Tourism Management System
Tourism Management System
And finally, we would like to thank all our friends for their
support and the timely help.
INDEX
Sr.No. Title
1. Introduction
2. System Analysis
3. System Design
4. Implementation Detail
7. Limitations
8. Future Enhancement
.
1.1.INTRODUCTION TO SYSTEM
This project is aimed at developing a Web application that depicts online management of
saloon parlour.This software help website admin to see all detail in brief like total
number of customer, Total number of appointment, Rejected Appointment, Accepted
Appointment, Total Services, This software helps user to take appointment with beauty
parlor on particular date and time. User views the services which are offer by beauty
parlor User sees the details of beauty parlor and can contact with beauty parlor.
Manger:Aniket Thorat.
Address: “Sangamner loni Rode Vadgon Sangamner, Maharashtra 422605 “
1.1Motivation-
• Provide better services to client.
• The objective of the project is to develop a system that
1.2Problem Statement-
• The existing system is a manual system. Here the
agency needs to save his information in the form .
• The manual system gives us very less security for
saving data , some data may be lost due to
mismanagement. Searching for particular information is
very critical; it takes a lot of time.
• It consumes more time, and involves more risk and it
requires more human power .There may be a chance of
missing, & getting confused. The order is taken by
telephone calls & some by emails ,so maintain all
records becomes a difficult task.
• Due to the manual system ,the firm faces some of the
following problems:
• Difficult to search details.
• Very less security for saving data.
• Time Consuming.
• Information Mishandling.
1.3Objectives-
• The objective of the project is to develop a system that
automates the processes and activities of a tourism
agency.
2.System Analysis
2.1Existing System:
In the present system a customer has to approach various agencies
to find details of places and to book tickets. This often requires a lot of
time and effort. A customer may not get the desired information from
these offices and often the customer may be misguided. It is tedious
for a customer to plan a particular journey and have it executed
properly.
3.Fact FindingTechnique
To study any system the analyst need to do collect fact and all
relevant information. The fact when express in quantities termed as data.
The success of any project independent upon the accuracy of available
data accurate information can be collected with the help of certain method
or techniques this specific method of finding information of the system
are term as fact finding techniques. Interview, questionnaire, record view
and observation are the different fact finding technique used by the
analyst the analyst may use more than one technique for investigation.
A.
Record
Review
. B.
Observ
ation.
A: Record Review: -
The information related to the system is published in the source Like
Newspaper Journals document,, etc this record view helps the analyst
to get valuable about the system and the organization.
B: Observation: --
Unlike the other fact finding techniques, in this method the analyst
himself visit the organization and observation and understand the
flow of documents, working of the existing system the user of the
system etc for this method to be adapted it takes and analyst to perform
this job as he knows which points should be noticed and highlighted.
In analyst may observes the ban wanted things as well and simply
cause delay in the development of the new system.
4.Feasibility Study
Preliminary investigation examines project feasibility, the
likelihood the system will be useful to the organization. The main
objective of the feasibility study is to test the Technical, Operational
and Economical feasibility for adding new modules and debugging
old running system. All systems are feasible if they are given unlimited
resources and infinite time. There are aspects in the feasibility study
portion of the preliminary investigation:
There are three types of feasibility study:-
➢ Technical Feasibility.
➢ Economical Feasibility.
➢ Operational Feasibility.
4.1Technical feasibility study-
-This developed system has technically feasible because the
technology needed for the proposed system is available i.e. php
software, ph editors are easily available.
-The proposed system is integrated within the organization is easy.
-The proposed system needs no new equipment installed at the user
end - Technically this system in very much safe and sound. The
system does not need extra hard ware to run the given project.
5.Requirement Analysis
Software Requirements:
Operating System-Windows10
Programming Language-PHP
Data Base-MySQL
Hardware Reuirements
Hard Disk- 250 GB or more
RAM- 4 GB or more
6.UML Diagrams
6.1ER Diagram-
do
has
See
Payment
Booking
make
Payment
approve
7.Data design
Admin :
Name Datatype Constraint
User :
Name Datatype Constraint
Payment:
Name Datatype Constraint
Package:
Name Datatype Constraint
Booking:
Name Datatype Constraint
Package –Booking:
Name Datatype Constraint
8.Input-output Screen:
Home Page:
Packages:-
Privacy Policy:-
Users Registration:-
Users Login:-
Home Page:-
Packages Details:-
Booking History:-
Admin login:-
Dashboard:-
Creates Packages:-
Manages Packages:-
Manage Users:-
Manages Bookings:-
Manage Issues:-
Manage Enquiries:-
<?php
session_start();
include('includes/config.php');
if(strlen($_SESSION['alogin'])==0)
header('location:index.php');
else{
?>
<!DOCTYPE HTML>
<html>
<head>
<div class="four-w3ls">
<div class="icon">
</div>
<div class="four-text">
<h3>Issues Riaised</h3>
<?php $sql5 =
<div class="four-wthree">
<div class="icon">
</div>
<div class="four-text">
<h3>Toatal packages</h3>
<?php $sql3 = "SELECT PackageId from tbltourpackages";
$query3->execute();
$results3=$query3->fetchAll(PDO::FETCH_OBJ);
$cnt3=$query3->rowCount();
?>
</div>
</div>
</div>
<div class="clearfix"></div>
</div>
</a>
<div class="four-agileits">
<div class="icon">
<i class="glyphicon glyphicon-folder-
open" aria-hidden="true"></i>
</div>
<div class="four-text">
<h3>New Enquiries</h3>
$query->execute();
$results=$query->fetchAll(PDO::FETCH_OBJ);
$newenq=$query->rowCount();
</div>
</div>
</div></a>
</div>
</div>
</div>
</a>
<div class="clearfix"></div>
</div>
<div class="four-grids">
<div class="icon">
</div>
<div class="four-text">
<h3>New Bookings</h3>
$query->execute();
$results=$query->fetchAll(PDO::FETCH_OBJ);
$newbookings=$query->rowCount();
</div>
</div>
</div>
</a>
<div class="four-w3ls">
<div class="icon">
</div>
<div class="four-text">
<h3>Confirmed Bookings</h3>
$query->execute();
$results=$query->fetchAll(PDO::FETCH_OBJ);
$cancelbooking=$query->rowCount();
</div>
</div>
</div>
</a>
<div class="clearfix"></div>
</div>
<!--//four-grids here-->
<div class="inner-block">
</div>
<?php include('includes/footer.php');?>
</div>
</div>
</script>
</body>
</html>
<?php } ?>
Future Enhancement:
• In future the user need to just login into the application and
can also book vehicles ,hotels in package.
10.Project Scope -
It is integrated software developed for tour operating agencies. The
main aim of this project is to help the tourism agencies to manage their
customers. It makes all operations of the tour agency easy and accurate.
• It satisfies the user requirement.
• Be easy to operate.
• Be easy to understand by the user and admin.
• Any tourist agency can make use of it for saving customer
details in Database.
Limitations-
• No direct interaction between user and administrator.
11.Conclusion:
• Tourism Management System simplifies the management process
• Fast processing and immediate results with high security.
• Minimizing human efforts and cost efficient databases.
• Navigation through the site is easy.
References:
• www.phpcity.com
• https://www.javatpoints.com
• http://www.w3schools.com
• https://html.com