CTFL 001 Demo
CTFL 001 Demo
iSQI CTFL-001
Version Demo
https://dumpsarena.com
[email protected]
Topic Break Down
Total 343
Which of the following would be the TWO most appropriate examples of entry criteria documented in the system integration
test plan? 2 credits
B. The availability of the latest version of the capture-replay tool (for testing the interface with the newly developed test
management tool).
C. The sign-off of a performance test software release note (test item transmittal report) by both development and testing
showing that system performance meets the specified acceptance criteria.
ANSWER: A B
QUESTION NO: 2
A. Project Manager
B. Test Engineer
C. Test Manager
ANSWER: C
QUESTION NO: 3
Which of the following represents good testing practice for testers, irrespective of the software lifecycle model used?
A. They should start test analysis when the corresponding development level is complete
B. They should be involved in reviewing requirements or user stories as soon as drafts are available
C. They should ensure that the same test objectives apply to each test level
D. They should minimize the ratio of development levels to test levels to reduce project costs
ANSWER: D
One of the roles in a review is that of moderator, which of the following best describes this role?
A. Plans the review, runs the review meeting and ensures that follow-up activities are completed.
B. Allocates time in the plan, decides which reviews will take place and that the benefits are delivered.
C. Writes the document to be reviewed, agrees that the document can be reviewed, and updates the document with any
changes.
D. Documents all issues raised in the review meeting, records problems and open points.
ANSWER: A
QUESTION NO: 5
Within the projects, a master test plan and phase test plan will be used. Following is a list of characteristics applicable for
test plans:
b. strategy document
d. requirements
Which TWO of the above mentioned characteristics relate to the phase test plan? 1 credit
A. a
B. b
C. c
D. d
E. e
F. f
ANSWER: C E
1. Frequency - The number of times the system should be automatically switched on per day; minimum once per day,
maximum 5 times
2. Duration - The duration of operation, in whole minutes, each time it is switched on; ranging from 1 to 60
Applying 2-value boundary value analysis which of the following options has the correct test set of valid and invalid boundary
values?
A. Frequency 1, 5; Duration 1, 60
ANSWER: B
QUESTION NO: 7
Which TWO of the review types below are the BEST fitted (most adequate) options to choose for reviewing safety critical
components in a software project? Select 2 options.
A. Informal review.
B. Management review.
C. Inspection.
D. Walkthrough
E. Technical Review
ANSWER: C E
QUESTION NO: 8
C. Because independent testers can verify assumptions made during specification and implementation of the system
D. Because independent testers have a greater sense of responsibility for quality than developers
QUESTION NO: 9
During test process improvement it is recommended to use standards where possible. Standards originate from various
sources and they cover different subjects in relation to testing Pick TWO sources of software standards, useful to software
testing from the ones mentioned below. 1 credit
C. BS-7925-2 ‘Software testing. Software component testing is a national standard used internationally. It covers a number
of testing techniques that may be useful both on component testing level and on system testing level.
D. SY-395-01 ‘Standard for East Coast Hospital software’ is a regional standard adapted from a national one. Besides
hospital software, this standard ought to be used also by other types of software system in the region.
E. IEEE 829 ‘standard for software test documentation’ is an international standard to be following mandatory by all testing
origination regardless of lifecycle models.
ANSWER: A C
QUESTION NO: 10
Test Implementation and execution has which of the following major tasks?
i. Developing and prioritizing test cases, creating test data, writing test procedures and optionally preparing the test
harnesses and writing automated test scripts.
ii. Creating the test suite from the test cases for efficient test execution.
iii. Verifying that the test environment has been set up correctly.
ANSWER: A
QUESTION NO: 11
C. Memory leakage
ANSWER: B
QUESTION NO: 12
Identify THREE items that would be part of the work-breakdown structure showing the key testing activities for the
acceptance test project. 2 credits (for 2 out of 3 correct 1 credit)
A. Test planning, test case preparation and test execution for each of the four iterations
B. Work should be explicitly allocated to test completion, test management, installation and to training on using the system
ANSWER: A B D
QUESTION NO: 13
Part of the testing strategy indicates that you are going to be using systematic test design techniques. Your manager has
asked that you present the main advantages of using these techniques at the next board meeting. Identify THREE main
benefits of using systematic test design techniques within this company. 2 credits (for 2 out of 3 correct 1 credit)
D. Provides a way to differentiate depth of testing based on product risks by using different techniques
QUESTION NO: 14
The introduction of reviews and inspections has often failed as a process improvement action. Identify the THREE most
important measures that should be taken to reduce the risk that this test process improvement will fail. 2 Credits (for 2 out of
3 correct 1 credit)
A. Process ownership and experienced moderators who drive the inspection process.
B. Management support
ANSWER: A B C
QUESTION NO: 15
B. Zero defects
C. Conformance to requirements
D. Work as designed
ANSWER: C