0% found this document useful (0 votes)
49 views8 pages

Javier Rodriguez-English

Javier Rafael Rodríguez Marrón is a 49-year-old Venezuelan Mechanical Engineer with 22 years of experience in engineering and construction projects, particularly in the Oil & Gas sector. He holds a Bachelor's degree in Mechanical Engineering and a Diploma in Integrated Project Management, with extensive training in various engineering disciplines. Currently, he works as a Project Manager, overseeing multiple projects related to the procurement and construction of surface facilities and gas compression plants in Venezuela.

Uploaded by

tulasirao.nammi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views8 pages

Javier Rodriguez-English

Javier Rafael Rodríguez Marrón is a 49-year-old Venezuelan Mechanical Engineer with 22 years of experience in engineering and construction projects, particularly in the Oil & Gas sector. He holds a Bachelor's degree in Mechanical Engineering and a Diploma in Integrated Project Management, with extensive training in various engineering disciplines. Currently, he works as a Project Manager, overseeing multiple projects related to the procurement and construction of surface facilities and gas compression plants in Venezuela.

Uploaded by

tulasirao.nammi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

RESUME

PERSONAL DATA
Last Name: Rodríguez Marrón
First Name: Javier Rafael
ID Card: 8.264.119
Passport Number: 143889470
Age: 49 Years Old
Birth date: October 24th, 1969
Nationality: Venezuelan
Marital State: Married, two daughters
Address: Urb. San Onofre, Calle Rumurú, No. A-2-2-22, El Tigre, Anzoátegui,
Venezuela
E-mail: [email protected], [email protected]
Skype: Javier.rodriguez2410
Telephones: (+58)-426-583 6877 / (+58) 424-832 3237

SUMMARY
Mechanical Engineer with 22 years of experience in development of engineering&construction projects
using methodology of Visualization, Conceptualization and Definition (VCD). Development of EPC
Projects. Diploma in Management of Integrated Projects. Experience in inspection and construction of
infrastructure for Oil & Gas ensuring that the design is safe for operability, reliability and effectiveness
for all systems.

EDUCATION
Universidad de Oriente (UDO), Puerto La Cruz – Anzoátegui-Venezuela
Bachelor of Science in Mechanical Engineering, 1996

Universidad de Oriente (UDO), Puerto La Cruz – Anzoátegui-Venezuela


Diploma in INTEGRAL PROJECT MANAGEMENT, 2009

• PROJECT AND CONTEXT


• PROJECT MANAGEMENT: PROCESSES AND INTEGRATION
• PROJECT COST MANAGEMENT
• PROJECT QUALITY MANAGEMENT
• PROJECT TIMES MANAGEMENT
• PROJECT HUMAN RESOURCE MANAGEMENT
• PROJECT COMMUNICATIONS MANAGEMENT
• PROJECT RISK MANAGEMENT
• PROJECT PURCHASES MANAGEMENT
• PROJECT EVALUATION

COURSES AND KNOWLEDGE OF WORK


Description Institute Year
 Second Conference on Fail Analysis “Gran Mariscal de Ayacucho” University (UGMA) 2017
 4th Conference on Thermal and Hydraulic Machines “Gran Mariscal de Ayacucho” University (UGMA) 2016
 First Failures Technical Evaluation Gran Mariscal de Ayacucho University (UGMA) 2015
 First Management on Engineering Maintenance Gran Mariscal de Ayacucho University (UGMA) 2014
 New Approach to Project Management ADP Talento y Actitud, C.A./Inexertus 2013
and Earned Value Based on Results
 5th Productive Sector Business round PDVSA PDVSA- Plan Siembra Petrolera 2013-2019 2013
 Projects Management ESP Oil, CORP. 2007
 Use and Handling of Fire Extinguishers Petrobras Energía Venezuela, CORP. 2004
 Administration of Integrated System Petrobras Energía Venezuela, CORP. 2004
 Systems of Work permission Petrobras Energía Venezuela, CORP 2004
 Defensive Driving Sermeca- Petrobras Energía Venezuela, CORP 2003
 Intermediate Level English Course Gerard Bassó 2003
 First Aids Operadora Cerro Negro, S.A. (PDVSA-EXXON-MOBIL-VEBA) 2003
 H2S Operadora Cerro Negro, S.A. (PDVSA-EXXON-MOBIL-VEBA) 2003
 Roll of supervisor in accidents prevention CAHSI 2002
 Elaboration of Presupposed & Unitary price Analysis Ingesis Consultores, C.A. 2001
 Conversational English level II Centro de Informática Digital, C.A. 2001
 Quality Management ISO 9000 Mantenimientos Quijada- GM Consultores 2001
 Statistic tools for Quality Control Mantenimientos Quijada- GM Consultores 2001
 ISO 9000. 20th Clause of Quality Mantenimientos Quijada- GM Consultores 2001
 Piping Design in Process Plants Construction & Design, C.A. 1999
 Welding Inspection & Quality Control IETSA 1999
 Security in Petroleum Facilities Operadora Cerro Negro, C.A. (PDVSA-EXXON-MOBIL-VEBA) 1999
 I Mechanical Design Seminary Projects & Development, C.A. 1999
 Industrial Coatings Inelectra, Puerto La Cruz 1998
 Steam Recuperation Units Corimpet, C.A, Puerto La Cruz 1998
 Fail Analysis and Corrosion U.D.O. / Centro de Estudios de Ing. Mecánica 1998
 Environment & Eucalyptus: Sustainability Criteria MARNR, MAC, FONAIAP, PETROZUATA 1998
 ISO-9000 Induction Workshop Vepica, Puerto La Cruz 1998
 AutoCAD. 13th version Christina Computers, C.A. 1997
 III Gas Industry International Exposition Petróleos de Venezuela, Cámara Venezolana de Gas 1996
 Residual Waters: Environmental Impact Asoc. Venezolana de Ing. Sanitaria y Ambiental 1996
 Mathematics Yesterday and Today Seminary Louis Leithold /Oxford University/Harla de Venezuela 1996
 Dust collector. Design & Building C.A. Vencemos Pertigalete 1995
 I Scientific Congress . Universidad de Oriente 1989

ORGANIZATIONS
Venezuela Engineers College Since 1996
Inscription Number # 103.499

WORKING EXPERIENCE

 GRUPO COSTA HBN, C.A.


Project Manager 03-12-2018/ Current
Coordination of activities for projects of Procurement and Construction of Surface Facilities reporting to
the company CHINA HUANQIU CONTRACTING & ENGINEERING CO LTD, for the development
of the general project "Complementary Works for the Increase of Production from 105 MBD to 165
MBD of Extra Heavy Crude in the Facilities of PETROLERA SINOVENSA in Mix Plant JOSE,
MORICHAL and MPE3, Front 1: Complementary Works PMJ-MORICHAL ", in Morichal, Monagas
State, Venezuela.

Project “UNDERGROUND PIPE INSTALLATION WORKS IN DDP CONTRAT Nº: 50831-000-CA-CSC-C-053”

Project “PIPING INSTALATION OF FEED PUMP AREAS” CONTRAT Nº: 50831-000-CA-CSC-C-062”

 OIL&GAS-ENGINEERING&CONSTRUCTION, C.A.

Project Manager 01-04-2014/ current

Coordination and development of basic and details

Project "INCREASE OF FLEXIBILITY AND RELIABILITY GAS- COMPRESSION PHASE II


IMPLEMENTATION SCHEDULE (AREA ANACO): SANTA ROSA II COMPRESSION PLANT "

