0% found this document useful (0 votes)
19 views7 pages

KK

The document outlines a detailed bill of quantities and estimate for a construction project, including various materials and their costs. The total estimated cost for materials, labor, and management is $188,500.00, with specific breakdowns for finishes, block work, formwork, deck, aggregate, fill, and services included.

Uploaded by

jaquilla.ambrose
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views7 pages

KK

The document outlines a detailed bill of quantities and estimate for a construction project, including various materials and their costs. The total estimated cost for materials, labor, and management is $188,500.00, with specific breakdowns for finishes, block work, formwork, deck, aggregate, fill, and services included.

Uploaded by

jaquilla.ambrose
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

BILL OF QUANTITIES & ESTIMATE

Item Quantity Unit Unit Cost Material Price

Column 1 Column 2 Column 3 Column 4 Column 5


Finishes Column 1 Column 2 Column 3 Column 4
internal doors (36" wooden panel doors) 2 no $ 300.00 $ 600.00
internal door frame (aluminium) 2 no $ 170.00 $ 340.00
external doors (56" steel door) 1 no $ 5,800.00 $ 5,800.00
ceiling area (gypsum) 700 sf $ 8.00 $ 5,600.00
windows (4x4 Steel) 4 no $ 800.00 $ 3,200.00
windows (2x2 steel) 2 no $ 250.00 $ 500.00
windows (1x1 steel) 1 no $ 350.00 $ 350.00
paint 10 gal $ 260.00 $ 2,600.00
tile for master bedroom 238 sf $ 15.00 $ 3,570.00
tile for bedroom #2 286 sf $ 15.00 $ 4,290.00
toilet (bowl, tank, seat) 1 no $ 1,500.00 $ 1,500.00
shower (mixer set) 1 no $ 1,540.00 $ 1,540.00
kitchen sink/ foscet 1 no $ 1,200.00 $ 1,200.00
sink/foscet (vanity) 1 no $1,200.00 $ 1,200.00
bathroom decor (towel, paper, & robe holder) 1 sum $750 $ 750.00
bathroom drainage 1 no $310 $ 310.00
total $ 33,350.00

Blocks Column 1 Column 2 Column 3 Column 4


block work - Wall 4x8x16 (concrete) 500 no $ 6.50 $ 3,250.00
$ -
total $ 3,250.00

Formwork
4x8 cons ply 10 no $ 310.00 $ 3,100.00
2X2X10 Lumber 10 no $ 22.00 $ 440.00
concrete nails (2" 1/2") 2 box $ 40.00 $ 80.00
total $ 3,620.00

Deck
deck pan 15 no $ 435.00 $ 6,525.00
corrugated steel 6 no $ 495.00 $ 2,970.00
brc wire 1680 sq.ft $ 12.08 $ 20,294.40
total $ 29,789.40

Aggregate & Fill


sand 10 yard $ 370.00 $ 3,700.00
gravel 2 load $ 2,300.00 $ 4,600.00
cement 70 bags $ 53.00 $ 3,710.00
total $ 12,010.00

Services
electrical 1 item $ - $ -
plumbing 1 item $ - $ -
$ -
total $ -
Material $ 100,000.00
Labor $ 68,500.00
Discounted Management $ 20,000.00
Total $ 188,500.00
TOTAL $ 188,500.00
Package Duration No.of Men Rate (labour) Rate (tools)
(Days) (No.)

Preliminaries Column 1 Column 2 Column 3 Column 4


remodel steel work - columns 3 2 $400.00 $0.00
steel work - top beam 5 2 $400.00 $0.00
formwork - columns 3 2 $400.00 $0.00
formwork - top beam 4 2 $400.00 $0.00
mobilization - steel, bricks, sand
5 4 $300.00 $0.00
and lumber

Casting Column 1 Column 2 Column 3 Column 4


cast columns 2 4 $400.00 $0.00
finish casting ground floor 1 3 $400.00 $0.00
cast top beam 1 6 $400.00 $0.00
cast deck pan - first floor 4 6 $400.00 $0.00
cast lintel (window & doors) 2 2 $400.00 $0.00

Services Column 1 Column 2 Column 3 Column 4


Electrical 5 2 $400.00 $0.00
Plumbing 4 2 $400.00 $0.00
Block work 6 3 $400.00 $0.00
Plastering (exterior & interior) 4 4 $400.00 $0.00

Finishes Column 1 Column 2 Column 3 Column 4


Painting 3 1 $500.00 $0.00
Tiling 4 1 $500.00 $0.00
Ceiling 6 1 $500.00 $0.00
Windows & Doors 2 2 $400.00 $0.00
Install Cupboards, Closets, &
3 1 $500.00 $0.00
Countertop
Labor Total
Total

Column 5
$2,400.00
$4,000.00
$2,400.00
$3,200.00
$6,000.00

Column 5
$3,200.00
$1,200.00
$2,400.00
$9,600.00
$1,600.00

Column 5
$4,000.00
$3,200.00
$7,200.00
$6,400.00

Column 5
$1,500.00
$2,000.00
$3,000.00
$1,600.00
$1,200.00
$66,100.00