The document provides a detailed breakdown of construction work, including quantities and dimensions for brick work, plaster, staircases, lifts, and beams across various floors. It includes both the total quantities and deductions for doors, along with corresponding costs for each item. The total estimated cost for the project is 1,911,513 currency units.

Uploaded by

SHYAMツ DÔDÈ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views9 pages

Diffrent Sheet

The document provides a detailed breakdown of construction work, including quantities and dimensions for brick work, plaster, staircases, lifts, and beams across various floors. It includes both the total quantities and deductions for doors, along with corresponding costs for each item. The total estimated cost for the project is 1,911,513 currency units.

Uploaded by

SHYAMツ DÔDÈ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Lucky sir

2
Sr. No. Item Description No. Lenth Width Depth Quantity Unit
1 Brick Work
Ground floor Front Wall 6.00 6.26 2.64 0.23 22.81 cum
Mz Floor 10.00 6.26 1.86 0.23 26.78 cum
partition wall 0.50 6.79 2.77 0.23 2.16 cum
0.50 6.27 2.52 0.23 1.82 cum
0.50 6.79 2.77 0.23 2.16 cum
0.50 6.27 2.52 0.23 1.82 cum
Toilet 1.00 7.70 2.40 0.23 4.25 cum
Total 61.80 cum

2 Half Brick Wall Toilet (1 st fl.) 1.00 12.65 2.85 36.05 sqm
4.00 3.05 2.85 34.77 sqm
3.00 1.40 2.85 11.97 sqm
4.00 1.15 2.85 13.11 sqm

Ground floor
Account row 1.00 3.15 2.85 8.98 Sqm
Pantry room (s.w) 2.00 3.15 2.85 17.96 Sqm
As per actual size Pantry room (f.w) 1.00 2.37 2.85 6.75 Sqm
measured on
site…. Meter room (s.w) 1.00 3.15 2.85 8.98 Sqm
Meter room (f.w) 1.00 1.50 2.85 4.28 Sqm
Toilet gents (s.w) 1.00 3.03 2.40 7.27 Sqm
Toilet gents (f.w) 1.00 1.65 2.40 3.96 Sqm
Toilet gents (s.w) 1.00 3.15 2.85 8.98 Sqm
Toilet gents (p.w) 1.00 1.65 2.85 4.70 Sqm
Toilet ladies(f.w) 1.00 1.72 2.40 4.13 Sqm
Toilet ladies (p.w) 1.00 1.72 1.96 3.37 Sqm
Total 79.35 Sqm
Deduction door 6.00 0.90 2.10 11.34 Sqm
9.00 0.75 2.10 14.18 Sqm
Total 25.52 Sqm
Net qty 53.84 Sqm

3 Plaster
Front Wall No.
Ground floor 6.00 6.26 2.77 2.00 208.08 sqm
Mz Floor 9.00 6.26 1.86 2.00 209.58 sqm

Toilet 1.00 12.65 2.85 2.00 72.11 sqm


3.00 3.05 2.85 2.00 52.15 sqm
3.00 1.50 2.85 2.00 25.65 sqm
Ground floor
Account row 1.00 3.15 2.00 2.85 17.96 Sqm
Pantry room (s.w) 2.00 3.15 2.00 2.85 35.91 Sqm
Pantry room (f.w) 1.00 2.37 2.00 2.85 13.51 Sqm
Meter room (s.w) 1.00 3.15 2.00 2.85 17.96 Sqm
Meter room (f.w) 1.00 1.50 2.00 2.85 8.55 Sqm
Toilet gents (s.w) 1.00 3.03 2.00 2.40 14.54 Sqm
Toilet gents (f.w) 1.00 1.65 2.00 2.40 7.92 Sqm
Toilet gents (s.w) 1.00 3.15 2.00 2.85 17.96 Sqm
Toilet gents (p.w) 1.00 1.65 2.00 2.85 9.41 Sqm
Toilet ladies(f.w) 1.00 1.72 2.00 2.40 8.26 Sqm
Toilet ladies (p.w) 1.00 1.72 2.00 1.96 6.74 Sqm
Total 726.28 Sqm
Deduction door 6.00 0.90 2.00 2.10 22.68 Sqm
9.00 0.75 2.00 2.10 28.35 Sqm
Total 51.03 Sqm
Net qty 675.25 Sqm

