0% found this document useful (0 votes)
40 views2 pages

Civil Method Statement Schedule

The document outlines the method statement schedule for the construction of a residential development comprising 312 units in Dubai. It includes a detailed list of method statements for various construction activities, their submission and approval dates, and the status of each item. Additionally, it provides a prequalification process for suppliers related to different construction materials and works required for the project.

Uploaded by

HQHome
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views2 pages

Civil Method Statement Schedule

The document outlines the method statement schedule for the construction of a residential development comprising 312 units in Dubai. It includes a detailed list of method statements for various construction activities, their submission and approval dates, and the status of each item. Additionally, it provides a prequalification process for suppliers related to different construction materials and works required for the project.

Uploaded by

HQHome
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

CONSTRUCTION OF RESIDENTIAL DEVELOPMENT (312 UNITS) @ THE VALLEY WEST TH03 VELORA 2, DUBAI (D-489)

CIVIL METHOD STATEMENT SCHEDULE

METHOD STATEMENT SUBMITTAL PROCESS


SNO ITEM DESCRIPTION
UNIFIER REF. NO. BL SUBMISSION DATE BL APPROVAL DATE ACTUAL SUBMISSION DATE ACTUAL APPROVAL DATE STATUS COMMENTS

1 Method Statement Of Moblization Work 1 11-Mar-25 25-Mar-25

2 Method Statement Of Excavation & Backfilling Works 1 11-Mar-25 25-Mar-25

3 Method Statement On The Application Of Anti-Termite 1 13-Mar-25 27-Mar-25

4 Method Statement On Application Of Waterproofing For Substructure 2 17-Mar-25 31-Mar-25

5 Method Statement On Concreting Works 1 19-Mar-25 02-Apr-25

6 Method Statement On The Concrete Repair Works 21-Mar-25 04-Apr-25

7 Method Statement On Laying Of Block Works (Solid, Hollow, Aac Block And Thermal Insulated Block) 2 25-Mar-25 08-Apr-25

8 Method Statement On The Application Plastering Works 2 27-Mar-25 10-Apr-25

9 Method Staement On The Application Of Waterproofing For Wet Areas 31-Mar-25 14-Apr-25

10 Method Statement On The Installation Of Tiling Works (Porcelain And Stone ) 02-Apr-25 16-Apr-25

11 Method Statement On The Application Of Painting Works For Wall & Ceiling (Internal) 04-Apr-25 18-Apr-25

12 Method Statement On The Application Of Painting Works For External 08-Apr-25 22-Apr-25

13 Method Statement On The Application Of Epoxy Painting Works For Floor 10-Apr-25 24-Apr-25

14 Method Statement On The Installation Of Suspended False Ceiling Works 14-Apr-25 28-Apr-25

15 Method Statement On The Installation Cement Board Cladding 16-Apr-25 30-Apr-25

16 Method Statement On The Application Of Combo Waterproofing System 18-Apr-25 02-May-25

17 Method Statement On The Application Of Grp Lining 22-Apr-25 06-May-25

18 Method Statement On The Installation Of Aluminum , Glazing , Railing And Ballustrade Works 24-Apr-25 08-May-25

19 Method Statement On The Installation Of Canopy And Pergola 28-Apr-25 12-May-25

20 Method Statement On The Installation Of Wooden Joinery Works ( Wardrobe And Kitchen Cabinet) 30-Apr-25 14-May-25

21 Method Statement On The Installation Of Wooden Wooden Doors 02-May-25 16-May-25

22 Method Statement On The Installation Of Vanity Counter And Mirror 06-May-25 20-May-25

23 Method Statement On Installation Of WPC Works 08-May-25 22-May-25

24 Method Statement On The Installation Of Metal Fence And Gate 12-May-25 26-May-25

25 Method Statement On The Installation Of Retractable Ladder 14-May-25 28-May-25

26 Method Statement On The Installation Metal Doors 16-May-25 30-May-25

27 Method Statement On The Installation Of Roof Access Hatch Door 20-May-25 03-Jun-25

28 Method Statement On The Installation Of Toilet Cubicle 22-May-25 05-Jun-25

29 Method Statement On The Installation Of Interlock Paving Blocks 26-May-25 09-Jun-25

30 Method Statement On The Sanitaryware And Accessories 28-May-25 11-Jun-25

31 Method Statement On The Construction Of Swimming Pool And Features 30-May-25 13-Jun-25

32 Installation And Gravity Test Of Underground & Above Ground Drainage System 28-Mar-25 11-Apr-25

33 Installation And Testing Of Domestic Water Supply Piping System (Upvc, Ppr, Pex Pipes And Fittings) 07-Apr-25 21-Apr-25