The project includes the development of basic and detailed engineering, procurement, construction,
installation, commissioning and starting of two (02) moto-compressor units 60 MMSCFD of Gas from 60
psig to 1200 psig in SANTA ROSA II Compression Plant.
The characteristics of the equipment are:
One (1) gas pack compressor:
One (1) natural gas reciprocating compressor in three stages Dresser-Rand 7HOS4
Step 1 Cylinders: Two (2) 15.00 "diameter
Step 2 Cylinders: One (1) Diameter 11.50 "
Step 3 Cylinders: One (1) 8.00 "diameter
One (1) Motor CAT3608LE 2370HP @ 1000 RPM

Project "INSTALLING OF 5,7 MMSCFD GAS COMPRESSOR - MATA-R COMPRESSION


PLANT"
The project includes the development of basic and detailed engineering, procurement, construction,
installation, commissioning and starting of one (01) moto-comppressor unit of 5.7 MMSCFD from 60 psig to
1200 psig MATA R Compression Plant.
The characteristics of the equipment are as follows (Source: Plano 2291-200-02, "COMPRESSOR
GENERAL ARRANGEMENT" PLAN VIEW, WUAKESHA 5794 / ARIEL JGK-4, Midcon UNIT, UNIT
SEC 2288 & 2291):
One (1) natural gas reciprocating compressor in three stages Ariel JGK / 4
(2) Cylinders 15 7-8 Class "K" (15.875 BORE ")
(1) Cylinders Class 11 "K" (BORE 11 ")
(1) Cylinders Class 6 1/4 "K" BORE 6.25 ")
Engine: WAUKESHA L5794GSI
Attach - FSH 70
Cooler - AIR-X-156-EH CHANGERS
PANEL - ALTRONIC

Project DETAILED ENGINEERING FOR SEPARATION AND TREATMENT " CENTRALIZED


OPERATIONS ON CAMPO SANTA ROSA, DESIGN OF GUN BARREL TANKS T-2123101/201”
Perform engineering details for two (02) resting tanks (Gun Barrels, washing type baffles, diffuser, internal
structure), T-2123101/2123201 rated at 10,000 "CAMPO SANTA ROSA CENTRALIZED OPERATIONS"-

Project "CONSTRUCTION OF A 40 MBBL WASH TANK AT MED-20 DISCHARGE STATION"

Projet P1C031203 ¨ EXPANSION AND ADAPTATION OF MEF-17 FLOW STATION STAGE III:
WATER PHYSICAL CHEMICAL TREATMENT PLANT ¨

Project P1C031203 ¨ EXPANSION AND ADAPTATION OF MEF-17 FLOW STATION STAGE III
FIRE DETECTION AND EXTINCTION¨

Project PC031202 ¨ BARED-12 DISCHARGE STATION ¨ Project "CENTRALIZATION OF


ARECUNA FIELD IN ARED-4 (PACKAGE 2: ARED-4 CIVIL, ELECTRO-MECHANICAL AND
INSTRUMENTATION WORKS"

Project PC041210 ¨ HYDRAULIC EVALUATION OF TRANSFER AND INSTALLATION OF


OVENS IN BARED-4 ¨ Project PC041316 ¨CENTRALIZATION OF ARECUNA IN ARED-4 (Package
5: AREM-2)

Project ADO41013 "HANDLING EARLY PRODUCTION AT CARIÑA FIELD" CONSTRUCTION


AND INSTALLATION OF OVENS FOR THE U.P. HEAVY AREA- DOBOKUBI DISCHARGE
STATION, DOBED-1”

Project "CONSTRUCTION AND INSTALLATION OF OVENS FOR THE U.P. HEAVY AREA-
STATION MED 17 "

 ALFA OMEGA CONSULTORA DE INGENIERÍA, C.A.

San José de Guanipa -Venezuela 02-2012 / 02-2014

Project Manager

Responsible and accountable for engineering and design deliverables for all Engineering works within the
company’s projects group.

Responsible for identification and addressing gaps, against company’s Engineering standards and best
Engineering Practices.

Ensure the design is safe for the operability, reliability and effective for all systems.

Responsible for the technical review of engineering deliverables produced by engineering contractors.
Provide technical assistance during construction and commissioning phase, where required act as
commissioning leads in own area of expertise.

