Flow Transmitter: HP LP

The document outlines the specifications and requirements for flow transmitters and associated components for a thermal power project at Haldia. It includes details on various flow measurements, materials, and item descriptions, along with notes on supply and installation responsibilities. Additionally, it emphasizes that certain documents are not approved for construction and must be cleared before proceeding with any work.

Uploaded by

chhandak bera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views4 pages

Flow Transmitter: HP LP

The document outlines the specifications and requirements for flow transmitters and associated components for a thermal power project at Haldia. It includes details on various flow measurements, materials, and item descriptions, along with notes on supply and installation responsibilities. Additionally, it emphasizes that certain documents are not approved for construction and must be cleared before proceeding with any work.

Uploaded by

chhandak bera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

APPLICABLE TAG

SL NO. TAG NO. SERVICE PID NO.

FLOW TRANSMITTER P11PAB03CF500 /


1 Flow at ACW line to Coolers Unit#1

P11PAB03CF100

P10PAB01CF500 /
2 Flow of CW at Condensor inlet header Unit#1
TCE.6428A-613-
P10PAB01CF100
FD-1128
530A
P21PAB03CF500 / [SH 02 OF 03]
530A 3 Flow at ACW line to Coolers Unit#2
539A P21PAB03CF100
520A
520A
577A 539A
P20PAB01CF500 /
4 Flow of CW at Condensor inlet header Unit#2
P20PAB01CF100

526
520A
BOM

SR. ITEM DESCRIPTION SIZE MATERIAL UNIT TOTAL


NO NO QTY QTY
3-Way
Valve CS as per
BOTH SIDE THREDED 1/2" NPT(M)
manifold 1 520A 6 24
HEAVY SCH PIPE X 1 M Long
IS 1239 Part 1

CS as per IS 1239 4 16
2 530A HEX PLUG, 3000# 1/2" NPT(M)
Part 2

FORGED EQUAL TEE CS as per


510 577A 3 1/2" NPT(F)
577A IS 1239 Part 2 4 16
3000#
518A
MANUAL GLOBE VALVE ASTM B62/ LTB-2
HP LP 522A 4 518A OF 800# RATING WITH
1/2" NPT(F) of IS 318/ A182 4 16

522A 3000# END CONNECTION F316L

510 518A
1/2" O.D. X
5 514 SEAMLESS TUBE SS304 5 M 20 M
514 1.6mm THICK
530A

514 FORGED 90 DEGREE 1/2" NPT(F) CS as per


6 539A 4 16
ANNUBAR ELBOW, 3000# IS 1239 Part 2
510

MALE CONNECTOR 1/2" NPT(M)


7 510 WITH DOUBLE 4 16
(SUITABLE
SS304, 3000#
COMPRESSION TYPE FOR 1/2"
T FERRULES & NUT
NS
I
OD TUBE)

BY BOTH SIDE THREADED 1/2" NPT (M)


CS as per
8 522A
HEAVY SCH PIPE IS 1239 Part 1 4 16
X 3" LONG

BOTH SIDE THREADED CS as per


1/2" NPT(M)
9 526 HEAVY SCH PIPE 2 8
X4 M Long IS 1239 Part 1

CH
ME
BY

OW
FL

DO NOT SCALE
OWNER.

HEL HALDIA ENERGY LIMITED

OWNER’S CONSULTANT.
NOTE: LAHMEYER LAHMEYER INTERNATIONAL (INDIA) PVT. LTD.
INTERNATIONAL
INDIA CONSULTING ENGINEERS, GURGAON, INDIA
1. INSTRUMENT (ANNUBAR, TRANSMITTER, MANIFOLD) WILL BE FREE SUPPLIED BY PLL.
BOP CONTRACTOR.