34 Installation And T&C Of Duct Work , Accessories And Ac Equipment(Pre Insulated Phenolic Duct And Gi Duct) 15-Apr-25 29-Apr-25

35 Method Statement For Installation And T&C Of Solar Water Heater 15-Apr-25 29-Apr-25

36 Method Of Statement For Hvac T&C 15-Apr-25 29-Apr-25

37 Method Statement For Installation, Testing And Commissioning Of Water Booster Pumps 15-Apr-25 29-Apr-25

38 Installation Of Pvc Conduits And G.I Boxes 07-Apr-25 21-Apr-25

39 Installation Of Cable Tray And Trunking. 07-Apr-25 21-Apr-25

40 Method Statement For Distribution Board System (Installation, Testing And Commissioning). 15-Apr-25 29-Apr-25

41 Installation, Testing And Commissioning For Fire Alarm And Voice Evacuation System 15-Apr-25 29-Apr-25

42 Method Statement For Installation, Testing Commissioning Of Scs System 15-Apr-25 29-Apr-25

43 Method Statement For Installation, Testing And Commissioning Of Intercom System 15-Apr-25 29-Apr-25
CONSTRUCTION OF RESIDENTIAL DEVELOPMENT (312 UNITS) @ THE VALLEY WEST TH03 VELORA 2, DUBAI (D-489)
PREQUALIFICATION
PREQUALIFICATION SUBMITTAL PROCESS
SNO ITEM DESCRIPTION NAME OF SUPPLIERS
BL SUBMISSION
UNIFIER REF. NO. BL APPROVAL DATE ACTUAL SUBMISSION ACTUAL APPROVAL STATUS COMMENTS
DATE DATE DATE
EXTERNAL ITEMS
ANTI-TERMITE WORKS
PRECAST CONCRETE KERB AND INTERLOCK PAVING BLOCKS
GARBAGE BINS AND TROLLEY
CONCRETING WORKS
ANTI-TERMITE WORKS
READY MIXED CONCRETE
RENIFORCEMENT BARS
THERMAL & MOISTURE PROTECTION
WATERPROOFING WORKS (Substructure/Wet Areas/Roof Areas)
GRP LINING (UG Water Tank Inner Wall)
MISCELLANEOUS STEEL ITEMS
GATE & FENCE
BALCONY HANDRAIL
STAIRCASE HANDRAIL
ENTRANCE PERGOLA
RETRACTABLE LADDER
ACCESS HATCH DOOR
CAT LADDER
DOORS/CLADDING/ENVELOPING
ALUMINIUM & GLAZING DOORS & WINDOWS (with Hardwares)
TIMBER DOORS & FOLDING DOORS
IRONMONGERY (FOR TIMBER DOORS)
WOODEN PLASTIC COMPOSITE (WPC)
ARCHITECTURAL FINISHES
KITCHEN CABINETS/WARDROBES/VANITY/WALL CABINETS
CUBICLE PARTITION
PAINTING WORKS (INTERIOR & EXTERIOR)
MIRRORS
SUSPENDED FALSE CEILING
GLAZED SHOWER PARTITION
STONE WORKS (MARBLE/GRANITE)
PORCELAIN TILES
KITCHEN APPLIANCES
MECHANICAL WORKS
LPG SYSTEM
FIRE FIGHTING SYSTEM
SANITARY FIXTURES & SANITARY WARES
MEP DIVISION FOR MEP WORKS
ELECTRICAL WORKS
LV SWITCH GEAR & METER CABINET
LOW CURRENT SYSTEM
LIGHT FITTINGS
WIRING ACCESSORIES