The document provides a detailed log of various packages (ISOL-PKG) checked in and out across multiple units from July 7 to July 15, 2021. Each entry includes the package identifier, unit number, status (DONE), and specific check-in and check-out dates. The log indicates the completion of tasks and the number of packages handled on each date.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
16 views4 pages
Book 1
The document provides a detailed log of various packages (ISOL-PKG) checked in and out across multiple units from July 7 to July 15, 2021. Each entry includes the package identifier, unit number, status (DONE), and specific check-in and check-out dates. The log indicates the completion of tasks and the number of packages handled on each date.