Detail-A: SL No. Tag No. Service Pid No
Detail-A: SL No. Tag No. Service Pid No
FD-1128
2 P00PAB01DL101 LEVEL AT CW & ACW FOREBAY
[SH 03 OF 03]
3 P00PAB01DL102 LEVEL AT CW & ACW FOREBAY
LEVEL TRANSMITTER
(TOP MOUNTED)
BOM
501
502
SR. ITEM DESCRIPTION SIZE MATERIAL UNIT TOTAL
FLANGE (HOLD)
BY INST 1 501 3mm FLAT GASKET, 4", 150# 1
CNAF 3
FULL FACE (HOLD)
75X75X8mm GALVANISED
ANGLE (SEE DETAIL-A FOR
MOUNTING DETAILS
ANCHOR BOLT OF THESE ANGLES)
75X75X8mm
GALVANISED ANGLE
INSTRUMENT FLANGE
150
WILL BE MOUNTED HERE.
ANCHOR BOLT
DO NOT SCALE
300
OWNER.
OWNER’S CONSULTANT.
DETAIL-A
INTERNATIONAL
INDIA CONSULTING ENGINEERS, GURGAON, INDIA
BOP CONTRACTOR.
PROJECT.
FOR R0 ISSUE ONLY CLEARED
ISSUE REVISIONS DRN APPD DATE FILE NAME :
2 x 300 MW COAL BASED THERMAL
CLEARED CHEM CIVIL ELEC I&C MECH POWER PROJECT AT HALDIA
DEPT SIGNATURE DATE R1 REVISED AS PER CLIENT’S COMMENTS AB SN SB 18-10-2012 ‘P’ (PRELIMINARY) ISSUES ARE NOT TO BE
APPROVED BY
USED FOR CONSTRUCTION / FABRICATION TITLE
BUT ARE ISSUED FOR LIMITED PURPOSES SCALE:NTS
CHEM SB
-- ONLY AS INDICATED IN THE SMALL BLOCK
AT THE TOP RIGHT HAND CORNER OF
HOOK-UP FOR LEVEL TRANSMITTER
THE TITLE BLOCK. OFFICE-DISC: PROJECT MANAGER
CIVIL -- CONSTRUCTION / FABRICATION WORK IS (CW & ACW FOREBAY)
PERMITTED ON ‘R’ (RELEASED) ISSUES DK-IC SB
ONLY.
ELEC -- INFORMATION CONTAINED WITHIN ’HOLD’
DATE (R0 ISSUE)
IS NOT RELEASED FOR CONSTRUCTION / SHEET DRAWING NO. REV.
FABRICATION. FIELD MUST GET
DRN:AB 16-08-2012
I&C SUJAY NANDI 16-08-2012 DESIGN OFFICE TO CLEAR ’HOLDS’ IN
TIME BEFORE PROCEEDING WITH ANY DATE(CURRENT ISSUE)
MECH --
CONSTRUCTION / FABRICATION WORK
RELATED TO ‘HOLDS’.
CHD:SN
18-10-2012
27 OF 33 TCE.6428A-IC-613-IN-1701 R1
SIZE-A3
APPLICABLE TAG
(TOP MOUNTED)
501
502
4" 150#
BY INST FLANGE
(HOLD)
80m m
BOM
RCC TANK
NOTE: 1. INSTRUMENT WILL BE FREE SUPPLIED BY PLL.
DO NOT SCALE
OWNER.
OWNER’S CONSULTANT.
BOP CONTRACTOR.
PROJECT.