Project "Changing in Dehydrators 3004's San Diego de Cabrutica Main Station. Petrocedeño / PDVSA".

Project "Adaptation diluent pumping system, Cabrutica Main Station/ PDVSA"

Project " General Services, Cabrutica Urban Development/PDVSA"

Project " Dining Industrial. Urban Development/PDVSA"

Project "Basic and Detail Engineering for 9000 Barrels Oil Tank in Bared-5 Station /PDVSA"

Project "Detail Engineering for Saltwater Tank Bls 10,000 Salad Water Treatment Plant Cabrutica/PDVSA"

Project " Construction of two (02) Crude Oil Storage Tanks of 1500 and 5000 Barrels in Quiamare Station-2
(QED-2) PDVSA.

 D & D PROINSERCA.
San José de Guanipa -Venezuela 12-2010 / 01-2012

Project Coordinator
Engineering Coordinator in Conceptual, Basic and Details Engineering activities.

"Expansion and Adaptation of Water Treatment Plant San Diego Cabrutica Main Station / PDVSA
Orinoco Strip District."
The project includes the development of basic engineering, detail of 35.0 MBD capacity which will increase
plant capacity from 25 MBD to 60 MBD, this should meet the requirements necessary for processing the
current conditions of the water stream the entrance of the plant, until the permissible values hole injection

Project "Construction of New Module Physical Chemical Treatment Plant Water in Cabrutica Main
Station".

Project "Pumping Facilities Construction in CC-18 Pump Station "

Project "Grit System Optimization of Static Equipment Main Station San Diego Cabrutica"

Project "Design of Telescopic Tower for Telecommunications"

Project "Retrieval System Optimizing Zuata Crude Principal, Dtto Cabrutica"

 VENEZOLANA DE INGENIERÍA DE CONSULTA, S.A. (VENINCO)


San José de Guanipa -Venezuela 11-2009 / 10-2010

Project Leader 16-11-09 / 08-10-10

Coordination of activities related to conceptual, Basic and Details engineering. "Expansion and
Adaptation of Water Treatment Plant San Diego Cabrutica Main Station / PDVSA Orinoco Strip
District."

 SKANSKA VENEZUELA, C. A.
El Tigre -Venezuela 02-2009 / 11-2009

Engineering Coordinator 02-02-09 / 13-11-09

Coordination of activities related to details engineering. Project "IPC for compression and expansion to
treatmen of 60 MMPCND in Orinoco Compressor Plant."
 N & V, CONSULTORES C. A.
El Tigre -Venezuela 08-2007 / 02-2009

Project Leader / Mechanical Leader


Development activities related to Conceptual, Basic and Details Engineering. Coordination of
multidisciplinary teams of engineering implementation and development. Development of technical and
economic offers.

Project "I / B Enlargement and Pumping System Adequacy MED-20"


Basic Engineering Preparation to adapt and expand station capacity screw pumps handling Merey Crude
production in Download Station Merey-20 (MED-20).

Project "I / D Adequacy of Collection Stations and Field Lines ACEMA-200"


Preparation of Detailed Engineering for Pumping Systems adequacy of stations belonging to the UP Medium.

Mechanical Discipline Leader Project:


• " Pumping System Optimization stations in UP Medium, Phase I "
• "Building Sweetening Plant Beds in Solid nonregenerable AGLA SJED-3 Phase I"
• "IB / ID Install a filtering system in Santa Rosa".
• “Building a Fire System Discharge in La Ceiba Station (LCED-2)”.

 PCI INGENIEROS CONSULTORES, C.A.


San José de Guanipa -Venezuela 10-2006 / 07-2007
Project Manager

Project “Light Oil Area Development -PDVSA ."


Supervision and execution of Basic Engineering for facilities upgrading, construction of a oleoduct, storaging
tanks, transfer pumps, heaters, instrumentation, Process, Mechanical, Electricity, and hazardous operations
analisys.

 BG&D, C.A. /PETROBRAS ENERGIA DE VENEZUELA, CORP.


