Pearl Jupiter - Class Status Report
Pearl Jupiter - Class Status Report
NK-SHIPS
Survey and/or Audit Status, History and Particulars Information Service
PEARL JUPITER
Class No. NK 141420
IMO No. 9695872
Printed on 13.Sep.2024
NK-SHIPS information is solely provided for the convenience of owners or managers as a guide to their ship's survey and/or
audit status and in no way substitutes for formal advice from ClassNK Society.
Neither the society, nor any of its employees, assumes any responsibility for the accuracy, or legal liability for any loss or
damage that may be sustained as a result of using this service.
For further details, refer to http://www.classnk.or.jp/hp/pdf/Rules_Guidance/archive/auth/ERCND.pdf
NK-SHIPS: Particulars of Ship
Name of Ship: PEARL JUPITER Class No. :N
NK 141420
IMO No. : 9695872
Particulars
Ship Status: --
No of Passengers: --
Capacity of Tanks (m3): FO 166.00 FW 150.00
No. & Kind of Engines: 2DE : 4 SA 6 CY
- Bore x Stroke (mm): 210.0 x 290.0
- Power (kW): 1,766 (883 x 2)
- Revolution (rpm): 850.0
- Manufacturer: YANMAR CO., LTD. MANUFACTURAING MANAGEMENT DEP
T.
No. & Kind of Boilers: --
- Pressure (MPa): --
- Evaporation (t/h): --
- Manufacturer: --
*Evaporation rate: Thermal output (kW) is shown for TOH (Thermal Oil Heater).
- to be continued -
General
- to be continued -
Kind of Survey Status Due Date Range Date Postponed Last Date
OPP Annual Survey -- 29 Dec 2024 - 29 Jun 2025 -- --
SPP Renewal Survey 29 Mar 2029 -- -- 03 Apr 2024
APP Renewal Survey 29 Mar 2029 -- -- 03 Apr 2024
APP Intermediate Svy -- 29 Dec 2025 - 29 Jun 2026 -- --
-- or 29 Dec 2026 - 29 Jun 2027 -- --
APP Annual Survey -- 29 Dec 2024 - 29 Jun 2025 -- --
AFS Periodical Survey 02 Apr 2027 -- -- 03 Apr 2024
Condition
1. Class Survey
Condition of Class
Nil.
2. Installation Survey
Condition of Installation
Nil.
3. Statutory Survey
Statutory Condition
Nil.
- to be continued -
System applied: CMS: Continuous Machinery Survey (Part B, 9.1.2), PMS: Planned Machinery Maintenance Scheme
(Part B, 9.1.3), CBM: Condition Based Maintenance Scheme (Part B, 9.1.4),
System: In addition to the above, CBM* is as follows;
CBM*: Condition Monitoring Maintenance Method under PMS (Part B, 9.1.3-2)
Ap.: Applicable kind of examination as 1: X/E/G, 2: X or E, 3: X only, 4(for CBM/CBM*): V or O
Ex.: X: Open-up examination, G: Examination in working condition and/or externally by Surveyor,
(Kind of Examination) E: Overhaul inspection by Chief Engineer and confirmation by Surveyor, P: Postponed,
V: Verification of monitoring record, O: Verification of monitoring record and open-up examination
Confirmatory Survey: This item should be subject to Chief Engineer's overhaul inspection by the Due Date designated on
this Status and be subject to Society's Confirmatory Survey by next Periodical Survey.
Upon Confirmatory Survey, the Due Date is updated.
Ex.by C/E: Year and month of overhaul inspection by qualified Chief Engineer
NK-SHIPS Information Service
NIPPON KAIJI KYOKAI 11:31 13 Sep 2024
Page 6 of 13
NK-SHIPS: Survey Status - Planned Machinery Survey
Name of Ship: PEARL JUPITER Class No. : NK 141420
IMO No. : 9695872
- to be continued -
System applied: CMS: Continuous Machinery Survey (Part B, 9.1.2), PMS: Planned Machinery Maintenance Scheme
(Part B, 9.1.3), CBM: Condition Based Maintenance Scheme (Part B, 9.1.4),
System: In addition to the above, CBM* is as follows;
CBM*: Condition Monitoring Maintenance Method under PMS (Part B, 9.1.3-2)
Ap.: Applicable kind of examination as 1: X/E/G, 2: X or E, 3: X only, 4(for CBM/CBM*): V or O
Ex.: X: Open-up examination, G: Examination in working condition and/or externally by Surveyor,
(Kind of Examination) E: Overhaul inspection by Chief Engineer and confirmation by Surveyor, P: Postponed,
V: Verification of monitoring record, O: Verification of monitoring record and open-up examination
Confirmatory Survey: This item should be subject to Chief Engineer's overhaul inspection by the Due Date designated on
this Status and be subject to Society's Confirmatory Survey by next Periodical Survey.
