Hardware Level 3

The document outlines a project plan for optimizing and reorganizing network infrastructure, detailing phases, activities, durations, and required manpower. It includes specifications for hardware and software needed for the infrastructure, along with estimated costs and a client support mechanism. Additionally, it emphasizes the importance of preventive maintenance, repair work, and continuous improvement for effective network management.

Uploaded by

Jemal Seid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views8 pages

Hardware Level 3

The document outlines a project plan for optimizing and reorganizing network infrastructure, detailing phases, activities, durations, and required manpower. It includes specifications for hardware and software needed for the infrastructure, along with estimated costs and a client support mechanism. Additionally, it emphasizes the importance of preventive maintenance, repair work, and continuous improvement for effective network management.

Uploaded by

Jemal Seid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

HARED WARE AND NETWORKING

ASSIGMENT

Task 1- Planning and Organizing Project work

Contents

1. Phases of the project


2. Activities to be performed.
3. Duration for each activity.
4. Required man power and responsible body.

1-: Phases of the project

Pha Topic
se
A Analyze the existing LAN/WAN Phase A completion
infrastructure time
B Prepare a proposal for the optimization / Phase B starts after
reorganization and development of the the ending of phase
network infrastructures. A

C Making the initial deployment plan Phase C starts after


including costing, duration and the end of Phase B
resources and outline a preliminary list or Phase A or can
of network equipment’s essential for run simultaneously
network establishment; with phase B

D Prepare a training plan for IT staff for After finishing the


the network deployment and phase C Phase D
maintenance starts
E Network deployment stages. Phase E starts after
the phase D

F Establishment of network monitoring Phase F can be kept Final auditing report Time table six is
and auditing cell and feed back report monitoring and will be submitted reserved for the
for further improvement. auditing while after the phase F and fixing the problems
deployment phase E before the starting of found in auditing.
going on by a audit phase G
team on site
G Documentation of the network and final This phase starts
handover to the project. after the phase F

2:-Activities to be performed

This is containing in project phase in topics.

Analyze the existing LAN/WAN infrastructure of the organization.

1. Analyze existing LAN and WAN infrastructure report, prepared by Information-


Analytical Department of the government and examine the government’s requirements.
2. Preparing solution for urgent temporary merging of existing LAN/WANs to meet the
government’s requirements.
3. Prepare a final assessment report based on the analysis of the existing network.

Prepare a proposal for the optimization / reorganization and development of the data
infrastructure:

1. Analyze the market of local communications (lines) owners/providers and


2. Propose a viable solution for communications link setup across the country.
3. Calculating the estimated cost of the network optimization / reorganization and
deployment.
4. Outline a preliminary list of network equipments essential for network establishment;
Submitting a complete project plan to Government for approval

Prepare training plan for IT staff for deployment and maintenance:

For IT support and Network Administrators

1. Plan a short term local training for IT specialists on network installation/support,


calculate estimated cost of trainings.
2. Communicate with the Head hunting firms for the required experts and consultants.

3:-Duration for each activity

This is containing in project phase in different time tables.

First 1 day: - for surveying the project site and proposing

Second 5 days: - will be purchasing of devices and equipment’s

Third 7 days: - for Trucking

Forth 6 days: - for Cabling

Fifth 3 days: - for Crimping


Sixth 9 days: - for Configuration of client and server

4:-Required man power and Responsible body

Network technicians, Network Engineers, who assist man power for drilling the wall etc.

15 daily labors for trunk and cabling

3 IT officers for crimping and installation and configuration purpose

1 IT manager for the Management of the project and will Responsible for the technical works.

Task2.Identifying Network and Internet Infrastructure resources

Servers Brand name of Capacity


manufacture
Database Server Dell 8GB RAM.
Application Server “ 8GB RAM.
Mail Server “ 8GB RAM.
Web server “ 8GB RAM.

1. Hardware needed to built the infrastructure


 Servers

Database Server, Application Server, Mail Server, Web server, Storage Server. Servers should
have above 8GB RAM.

