TQM Assignment 3
TQM Assignment 3
(https://swayam.gov.in) (https://swayam.gov.in/nc_details/NPTEL)
Stem, Leaf
Week-1
Introduction Leaf, Stem
to Total Tree, Stem
Quality Tree, Lea
Management
() No, the answer is incorrect.
Score: 0
Accepted Answers:
Week 2-
Stem, Leaf
Introduction
to Total
2) Typically in a cause and effect diagram, the _______________ is used for 1 point
Quality
classification of causes
Management
- II () in the service industry.
5Ms
Week 3-
8Ps
Tools for
Quality 5Ss
Assurance () 6Ps
https://onlinecourses.nptel.ac.in/noc23_mg06/unit?unit=34&assessment=98 1/4
11/03/2025, 08:12 Total Quality Management - I - - Unit 5 - Week 3-Tools for Quality Assurance
unit=34&lesso
n=35)
3) ___________ diagram is used for identifying potential relationship between two 1 point
variables.
7 New Tools
for Quality Pareto
Assurance
Ishikawa
(unit?
unit=34&lesso Histogram
n=36) Scatter
Quiz: Week 3: 5) A ____________ diagram shows the location of defects in any unit. This diagram is 1 point
Assignment 3 used in the
(assessment?
analyse step of DMAIC.
name=98)
Feedback For
Affinity
Week 3 (unit? Relations
unit=34&lesso
Defect Concentration
n=41)
Scatter
Week 4 - No, the answer is incorrect.
Acceptance Score: 0
Sampling Accepted Answers:
and Brief Defect Concentration
Introduction
to R () 6) Producers risk can be defined as: 1 point
https://onlinecourses.nptel.ac.in/noc23_mg06/unit?unit=34&assessment=98 2/4
11/03/2025, 08:12 Total Quality Management - I - - Unit 5 - Week 3-Tools for Quality Assurance
7) A _____________ chart can be used to identify the most frequently occurring defect 1 point
Week 7 -
Process Pareto
Capability
Ishikawa
Analysis and
ISO 9000 Histogram
basics () Scatter
No, the answer is incorrect.
Week 8 - Score: 0
Basic of ISO Accepted Answers:
9000, Pareto
CUSUM and
EWMA 8) The critical path method determines the ___________ path from the beginning to 1 point
charts ()
the end of the project.
DOWNLOAD Middle
VIDEOS () No, the answer is incorrect.
Score: 0
Text Accepted Answers:
Transcripts () Longest
Books () 9) The ______________ is used to identify what might go wrong in a plan under 1 point
development.
Pareto Chart
PDPC
Arrow Diagram
Matrix Diagram
10) Lots for acceptance sampling should be ____________ and _____________. 1 point
Homogeneous, Large
Heterogeneous, Small
Homogeneous, Small
Heterogeneous, Large
https://onlinecourses.nptel.ac.in/noc23_mg06/unit?unit=34&assessment=98 3/4
11/03/2025, 08:12 Total Quality Management - I - - Unit 5 - Week 3-Tools for Quality Assurance
https://onlinecourses.nptel.ac.in/noc23_mg06/unit?unit=34&assessment=98 4/4