PUNJ LLOYD LIMITED


2. 3-WAY VALVE MANIFOLD (1/2 "NPTF) WILL BE SUPPLIED ALONG WITH THE INSTRUMENT.
GURGAON

3. ANNUBAR WILL BE INSTALLED ON UNDERGROUND CW & ACW PIPE BOP CONTRACTOR’S CONSULTANT.

IN A PIT AND TRANSMITTER WILL BE MOUNTED ON 2"


TATA CONSULTING ENGINEERS LIMITED
STANCHION OVERGROUND NEAREST TO THE PIT.
KOLKATA

PROJECT.
FOR R0 ISSUE ONLY CLEARED
ISSUE REVISIONS DRN APPD DATE FILE NAME :
2 x 300 MW COAL BASED THERMAL
CLEARED CHEM CIVIL ELEC I&C MECH POWER PROJECT AT HALDIA
DEPT SIGNATURE DATE R1 REVISED AS PER CLIENT’S COMMENTS AB SN SB 18-10-2012 ‘P’ (PRELIMINARY) ISSUES ARE NOT TO BE
APPROVED BY
USED FOR CONSTRUCTION / FABRICATION TITLE
BUT ARE ISSUED FOR LIMITED PURPOSES SCALE:NTS
CHEM SB
-- ONLY AS INDICATED IN THE SMALL BLOCK
AT THE TOP RIGHT HAND CORNER OF
HOOK-UP FOR FLOW TRANSMITTER (ANNUBAR)
THE TITLE BLOCK. OFFICE-DISC: PROJECT MANAGER
CIVIL -- CONSTRUCTION / FABRICATION WORK IS (CW & ACW SERVICE)
PERMITTED ON ‘R’ (RELEASED) ISSUES DK-IC SB
ONLY.
ELEC -- INFORMATION CONTAINED WITHIN ’HOLD’
DATE (R0 ISSUE)
IS NOT RELEASED FOR CONSTRUCTION / SHEET DRAWING NO. REV.
FABRICATION. FIELD MUST GET
DRN:AB 16-08-2012
I&C SUJAY NANDI 16-08-2012 DESIGN OFFICE TO CLEAR ’HOLDS’ IN
TIME BEFORE PROCEEDING WITH ANY DATE(CURRENT ISSUE)
MECH --
CONSTRUCTION / FABRICATION WORK
RELATED TO ‘HOLDS’.
CHD:SN
18-10-2012
20 OF 33 TCE.6428A-IC-613-IN-1701 R1

SIZE-A3
APPLICABLE TAG

SL NO. TAG NO. SERVICE PID NO.

FLOW TRANSMITTER P00PAR01CF500 /


CT MAKEUP TO CW & ACW FOREBAY
TCE.6428A-613-
1
FD-1128
P00PAR01CF100
[SH 03 OF 03]

530A BOM
530A
SR. ITEM DESCRIPTION SIZE MATERIAL UNIT TOTAL
539A
520A
520A NO NO QTY QTY
577A 539A

BOTH SIDE THREDED CS as per


520A 1/2" NPT(M)
1 IS 1239 Part 1 6 6
HEAVY SCH PIPE X 1 M Long
522A
CS as per IS 1239 4 4
2 530A HEX PLUG, 3000# 1/2" NPT(M)
Part 2

FORGED EQUAL TEE CS as per


3 577A 1/2" NPT(F) 4 4
520A 3000# IS 1239 Part 2
518A
MANUAL GLOBE VALVE ASTM B62/ LTB-2
4 518A 1/2" NPT(F) of IS 318/ A182 4 4
OF 800# RATING WITH
522A 3000# END CONNECTION F316L
3-Way
Valve 1/2" O.D. X
5 514 SEAMLESS TUBE SS304 5 M 5 M
manifold 1.6mm THICK

FORGED 90 DEGREE 1/2" NPT(F) CS as per


6 539A 4 4
ANNUBAR ELBOW, 3000# IS 1239 Part 2

510 577A
MALE CONNECTOR 1/2" NPT(M)
7 510 WITH DOUBLE 4 4
(SUITABLE
SS304, 3000#
COMPRESSION TYPE FOR 1/2"
T HP LP FERRULES & NUT
NS
I 522A OD TUBE)

BY BOTH SIDE THREADED 1/2" NPT (M)


CS as per
8 522A
HEAVY SCH PIPE IS 1239 Part 1 6 6
510 518A X 3" LONG

514
530A

514

CH 510
ME
BY

OW
FL

DO NOT SCALE
OWNER.

