0% found this document useful (0 votes)
48 views2 pages

SAP IBP Real-Time Integration Extend CIF - CCR - STOCK - MODIF BAdI With Refresh Size Parameter

SAP Note 3504024 addresses an issue in SAP IBP where the reconciliation action 'Send to SAP IBP' incorrectly integrates stock items due to a fixed refresh size parameter of 5 in the CIF_CCR_STOCK_MODIF BAdI. To resolve this, users are advised to implement the note and increase the lv_refresh_size parameter. The note is relevant for various SAP software components and includes correction instructions for multiple versions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views2 pages

SAP IBP Real-Time Integration Extend CIF - CCR - STOCK - MODIF BAdI With Refresh Size Parameter

SAP Note 3504024 addresses an issue in SAP IBP where the reconciliation action 'Send to SAP IBP' incorrectly integrates stock items due to a fixed refresh size parameter of 5 in the CIF_CCR_STOCK_MODIF BAdI. To resolve this, users are advised to implement the note and increase the lv_refresh_size parameter. The note is relevant for various SAP software components and includes correction instructions for multiple versions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SAP Note

3504024 - SAP IBP Real-Time Integration: Extend CIF_CCR_STOCK_MODIF BAdI


with refresh size parameter
Component: SCM-IBP-INT-RTI-STK (Supply Chain Management > Integrated Business Planning > Integration
> Real Time Integration > Stock), Version: 1, Released On: 19.09.2024

Symptom
In SAP IBP, the Real-Time Integration: Reconciliation action "Send to SAP IBP" results in incorrect integration of stock
items.

Other Terms
IBP, Real-time integration, RTI, Stock, BAdI, Reconciliation, CCR, Send to IBP, Send to SAP IBP, CIF_REFRESH_STOCK,
CIF_CCR_STOCK_MODIF, CIF_CCR_STOCK_MOD, CCR_STOCK_MOD, refresh size, lv_refresh_size

Reason and Prerequisites


This situation may arise if the following conditions are met:
Stock items at different plants in the external system are mapped to one logical plant in IBP
Plant IDs are modified with BAdI CIF_STOCK_MAP_IBP at stock integration into IBP
Stock keys are modified with BAdI CIF_CCR_STOCK_MODIF at reconciliation
During the reconciliation action "Send to SAP IBP", at CIF_REFRESH_STOCK method, the lv_refresh_size parameter has a
fix value 5. This means that maximum 5 stock items will be processed in one block. If there are more than 5 plants that need
to be mapped to 1 plant, the result may be incorrect.

Solution
Implement this note and increase the lv_refresh_size in BAdI CIF_CCR_STOCK_MODIF.

Attributes
Key Value

Other Supply Chain Management > Advanced Planning and Optimization > Interfaces > CIF Compare and Refresh >
Components Stock (SCM-APO-INT-CCR-STK)

Other Supply Chain Management > Advanced Planning and Optimization > Interfaces > Stock (SCM-APO-INT-STK)
Components

Software Components
Software Component From To And subsequent

SAP_APPL 604 604

SAP_APPL 605 605

SAP_APPL 606 606

SAP_APPL 617 617

SAP_APPL 618 618

S4CORE 102 102

S4CORE 103 103

S4CORE 104 104

S4CORE 105 105

S4CORE 106 106


S4CORE 107 107

S4CORE 108 108

Correction Instructions
Software Component Number of Correction Instructions

SAP_APPL 5

S4CORE 7

Support Package
Software Component Version Support Package

S4CORE 102 SAPK-10215INS4CORE

S4CORE 103 SAPK-10313INS4CORE

S4CORE 104 SAPK-10411INS4CORE

S4CORE 105 SAPK-10509INS4CORE

S4CORE 106 SAPK-10607INS4CORE

S4CORE 107 SAPK-10705INS4CORE

S4CORE 108 SAPK-10803INS4CORE

SAP_APPL 604 SAPKH60427

SAP_APPL 605 SAPKH60524

SAP_APPL 606 SAPKH60635

SAP_APPL 617 SAPKH61729

SAP_APPL 618 SAPK-61823INSAPAPPL

You might also like