Temp. Work - - - - - - - - - - 2
Pile Rebar - - - - - - - - - - -
Pile Formwork - - - - - - - - - - -
Pile Casting - - - - - - - - - -
Pile Load-Test - - - - - - - - - - -
Excavation - - - - - - - - - - -
Foundation Rebar - - - - - - - - - - -
Foundation Formwork - - - - - - - - - - -
Foundation Casting - - - - - - - - - - -
Backfilling - - - - - - - - - - -
Sand Fill - - - - - - - - - - -
GF Rebar - - - - - - - - - - -
GF Formwork - 3 - - - - - - - - -
GF Casting - - - - - - - - - - -
1F Rebar - - 11 - - 5 - - - - -
1F Formwork - - - - - 3 3 - - 4 -
1F Casting - - - - - - 4 - - - -
Activity RF Rebar - - - - - - - - - - 2
RF Formwork - - - - - - - - - - -
Division 2 (Khulna) 3 (Rajshahi) 4 (Ran
Site No. 16 17 18 19 27 40 50 53 58 64 70
Type A3 22.5m 28.5m 22.5m 18m A3 A2 A1 13.5m A3 A1
RF Casting - - - - - - - - - - -
GF Brick - 4 - - - - - - - 4 -
1F Brick - 4 - - - - - - - - -
Lime Terracing - - - - - - - - - - -
GF Plaster - - - - - - - - - - -
1F Plaster - - - - - - - - - - -
Stair Railing - - - - - - - - - - -
GF Tile Work - - - - - - - - - - -
1F Tile Work - - - - - - - - - - -
GF Paint Work - - - - - - - - - - -
1F Paint Work - - - - - - - - - - -
GF Aluminum Work - - - - - - - - - - -
1F Aluminum Work - - - - - - - - - - -
Generator Room - - - - - - - - - - -
Sanitary Room - - - - - - - - - - -
Electrical Work - - - 5 - - - - - - -
Division 2 (Khulna) 3 (Rajshahi) 4 (Ran
Site No. 16 17 18 19 27 40 50 53 58 64 70
Type A3 22.5m 28.5m 22.5m 18m A3 A2 A1 13.5m A3 A1
8 mm Kg - - - - - - - - - - -
10 mm Kg - - - - - - - - - - -
12 mm Kg - - - - - - - - - - -
Rebar
16 mm Kg - - - - - - - - - - -
20 mm Kg - - - - - - - - - - -
25 mm Kg - - - - - - - - - - -
Stone Cft - - - - - - - - - - -
Cement Bag - - - - - - - - - - -
300*300 Sqm - - - - - - - - - - -
Division 2 (Khulna) 3 (Rajshahi) 4 (Ran
Site No. 16 17 18 19 27 40 50 53 58 64 70
Type A3 22.5m 28.5m 22.5m 18m A3 A2 A1 13.5m A3 A1
250*300 Sqm - - - - - - - - - - -
Excavator Nos - - - - - - - - - - -
Note ※ 7 sites to be cancelled : #49(Restricted area), #113(Pond area), #98(Undemolished existing building), #128(Restricted
February 17, 2025
ngpur) 5 (Dhaka) 7(Sylhet) 8 (Chittagong)
- - 2 11 3 - - 8 - 7 7 12 - 132
- - 2 1 1 - - 1 - 1 1 1 - 16
- - - - - - - - - - - - - 2
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - 3
- - - - - - - - - - - - - -
- - - - - - - - - - - - 16
- - - 10 2 - - - 2 - - - 24
- - - - - - - - - - - - 4
- - - - - - - - - - - - 2
- - - - - - 7 - 4 - 3 - 14
ngpur) 5 (Dhaka) 7(Sylhet) 8 (Chittagong)
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - 150 - 250
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - 1,000
- - - - - - - - - - - - - 100
- - - - - - - - - - - - - -
ngpur) 5 (Dhaka) 7(Sylhet) 8 (Chittagong)
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - 1
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
Division-2
18 Dacope 28.5m On-going 1. Installation rebar for 1F beam.
(Khulna)
Division-4
77 Thakurgaon Sadar A1 Pending No Work
(Rangpur)
Division-7
135 Golapganj A2 Pending No Work
(Sylhet)
Pending 8 sites
Total 24 sites
On-going 16 sites
February 17, 2025
Issues
An official letter from BANBEIS is required to obtain a work permit from UNO.
None
None
None
None
None
None
An official letter from BANBEIS is required to obtain a work permit from UNO.
Issues
An official letter from BANBEIS is required to obtain a work permit from UNO.
None
None
An official letter from BANBEIS is required to obtain a work permit from UNO.
Issues
An official letter from BANBEIS is required to obtain a work permit from UNO.
There is an issue with the workers, and it is being resolved. The arrangement will be completed within three days.
None
None
None
An official letter from BANBEIS is required to obtain a work permit from UNO.
None
None
Issues
None
None
An official letter from BANBEIS is required to obtain a work permit from UNO.
Daily Site Report
An official letter from BANBEIS is required to obtain a work permit from UNO.
None None
None
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
None
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
An official letter from BANBEIS is required to obtain a work permit from UNO.
None None
None
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
None
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
An official letter from BANBEIS is required to obtain a work permit from UNO.
None None
An official letter from BANBEIS is required to obtain a work permit from UNO.
None None
None
None None
An official letter from BANBEIS is required to obtain a work permit from UNO.
None None
None None
None
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
None
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
None
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
An official letter from BANBEIS is required to obtain a work permit from UNO.
None None
None
None None
Daily Activities
Manpower Material
Equipment Issues
Daily Site Report
None
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
None
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
None
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
An official letter from BANBEIS is required to obtain a work permit from UNO.
None None
There is an issue with the workers, and it is being resolved. The arrangement will be completed within three days.
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
None
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
None
None None
Daily Activities
Manpower Material
Equipment Inspection
Daily Site Report
None
None None
Daily Activities
Manpower Material
Equipment Inspection