1. Find the total force and moment for the following case.
(iv) Horizontal earthquake acceleration 0.2g toward downstream. In this case, consider only U/S
water and dam weight. (20 marks)
Page 1 of 1
WYTU/TCH/C/F-004/Rev -1/1.6.2019
Prob
Assessment Criteria/Solution Marks
No
Page 1 of 3
WYTU/TCH/C/F-004/Rev -1/1.6.2019
If y = H, C = Cm = 0.735
pe = C αh w H = 0.735 × 0.2 × 9.81 × 52 = 74.99 KN/m2
Pe = 0.726 pe y = 0.726 × 74.99 × 52 = 2831 KN
Me = 0.299 pe y2
= 0.299 × 74.99 × 522 = 60629.1 KN-m
Item Descriptions and Forces (KN) Lever arm Moment about toe
Dimensions (m) (KN-m)
Vertical Horizontal Counter Clockwise
(+ (+ d/s) clockwise (-)
downward) (+)
W2 6 × 65 × 24 9360 49 458640
Page 2 of 3
WYTU/TCH/C/F-004/Rev -1/1.6.2019
Σ V = 29653.93 KN
Σ H = 1166.7 KN
Σ M = 1841745.7 - 750440.53 = 1091305.17 KN-m
Page 3 of 3
WYTU/TCH/C/F – 003/Rev -1/ 1.6.2019
1. Find the elevation and design the rectangular stilling basin for the spillway as shown in
figure. (25 marks)
Q = 1600 cusecs
Base width of stilling basin = 40 ft
Design head = 4 ft
P0 = 20 ft
Tail water depth = 3.5 ft
Page 1 of 1
WYTU/TCH/C/F-004/Rev -1/1.6.2019
Prob
Assessment Criteria/Solution Marks
No
Q = 1600 cusecs
Design head = 4 ft
P0 = 20 ft
Page 1 of 3
WYTU/TCH/C/F-004/Rev -1/1.6.2019
V23 10.12
= = 1.59 ft
2g 2 ×32
Q 40 40
V0 = = = = 1.67 ft/sec
yo P o + Hd 20+ 4
V2𝑜 1.672
= = 0.044 ft
2g 2 ×32
Bernoulli’s equation,
V2𝑜 V2𝑜
Elev: A + Po + Hd + = Elev: C + y3 + + HL
2g 2g
x = 11.075
𝑦2
= 11.075
𝑦1
𝑦
HL ( 2 −1)3 ( 11.075 −1)3
𝑦1
=[ 𝑦2 ]= [ ]
y1 4 4 × 11.075
𝑦1
20.954
= 23.085
y1
y1= 0.908 ft
y2 = 11.075 × 0.908 = 10.526 ft
q 40
V2 = = = 3.978 ft/sec
𝑦2 10.056
V22 3.9782
= = 0.247 ft
2g 2 ×32
Bernoulli’s equation,
𝑉𝑜2 𝑉22
Elev: A + Po + Hd + = Elev: B + y2 + + HL
2𝑔 2𝑔
Page 2 of 3
WYTU/TCH/C/F-004/Rev -1/1.6.2019
q 40
V1 = = = 44.053 ft/sec = 13.427 m/sec < 15 m/sec
𝑦1 0.908
𝑉1 44.053
Fr1 = = = 8.173 > 4.5
√𝑔 𝑦1 √32 ×0.908
Page 3 of 3
WYTU/TCH/C/F – 003/Rev -1/ 1.6.2019
1. Locate the phreatic line and flow net on the homogenous earth dam and
determine the discharge.
(i) Horizontal drainage blanket 30 m
(ii) Without any drainage (α = 25˚)
(iii) Drainage with rock toe (α = 135˚) (25 marks)
Nf = 4, Nd = 9, k = 4 × 10-6 m/s
Page 1 of 1
WYTU/TCH/C/F-004/Rev -1/1.6.2019
Prob
Assessment Criteria/Solution Marks
No
(i) Phreatic line on earth dam with horizontal drainage blanket (30 m)
L = 32 x 3 = 96 m
b = (35 x 3) + 8 + (35 x 2.5) – (0.7 x 96) - 30 = 103.3 m
x 20 40 60 80 100 103.3
y 14.7 20.2 24.5 28.1 31.4 31.9
Nf = 4, Nd = 9, k = 4 × 10-6 m/s
𝑁𝑓
q = k h ( ) = 4 × 10-6 × 32 × (4/9) = 5.69 × 10-5 cumecs/m
𝑁𝑑
Page 1 of 3
WYTU/TCH/C/F-004/Rev -1/1.6.2019
q = k tan 𝛼 (a sin 𝛼)
= 4 × 10-6 tan 25 (20.99 sin 25) = 1.65 × 10-5 cumecs/m
yo = √𝑏 2 + ℎ2 – b = √133.32 + 322 - 133.3 = 3.8 m
y = √2𝑥𝑦𝑜 + 𝑦𝑜2 = √2𝑥 × 3.8 + 3.82 = √7.6 𝑥 + 14.4
Page 2 of 3
WYTU/TCH/C/F-004/Rev -1/1.6.2019
Page 3 of 3
WYTU/TCH/C/F – 003/Rev -1/ 1.6.2019
1. The average seasonal (2 months) discharge of a river for 2 years is as follow: (20 marks)
Period 1 2 3 4 5 6 7 8 9 10 11 12
Discharge 1.93 2.51 1.16 28.94 13.5 2.31 1.35 2.31 2.51 23.15 9.65 2.7
(cumecs)
(i) Determine the storage capacity and spill water for the case when the demand is the
average discharge of the river.
(ii) Determine the safe yield for storage capacity of 6000 ha-m.
Page 1 of 1
WYTU/TCH/C/F-004/Rev -1/1.6.2019
Prob
Assessment Criteria/Solution Marks
No
1 cumec – 2 months = 1 × 2 × 30 × 24 × 3600 = 5.184 × 106 m3
= 518.4 ha-m
Inflow at period 1 = 1.93 × 518.4 = 1000.51 ha-m
Period
10
11
12
1
9
Discharge
(cumecs)
28.94
23.15
1.93
2.51
1.16
13.5
2.31
1.35
2.31
2.51
9.65
2.7
15002.50
12000.96
1000.51
1301.18
6998.40
1197.50
1197.50
1301.18
5002.56
1399.68
601.34
699.84
(ha-m)
Inflow
Mass Inflow
17905.54
24903.94
26101.44
26801.28
27998.78
29299.97
41300.93
46303.49
47703.17
1000.51
2301.70
2903.04
(ha-m)
Page 1 of 2
WYTU/TCH/C/F-004/Rev -1/1.6.2019
60000
50000
Mass Inflow (ha-m)
40000
30000
Storage
capacity Spill
20000
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Period
(ii) Safe yield for storage capacity of 6000 ha-m = 2500 ha-m