FOR R0 ISSUE ONLY CLEARED
ISSUE REVISIONS DRN APPD DATE FILE NAME :
2 x 300 MW COAL BASED THERMAL
CLEARED CHEM CIVIL ELEC I&C MECH POWER PROJECT AT HALDIA
DEPT SIGNATURE DATE R1 REVISED AS PER CLIENT’S COMMENTS AB SN SB 18-10-2012 ‘P’ (PRELIMINARY) ISSUES ARE NOT TO BE
APPROVED BY
USED FOR CONSTRUCTION / FABRICATION TITLE
BUT ARE ISSUED FOR LIMITED PURPOSES SCALE:NTS
CHEM SB
-- R2 REVISED AS PER CLIENT’S COMMENTS AB SN SB 16-11-2012 ONLY AS INDICATED IN THE SMALL BLOCK
AT THE TOP RIGHT HAND CORNER OF
HOOK-UP FOR LEVEL TRANSMITTER
THE TITLE BLOCK. OFFICE-DISC: PROJECT MANAGER
CIVIL -- CONSTRUCTION / FABRICATION WORK IS (RAW WATER TANK)
PERMITTED ON ‘R’ (RELEASED) ISSUES DK-IC SB
ONLY.
ELEC -- INFORMATION CONTAINED WITHIN ’HOLD’
DATE (R0 ISSUE)
IS NOT RELEASED FOR CONSTRUCTION / SHEET DRAWING NO. REV.
FABRICATION. FIELD MUST GET
DRN:AB 16-08-2012
I&C SUJAY NANDI 16-08-2012 DESIGN OFFICE TO CLEAR ’HOLDS’ IN
TIME BEFORE PROCEEDING WITH ANY DATE(CURRENT ISSUE)
MECH --
CONSTRUCTION / FABRICATION WORK
RELATED TO ‘HOLDS’.
CHD:SN
16-11-2012
28 OF 33 TCE.6428A-IC-613-IN-1701 R2
SIZE-A3
APPLICABLE TAG
LEVEL TRANSMITTER
1/2" O.D. X
3 514 Seamless Tube SS304
1.6mm Thick 3 M 6 M
HP LP
BY BY 510
MECH INST
523C
512 514
3-WAY VALVE MANIFOLD
12
1:
1/2" SW Valve
DO NOT SCALE
METALIC TANK OWNER.
OWNER’S CONSULTANT.
BOP CONTRACTOR.
PROJECT.
FOR R0 ISSUE ONLY CLEARED
ISSUE REVISIONS DRN APPD DATE FILE NAME :
2 x 300 MW COAL BASED THERMAL
CLEARED CHEM CIVIL ELEC I&C MECH POWER PROJECT AT HALDIA
DEPT SIGNATURE DATE R1 REVISED AS PER CLIENT’S COMMENTS AB SN SB 18-10-2012 ‘P’ (PRELIMINARY) ISSUES ARE NOT TO BE
APPROVED BY
USED FOR CONSTRUCTION / FABRICATION TITLE
BUT ARE ISSUED FOR LIMITED PURPOSES SCALE:NTS
CHEM SB
-- ONLY AS INDICATED IN THE SMALL BLOCK
AT THE TOP RIGHT HAND CORNER OF
HOOK-UP FOR LEVEL TRANSMITTER
THE TITLE BLOCK. OFFICE-DISC: PROJECT MANAGER
CIVIL -- CONSTRUCTION / FABRICATION WORK IS (CONDENSATE STORAGE TANK)
PERMITTED ON ‘R’ (RELEASED) ISSUES DK-IC SB
ONLY.
ELEC -- INFORMATION CONTAINED WITHIN ’HOLD’
DATE (R0 ISSUE)
IS NOT RELEASED FOR CONSTRUCTION / SHEET DRAWING NO. REV.
FABRICATION. FIELD MUST GET
DRN:AB 16-08-2012
I&C SUJAY NANDI 16-08-2012 DESIGN OFFICE TO CLEAR ’HOLDS’ IN
TIME BEFORE PROCEEDING WITH ANY DATE(CURRENT ISSUE)
MECH --
CONSTRUCTION / FABRICATION WORK
RELATED TO ‘HOLDS’.
CHD:SN
18-10-2012
29 OF 33 TCE.6428A-IC-613-IN-1701 R1
SIZE-A3