4 Stair case
Passenger lift
GF to Mz
landing 1.00 6.80 1.20 0.15 1.22 Cum
Steps 20.00 0.27 0.15 1.20 0.49 Cum

Mz to FF
landing 1.00 5.37 1.20 0.15 0.97 Cum
Steps 20.00 0.27 0.15 1.20 0.49 Cum

FF to Roof
landing 1.00 5.37 1.20 0.15 0.97 Cum
Steps 20.00 0.27 0.15 1.20 0.49 Cum

Goods lift
GF to Mz
landing 1.00 6.80 1.50 0.15 1.53 Cum
Steps 20.00 0.27 0.15 1.50 0.61 Cum

Mz to FF
landing 1.00 5.37 1.50 0.15 1.21 Cum
Steps 20.00 0.27 0.15 1.50 0.61 Cum

FF to Roof
landing 1.00 5.37 1.50 0.15 1.21 Cum
Steps 20.00 0.27 0.15 1.50 0.61 Cum
Total 10.38 Cum

5 Lift
Excavation Passenger 1.00 3.13 2.33 2.15 15.68 cum
Goods 1.00 4.10 2.41 2.15 21.24 cum
Total 36.92 cum

P.C.C. Passenger 1.00 3.13 2.33 0.15 1.09 cum


Goods 1.00 4.10 2.41 0.15 1.48 cum
Total 2.58 cum

Footing Passenger 1.00 3.13 2.33 0.50 3.65 cum


Goods 1.00 4.10 2.41 0.50 4.94 cum
Total 8.59 cum

R.C.C. Wall Passenger 2.00 1.53 0.15 1.50 0.69 cum


1.00 1.23 0.15 1.50 0.28 cum
Goods 2.00 2.62 0.15 1.50 1.18 cum
1.00 1.16 0.15 1.50 0.26 cum
Total 1.44 cum

Column Passenger 4.00 0.45 0.15 13.50 3.65 cum


Goods 4.00 3.08 0.23 13.50 38.25 cum
Total 41.90 cum

beam Passenger 12.00 1.53 0.15 0.45 1.24 cum


12.00 1.23 0.15 0.45 1.00 cum
Goods 12.00 2.62 0.23 0.45 3.25 cum
12.00 1.16 0.23 0.45 1.44 cum
Total 6.93 cum

Brick Work Passenger 8.00 1.53 2.55 0.23 7.18 cum


4.00 1.23 2.55 0.23 2.89 cum
Goods 8.00 2.62 2.55 0.23 12.29 cum
4.00 1.16 2.55 0.23 2.72 cum
Total 25.08 cum
No.
Plaster Passenger 8.00 1.83 2.55 2.00 74.66 sqm
4.00 2.03 2.55 2.00 41.41 sqm
Goods 8.00 2.06 2.55 2.00 84.05 sqm
4.00 3.08 2.55 2.00 62.83 sqm
Total 262.96 sqm

6 BEAM FRONT 12.00 6.23 0.23 0.6 10.32 Cum


STAIRCASE BEAM 6.00 6.43 0.30 0.5 5.79 Cum
Total 16.10 Cum
7 REBARING no holes
steps 12mm 2 22 44.00 nos
beam 20mm 4 16 64.00 nos
Lucky Sir 1
1 slab shop 12-23 1 78.9 15.95 1258.46 sqm

