SESSION II -ANALYSIS AND DESIGN OF CABLE STAYED
BRIDGES & SOFTWARE APPLICATIONS
ANIRUDDHA CHANDE
MANAGING DIRECTOR, IDEAS SE PVT LTD
INTERMEDIATE SOLUTION,
RIGIDITY DISTRIBUTED BETWEEN
PIERS,DECK AND PYLONS
EFFECT OF SPAN LOADING WITH BENDING PIERS TAKING PART IN THE LIMITATION OF DEFLECTIONS
METHODS OF STAYING DOWN THE TOWERS
LONG CABLES FROM A PYLON HEAD TO AN ADJECENT PYLON AT THE DECK LEVEL
CABLE STAYS COMING FROM BOTH ADJECENT PYLONS TO SUPPORT THE CENTRAL PART OF EACH SPAN
TING KAU BRIDGE, HONG
KONG
UNIQUE METHODS OF STAYING THE
DECK
OBERE ARGEN VALLEY BRIDGE, GERMANY
UNIQUE METHODS OF STAYING THE ALAMILLO BRIDGE,
DECK SPAIN
ACTION FORCES FOR
EQUIVALENT STATICAL
SYSTEMS
BASIC LOAD TRANSFER IN CABLE-STAYED
SYSTEMS
STATICAL
SYSTEM
LOADS ON
MAIN SPAN
LOADS ON
SIDE SPAN
BASIC LOAD TRANSFER IN TYPICAL CROSS SECTIONS
OPEN STEEL COMPOSITE
SECTIONS
CROSS
BEAM
MAIN BEAM
BASIC LOAD TRANSFER IN TYPICAL CROSS SECTIONS
STEEL BOX *HIGH TORSIONAL RIGIDITY
SECTION
ORTHOTROPIC STEEL-
BOX GIRDER
CROS
S
BEAM
ORTHOTROPIC STEEL-
BOX GIRDER
MAIN GIRDER
CROS
S
BEAM
CROSS BEAM PRESTRESSED OR
RCC DEPENDS UPON THE DECK
WIDTH
BASIC LOAD TRANSFER IN TYPICAL CROSS SECTIONS
CONCRETE BOX SECTIONS PRESTRESSED AT
STAY CABLE
LOCATION
RIB
DIAPHRAGM AT STAY CABLE S
LOCATION
RUNNING SECTION
BASIC LOAD TRANSFER IN TYPICAL CROSS SECTIONS
CONCRETE BOX SECTIONS WITH 2 PLANES OF
CABLES
RENAULT
SOUTH BOUND
CARRIAGEWAY
PYLON NORTH BOUND
CARRIAGEWAY
PYLON
EAST
SIDE
PYLON
WEST
SIDE TOWARDS
PYLON LOCATION :
P20
TOWARDS
LOCATION
: P18
OTHER UNIQUE DECK TYPES
ÖRESUND THE
BRIDGE, SAMUEL
DENMARK BECKETT
BRIDGE,
DUBLIN
CASE STUDY
STORSTROM BRIDGE
LOCATION AND BACKGROUND
• THE EXISTING STORSTRØMS BRIDGE IS SINGLE-RAIL TRACK
AND WILL NOT BE ABLE TO SUSTAIN THE INCREASED RAIL
TRAFFIC
NEW
BRIDGE
OLD
BRIDGE
BRIDGE LAYOUT
• Length =3830m • Piers founded at 8m - 16m below sea level
• 44 approach spans (80 m) - viaducts • Pylon founded at 21m below sea level
Power Joint
3 fixed piers (integral) 3 fixed piers
Exp. Joints + STU
CONSTRUCTION METHOD – LARGE SCALE
PREFABRICATION
• Construction Quality
o Factory environment
• Construction Speed
o Large elements assembly
o Optimized procedures
• Cost optimization
o Available or standard marine equipment
o Project specific, but simple temporary works
o Project specific, but standard/light lifting and
mechanical equipment
o Set up of prefabrication plant on site
• Coherent Construction Philosophy
o Same construction concept for all elements
o Same prefabrication plant for all elements
PRECAST SEGMENT
EACH APPROX 73M
PRECAST OPEN
FOUNDATION
CASTING
LINE/FABRICATI
ON SHED
PIERS & FOUNDATIONS
• 40 piers – 18m to 36m high
• Multi-faceted hollow sections (rectangle, hexagon, octagon)
• Precast construction (factory environment) + assembly offshore.
Modular approach - repetition of segments.
• Offshore casting of pier head (lifting weight limits).
Rebar cage + formwork preassembled - lifted with last precast
segment.
