OM Test - 2
OM Test - 2
1.
2. Table shows the time remaining (number of days until due date) and the work remaining
(number of day’s still required to finish the work) for 5 jobs which were assigned the
letters A to E as they arrived to the shop. Sequence these jobs by priority rules viz., (a)
FCFS, (b) EDD, (c) LS, (d) SPT and (e) LPT.
Job Number days until due date Number of days of work remaining
A 7 2
B 9 7
C 4 3
D 1 1
E 3 8
3. In a factory, there are six jobs to perform, each of which should go through two machines
A and B, in the order BA. The processing timings (in hours) for the jobs are given here.
You are required to determine the sequence for performing the jobs that would
minimize the total elapsed time, T. What is the value of T?
Job Machine A Machine B
1 7 4
2 1 6
3 6 5
4 8 2
5 4 9
6 2 7
4. With the help of following data project, the trend of sales for the next five years:
6. XYZ enterprise has three factories at locations A, B and C which supply three warehouses
located at D, E and F. Monthly factory capacities are 20, 90 and 35 units respectively.
Monthly warehouse requirements are 65, 40 and 60 units respectively. Unit shipping
costs (in ₹) are given in the following table:
Determine the initial feasible distribution using NWC method.
7. An incentive scheme allows proportionate production bonus beyond 100% performance
level. Calculate the amount of (i) Incentive bonus and (ii) Total payment received by an
operator on a particular day during which the following particulars apply:
Operation: Assembling pocket transistor radio set
Work Content: 20 Standard minutes per assembled set
Attended Time: 8 Hours
Time spent on unmeasured work: 1 Hours
Numbers of sets assembled during the day: 25
Wage rate: ₹5 per hour
8. A building contractor is evaluating its machine shops current process layout. The figure
below shows the current layout and the table shows the trip matrix for the facility.
Health and safety regulations require departments E and F to remain at their current
positions.
E B F
A C D
Current Layout
From / To A B C D E F
A 7 4 8 6
B - 5
C - 9 10
D - 2
E - 3
F -
Can layout be improved? Also evaluate using load distance (ld) score.