to be protected against seat occupancy signal short to battery by providing signal conditioning circuitry(SI2) Not In DTPL Scope
CF16) Design to be protected against output signal short to ground(SI3) Not In DTPL Scope
CF17) Design to be protected against output signal short to battery/Ignition(SI4) Not In DTPL Scope
CF18) Component are selected to meet specified operating voltage and current (SI5) Not In DTPL Scope
CF19) Design to operate between voltage range 10V to 16V(SI5) Not In DTPL Scope
CORE TEAM
DEPARTMENT MEMBERS
R&D
QA
PE
PROD
VENDOR DEV
Part Name Unit Engine Shut Off Controller With Seat Occupancy Design / Process Responsibility Prepared By
Part No. CNT000005046 R&D YH/SBP
Model Year(s) / Vehicle(s) Key Date FMEA Date (Orig.)
06.04.2017
Classification
Item Potential Current Design Responsibilit Actions Results
Severity
R
Potential Failure Potential Effect(s) Cause(s) / Recommended y & Target
Requirement
Detect
P
Occur
Mode of Failure Mechanism(s) of Controls Actions Completion
RPN
Occ
Sev
Det
Controls Prevention N Actions taken
Function Failure Detection Date
70
7 center to center mentioned in drawing 5 5 175 R&D 7 5
2
Verification to ensure potential Testing
distance(65) and customer cause
(E1.1). approval to be taken
(P1)
70
7 5 5 175 R&D 7 5
2
diamensions(69,53 and customer Verification to ensure potential Testing
,77)(E1.1) approval to be taken cause
(P2)
70
7 5 5 175 R&D 7 5
2
dimensions(27.5) and customer Verification to ensure potential Testing
(E1.1) approval to be taken cause
(P3)
CF4) Housing
thickness
Mounting on vehicle
P4) Variation in diamensions to be
Design needs to be perform Vehicle
70
7 thickness of mentioned in drawing 5 5 175 R&D 7 5
2
Verification to ensure potential Testing
housing (6)(E1.1) and customer cause
approval to be taken
(P4)
70
Controller on mount. primary function 7 5 5 175 R&D 7 5
2
length(200+10) and customer Verification to ensure potential Testing
Vehicle. (E1.1) approval to be taken cause
(P5)
14
7 wrong mating mentioned in drawing 2 1 14 PE 7 1
2
Verification at end of line
coupler(E1.1,E2.1) and customer
testing
approval to be taken
(CU1)
70
7 unit in transit. specified vibration 5 5 175 Product validation QA 7 5
2
validation validation
(E1.1,E3.1) and DVP to run
(CU2,EE1)
70
7 mounting/ mating 5 Proto Validation 5 175 QA 7 5
2
mounting / mating needs to be used validation
force (E1.1)
force (CU3)
70
7 specified vibration 5 5 175 Product validation QA 7 5
2
Vibration(E1.1,E3.1) validation validation
and DVP to run
(CU2,EE1)
validation validation
(E1.1,E3.1) and DVP to run
(CU2,EE1)
E3.1) Failure
3) IP resistant Degardation of
against IP67
(IP-67) primary function
protection.
CF12) Robust design
to withstand the
EE1) Vibration Product Product
70
EE2) Over/under
Temperature,
Humidity, Dust, CF20) NOT in DTPL NOT in DTPL
7 - - - - - -
Water Scope (EE2) Scope
(E3.1,E4.1,E4.2,E4.
3,E4.4,E5.1,E6.1)
CF8) Component are
P8)Failure of Design Design
selected to meet
electrical circuit/ verification, verification,
electrical design ,
placement of Component Component Proto
70
7 tolerance , 5 5 175 R & D, QA 7 5
2
wrong components verification(line verification(line Validation
simulation, testing
(E4.1,E4.2,E4.3,E5. assembly) & assembly) & Proto
and validation to be
1) Proto validation validation
done (P8)
70
7 terminals terminals and sealed 5 5 175 Product validation QA 7 5
2
signal) validation validation
(E4.1,E4.2,E4.3,E4. coupler used(P10)
4,E5.1)
EE2) Over/under
Temperature,
Humidity, Dust, CF20) NOT in DTPL NOT in DTPL
7 - - - - - -
Water Scope (EE2) Scope
(E3.1,E4.1,E4.2,E4.
3,E4.4,E5.1,E6.1)
70
7 software 5 verification & 5 175 R&D 7 5
2
design, testing and and validation e testing and
design(E4.2) Proto validation
validation (P7) validation
70
7 tolerance , 5 5 175 R & D, QA 7 5
2
wrong components verification(line verification(line validation
simulation, testing
(E4.1,E4.2,E4.3,E5. assembly) & assembly) & Proto
and validation to be
1) Proto validation validation
done (P8)
P10) Corrosion /
oxidation of CF10) Plated
Product Product
70
7 terminals terminals and sealed 5 5 175 Product validation QA 7 5
2
validation validation
(E4.1,E4.2,E4.3,E4. coupler used(P10)
4,E5.1)
E4.2) Relay
output not Degardation of
working as per primary function
functionality EE2) Over/under
Temperature,
1.Mounting of Humidity, Dust, CF20) NOT in DTPL NOT in DTPL
7 - - - - - -
Engine Shut Off Water Scope (EE2) Scope
Controller on (E3.1,E4.1,E4.2,E4.
