School 2ndF & Final
School 2ndF & Final
(Ref.:- P.W.D. (W.B) Schedule of rates for Building Works for the year 2017,Incorporation of GST Act, an necessary Corrigenda and Addenda with
effected from 1/12/2015)
SECOND FLOOR
QUANTIT
PARTICULARS UNITS RATE. AMOUNTS
Y
Item No. -1
Page-42, Item-36 (a) of Vol. I Hire and labour charges for shuttering with
centering and necessary staging upto 4 m using approved stout props and thick
hard wood planks of approved thickness with required bracing for concrete slabs,
beams and columns, lintels curved or straight including fitting, fixing and
striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30
mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Item No. -2
Page-43 & 44, Item-40 (a) (i) (I) of Vol. I Reinforcement for reinforced concrete
work in all sorts of structures including distribution bars, stirrups, binders etc
initial straightening and removal of loose rust (if necessary), cutting to requisite
length, hooking and bending to correct shape, placing in proper position and
binding with 16 gauge black annealed wire at every intersection, complete as per
drawing and direction, For works in foundation and upto roof of ground
floor/upto 4 m,Tor steel/Mild Steel,SAIL/ TATA/RINL
Column: Mt 3.06
Roof Beam : Mt 5.61
Roof Slab : Mt 10.72
Chajja & Lintel : Mt 5.00
Stair : Mt 1.63
Other : Mt 1.53
Total Mt 27.55 ₹ 68,146.00 ₹ 18,77,660.81
Item No. -3
Page-24, Item-5 (i) of Vol. I Controlled Cement concrete with well graded stone chips (20
mm graded nominal size) excluding shuttering and reinforcement with complete design
of concrete as per IS 456 and relevant special publications, submission of job mix
formula after preliminary mix design after testing of concrete cubes as per direction of
Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with
Super plasticiser per cubic meter of controlled concrete but actual consumption will be
determined on the basis of preliminary test and job mix foumula. In ground floor and
foundation. [using concrete mixture] M 20 Grade
Item No. -4
Page-15, Item-7 (b) of Vol. I Brick work with 1st class bricks in cement mortar (1:4) (b)
In superstructure.
SB ENGINEERING
Item No. -6
Page-189, Item-1 (ii) (a) of Vol. I Plaster (to wall, floor, ceiling etc.) with sand and cement
mortar including rounding off or chamfering corners as directed and raking out joints
including throating, nosing and drip course, scaffolding/staging where necessary
(Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement
mortar (a) 20 mm thick plaster
FOR OUTER SURFACE
Item No. -8
Page-192, Item-1 of Vol. I Labour for Chipping of concrete surface before taking up Sqm 740 ₹ 25.00 ₹ 18,500.00
Plastering work.
Item No. -9
Page-189, Item-1 (ii) (c) of Vol. I Plaster (to wall, floor, ceiling etc.) with sand and cement
mortar including rounding off or chamfering corners as directed and raking out joints
including throating, nosing and drip course, scaffolding/staging where necessary
(Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement
mortar (b) 10 mm thick plaster
FOR CEILING
SB ENGINEERING
Item No. -14
Page-114, Item-1 (h) of Vol. I Wood work in door and window frame fitted and fixed in
position complete including a protective coat of painting at the contact surface of the Cum 20 ₹ 53,057.00 ₹ 10,61,140.00
frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should
be correted upto three decimals). (h) Neem, Jam, Jackfruits
Four Crores Fifty lacks and Twenty Nine thousands Three Hundreds Eighty Six rupees
Rounded (T') Estimated Amount =
only.
PREPARED BY :-
DATE :-
PLACE :-
SB ENGINEERING