Periodic Welding Inspection Checklist

The document outlines a quality plan and inspection checklist for welding activities, detailing the necessary checks and actions required at various stages: before, during, and after welding. It includes sections on materials, welder qualifications, welding equipment, and compliance with specifications. The checklist is to be completed by responsible personnel to ensure all activities conform to contract specifications and quality control procedures.

Uploaded by

krushnraj111
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views4 pages

Periodic Welding Inspection Checklist

The document outlines a quality plan and inspection checklist for welding activities, detailing the necessary checks and actions required at various stages: before, during, and after welding. It includes sections on materials, welder qualifications, welding equipment, and compliance with specifications. The checklist is to be completed by responsible personnel to ensure all activities conform to contract specifications and quality control procedures.

Uploaded by

krushnraj111
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Quality plans or inspection check lists for: (To be completed by the pers

for the work)


Contract Number: Work area:
Contract/Project Name:
Contractor:
Subcontractor:
WORK Check Action
In accordance with drawing/WPS
Identified and can be traced to a test certificate
Material
In suitable condition (free from damage and
contamination)
Have been approved and are available to welders and
WPS
inspectors
Welding equipment In suitable condition and calibrated as appropriate
Welding preparation In accordance with WPS and (or) drawing

Before Welding Identification of welders qualified for each WPS tobe


Welder qualifications
used. All welder qualification certificates are valid

Those to be used are as specified by the WPS arebeing


Welding consumables
stored /controlled as specified by the qc procedures

In accordance with WPS/drawings tack welds areto good


Joint fit-up
workmanship standard and to code/WPS
Weld Faces Are free from defect, contamination and damage
Preheat (if required) Minimum temperature is in accordance with WPS

I have carried out all necessary inspections and verify that the above items/activities conform to the
contract specification/documents

WORK Check Action


Ensure weather conditions are suitable/comply with code
Site/field welding
(Conditions will not affect welding)
Welding Process In accordance with WPS
Minimum tempearature is being maintained
Preheat (if required)
inaccordance in WPS
Interpass temperature Maximum temperature is in accordance in WPS

Those to be used are as specified by the WPS arebeing


During welding Welding consumables
stored /controlled as specified by the qc procedure

Welding parameters Current, volts, travel speed are in accordance withWPS


Root run Visually acceptable to code (before filling the joint)
By an approved method and to good workmanship
Gouging/grinding
standard
welder To good workmanship standard on the
Interrun cleaning
approvalregister/qualified for the WPS being used
I have carried out all necessary inspections and verify that the above items/activities conform to the
contract specification/documents

WORK Check Action

Each weld is marked with the welders identification and


Weld identification
is identified in accordance with drawing/weld map

Ensure welds are suitable for all NDT (cleanness, profile,


Weld apperance etc) Visually inspect welds and sentence in accordance
After Welding with Code

Dimensional survey Check dimensions are in accordance with drawing/Code

Ensure any modifications are included on as-built


Drawings
drawings
mpleted by the person(s) directly responsible
rk)
Checklist Number:

Initialled/OK Comments

Name:
Signature:
Date:
Initialled/OK Comments
Name:
Signature:
Date:
Initialled/OK Comments