• In-situ joints with headed bars (minimising rebar congestion)
PIERS & FOUNDATIONS – ONSHORE ACTIVITIES
• ONSHORE CASTING OF FOUNDATION PLINTH & LOWER • TRANSFERING ON BARGE & TRANSPORT TO
PIER SINKING AREA
• Foundation backfillig
BOX-GIRDER - CROSS-SECTION
• ASYMMETRIC CROSS-SECTION AND LOADING
• PREFABRICATION + STANDARD (LIGHT) LIFTING EQUIPMENT LIFTING WEIGHT LIMITS
BOX-GIRDER – TYPICAL SPAN
73M FULLY
PRECAST
SEGMENT
250 TONS
LIFTING LIMIT
BOX-GIRDER - POST-TENSIONING
• INTERNAL BONDED POST-TENSIONING (22-STRANDS TENDONS TYPICALLY)
• BOTTOM SLAB + WEB PT STRESSED IN PRECAST YARD
• TOP SLAB PT + WEB CAP PT STRESSED OFFSHORE (CONTINUITY AFTER INSTALLATION OF GIRDERS)
Top PT
Pier section
Web Cap PT
Web PT
Mid-span section
Bottom PT
BOX-GIRDER - CONSTRUCTION SEQUENCE
DIRECTION OF ERECTION
TEMPORARY PIERS
• FROM THIRD SPAN, SPAN-BY-SPAN ERECTION METHOD OF PRECAST GIRDERS (INCLUDING CSB SPANS)
BOX-GIRDER - CONSTRUCTION SEQUENCE –
PRECAST YARD
STATION 1: STATION 2: STATION 3: STATION 4: STATION 5:
BOTTOM SLAB + WEB BOTTOM SLAB + WEB TOP SLAB REBAR POST-TENSIONING + STORAGE &
REBAR ASSEMBLY CASTING ASSEMBLY + CASTING LOAD TRANSFER ON LOAD-OUT AREA
LIFTING ARMS AND
SPMT
PREFABRICATION
SHED
BAR
GE
BOX-GIRDER - CONSTRUCTION SEQUENCE - LIFTING
HOISTING TOWER ”SIMPLE” LIFTING EQUIPMENT:
LIFTING ARM • HOISTING TOWER
4000 TONS • LIFTING ARMS
• HYDRAULICALLY CONTROLLED
STRAND JACKS
FRONT STITCH
BOX-GIRDER - CONSTRUCTION SEQUENCE –
OPTIMIZATION
FRONT END
LOWERING
BENDING MOMENT
LOWERING: ~275MM
LOCKING-IN HOGGING MOMENTS
COMBINED EFFECT
CUMULATIVE MOMENT AT
END OF CONSTRUCTION
CABLE STAYED SPANS
• 22M CAST IN-SITU DECK AT TOWER • 7M C/C CABLE STAYS (18 NO. PER SPAN)
• ≈ 62M PRECAST DECK SEGMENTS • SINGLE LINE OF CABLES CENTERED IN THE
DECK
• 7M PARTIALLY PRECAST SEGMENT 0 ON
TPS/TPN • CONSTRUCTION METHOD AS PER VIADUCT
• 1,1M CAST IN-SITU STITCHES
PYLON FOUNDATION
34M
TEMPORARY
VERTICAL TUBES &
42M BOX TOWERS FOR
FLOATING DURING
INSTALLATION
21M
PYLON FOUNDATION INSTALLATION
PYLON
STAY ANCHOR BOXES
UPPER PYLON
POWER JOINT
LOWER PYLON
PYLON
UPPER PYLON – ANCHOR BOX
MODELLING
1. LOCAL MODELS IN RFEM SOFTWARE
DISTORTIONAL
EFFECTS
SOFTWARES
SOFISTIK IS A MODULAR SOFTWARE
EVALUATION &
DOCUMENTATION PROPERTIES &
(VISUALISATION, REPORT MODELING
BROWSER, GRAPHICS (AQUA, SOFIPLUS, SOFIMSHA/-C)
(WINGRAF), RESULT VIEWER)
SUPERPOSITIONING ANALYSIS
(MAXIMA, SOFILOAD FOR
(ASE, DYN, HASE, TALPA, HYDRA)
NONLINEAR LOAD CASES)
GAD Based &
Axis Based
Modeling
WO R K F L OW
AutoCAD Automated
3D
export of
Reinforcement
any result /
Generation
data-set Parametric
SOFiPLUS & Detailing Input for
Graphical Similar
Interface Projects
Revit Bridge &
Linear
Infrastructure XLSX
Modelling
Grass
hopper
Matlab Python
Visual
Idea
Statica Basic
Introduction to SOFiSTiK | 59
Millau Viaduct (Tallest bridge in the world)
France
Study for Computational Fluid Dynamics
Mumbai Metro
Mumbai, India
Metro Line 3
SSB and Cable Optimization
PRELIMINARY SIZING PRELIMINARY SIZING
DETERMINE DECK DETERMINE PYLON
BACK SPAN TO MAIN DETERMINE CABLE STIFFNESS HEIGHT
SPAN RATIO SPACING
CONSTRUCTION STAGE
DETERMINE PRELIMINARY
ASSES MAXIMUM ANALYSIS, FORWARD
CABLE FORCE (INITIAL STATIC ANALYSIS
PERMANENT LOADS ANALYSIS AND
TUNING)
BACKWARD ANALYSIS