Vehicle. 3,E4.4,E5.1,E6.1)
2.Electrical
mating with
vehicle system
3. IP resistant CF16) Design to be
(IP-67) SI3) Relay output
protected against NOT in DTPL
4.Functionality as 7 short to - - - - - -
output signal short to Scope
per ground(E4.2)
ground(SI3)
CNT000005046_
SQCS_Rev00
5.Sustainance to
electrical
transients /
stresses. CF17) Design to be
SI4) Relay output
6. To withstand protected against NOT in DTPL
7 short to - - - - - -
Operating output signal short to Scope
ignition/battery (E4.2)
Temperature(- battery/Ignition(SI4)
40°C to +85°C) 4) Functionality
as per
CNT000005046
_SQCS_Rev00 CF8) Component are
P8)Failure of Design Design
selected to meet
electrical circuit/ verification, verification,
electrical design ,
placement of Component Component Proto
50
5 tolerance , 5 5 125 R & D, QA 5 5
2
wrong components verification(line verification(line validation
simulation, testing
(E4.1,E4.2,E4.3,E5. assembly) & assembly) & Proto
and validation to be
1) Proto validation validation
done (P8)
P10) Corrosion /
oxidation of CF10) Plated
Product Product
50
5 terminals terminals and sealed 5 5 125 Product validation QA 5 5
2
validation validation
(E4.1,E4.2,E4.3,E4. coupler used(P10)
4,E5.1)
EE2) Over/under
E4.3)
Temperature,
Continous/interm
Degradation of Humidity, Dust, CF20) NOT in DTPL NOT in DTPL
ittent low 5 - - - - - -
secondary function. Water Scope (EE2) Scope
inputs(Seat
(E3.1,E4.1,E4.2,E4.
signal).
3,E4.4,E5.1,E6.1)
CF14) Design to be
protected against
SI1) Seat
seat occupancy signal Design
Occupancy signal Design verification
10
CF15) Design to be
SI2)Seat protected against
Occupancy signal seat occupancy signal Design
Design verification
10
P10) Corrosion /
oxidation of CF10) Plated
Product Product
50
validation validation
(E4.1,E4.2,E4.3,E4. coupler used(P10)
4,E5.1)
EE2) Over/under
Temperature,
Humidity, Dust, CF20) NOT in DTPL NOT in DTPL
5 - - - - - -
Water Scope (EE2) Scope
(E3.1,E4.1,E4.2,E4.
E4.4) 3,E4.4,E5.1,E6.1)
Continous/interm
Degradation of
ittent high
secondary function.
inputs(Seat
signal).
E4.4)
Continous/interm
Degradation of
ittent high
secondary function.
inputs(Seat CF14) Design to be
signal). protected against
SI1) Seat
seat occupancy signal Design
Occupancy signal Design verification
10
5 short to ground by 2 verification & 1 10 R&D 5 1
2
short to ground & Proto validation
providing signal Proto validation
(E4.3,E4.4).
conditioning circuitry
(SI1).
CF15) Design to be
SI2)Seat protected against
Occupancy signal seat occupancy signal Design
Design verification
10
5 short to short to battery by 2 verification & 1 10 R&D 5 1
2
& Proto validation
battery/ignition providing signal Proto validation
(E4.3,E4.4) conditioning
circuitry(SI2)
60
6 tolerance , 5 5 150 R & D, QA 6 5
2
wrong components verification(line verification(line Validation
simulation, testing
(E4.1,E4.2,E4.3,E5. assembly) & assembly) & Proto
and validation to be
1) Proto validation validation
done (P8)
P9) Wrong
CF9)component
component
verification(incoming Component Component
placement with
12
6 inspection) to operate 2 verification(line 1 12 verification(line QA 6 1
2
low operating
in temperature range assembly) assembly)
temperature range
-40°C to +85°C (P9)
(E5.1,E6.1)
P10) Corrosion /
oxidation of CF10) Plated
Product Product
60
6 terminals terminals and sealed 5 5 150 Product validation QA 6 5
2
validation validation
(E4.1,E4.2,E4.3,E4. coupler used(P10)
4,E5.1)
5) Sustainance Degradation of
E5.1) Failure
to electrical secondary function or
against electrical EE2) Over/under
transients / Loss of secondary
sustainance. function Temperature,
stresses.
Humidity, Dust, CF20) NOT in DTPL NOT in DTPL
6 - - - - - -
Water Scope (EE2) Scope
(E3.1,E4.1,E4.2,E4.
3,E4.4,E5.1,E6.1)
60
6 specified operating 5 verification & 5 150 R&D 6 5
2
transients/ & Proto validation Validation
voltage and current Proto validation
stresses(Operating
(SI5)
voltage,current
consumption in
OFF mode/ON
mode/monitoring
mode/operating
current/current
HOLD limit/current
full down limit)
(E5.1)
CF19) Design to
Design
operate between Design verification Proto
60
6 5 verification & 5 150 R&D 6 5
2
voltage range 10V to & Proto validation Validation
Proto validation
16V(SI5)
P9) Wrong
CF9) Component
component
verification(incoming Component Component
placement with
12
6 inspection) to operate 2 verification(line 1 12 verification(line QA 6 1
2
low operating
in temperature range assembly) assembly)
temperature range
-40°C to +85°C (P9)
(E5.1,E6.1)
E6.1) Fail to
6) To withstand operate within Degradation of
Operating specified secondary function or
Temperature(- temperature Loss of secondary
40°C to +85°C) range( -40°C to function
+85°C).
EE2) Over/under
Temperature,
Humidity, Dust, CF20) NOT in DTPL NOT in DTPL
6 - - - - - -
Water Scope (EE2) Scope
(E3.1,E4.1,E4.2,E4.
3,E4.4,E5.1,E6.1)
iii) Appearance/Key Instruction 5,4,3,2 or1 Key instruction INTERNAL LINE REJ. (Ö)