Oil fields Round 3ª Oritupano-Leona/Acema-Mata-Araibel -Venezuela 08-2004 /01-2005
Inspector of Construction

Project “ORI South-ORI “A” Gas duct Interconnection."


Supervision and execution of relating works to the Construction, Installation and starting of gas duct of 6”
from Oritupano South Compressor Plant until Center of Generation ORI A.

Project “Installation of 3th. Pump in Oritupano Oil Treatment Plant (OTP)"


Supervision and execution of relating works to the disassembly, Installation and startup of the 3th OTP pump
until the Oritupano Injection and Treatment of Salted Water Plant (PITASO), oil&gas pipes adaptation and,
electric interconnection of the pump, grouting casting, construction for pump house.

Project “Centralization of Generators in ORI-A. PETROBRAS ENERGIA DE VENEZUELA CORP”.


Supervision and execution of works relating to the Design, Construction, Installation and starting of a oil tank,
recovery and installation in Purifying, conditioned air, construction of Stand Pipe, execution of Tie In and Hot
Tapping, adaptation and connecting of pipes of gas to the generators, etc.

 PCI INGENIEROS CONSULTORES, C.A./PETROBRAS ENERGIA DE VENEZUELA, CORP.


3th Oil fields Round Oritupano-Leona/Acema-Mata-Araibel camps -Venezuela 11-2003 / 07-2004
Inspector of Construction

Project “Systems of Protection Against Atmospheric Electric Discharges in ORI-A (PIAS 2 and
Multiple 12), ORI-B (PIAS 4 and ORED 4) and ORI-D (Multiple 10)". PETROBRAS ENERGY
CORP.
Supervision and execution of works relating to the Design, Construction, Installation and starting of the
Systems of Protection against Atmospheric discharges, Systems of Setting to Earth and Protection of Teams
like Bombs, PLC.

Project “Oritupano New Building of Offices ". PETROBRAS ENERGIA DE VENEZUELA CORP.
Supervision and execution of relating works to the Design, Construction, Installation and starting of the
System of Conditioned Air, System against Fire and Hidroneumatic System of the New Building of Offices
Oritupano.

Project “East Integrity of Ducts ". PETROBRAS ENERGIA DE VENEZUELA CORP.


Supervision of procedures and execution of relating works to the Construction, Installation and conditioning
of shipment traps and reception for POLIPIG tools, realization of works of concrete in area of the traps,
court, beveled and welding of pipes, cleaning and drainage of pipes, production and installation of supports
for traps, hydrostatic and radiographic tests, final cleaning and painting.
Acting evaluation in executed tasks, evaluations of Quality, Security, and environment.
The execution of the works made in the facilities: OREF 1, OREF 2, OREF 7, OREF 9,OREF 12, ORED
2,ORED 4, Multiple 7, it Joins 1, it Joins 12, Oritupano Oil Treatment Plant (PTCO), Multiport Valve A&B,
LED 1, LED 6, Station WOLF, etc.

Project “Salted Water Injection Substitution of steel lines for Fiber Glass to the wells ORM-33 and
ORM-38". PETROBRAS ENERGIA DE VENEZUELA CORP.
Supervision of procedures and execution of excavation works, spread of pipes of 4 of glass fiber, hydrostatic
tests, and pipe connection to the wells of Injection of Salted Water ORM-33 and ORM-38 belonging to the
net injection of the Plant of Injection of Salted Water 2 (PIOUS 2).

 INELECTRA S.A.C.A
Lecherias, Jose Cryogenic Complex, -Venezuela 04-2003 / 08-2003
Project Engineer
Project “Air Fin 11-AF-1102 A/B/C/D/E/F Modification” OPERADORA CERRO NEGRO, S.A..
Project “Air Fin 11-AF-1101 A/B/C/D/E/F/G/H Modification ”OPERADORA CERRO NEGRO, S.A..

