Regulations - rules based on and meant to carry out a specific piece of legislation
Hierarchy of laws
Sustainable development - meeting the needs of the present without sacrificing the future
- Rio de Janeiro
Paris Agreement - treaty on climate change to hold the increase of global average temp to below 2
degrees (196 states)
LGU Ordinances
MMDA v Res of Manila bay - SC issued a mandamus to 13 agencies to rehab the bay
1977 - PD 1151, 1152 Philippine Environmental Policy and Philippine Environmental Code
1981 - PD 2146 PEISS coverage technical desc (Environmentally Critical Projects and ECAreas)
EIS content
PD 1152 - defined 5 components: air qual mgmt, water qual mgmt, land use mgmt, natres mgmt,
waste mgmt
pd 1586 - established by the eiss// no person shall undertake or operate any environmentally
critical project or area without first securing an ECC
- ECA sensitive areas which require an ECC although not an ECP (e.g. tourist spots, prime agri
lands, reefs)
- FMB
- LMB
- EMB
- REGIONAL OFFICES
RA 8749 - EMB was converted from staff bureau to line bureau, meaning equal level with the other
bureaus, having their own regional directors
Envi Laws
PD 1586 - EISS
- of ecc projects
- validation of cnc
- issuance of sqi
- registration of cco
- import clearance
- survey of importers
- <12kw = exempt 13 kw and above, requires another permit distinct from the mechanical permit
RA 9003 - ESWMA
QA
PD 1586 - Section 4 no person shall operate until an ECC is secured by his authorized
representative
ECP
ECA
- areas declared by law as national parks, watershed reserves, wildlife preserves, sanctuaries,
tourist spot, habitats of endangered or threatened species (flora/fauna), historic, archaeological or
scientific interests
- mangrove areas
- corals
pre feasibility:
1. detailed assessment
Detailed engineering
ECC Amendments
minor: typos, deadlines, change of company name/owner, decrease in land area = 1000
1. Approval of ECC
2. Disapproval
a. Misrepresentation of facts
b. insufficiency in substance
ECC - approval document that signifies full compliance with the EIA process
- outlines commitments of the proponent, necessary to comply with existing regulations with the
best environmental processes
steel mills cat A - non ferrous metals, iron and steel mills
b. operational constraints
[email protected] - rd email
[email protected] - instructor
CNC vs ECC
has its own threshhold based on the number of liters, the number of liters determines if it should
be registered under ECC or CNC
Consult blue book, but generally depends on the land area and number of rooms offered
sec 4 - no person shall operate any declared environmentally critical area without first securing an
ECC issued by the president or his representative
Terms
ECP - project or program that has high potential for significant negative environmental impact
1. Heavy industries - non ferrous metal industries, iron and steel mills, petroleum and petro chem,
smelting plants
ECA - areas delineated through pd 2146 as environmentally sensitive such that environmental
impacts are expected
Environmental Impact Assessment - a process that predicts and evaluates the likely effects of a
project during construction, commissioning, operation to abandonment
dao 2003-30
mc 2014-05
mc 2020-23
mc 2020- 26
mc 2020-27
mc 2020-30
mc 2020-31
mc 2021-05
mc 2021-12
mc 2024-003
mc 2022-002
mc 2022-05
mc 2022-06
Categories
ECC online - 20 days max, payment could be for the same calendar year
- file ecc
pemaps
emp
if <1000sqm CNC
CNC online
valid id
geotagged photos
No amendment for CNC, if expansion is substantial, ECC must be sought, and use CNC as proof.
Before expansion, ECC must be secured to avoid penalties
A: no expiration,
A: depends on what type of building, the total building footprint dictates, if >1 hectare = ECC
otherwise = CNC
If gas station project, the basis whether it is ECC/CNC is the capacity for holding?
depends on capacity
If installing 26kW, does the ECC have to be amended? (for company consumption)
if manufacturing, ECC/CNC
b. change in ownership
nov 10 publication
Air pollutant - any matter found in the atmosphere excluding oxygen, nitrogen, water vapor, etc that
is detrimental to health and environment
PM/gaseous pollutants
gaseous pollutants -
lead - heavy
- authorization granted by emb to operate any installation for a specified period of time
types:
any activity, structure, equipment, facility, appurtenances that may be a potential source of air
pollution
Large sources -
Medium sources
boiler 100-250 hp
Small
boiler 51-99 hp
EXEMPTED:
Permitting procedure
- Technical conference
updates on p RA 8479
may 2020-17 - online ONLY application of PTO for air pollution through OPMS
- fuel burning and non-fuel burning equipment not required to secure PTO
non-fuel burning (welding, etc for small scale operations, MAXIMUM 5 units/item)
emb 2021-14 requiring firms to install Continuous emissions and monitoring systems (for big
facilities, cement plants etc)
emb 2022-03 standby generators are no longer required PTO (less than 200 hours annually, 3 hours
a day at most, 3 days at most/week)
FINES
100k FOR EACH DAY until complied with (for statinary source)
10k upto 100k and upto 6 years of imprisonment for any other
A: No, the mall shall give you a copy for the gensets and the PTO is with the mall
A: No, report to SMR, or write a letter to EMB with permit number xxxxx is no longer in
use/functional
if running for less than 200 hours, still required for ET?
A: No, only Emission Estimate based on the fuel consumed and hours operational
is pto still required for genset operating for less than 200 hours?