HEL HALDIA ENERGY LIMITED

OWNER’S CONSULTANT.

NOTE: LAHMEYER LAHMEYER INTERNATIONAL (INDIA) PVT. LTD.


INTERNATIONAL
INDIA CONSULTING ENGINEERS, GURGAON, INDIA
1. INSTRUMENT (ANNUBAR, TRANSMITTER, MANIFOLD) WILL BE FREE BOP CONTRACTOR.

SUPPLIED BY PLL. PUNJ LLOYD LIMITED


GURGAON

2. 3-WAY VALVE MANIFOLD (1/2 "NPTF) WILL BE SUPPLIED ALONG BOP CONTRACTOR’S CONSULTANT.

WITH THE INSTRUMENT.


TATA CONSULTING ENGINEERS LIMITED
KOLKATA

PROJECT.
FOR R0 ISSUE ONLY CLEARED
ISSUE REVISIONS DRN APPD DATE FILE NAME :
2 x 300 MW COAL BASED THERMAL
CLEARED CHEM CIVIL ELEC I&C MECH POWER PROJECT AT HALDIA
DEPT SIGNATURE DATE R1 REVISED AS PER CLIENT’S COMMENTS AB SN SB 18-10-2012 ‘P’ (PRELIMINARY) ISSUES ARE NOT TO BE
APPROVED BY
USED FOR CONSTRUCTION / FABRICATION TITLE
BUT ARE ISSUED FOR LIMITED PURPOSES SCALE:NTS
CHEM SB
-- ONLY AS INDICATED IN THE SMALL BLOCK
AT THE TOP RIGHT HAND CORNER OF
HOOK-UP FOR FLOW TRANSMITTER (ANNUBAR)
THE TITLE BLOCK. OFFICE-DISC: PROJECT MANAGER
CIVIL -- CONSTRUCTION / FABRICATION WORK IS (CW & ACW SERVICE)
PERMITTED ON ‘R’ (RELEASED) ISSUES DK-IC SB
ONLY.
ELEC -- INFORMATION CONTAINED WITHIN ’HOLD’
DATE (R0 ISSUE)
IS NOT RELEASED FOR CONSTRUCTION / SHEET DRAWING NO. REV.
FABRICATION. FIELD MUST GET
DRN:AB 16-08-2012
I&C SUJAY NANDI 16-08-2012 DESIGN OFFICE TO CLEAR ’HOLDS’ IN
TIME BEFORE PROCEEDING WITH ANY DATE(CURRENT ISSUE)
MECH --
CONSTRUCTION / FABRICATION WORK
RELATED TO ‘HOLDS’.
CHD:SN
18-10-2012
21 OF 33 TCE.6428A-IC-613-IN-1701 R1

SIZE-A3
APPLICABLE TAG

SL NO. TAG NO. SERVICE PID NO.

FLOW TRANSMITTER P10PAB08CF500 /


Flow of Blowdown from CW/ACW return line
1
to CT Unit#1
P10PAB08CF100
TCE.6428A-613-

FD-1128
P20PAB08CF500 /
2 [SH 03 OF 03]
Flow of Blowdown from CW/ACW return line
to CT Unit#2
P20PAB08CF100

539A
R1
539A
520A
520A 539A
BOM

SR. ITEM DESCRIPTION SIZE MATERIAL UNIT TOTAL

NO NO QTY QTY

BOTH SIDE THREDED CS as per


520A 1/2" NPT(M)
520A 1 IS 1239 Part 1 8 16
HEAVY SCH PIPE X 1 M Long

CS as per IS 1239 4 8
2 530A HEX PLUG, 3000# 1/2" NPT(M)
Part 2
520A
FORGED EQUAL TEE CS as per
3 577A 1/2" NPT(F) 4 8
3000# IS 1239 Part 2
OW 522A
FL
MANUAL GLOBE VALVE ASTM B62/ LTB-2
518A 4 518A 1/2" NPT(F) of IS 318/ A182 4 8
OF 800# RATING WITH
3000# END CONNECTION F316L
3-Way
1/2" O.D. X
Valve 5 514 SEAMLESS TUBE SS304 5 M 10 M
1.6mm THICK
manifold

