Ambf Computation

The document outlines the calculations for the Allowable Maximum Building Footprint (AMBF), Percentage of Site Occupancy (PSO), Maximum Allowable Impervious Surface Area (ISA), Minimum Unpaved Surface Area (USA), and Maximum Allowable Construction Area (MACA) for a property with a total land area of 6597 sqm. The AMBF is calculated to be 5237.2 sqm, while the PSO is 79%, exceeding the maximum allowable of 70%. Additionally, the ISA is 7.6% and the USA is 67%, both of which meet the commercial requirements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views2 pages

Ambf Computation

The document outlines the calculations for the Allowable Maximum Building Footprint (AMBF), Percentage of Site Occupancy (PSO), Maximum Allowable Impervious Surface Area (ISA), Minimum Unpaved Surface Area (USA), and Maximum Allowable Construction Area (MACA) for a property with a total land area of 6597 sqm. The AMBF is calculated to be 5237.2 sqm, while the PSO is 79%, exceeding the maximum allowable of 70%. Additionally, the ISA is 7.6% and the USA is 67%, both of which meet the commercial requirements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

AMBF COMPUTATION

1. Total Land Area (TLA): 6597 sqm, as per the Transfer Certificate of Title
2. Allowable Maximum Building Footprint (AMBF):
AMBF = TLA – Land area required for yard and court
=6597 – (front + left +right +rear)
= 6597 – (661.44 + 119.39 + 390.25 + 188.72)
AMBF = 5237.2 sqm
3. Percentage Of Site Occupancy (PSO):
PSO = AMBF/TLA
= 5237.2 / 6597
PSO = 79%
(As per Table Vlll.1, the Maximum Allowable PSO is 70% of TLA without firewall)
New AMBF
PSO = AMBF / TLA
70% =AMBF / 6597
AMBF = 4617.9 sqm
4. MAXIMUM ALLOWABLE IMPERVIOUS SURFACE AREA (ISA):
ISA = 500 / 6597
ISA = 7.6%
(As per Table Vlll.1, the Maximum Allowable ISA for commercial is 10% of TLA if 70% without
firewall)
5. MINIMUM UNPAVED SURFACE AREA (USA):
USA = (6597 – 500 – 1709) / 6597
USA = 67%
(As per Table Vlll.1, the Minimum USA for commercial is 10% of TLA if 70% without firewall)
6. MAXIMUM ALLOWABLE CONSTRUCTION AREA (MACA):
MACA = PSO + ISA
MACA = 70 + 7.6
MACA = 77.6%
A B C D E F G H I J K L M
39000
3000
D
4000 4000 4000 4000 4000 4000 4000 3000 5000
D
3 2

EXIT ENTRANCE 1

4500
CONCRETE BLEACHERS

4500
HALLWAY
3
STAGE STEPS

6000
4

ENTRANCE

4000
D
1
STAGE
STRUCTURE

37000
CONCRETE COURT PAVEMENT
5

6000
STAGE STEPS

4000 4000
6

4500
HALLWAY

CONCRETE BLEACHERS
7

4500
1 FLOOR PLAN 8

3000
A04 Scale 1: 250 D EXIT
3 HALLWAY

D ENTRANCE

9
D D 5
4 4

D
D D
6
D D D D D D D D D D D PWD'S 2
6 6 6 6 6 6 6 6 6 6 6 6 D
MEN'S WOMEN'S D RESTROOM 7

3800
7
RESTROOM RESTROOM
1800

1000
W
1
3000
W
1
4000
W
1
4000
W
1
4000 4000
W
1
1850 W
1
4000
10

CORPUZ, SUNSHINE E PROJECT TITLE: SHEET CONTENT:


PRC NO.: VALIDITY:
A04
UAP-IAPOA NO.: OR. NO DATE: PROPOSED COVERED FLOOR PLAN
PTR. NO.: DATE ISSUED:
BASKETBALL COURT
SO. KINALAPAN, PINGIT, BALER, AURORA