Upon Confirmatory Survey, the Due Date is updated.
Ex.by C/E: Year and month of overhaul inspection by qualified Chief Engineer
NK-SHIPS Information Service
NIPPON KAIJI KYOKAI 11:31 13 Sep 2024
Page 7 of 13
NK-SHIPS: Survey Status - Planned Machinery Survey
Name of Ship: PEARL JUPITER Class No. : NK 141420
IMO No. : 9695872
- to be continued -
System applied: CMS: Continuous Machinery Survey (Part B, 9.1.2), PMS: Planned Machinery Maintenance Scheme
(Part B, 9.1.3), CBM: Condition Based Maintenance Scheme (Part B, 9.1.4),
System: In addition to the above, CBM* is as follows;
CBM*: Condition Monitoring Maintenance Method under PMS (Part B, 9.1.3-2)
Ap.: Applicable kind of examination as 1: X/E/G, 2: X or E, 3: X only, 4(for CBM/CBM*): V or O
Ex.: X: Open-up examination, G: Examination in working condition and/or externally by Surveyor,
(Kind of Examination) E: Overhaul inspection by Chief Engineer and confirmation by Surveyor, P: Postponed,
V: Verification of monitoring record, O: Verification of monitoring record and open-up examination
Confirmatory Survey: This item should be subject to Chief Engineer's overhaul inspection by the Due Date designated on
this Status and be subject to Society's Confirmatory Survey by next Periodical Survey.
Upon Confirmatory Survey, the Due Date is updated.
Ex.by C/E: Year and month of overhaul inspection by qualified Chief Engineer
NK-SHIPS Information Service
NIPPON KAIJI KYOKAI 11:31 13 Sep 2024
Page 8 of 13
NK-SHIPS: Survey Status - Planned Machinery Survey
Name of Ship: PEARL JUPITER Class No. : NK 141420
IMO No. : 9695872
- to be continued -
System applied: CMS: Continuous Machinery Survey (Part B, 9.1.2), PMS: Planned Machinery Maintenance Scheme
(Part B, 9.1.3), CBM: Condition Based Maintenance Scheme (Part B, 9.1.4),
System: In addition to the above, CBM* is as follows;
CBM*: Condition Monitoring Maintenance Method under PMS (Part B, 9.1.3-2)
Ap.: Applicable kind of examination as 1: X/E/G, 2: X or E, 3: X only, 4(for CBM/CBM*): V or O
Ex.: X: Open-up examination, G: Examination in working condition and/or externally by Surveyor,
(Kind of Examination) E: Overhaul inspection by Chief Engineer and confirmation by Surveyor, P: Postponed,
V: Verification of monitoring record, O: Verification of monitoring record and open-up examination
Confirmatory Survey: This item should be subject to Chief Engineer's overhaul inspection by the Due Date designated on
this Status and be subject to Society's Confirmatory Survey by next Periodical Survey.
Upon Confirmatory Survey, the Due Date is updated.
Ex.by C/E: Year and month of overhaul inspection by qualified Chief Engineer
NK-SHIPS Information Service
NIPPON KAIJI KYOKAI 11:31 13 Sep 2024
Page 9 of 13
NK-SHIPS: Survey Status - Planned Machinery Survey
Name of Ship: PEARL JUPITER Class No. : NK 141420
IMO No. : 9695872
- to be continued -
System applied: CMS: Continuous Machinery Survey (Part B, 9.1.2), PMS: Planned Machinery Maintenance Scheme
(Part B, 9.1.3), CBM: Condition Based Maintenance Scheme (Part B, 9.1.4),
System: In addition to the above, CBM* is as follows;
CBM*: Condition Monitoring Maintenance Method under PMS (Part B, 9.1.3-2)
Ap.: Applicable kind of examination as 1: X/E/G, 2: X or E, 3: X only, 4(for CBM/CBM*): V or O
Ex.: X: Open-up examination, G: Examination in working condition and/or externally by Surveyor,
(Kind of Examination) E: Overhaul inspection by Chief Engineer and confirmation by Surveyor, P: Postponed,
V: Verification of monitoring record, O: Verification of monitoring record and open-up examination
Confirmatory Survey: This item should be subject to Chief Engineer's overhaul inspection by the Due Date designated on
this Status and be subject to Society's Confirmatory Survey by next Periodical Survey.
Upon Confirmatory Survey, the Due Date is updated.
Ex.by C/E: Year and month of overhaul inspection by qualified Chief Engineer
NK-SHIPS Information Service
NIPPON KAIJI KYOKAI 11:31 13 Sep 2024
Page 10 of 13
NK-SHIPS: Survey Status - Planned Machinery Survey
Name of Ship: PEARL JUPITER Class No. : NK 141420
IMO No. : 9695872
- to be continued -
System applied: CMS: Continuous Machinery Survey (Part B, 9.1.2), PMS: Planned Machinery Maintenance Scheme
(Part B, 9.1.3), CBM: Condition Based Maintenance Scheme (Part B, 9.1.4),
System: In addition to the above, CBM* is as follows;
CBM*: Condition Monitoring Maintenance Method under PMS (Part B, 9.1.3-2)
Ap.: Applicable kind of examination as 1: X/E/G, 2: X or E, 3: X only, 4(for CBM/CBM*): V or O
Ex.: X: Open-up examination, G: Examination in working condition and/or externally by Surveyor,
(Kind of Examination) E: Overhaul inspection by Chief Engineer and confirmation by Surveyor, P: Postponed,
V: Verification of monitoring record, O: Verification of monitoring record and open-up examination
Confirmatory Survey: This item should be subject to Chief Engineer's overhaul inspection by the Due Date designated on
this Status and be subject to Society's Confirmatory Survey by next Periodical Survey.
Upon Confirmatory Survey, the Due Date is updated.
Ex.by C/E: Year and month of overhaul inspection by qualified Chief Engineer
NK-SHIPS Information Service
NIPPON KAIJI KYOKAI 11:31 13 Sep 2024
Page 11 of 13
NK-SHIPS: Survey Status - Planned Machinery Survey
Name of Ship: PEARL JUPITER Class No. : NK 141420
IMO No. : 9695872
- to be continued -
System applied: CMS: Continuous Machinery Survey (Part B, 9.1.2), PMS: Planned Machinery Maintenance Scheme
(Part B, 9.1.3), CBM: Condition Based Maintenance Scheme (Part B, 9.1.4),
System: In addition to the above, CBM* is as follows;
CBM*: Condition Monitoring Maintenance Method under PMS (Part B, 9.1.3-2)
Ap.: Applicable kind of examination as 1: X/E/G, 2: X or E, 3: X only, 4(for CBM/CBM*): V or O
Ex.: X: Open-up examination, G: Examination in working condition and/or externally by Surveyor,
(Kind of Examination) E: Overhaul inspection by Chief Engineer and confirmation by Surveyor, P: Postponed,
V: Verification of monitoring record, O: Verification of monitoring record and open-up examination
Confirmatory Survey: This item should be subject to Chief Engineer's overhaul inspection by the Due Date designated on
this Status and be subject to Society's Confirmatory Survey by next Periodical Survey.
Upon Confirmatory Survey, the Due Date is updated.
Ex.by C/E: Year and month of overhaul inspection by qualified Chief Engineer
NK-SHIPS Information Service
NIPPON KAIJI KYOKAI 11:31 13 Sep 2024
Page 12 of 13
NK-SHIPS: Survey Status - Planned Machinery Survey
Name of Ship: PEARL JUPITER Class No. : NK 141420
IMO No. : 9695872
System applied: CMS: Continuous Machinery Survey (Part B, 9.1.2), PMS: Planned Machinery Maintenance Scheme
(Part B, 9.1.3), CBM: Condition Based Maintenance Scheme (Part B, 9.1.4),
System: In addition to the above, CBM* is as follows;
CBM*: Condition Monitoring Maintenance Method under PMS (Part B, 9.1.3-2)
Ap.: Applicable kind of examination as 1: X/E/G, 2: X or E, 3: X only, 4(for CBM/CBM*): V or O
Ex.: X: Open-up examination, G: Examination in working condition and/or externally by Surveyor,
(Kind of Examination) E: Overhaul inspection by Chief Engineer and confirmation by Surveyor, P: Postponed,
V: Verification of monitoring record, O: Verification of monitoring record and open-up examination
Confirmatory Survey: This item should be subject to Chief Engineer's overhaul inspection by the Due Date designated on
this Status and be subject to Society's Confirmatory Survey by next Periodical Survey.
Upon Confirmatory Survey, the Due Date is updated.
Ex.by C/E: Year and month of overhaul inspection by qualified Chief Engineer
NK-SHIPS Information Service
NIPPON KAIJI KYOKAI 11:31 13 Sep 2024
Page 13 of 13