0% found this document useful (0 votes)
8 views4 pages

File

The document outlines various procedures and regulations related to aircraft maintenance, including responses to lightning strikes, inspection protocols, and the roles of licensed mechanics. It emphasizes the importance of proper documentation, human factors in aviation, and safety measures for handling equipment and emergencies. Additionally, it details the responsibilities of maintenance personnel and the significance of compliance with aviation standards.

Uploaded by

bounnheng.vx1967
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views4 pages

File

The document outlines various procedures and regulations related to aircraft maintenance, including responses to lightning strikes, inspection protocols, and the roles of licensed mechanics. It emphasizes the importance of proper documentation, human factors in aviation, and safety measures for handling equipment and emergencies. Additionally, it details the responsibilities of maintenance personnel and the significance of compliance with aviation standards.

Uploaded by

bounnheng.vx1967
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

1. Lightning strike?

• Flight control free and full movement


2. Custom load equipment / component, mechanic inform?
• Director
3. Return departure / arrival kit?
• 15 min
4. Mechanic staff arrive arrival gate?
• 30 min
5. A-license signed on CRS for what?
• Training type
6. Torque loading provide to…
• Sufficient……… over-stressing
7. Additional work….
• Customer
8. A-license can do?
• Minor schedule line maintenance on turbine eng
9. Discrepancies of work?
• Talk to inspector for risk NRC or fill TLB
10. Benefit of attention human?
• Both
11. Issu CRS…
• All performed works are done
12. Authorized mechanic….
• All authorized document are certified
13. Human factor…..
• Performance
14. Brake fire …
• Dry powder
15. Co2 …
• Liquid, solid, electric fire
16. Grease, oil ….---- union
• N2
17. Lubricate seal of hydraulic filter ….
• Hydraulic
18. Part 145….
• 6 months with 24 months
19. Certified mechanic A can be defer defect and a/c dispatch by MEL, if the defect relate ATA 33
• True
20. Torque loading is carried out provide.
• Sufficient camping without over stressing.
21. In which cases should you request a one-time approval?
• In the unforeseen cases, where an aircraft is ground and there is no appropriate inspection and
return to service personnel available at the out-station
22. Move right-hand wand in a “fanning” motion form shoulder to knee, while at the same time
pointing with left-hand wand to the target area
• Tell the cockpit persons that there is a fire at the indicator point
23. Fire on landing gear brake should be extinguished with
• Dry powder extinguisher
24. When fitting a hydraulic component, the hydraulic seal should be lubricated with
• The same fluid that is use in the hydraulic system
25. In process inspection. If finding some discrepancies during the inspection, how do you do?
• Talk to inspector for Entry to the TL or Issu NRC
26. Process returns of serviceable part; how do you do?
• Packing / container is not unwrap/opened, the status is good. The stock requestion…….
27. NRC arise in case
• Correct a both(1.discrepancies found during inspection/check and non-routine work/schedule, 2.
defect found during inspection check with routine work/schedule)
28. CDCCL stand for
• Critical Design Configuration Control Limitations
29. What are the benefits of operational attention to Human Factors in aviation environments?
• Cost control only
30. A co2 extinguisher is use on?
• Solid, Liquid and Electrical fire
31. In the case of swap component between Aircrafts, who are Issue for the WO before aircraft
component/part swap performance?
• MCC
32. Role of the international Civil Aviation Organization
• Coordinates the participles and technique of international air navigation, and foster the planning
and development of international air transport to ensure safe and orderly growth.
33. A maintenance task involving some element of removal/disassembly and installation/reassembly of
several component of the same type fitted to more than one system on the same aircraft during
particular maintenance check. What kind of the task?
• Critical task
34. A part2 licensed, when signing a CRS for a non-Part-145 company would to have
• Maintenance experience for 6 months within the last 24 months
35. Duplicate inspections are
• Inspections certified by one approved signatory or LAE and then certified by second approved
signatory or LAE
36. How identification of critical task?
• Identification by “red” highlight by stamp with “Critical” at the right upper corner of the respect
job card or work pack
37. Neither oil nor grease should be used as a lubricant on coupling or pipelines
• Oxygen
38. What work has to be recorded and signed for?
• All work carried out.
39. What human factor measures quantify?
• Human performance.
40. Raise right arm up to head level with wand pointing up and start a circulate motion with hand; at
the same time, with left arm raised above head level, point to engine to be started. What sign to
cockpit man?
• Start engine(S)
41. Preliminary inspection in line maintenance should include:
• Inspection check list; visual inspection of aircraft exteriors and interiors; review of technical and
cabin logs; review of notice of flight crews; review of post flight report (PFR); check of the
status of ADDs and associated requirements; review of the out of phase (OOP) list
42. An engineer may issue a CRS if they
• Company approved on the appropriate type of aircraft
43. Return of unserviceable repairable part from Maintenance sections. How do you do?
• Must be attached unserviceable tag and filled appropriate information by authorized staff, End
of duct and connector must be Cabe hermetically and enter the detail information on the defect
44. How many step for aircraft maintenance procedure on Lao Airline SOP-TECH001?
• 3
45. What can an A1 license engineer sign for
• Minor schedule Line Maintenance task of turbine engine aircraft
46. Any work which is not originally part of the contracted work package or variations to exiting
documents in contracted work package request by the customer. What type of work?
• WO (It’s additional work)
47. After report Lightning Strike, Mechanic shall be check?
• Flight controls should be checked for full and free movement before the next flight.
48. If an unauthorized (Aircraft Maintenance License) is carried out
• The authorization is invalidated until an authorized document has been done.
49. MEL occurs. Please choose the correct answer according to (1), (2) and (3) position
• (1) tick on MEL block and fill the MEL item, MEL category, hold item number and MEL due
date; (2) aircraft dispatch by MEL….;(3) Defect and Aircraft release by Mr. bounkham stamp
QVCRS005 date 7 Feb 2025.
50. All Aircraft part removed from aircraft must be attached mediately with which the tag, if you cannot
verified that part unserviceable. What the tag do you attach?
• Quarantine tag
51. In a torque wrench of handle length, L=12in. and extension A=3in, the desire torque value is
TA=300 lbs.in the dial should read (TW)?
• 240 lb. Ins
52. Blown or flat spotted tires, you shall to check which ATA?
• Check at ATA 05
53. A category-A licensed can sign a CRS for what?
• A task he has been locally trained for
54. Certifying mechanic (Certify Category A) can be fill hydraulic fluid in to aircraft hydraulic reservoir
or not?
• Can
55. Whenever possible a fictional test should be carried out on aircraft using which power supply?
• An external supply.
56. If there is any error in the maintenance documents. How do we fix it?
• Block of text or page he/she makes a line from 7 O’clock to 13 O’clock or incorrect word is
cross by drawing a line through that word after that write down on over or next for incorrect
word and certifies by his/her signature and stamp
57. Raise right arm to head level with wand pointing up and start a circular moment with hand; at the
same time, with left arm raise above head level, show 2 fingers to cockpit persons. What meaning
to signal?
• Allow Engine 2 start.
58.

You might also like