FORGED 90 DEGREE 1/2" NPT(F) CS as per


6 539A 6 12
ELBOW, 3000# IS 1239 Part 2
522A
577A MALE CONNECTOR 1/2" NPT(M)
ORIFICE ASSEMBLY 510
7 510 4 8
BY 577A 530A WITH DOUBLE (SUITABLE
SS304, 3000#
BY CH COMPRESSION TYPE FOR 1/2"
ME FERRULES & NUT
BY T HP LP OD TUBE)
NS
I R1 522A CS as per
CH BOTH SIDE THREADED 1/2" NPT (M)
ME 8 522A
HEAVY SCH PIPE X 3" LONG
IS 1239 Part 1 6 12
510
518A
514

530A

514

510

DO NOT SCALE
OWNER.

HEL HALDIA ENERGY LIMITED

OWNER’S CONSULTANT.

NOTE: LAHMEYER LAHMEYER INTERNATIONAL (INDIA) PVT. LTD.


INTERNATIONAL
INDIA CONSULTING ENGINEERS, GURGAON, INDIA
1. INSTRUMENT (ORIFICE ASSEMBLY, TRANSMITTER & MANIFOLD) WILL BE FREE SUPPLIED BY PLL. BOP CONTRACTOR.

PUNJ LLOYD LIMITED


2. 3-WAY VALVE MANIFOLD (1/2 "NPTF) WILL BE SUPPLIED ALONG WITH THE INSTRUMENT. GURGAON

BOP CONTRACTOR’S CONSULTANT.

TATA CONSULTING ENGINEERS LIMITED


KOLKATA

PROJECT.
FOR R0 ISSUE ONLY CLEARED
ISSUE REVISIONS DRN APPD DATE FILE NAME :
2 x 300 MW COAL BASED THERMAL
CLEARED CHEM CIVIL ELEC I&C MECH POWER PROJECT AT HALDIA
DEPT SIGNATURE DATE R1 REVISED AS PER CLIENT’S COMMENTS AB SN SB 18-10-2012 ‘P’ (PRELIMINARY) ISSUES ARE NOT TO BE
APPROVED BY
USED FOR CONSTRUCTION / FABRICATION TITLE
BUT ARE ISSUED FOR LIMITED PURPOSES SCALE:NTS
CHEM SB
-- ONLY AS INDICATED IN THE SMALL BLOCK
AT THE TOP RIGHT HAND CORNER OF
HOOK-UP FOR FLOW TRANSMITTER (ORIFICE)
THE TITLE BLOCK. OFFICE-DISC: PROJECT MANAGER
CIVIL -- CONSTRUCTION / FABRICATION WORK IS (CLARIFIED & CW - ACW SERVICE)
PERMITTED ON ‘R’ (RELEASED) ISSUES DK-IC SB
ONLY.
ELEC -- INFORMATION CONTAINED WITHIN ’HOLD’
DATE (R0 ISSUE)
IS NOT RELEASED FOR CONSTRUCTION / SHEET DRAWING NO. REV.
FABRICATION. FIELD MUST GET
DRN:AB 16-08-2012
I&C SUJAY NANDI 16-08-2012 DESIGN OFFICE TO CLEAR ’HOLDS’ IN
TIME BEFORE PROCEEDING WITH ANY DATE(CURRENT ISSUE)
MECH --
CONSTRUCTION / FABRICATION WORK
RELATED TO ‘HOLDS’.
CHD:SN
18-10-2012
22 OF 33 TCE.6428A-IC-613-IN-1701 R1

SIZE-A3
FLOW TRANSMITTER
APPLICABLE TAG

SL NO. TAG NO. SERVICE PID NO.