Project “Injection of Natural Gas to Boilers 43-U-4301A/B/C” OPERADORA CERRO NEGRO, S.A..
Project “Instrumentation & Plant Air Expansion” OPERADORA CERRO NEGRO, S.A.
Project “Modificación de Sellos de las Bombas 11-P1101A/B OPERADORA CERRO NEGRO, S.A.”.
Project “Warm Up Lines Pumps 13-P-1310A/B/C” OPERADORA CERRO NEGRO, S.A.

 EMPRESAS Y&V, PROCEGAS C.A


Puerto La Cruz-Venezuela 11- 2002 / 01- 2003
Project Engineer
Project “Increment of Storaging Capacity in “Oficina” Tanks Patio and Manage of Heavy Oil through
30” & 42” Pipelines.

 SERVICIOS Y PROYECTOS TECNOLÓGICOS, C.A (SPT, C.A.).


PDVSA/ Puerto La Cruz Refinery-Venezuela 04- 2002 /09-2002
Mechanical Project Leader
Project “Engineering, Procure and Construction for replacement of spherical tanks IC4 (Isobutene) and
propane (LPG)”
Coordination of mechanical discipline for Engineering, procure and construction for interconnection of piping
of one spherical tank of Isobutene (30.000 Barrels) and two spherical tanks of Propane ( 10.000 Barrels),
pressure vessels for liquids separation under ASME Section VIII, montage of pumps, connections (Tie In),
Hot Tapping, etc.

 MANTENIMIENTOS QUIJADA, C.A.


PDVSA/ Puerto La Cruz Refinery-Venezuela 11-2000 / 03- 2002

Resident Engineer & Project Manager


Project “Reception &Treatment Center of Petrolized Sludges with High Content of Hydrocarbons”
Supervision of procedures and execution of relating works to Basic and Detail Engineering for Procure and
Construction (EPC) of three tanks for storing of Petrolized Sludges (15000 y 5000 Barrels) undo API 650
Standard, reconditioning of existent tanks, construction of roads and dikes, installation of 3 diaphragms
pumps and 2 of progressive cavity, construction of steam heaters, agitators, fabrication of piping and supports,
Tie Ins, Hot Tapping, projects execution, costs control. I developed Supervision of Electrical,
Instrumentation, Civil, Mechanical, Processes, Industrial Security, HAZOP elaboration.

 DEN SPIE, C.A


Cryogenic Complex Jose- Barcelona, Venezuela 12-1999 / 07-2000
Supervisor of Welding.
Project “Venezuela Extra Heavy Oil Project. Down Stream PETROZUATA”
Execution and procedures Supervision of piping especial welding undo SMAW, GTAW processes (Carbon
steel, stainless steel and allowed steels), welding procedures specification (WPS) and Procedures of
Qualification Record (PQR), fabrication of piping spool and supports, knowledge of non destructive test
(NDT), skills for manage and direct task groups.

 TRANSFORMACIONES METALÚRGICAS, C.A. (TRANSMECA)


Cryogenic Complex Jose- Barcelona, Venezuela 07- 1999 / 11-99

Supervisor of Piping and Mechanical Montages.


Project “Interconnection of Tanks patio OPERADORA CERRO NEGRO, C.A. (PDVSA-EXXON-
MOBIL-VEBA OEL)”
Supervision of Mechanical Montages (Piping, supports, tanks).
Supervisor of Pipes and Mechanical Assemblies Project Interconnection Patio of Tanks, C.A."
OPERADORA CERRO NEGRO, C.A. Supervision of Assembly of pipes, production of pipes in shop and
in field, Production of storage tanks of raw and it dilutes, assembly of valves, buried pipes, systems against
fire, production of supports, control of production of meetings soldiers.

 UNIVERSITARY INSTITUTE OF TECNOLOGY “ANTONIO JOSÉ DE SUCRE”


Puerto La Cruz, Barcelona, Venezuela 05-1999 / 08-1999

Contracted Teacher
Subjects: Mathematical Analysis II, Mathematical Analysis IV, Fluids Mechanics, Hydraulics Machines and
Electricity.

