Javier Rodriguez-English
Javier Rodriguez-English
PERSONAL DATA
Last Name: Rodríguez Marrón
First Name: Javier Rafael
ID Card: 8.264.119
Passport Number: 143889470
Age: 49 Years Old
Birth date: October 24th, 1969
Nationality: Venezuelan
Marital State: Married, two daughters
Address: Urb. San Onofre, Calle Rumurú, No. A-2-2-22, El Tigre, Anzoátegui,
Venezuela
E-mail: [email protected], [email protected]
Skype: Javier.rodriguez2410
Telephones: (+58)-426-583 6877 / (+58) 424-832 3237
SUMMARY
Mechanical Engineer with 22 years of experience in development of engineering&construction projects
using methodology of Visualization, Conceptualization and Definition (VCD). Development of EPC
Projects. Diploma in Management of Integrated Projects. Experience in inspection and construction of
infrastructure for Oil & Gas ensuring that the design is safe for operability, reliability and effectiveness
for all systems.
EDUCATION
Universidad de Oriente (UDO), Puerto La Cruz – Anzoátegui-Venezuela
Bachelor of Science in Mechanical Engineering, 1996
ORGANIZATIONS
Venezuela Engineers College Since 1996
Inscription Number # 103.499
WORKING EXPERIENCE
OIL&GAS-ENGINEERING&CONSTRUCTION, C.A.
The project includes the development of basic and detailed engineering, procurement, construction,
installation, commissioning and starting of two (02) moto-compressor units 60 MMSCFD of Gas from 60
psig to 1200 psig in SANTA ROSA II Compression Plant.
The characteristics of the equipment are:
One (1) gas pack compressor:
One (1) natural gas reciprocating compressor in three stages Dresser-Rand 7HOS4
Step 1 Cylinders: Two (2) 15.00 "diameter
Step 2 Cylinders: One (1) Diameter 11.50 "
Step 3 Cylinders: One (1) 8.00 "diameter
One (1) Motor CAT3608LE 2370HP @ 1000 RPM
Projet P1C031203 ¨ EXPANSION AND ADAPTATION OF MEF-17 FLOW STATION STAGE III:
WATER PHYSICAL CHEMICAL TREATMENT PLANT ¨
Project P1C031203 ¨ EXPANSION AND ADAPTATION OF MEF-17 FLOW STATION STAGE III
FIRE DETECTION AND EXTINCTION¨
Project "CONSTRUCTION AND INSTALLATION OF OVENS FOR THE U.P. HEAVY AREA-
STATION MED 17 "
Project Manager
Responsible and accountable for engineering and design deliverables for all Engineering works within the
company’s projects group.
Responsible for identification and addressing gaps, against company’s Engineering standards and best
Engineering Practices.
Ensure the design is safe for the operability, reliability and effective for all systems.
Responsible for the technical review of engineering deliverables produced by engineering contractors.
Provide technical assistance during construction and commissioning phase, where required act as
commissioning leads in own area of expertise.
Project "Changing in Dehydrators 3004's San Diego de Cabrutica Main Station. Petrocedeño / PDVSA".
Project "Basic and Detail Engineering for 9000 Barrels Oil Tank in Bared-5 Station /PDVSA"
Project "Detail Engineering for Saltwater Tank Bls 10,000 Salad Water Treatment Plant Cabrutica/PDVSA"
Project " Construction of two (02) Crude Oil Storage Tanks of 1500 and 5000 Barrels in Quiamare Station-2
(QED-2) PDVSA.
D & D PROINSERCA.
San José de Guanipa -Venezuela 12-2010 / 01-2012
Project Coordinator
Engineering Coordinator in Conceptual, Basic and Details Engineering activities.
"Expansion and Adaptation of Water Treatment Plant San Diego Cabrutica Main Station / PDVSA
Orinoco Strip District."
The project includes the development of basic engineering, detail of 35.0 MBD capacity which will increase
plant capacity from 25 MBD to 60 MBD, this should meet the requirements necessary for processing the
current conditions of the water stream the entrance of the plant, until the permissible values hole injection
Project "Construction of New Module Physical Chemical Treatment Plant Water in Cabrutica Main
Station".
Project "Grit System Optimization of Static Equipment Main Station San Diego Cabrutica"
Coordination of activities related to conceptual, Basic and Details engineering. "Expansion and
Adaptation of Water Treatment Plant San Diego Cabrutica Main Station / PDVSA Orinoco Strip
District."
SKANSKA VENEZUELA, C. A.
El Tigre -Venezuela 02-2009 / 11-2009
Coordination of activities related to details engineering. Project "IPC for compression and expansion to
treatmen of 60 MMPCND in Orinoco Compressor Plant."
N & V, CONSULTORES C. A.
El Tigre -Venezuela 08-2007 / 02-2009
Project “Systems of Protection Against Atmospheric Electric Discharges in ORI-A (PIAS 2 and
Multiple 12), ORI-B (PIAS 4 and ORED 4) and ORI-D (Multiple 10)". PETROBRAS ENERGY
CORP.
Supervision and execution of works relating to the Design, Construction, Installation and starting of the
Systems of Protection against Atmospheric discharges, Systems of Setting to Earth and Protection of Teams
like Bombs, PLC.