 Router
 RACK
 Distribution /multilayer switch
 Access switch
 Patch panel,
 Module(jack),outlet and faceplate
 Cables
o UTP CAT6:-User cordcable are used for connect from the user to the outlet.
o UTP CAT6:-Patch cord cable are used for connect from the patch panel to the
switch.
o Fiber cable:-is used for connect from ISP to EPON.
 Network toolkits

Network toolkits are crimper, pancher, cutter, Cordless, drill with number 8 and number 22.

2. Software needed to build the infrastructure


Microsoft exchange server 2010 or latest for centralized messaging system Kaspersky server
based antivirus for server virus protection

Windows Server 2008, Windows 7, MS office 2010SQL server.

Type of internet connectivity needed to build the infrastructure.

Internet connectivity from telecommunication infrastrucre is EPON.

EPON abbreviated Ethernet Passive Optical Network. Since the project needed 4Mbps.

Estimate price of listed hardware, software and internet connectivity

Estimation of the necessary hardware and software and internet connection

1. Three 18 port D-link switch 5,736birr Estimation


2. One PowerEdge™ T420 tower server computer 35,000 birr
3. 500 meters of twisted pair cable will cost the company 1000birr Estimation
4. 500 meters of trunk with a size of 20×30 cm thickness 5000birr Estimation
5. 4mbps ADSL Broadband connection for the whole employee 230birr subscription fee
plus 700birr monthly charge

Task3:-Preparing Logical Design of an IT Infrastructure Solution


Task4:-Assisting in Policy development of client support and maintenanceThere should be a
permanent employee of It support officer who will maintain whenever the Network and hard
ware failure occurs.

Phases of Project

Activities to be performed

 Prepare equipments for infrastructure


 Implantation The network
 Installing the client computers
 Configure the system
 Test the system

Duration For each activates

No Tasks Month 1 Month 2 Month 3 Month 4


1 Prepare equipments
for infrastructure

2 Implantation The
network

3 Installing the client


computers
4 Configure the
system

5 Test the system

For the infrastructure need man power

 IT profession
 Electricians

Hard Ware Requirement

List of hardware’s for to built infrastructures

No Items Quantity Prices remark


1 Server 2 140000 birr
2 Computers 144 1152000 birr
3 Switches 11 16500 birr
4 Network Cables 3roll
5 Truncates
6 Rj 45 200
7 crimpers 3
8 Patch panels 9
9 punchers 3
10 Ups 146
11 Power stabilizers
12 Printers

Software Requirement

List of Software’s for to built infrastructures

Antivirus software’s
Windows Server Operating Systems
Windows operating Systems
Microsoft exchange server software
Microsoft software’s
Browser software’s like Mozilla, Chrome

Type of internet

4MB ADSL broadband internet connection

I propose for the client support mechanism

 Preventive maintenance—the prevention of equipment breakdowns before they happen.


This includes inspections, adjustments, regular service and planned shutdowns.
 Repair work—repairing equipment and troubleshooting malfunctions in an effort to
return the equipment to its previous condition. These repairs may be reactive or
preventive.
 Improvement work—searching for better materials and improved design changes to
facilitate equipment reliability. Repair work is often a part of improvement work.

Software Requirement

List of Software’s for to built infrastructures

• Antivirus software’s
• Windows Server Operating Systems
• Windows operating Systems
• Microsoft exchange server software
• Microsoft software’s
• Browser software’s like Mozilla, Chrome

Type of internet

• 4MB ADSL broadband internet connection

I propose for the client support mechanism

• Preventive maintenance—the prevention of equipment breakdowns before they happen.


This includes inspections, adjustments, regular service and planned shutdowns.
• Repair work—repairing equipment and troubleshooting malfunctions in an effort to
return the equipment to its previous condition. These repairs may be reactive or
preventive.
• Improvement work—searching for better materials and improved design changes to
facilitate equipment reliability. Repair work is often a part of improvement work.