P00GHC08CF500 / TCE.6428A-ME-640-FD-1112
Flow at DM Water Transfer pumps discharge header line
1 P00GHC08CF100 [Sh 01 of 02]

R1

BOM
539C
539C SR. ITEM DESCRIPTION SIZE MATERIAL UNIT TOTAL
520C
520C 539C NO NO QTY QTY

BOTH SIDE THREADED 1/2" NPTM X ASTM A312 TP304


1 520C 8 8
40S SCH PIPE 1 M LONG

522C BOTH SIDE THREADED 1/2" NPT (M) ASTM A312 TP304
2 6 6
40S SCH PIPE X 3" LONG
520C

FORGED EQUAL TEE


3 577C 1/2" NPT(F) ASTM A182 F304 4 4
520C 3000#

MANUAL GLOBE VALVE


OW 522C 4 518C 1/2" NPT(F) ASTM A182 F304 4 4
FL OF 800# RATING WITH
3000# END CONNECTION
518C
1/2" O.D. X
5 514 SEAMLESS TUBE SS304 5 M 5 M
3-Way 1.6mm THICK

Valve
manifold FORGED 90 DEGREE 1/2" NPT(F) ASTM A182 F304
6 539C 6 6
ELBOW, 3000#

MALE CONNECTOR 1/2" NPT(M)


7 510 WITH DOUBLE 4 4
522C (SUITABLE
577C SS304, 3000#
ORIFICE ASSEMBLY 510 COMPRESSION TYPE FOR 1/2"
BY 577C 530C FERRULES & NUT OD TUBE)

BY CH
ME HEX PLUG,
BY ST HP LP 522C 8 530C 1/2" NPT(M) ASTM A182 F304 4 4
N
I R1 3000#
CH
ME
510
518C

530C
514

510

DO NOT SCALE
OWNER.

HEL HALDIA ENERGY LIMITED


NOTE: OWNER’S CONSULTANT.

LAHMEYER LAHMEYER INTERNATIONAL (INDIA) PVT. LTD.


INTERNATIONAL
1. INSTRUMENT (ORIFICE ASSEMBLY, TRANSMITTER & MANIFOLD) WILL BE FREE SUPPLIED BY PLL. INDIA CONSULTING ENGINEERS, GURGAON, INDIA

BOP CONTRACTOR.
2. 3-WAY VALVE MANIFOLD (1/2 "NPTF) WILL BE SUPPLIED ALONG WITH THE INSTRUMENT.
PUNJ LLOYD LIMITED
GURGAON

BOP CONTRACTOR’S CONSULTANT.

TATA CONSULTING ENGINEERS LIMITED


KOLKATA

PROJECT.
FOR R0 ISSUE ONLY CLEARED
ISSUE REVISIONS DRN APPD DATE FILE NAME :
2 x 300 MW COAL BASED THERMAL
CLEARED CHEM CIVIL ELEC I&C MECH POWER PROJECT AT HALDIA
DEPT SIGNATURE DATE R1 REVISED AS PER CLIENT’S COMMENTS AB SN SB 18-10-2012 ‘P’ (PRELIMINARY) ISSUES ARE NOT TO BE
APPROVED BY
USED FOR CONSTRUCTION / FABRICATION TITLE
BUT ARE ISSUED FOR LIMITED PURPOSES SCALE:NTS
CHEM SB
-- ONLY AS INDICATED IN THE SMALL BLOCK
AT THE TOP RIGHT HAND CORNER OF
HOOK-UP FOR FLOW TRANSMITTER (ORIFICE)
THE TITLE BLOCK. OFFICE-DISC: PROJECT MANAGER
CIVIL -- CONSTRUCTION / FABRICATION WORK IS (DM WATER SERVICE)
PERMITTED ON ‘R’ (RELEASED) ISSUES DK-IC SB
ONLY.
ELEC -- INFORMATION CONTAINED WITHIN ’HOLD’
DATE (R0 ISSUE)
IS NOT RELEASED FOR CONSTRUCTION / SHEET DRAWING NO. REV.
FABRICATION. FIELD MUST GET
DRN:AB 16-08-2012
I&C SUJAY NANDI 16-08-2012 DESIGN OFFICE TO CLEAR ’HOLDS’ IN
TIME BEFORE PROCEEDING WITH ANY DATE(CURRENT ISSUE)
MECH --
CONSTRUCTION / FABRICATION WORK
RELATED TO ‘HOLDS’.
CHD:SN
18-10-2012
23 OF 33 TCE.6428A-IC-613-IN-1701 R1

SIZE-A3

You might also like