tower 1 4.08 6.85 27.95 sqm

actual area in sq.me total 1286.40 sqm


10.76
atcual area in sq.ft 13841.70 sq.ft
Lucky sir
2
Sr. Item Qty in Me Qty in Ft Rate in Me Amount Remark
1 Brick Work 61.80 2891.17 140 6560 405408
2 Half Brick Wall 53.84 579.32 130 1400 75376
3 Plaster 749.62 8065.91 30 324 242876.88
4 Stair Case 10.38 366.62 264 9340 96949.2
5 BEAM 16.10 568.65 264 9340 150374
6 LIFT
excavation 36.92 1304.01 5 163 6017.96
pcc 2.58 91.13 157 5550 14319
footing 8.59 303.40 264 9340 80230.6
rcc wall 1.98 69.93 264 9340 18493.2
column 41.90 1479.91 264 9340 391346
beam 10.04 354.61 264 9340 93773.6
brickwork 33.48 360.24 610 6560 219628.8
plaster 291.11 3132.34 30 324 94319.64
7 REBARING
12mm 44 160 7040
20mm 64 240 15360
TOTAL 1911513
Lucky sir
Sr. No. Item Description No. Lenth Width Depth Quantity
1 Half Brick Wall
Ground floor pantry room 1.00 4.00 2.85 11.40
pantry room 1.00 3.10 2.45 7.60

Mezanine floor passanger lift wall 2.00 3.10 2.85 17.67


passanger lift wall 1.00 1.84 2.85 5.24
good lift wall 1.00 3.23 2.45 7.91
office behind wall 1.00 3.38 2.45 8.28
office wall 1.00 3.76 2.85 10.72
office wall 1.00 1.40 2.85 3.99

First floor passanger lift wall 1.00 1.80 2.85 5.13


wall 2.00 3.10 2.85 17.67
good lift wall 1.00 3.25 2.45 7.96
shop 11 toilet wall 2.00 2.50 2.85 14.25
shop 11 toilet wall 3.00 1.15 2.85 9.83

Total 127.65
Deduction
Ground floor pantry room(door) 1.00 2.10 0.90 1.89
Mezanine floor passanger lift wall(door) 1.00 2.10 0.90 1.89
office (door) 1.00 2.10 0.85 1.79
First floor passanger lift wall(door) 1.00 2.10 0.90 1.89
shop 11 toilet wall(door) 3.00 2.10 0.75 4.73

Total 12.18

Net Qty 115.47

2 Plaster Work
Ground floor pantry room 2.00 4.00 2.85 22.80
pantry room 2.00 3.10 2.45 15.19

Mezanine floor passanger lift wall 4.00 3.10 2.85 35.34


passanger lift wall 2.00 1.84 2.85 10.49
good lift wall 2.00 3.23 2.45 15.83
office behind wall 2.00 3.38 2.45 16.56
office wall 2.00 3.76 2.85 21.43
office wall 2.00 1.40 2.85 7.98

First floor passanger lift wall 2.00 1.80 2.85 10.26


wall 4.00 3.10 2.85 35.34
good lift wall 2.00 3.25 2.45 15.93
shop 11 toilet wall 4.00 2.50 2.85 28.50
shop 11 toilet wall 6.00 1.15 2.85 19.67

Total 255.31
Deduction
Ground floor pantry room(door) 1.00 2.10 0.90 1.89
Mezanine floor passanger lift wall(door) 1.00 2.10 0.90 1.89
office (door) 1.00 2.10 0.85 1.79
First floor passanger lift wall(door) 1.00 2.10 0.90 1.89
shop 11 toilet wall(door) 3.00 2.10 0.75 4.73

Total 12.18

3 Concrete cube Net Qty 243.13


0.3x0.3x0.3 (m3) 31.00 0.30 0.30 0.30 0.84
Unit

Sqm
Sqm

Sqm
Sqm
Sqm
Sqm
Sqm
Sqm

Sqm
Sqm
Sqm
Sqm
Sqm

Sqm

Sqm
Sqm
Sqm
Sqm
Sqm

Sqm

Sqm

Sqm
Sqm

Sqm
Sqm
Sqm
Sqm
Sqm
Sqm

Sqm
Sqm
Sqm
Sqm
Sqm

Sqm

Sqm
Sqm
Sqm
Sqm
Sqm

Sqm

Sqm
cum