0% found this document useful (0 votes)
4 views

Assignment - 03

The document outlines examples for calculating quantities in construction project management, focusing on excavation, plain concrete, and reinforced concrete for foundations and ground beams. It provides specific dimensions and formulas for various construction elements, including footings, columns, and insulation. The examples serve as a guide for accurately estimating material requirements in construction projects.

Uploaded by

yousefmousa2040
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Assignment - 03

The document outlines examples for calculating quantities in construction project management, focusing on excavation, plain concrete, and reinforced concrete for foundations and ground beams. It provides specific dimensions and formulas for various construction elements, including footings, columns, and insulation. The examples serve as a guide for accurately estimating material requirements in construction projects.

Uploaded by

yousefmousa2040
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Construction Project Management

Example 01
• Calculate the quantities of Excavation, Plain Concrete Foundation,
and Reinforced Concrete Foundation.

1
Construction Project Management

Example
• Calculate the quantities of Excavation, Plain Concrete Foundation,
and Reinforced Concrete Foundation.
Dimension
No. Item unit No. Add Sub Total
L W H
Excavation m3
1 F1 m3
S1 m3
Plain Concrete
PC Footing
m3
2 ( t ˃ 20 cm )
PC Ground Beam
m2
( t ˂ 20 cm )
Reinforced Concrete m3
3 Footing m3 2
Ground Beam m3
Construction Project Management

Example (02)
• Calculate the Quantities of the following Items:
1. Excavation.
2. Plain Concrete.
3. Reinforced Concrete of Footings, ground beams
and ground columns.
4. Backfilling.
5. Insulation of footings and ground beams.

• Data:
 All Columns are 0.3 * 0.8 m
 All ground beams are 0.3 * 0.6 m
 All Footings are 2.0 * 1.5 * 0.6 m
 The thickness of plain concrete is 15 cm and
PC overhangs 10 cm from each direction.
 Walls thickness is 20 cm.
3
Construction Project Management

Example

4
No. Item unit No. L W H Add Sub Total
1 Excavation m3
2 Plain Concrete Footing m2
Reinforced Concrete m3
Footings m3
G.B Axis (A-A) & (B-B) m3
3
G.B Axis (1-1)&(2-2)&(3-3) m3
G.B Axis (2-3) m3
Columns m3
Backfilling m3
Excavation m3
Plain Concrete Footing m3
Reinforced Concrete Footing m3
4 Ground Beams m3
Column necks m3
m3
Under ground Walls m3 5

m3
No. Item unit No. L W H Add Sub Total
Insulation m2
Footing ( 4 sides ) m2
Footing ( Top ) m2
Subtract Column area m2
5 m2
Ground Beams m2
m2
Subtract Intersections m2
Columns neck m2