 INELECTRA, S.A.
Puerto La Cruz, Venezuela 07- 1998 to 02-1999

Project Engineer
Technical Assistance in the development of Projects for the Petroleum & Petrochemical, Cement, Mining,
Detergent, Glass and another industries. Knowledges on API, ANSI, AWS, ASME, AWWA, NFPA and
PDVSA Standards. Elaboration of Plot plans, Isometrics, Material list, Requisition for Materials and Metrics
Computes. Construction and Material Specifications.
Petróleos de Venezuela, S.A. (PDVSA)
- Fire Protection System Puerto La Cruz Refinery (723-25).
- Train C-Jose Ampliation, Building for Officinal and Access Project (723-27).
INEMAKA, C.A. Production Facilities Adequateness (Flux stations) Kaki-Maúlpa-Bucaral Petroleum
Camps
Operaciones al Sur del Orinoco, C.A. (OPCO). Balance Calibration System for JD-1002 Transporter.
Carbones del Orinoco, CA. (CARBONORCA). Green Anodes Feeding System Modification
Siderúrgica del Orinoco, C.A. (SIDOR) - Detail Engineering for H & L II Plant. CO2 Absorption System
VENCEMOS/CEMEX. Cement Pumping System Evaluation, Vencemos Guayana.

 VENEZOLANA DE PROYECTOS INTEGRADOS, C.A. ( VEPICA )


Puerto La Cruz, Venezuela 03-1998 to 07- 1998
Project Engineer
Petróleos de Venezuela, S.A. (PDVSA)
Diesel Segregation of Puerto La Cruz and Guamache Refinery.
Filling of Tracks for bottom Puerto La Cruz and Guamache Refinery
Petrozuata, S.A. Venezuela Extra Heavy Oil Project (VEHOP)

 INTENSCO-VENEZUELA, C.A.
Puerto La Cruz – Valencia, Venezuela 08- 1996 / 02- 1998

Project Engineer

Engineering, Design, Supervision of Fabrication and Installation of Dust Collector Systems, High Efficiency
Cyclones, Ducts, Air/Fabric Ratio.
Distribuidora Sal Bahía, C.A. Design of Dust Collector system for Salt Mill, Barcelona, Venezuela.
Cervecería de Oriente, C.A. (POLAR), Optimization of Dust Control System of Barley Powder, Venezuela
Vencemos Cemex, C.A. Design of Dust Collectors for Plant I. Pertigalete, Anzoátegui, Venezuela.
Hornos Eléctricos de Venezuela, S.A., Evaluation of Ferrosilicon Dust Collectors, Matanzas, Bolívar.
Venezuela.
Venalum, S.A., Basic Engineering for Carbon Plant Dust Collectors. Matanzas, Bolívar, Venezuela.
Colgate-Palmolive, C.A. Detergent fabrication tower, Dust Collectors System, Valencia, Carabobo,
Venezuela
Negroven, S.A. Optimization of high and low vacuum system, Valencia, Carabobo, Venezuela.
Cerámicas Carabobo, C.A., Evaluation of Dust Collector system for Ceramic Plant, Valencia, Carabobo,
Venez.
Owen IllinoisVenezuela, C.A. Maintenance and start-up of Dust Collector system kiln silos, Valencia,
Carab.
Cementos Caribe, C.A., Dust Collector system Evaluation for Cement Mills, San Sebastián de Los
Reyes,Aragua.
Cementos Catatumbo, C.A. Basic Engineering for Dust Collectors for Cement Mills, Maracaibo, Zulia.
Vencemos Mara, S.A. Evaluation for Dust Collector system Cement and Clinker silos, Maracaibo, Zulia.
Cementos Táchira, C.A. Evaluation of Cements Mills Electrostatic Filters. Palmira, Táchira
Cementos Diamante, C.A., Detail Engineering for Cement Mill I Dust Collector, Cúcuta, Colombia.

You might also like