The document is a checklist report for the demolition of a concrete road, outlining essential pre-demolition checks, equipment requirements, demolition execution steps, and post-demolition clean-up procedures. It emphasizes the importance of safety, environmental considerations, and proper waste management throughout the demolition process. The report requires signatures from the inspector or supervisor to confirm completion and compliance.

Uploaded by

lyhouret1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views2 pages

Checklist Report

The document is a checklist report for the demolition of a concrete road, outlining essential pre-demolition checks, equipment requirements, demolition execution steps, and post-demolition clean-up procedures. It emphasizes the importance of safety, environmental considerations, and proper waste management throughout the demolition process. The report requires signatures from the inspector or supervisor to confirm completion and compliance.

Uploaded by

lyhouret1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Checklist Report: Demolition of Concrete

Road
Project Name: ________________________
Location: ________________________
Date: ________________________
Inspector/Supervisor: ________________________

1. Pre-Demolition Checks
☐ Permits & Approvals – Ensure all necessary permits and approvals are obtained.
☐ Utility Identification & Disconnection – Confirm underground utilities (water, gas,
electricity, telecom) are marked and disconnected if necessary.
☐ Traffic Management Plan – Implement detours, road closures, and signage.
☐ Environmental Considerations – Dust control, noise reduction, and debris management plan
in place.
☐ Safety Gear & Equipment – Verify PPE for workers (helmets, gloves, safety vests, masks,
etc.).
☐ Emergency Response Plan – First aid kits, fire extinguishers, and emergency contacts
available.

2. Equipment & Machinery Check


☐ Excavators with Breaker Attachments – Checked and functional.
☐ Hydraulic Hammers & Jackhammers – Operational and ready.
☐ Concrete Cutters & Saws – Blades inspected and in working condition.
☐ Dump Trucks & Loaders – Checked for debris removal.
☐ Water Sprays for Dust Control – Available and functional.

3. Demolition Execution
☐ Sectional Demolition Plan – Work progresses in designated sections.
☐ Concrete Cutting & Removal – Ensured controlled removal to minimize damage to adjacent
areas.
☐ Rebar & Metal Separation – Scrap material collected separately for recycling.
☐ Dust & Noise Control Measures – Monitored regularly.
☐ Waste Segregation & Disposal – Concrete, asphalt, and other materials sorted and disposed
of properly.
☐ Inspection for Underground Infrastructure – Verify no damage to pipes or cables.
4. Post-Demolition Clean-Up & Site Inspection
☐ Debris Removal Completed – All waste transported to designated locations.
☐ Surface Leveling & Grading – Ground prepared for the next phase of construction.
☐ Final Safety & Environmental Inspection – No hazards left on-site.
☐ Utility Reconnection (if required) – Utilities restored safely.
☐ Final Report & Approval – Sign-off by site supervisor/engineer.

Remarks:

Inspector/Supervisor Signature: ________________________


Date: ________________________