Project “Oritupano New Building of Offices ". PETROBRAS ENERGIA DE VENEZUELA CORP.
Supervision and execution of relating works to the Design, Construction, Installation and starting of the
System of Conditioned Air, System against Fire and Hidroneumatic System of the New Building of Offices
Oritupano.
Project “Salted Water Injection Substitution of steel lines for Fiber Glass to the wells ORM-33 and
ORM-38". PETROBRAS ENERGIA DE VENEZUELA CORP.
Supervision of procedures and execution of excavation works, spread of pipes of 4 of glass fiber, hydrostatic
tests, and pipe connection to the wells of Injection of Salted Water ORM-33 and ORM-38 belonging to the
net injection of the Plant of Injection of Salted Water 2 (PIOUS 2).
INELECTRA S.A.C.A
Lecherias, Jose Cryogenic Complex, -Venezuela 04-2003 / 08-2003
Project Engineer
Project “Air Fin 11-AF-1102 A/B/C/D/E/F Modification” OPERADORA CERRO NEGRO, S.A..
Project “Air Fin 11-AF-1101 A/B/C/D/E/F/G/H Modification ”OPERADORA CERRO NEGRO, S.A..
Project “Injection of Natural Gas to Boilers 43-U-4301A/B/C” OPERADORA CERRO NEGRO, S.A..
Project “Instrumentation & Plant Air Expansion” OPERADORA CERRO NEGRO, S.A.
Project “Modificación de Sellos de las Bombas 11-P1101A/B OPERADORA CERRO NEGRO, S.A.”.
Project “Warm Up Lines Pumps 13-P-1310A/B/C” OPERADORA CERRO NEGRO, S.A.
Contracted Teacher
Subjects: Mathematical Analysis II, Mathematical Analysis IV, Fluids Mechanics, Hydraulics Machines and
Electricity.
INELECTRA, S.A.
Puerto La Cruz, Venezuela 07- 1998 to 02-1999
Project Engineer
Technical Assistance in the development of Projects for the Petroleum & Petrochemical, Cement, Mining,
Detergent, Glass and another industries. Knowledges on API, ANSI, AWS, ASME, AWWA, NFPA and
PDVSA Standards. Elaboration of Plot plans, Isometrics, Material list, Requisition for Materials and Metrics
Computes. Construction and Material Specifications.
Petróleos de Venezuela, S.A. (PDVSA)
- Fire Protection System Puerto La Cruz Refinery (723-25).
- Train C-Jose Ampliation, Building for Officinal and Access Project (723-27).
INEMAKA, C.A. Production Facilities Adequateness (Flux stations) Kaki-Maúlpa-Bucaral Petroleum
Camps
Operaciones al Sur del Orinoco, C.A. (OPCO). Balance Calibration System for JD-1002 Transporter.
Carbones del Orinoco, CA. (CARBONORCA). Green Anodes Feeding System Modification
Siderúrgica del Orinoco, C.A. (SIDOR) - Detail Engineering for H & L II Plant. CO2 Absorption System
VENCEMOS/CEMEX. Cement Pumping System Evaluation, Vencemos Guayana.
INTENSCO-VENEZUELA, C.A.
Puerto La Cruz – Valencia, Venezuela 08- 1996 / 02- 1998
Project Engineer
Engineering, Design, Supervision of Fabrication and Installation of Dust Collector Systems, High Efficiency
Cyclones, Ducts, Air/Fabric Ratio.
Distribuidora Sal Bahía, C.A. Design of Dust Collector system for Salt Mill, Barcelona, Venezuela.
Cervecería de Oriente, C.A. (POLAR), Optimization of Dust Control System of Barley Powder, Venezuela
Vencemos Cemex, C.A. Design of Dust Collectors for Plant I. Pertigalete, Anzoátegui, Venezuela.
Hornos Eléctricos de Venezuela, S.A., Evaluation of Ferrosilicon Dust Collectors, Matanzas, Bolívar.
Venezuela.
Venalum, S.A., Basic Engineering for Carbon Plant Dust Collectors. Matanzas, Bolívar, Venezuela.
Colgate-Palmolive, C.A. Detergent fabrication tower, Dust Collectors System, Valencia, Carabobo,
Venezuela
Negroven, S.A. Optimization of high and low vacuum system, Valencia, Carabobo, Venezuela.
Cerámicas Carabobo, C.A., Evaluation of Dust Collector system for Ceramic Plant, Valencia, Carabobo,
Venez.
Owen IllinoisVenezuela, C.A. Maintenance and start-up of Dust Collector system kiln silos, Valencia,
Carab.
Cementos Caribe, C.A., Dust Collector system Evaluation for Cement Mills, San Sebastián de Los
Reyes,Aragua.
Cementos Catatumbo, C.A. Basic Engineering for Dust Collectors for Cement Mills, Maracaibo, Zulia.
Vencemos Mara, S.A. Evaluation for Dust Collector system Cement and Clinker silos, Maracaibo, Zulia.
Cementos Táchira, C.A. Evaluation of Cements Mills Electrostatic Filters. Palmira, Táchira
Cementos Diamante, C.A., Detail Engineering for Cement Mill I Dust Collector, Cúcuta, Colombia.