METHOD STATEMENT Blader Ttank

This method statement outlines the procedure for installing a new irrigation bladder/pressure tank at the Irrigation Pump Station on July 27, 2024. The process includes shutting off the inlet valve, depressurizing the tank, and replacing the defective unit while ensuring the system remains operational during maintenance. A hot work permit is required, and the task will involve various personnel and tools to complete the installation safely.

Uploaded by

Junaid Manzoor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views1 page

METHOD STATEMENT Blader Ttank

This method statement outlines the procedure for installing a new irrigation bladder/pressure tank at the Irrigation Pump Station on July 27, 2024. The process includes shutting off the inlet valve, depressurizing the tank, and replacing the defective unit while ensuring the system remains operational during maintenance. A hot work permit is required, and the task will involve various personnel and tools to complete the installation safely.

Uploaded by

Junaid Manzoor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

METHOD OF STATEMENT

Field Below should be prepared by TAMIMI


Work Package Title: Installation of New Irrigation Bladder/Pressure Tank
Identification Code: Drawing Title: N/A Drawing Title: N/A Revision: N/A
Location: Irrigation Pump
Task Date: July27,2024 Start: July27,2024 Finish: July27,2024 Station/STP
TAMIMI - Mechanical Engineer Junaid Manzoor
Observation: The bottom of the tank was leaking, a clear indication of damaged rubber bladder membrane.

Work Procedure: Installation of new Bladder/Pressure Tank.

1. Shutting off bladder tank inlet valve.


2. Lock out/Tag out procedure is applied to the isolation valve.
3. Depressurize and drain the bladder/pressure tank.
4. Dismantle the pressure tank piping.
5. Lift the defective pressure tank with the help of forklift.
6. Install new bladder/pressure tank.
7. Installed the new fitting at the bottom of the pressure tank.
8. Fill the bladder tank to its pre-charge air pressure .
9. If the the tank pressure is stable then continue the operation of the new bladder/pressure tank.
10.House keeping of pump area.
11.Job is done.
Shutdown duration: 1 Day
Impact of maintenance: Bladder/Pressure tank will be out of service during the maintenance.
Effect on the system: The system will be in operational while the bladder/pressure tank is under installation.

The work will be done at Irrigation Pump Station/STP.


ManPower Materials Tools
Engineer, Supervisor, 1. Spare New Bladder/Pressure Forklift, Web Sling Belt, Shackle, Pipe
Technician, Pipe Fitter, Tank(PRESSURE TANK 500ltr 10bar ELBI wrench, Spanner, warning tape ,
Maintenance Labors. ITALY) barricade, Mechanic Tool kit, Drill
Machine.

TAMIMI COMMENTS:
Hot work permit is required for this activity.

Saudi Aramco Project Team will fill out below information:


Inspection Required
Item / Tasks Delivery Note Materials Task Preparation Task Completion
Status (Pass/Fail)

Saudi Aramco Comment

Prepared By (TAMIMI) Reviewed By (TAMIMI) Reviewed & Approved By (Saudi Aramco Representative):
Name: Junaid Manzoor NameEdmund Britanico (Plant Name: Mr. Saad Yahya
(Mechanical Engineer) Manager) Date:
Date: Date: Signature:
Signature: Signature: