0% found this document useful (0 votes)
14 views55 pages

Daily Summary Report 20250217

The document is a daily log detailing manpower, materials, and equipment procurement for various construction sites across different divisions. It includes specific counts of manpower and types of materials delivered, as well as equipment utilization. Notably, it indicates that seven sites are to be canceled due to various restrictions.

Uploaded by

ashraf.tcsk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views55 pages

Daily Summary Report 20250217

The document is a daily log detailing manpower, materials, and equipment procurement for various construction sites across different divisions. It includes specific counts of manpower and types of materials delivered, as well as equipment utilization. Notably, it indicates that seven sites are to be canceled due to various restrictions.

Uploaded by

ashraf.tcsk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 55

[UITRCE Phase Ⅱ] Daily Manpower & Material & Equipment Procurement Log

Division 2 (Khulna) 3 (Rajshahi) 4 (Ran


Site No. 16 17 18 19 27 40 50 53 58 64 70
Type A3 22.5m 28.5m 22.5m 18m A3 A2 A1 13.5m A3 A1

1. Today's Manpower Total - 14 12 6 8 9 8 - - 20 5


Site Engineer - 1 1 1 1 1 1 - - 1 1

Temp. Work - - - - - - - - - - 2

Pile Rebar - - - - - - - - - - -

Pile Formwork - - - - - - - - - - -

Pile Casting - - - - - - - - - -

Test Pile Driving - - - - - - - - - - -

Pile Load-Test - - - - - - - - - - -

Service Pile Driving - - - - - - - - - - -

Excavation - - - - - - - - - - -

Foundation Rebar - - - - - - - - - - -

Foundation Formwork - - - - - - - - - - -

Foundation Casting - - - - - - - - - - -

Backfilling - - - - - - - - - - -

Sand Fill - - - - - - - - - - -

GF Rebar - - - - - - - - - - -

GF Formwork - 3 - - - - - - - - -

GF Casting - - - - - - - - - - -

1F Rebar - - 11 - - 5 - - - - -

1F Formwork - - - - - 3 3 - - 4 -

1F Casting - - - - - - 4 - - - -

Activity RF Rebar - - - - - - - - - - 2

RF Formwork - - - - - - - - - - -
Division 2 (Khulna) 3 (Rajshahi) 4 (Ran
Site No. 16 17 18 19 27 40 50 53 58 64 70
Type A3 22.5m 28.5m 22.5m 18m A3 A2 A1 13.5m A3 A1
RF Casting - - - - - - - - - - -

GF Brick - 4 - - - - - - - 4 -

1F Brick - 4 - - - - - - - - -

Lime Terracing - - - - - - - - - - -

GF Plaster - - - - - - - - - - -

1F Plaster - - - - - - - - - - -

W.Grill & V.Railing - - - - - - - - - - -

Door & Window - - - - - - - - - - -

Stair Railing - - - - - - - - - - -

GF Tile Work - - - - - - - - - - -

1F Tile Work - - - - - - - - - - -

GF Paint Work - - - - - - - - - - -

1F Paint Work - - - - - - - - - - -

GF Aluminum Work - - - - - - - - - - -

1F Aluminum Work - - - - - - - - - - -

Septic Tank & Soak Well - 2 - - 7 - - - - 11 -

Generator Room - - - - - - - - - - -

Sanitary Room - - - - - - - - - - -

Electrical Work - - - 5 - - - - - - -
Division 2 (Khulna) 3 (Rajshahi) 4 (Ran
Site No. 16 17 18 19 27 40 50 53 58 64 70
Type A3 22.5m 28.5m 22.5m 18m A3 A2 A1 13.5m A3 A1

2. Today's Materials Delivered


Type of Material Unit

8 mm Kg - - - - - - - - - - -

10 mm Kg - - - - - - - - - - -

12 mm Kg - - - - - - - - - - -
Rebar
16 mm Kg - - - - - - - - - - -

20 mm Kg - - - - - - - - - - -

25 mm Kg - - - - - - - - - - -

Stone Cft - - - - - - - - - - -

Local Cft - - - - 100 - - - - - -


Delivered
Sand
Sylhet Cft - - - - - - - - - - -

Cement Bag - - - - - - - - - - -

Bricks Nos - - - - 1,000 - - - - - -

Brick Chips Cft - - - - 100 - - - - - -

300*300 Sqm - - - - - - - - - - -
Division 2 (Khulna) 3 (Rajshahi) 4 (Ran
Site No. 16 17 18 19 27 40 50 53 58 64 70
Type A3 22.5m 28.5m 22.5m 18m A3 A2 A1 13.5m A3 A1

Tile 600*600 Sqm - - - - - - - - - - -

250*300 Sqm - - - - - - - - - - -

Paint 250*300 Sqm - - - - - - - - - - -

3. Today's Equipment Utilization


Type of Equipment Unit

Excavator Nos - - - - - - - - - - -

Mixture Machine Nos - - - - - - 1 - - - -


Utilization

Pile Driving Nos - - - - - - - - - - -

Roof Hoist Nos - - - - - - - - - - -

Note ※ 7 sites to be cancelled : #49(Restricted area), #113(Pond area), #98(Undemolished existing building), #128(Restricted
February 17, 2025
ngpur) 5 (Dhaka) 7(Sylhet) 8 (Chittagong)

73 77 82 87 92 95 97 101 135 141 142 143 144 Total


A1 A1 18m 18m 13.5m A2 A2 18m A2 A2 A2 A2 A2

- - 2 11 3 - - 8 - 7 7 12 - 132
- - 2 1 1 - - 1 - 1 1 1 - 16
- - - - - - - - - - - - - 2
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - 3
- - - - - - - - - - - - - -
- - - - - - - - - - - - 16
- - - 10 2 - - - 2 - - - 24
- - - - - - - - - - - - 4
- - - - - - - - - - - - 2
- - - - - - 7 - 4 - 3 - 14
ngpur) 5 (Dhaka) 7(Sylhet) 8 (Chittagong)

73 77 82 87 92 95 97 101 135 141 142 143 144 Total


A1 A1 18m 18m 13.5m A2 A2 18m A2 A2 A2 A2 A2
- - - - - - - - - - - - -
- - - - - - - - - - 2 4 - 14
- - - - - - - - - - - 4
- - - - - - - - - - - - - -
- - - - - - - - - - 2 - - 2
- - - - - - - - - - - 4 - 4
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - 20
- - - - - - - - - - - - - -
- - - - - - - - - - 2 - - 2
- - - - - - - - - - - - - 5
ngpur) 5 (Dhaka) 7(Sylhet) 8 (Chittagong)

73 77 82 87 92 95 97 101 135 141 142 143 144 Total


A1 A1 18m 18m 13.5m A2 A2 18m A2 A2 A2 A2 A2

Daily Quantity Total

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - 150 - 250

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - 1,000

- - - - - - - - - - - - - 100

- - - - - - - - - - - - - -
ngpur) 5 (Dhaka) 7(Sylhet) 8 (Chittagong)

73 77 82 87 92 95 97 101 135 141 142 143 144 Total


A1 A1 18m 18m 13.5m A2 A2 18m A2 A2 A2 A2 A2

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

Daily Quantity Total

- - - - - - - - - - - - - -

- - - - - - - - - - - - - 1

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

d area), #129(Pond area), #138(Pond area), #148(Island area)


[UITRCE Phase Ⅱ] Daily Work & Issues

Division Site Type Status Main Activities

16 Fakirhate A3 Pending No Work

1. Brick work for GF and 1F.


17 Bagherhat Sadar 22.5m On-going 2. Installation formwork for GF lintel.
3. Excavation for soak well.

Division-2
18 Dacope 28.5m On-going 1. Installation rebar for 1F beam.
(Khulna)

19 Batiaghata 22.5m On-going 1. Installation electrical pipe for 1F slab.

27 Keshabpur 18m On-going 1. Dewatering and excavation for septic tank.

1. Installation formwork and rebar for 1F column.


40 Shathia A3 on-going
(15/20 ea)

1. Installation formwork for 1F column.


(9/20 ea)
50 Dhamoirhat A2 on-going
2. Concrete casting for 1F column.
Division-3 (9/20 ea)
(Rajshahi)

53 Godagari A1 Pending No Work


Division Site Type Status Main Activities

58 Singra 13.5m Pending No Work

1. Concrete casting for septic tank bottom slab.


(Last night work_16 Feb)
64 Patgram A3 on-going
2. Brick work for septic tank and GF.
3. Installation formwork for 1F false slab.

Division-4 1. Installation rebar for 1F column.


70 Nilphamari Sadar A1 On-going
(Rangpur) 2. Concrete curing for 1F slab.

73 Dinajpur Sadar A1 Pending No Work


Division Site Type Status Main Activities

Division-4
77 Thakurgaon Sadar A1 Pending No Work
(Rangpur)

82 Kotalipara 18m On-going No work

87 Nagarkanda 18m On-going 1. Installation formwork for RF beam.

1. Installation formwork for 1F column.


92 Gazaria 13.5m On-going
2. Concrete curing for 1F slab.
Division-5
(Dhaka)

95 Keranigonj A2 On-going No work.

97 Gazipur Sadar A2 Pending No Work

101 Ghior 18m On-going 1. Installation formwork for RF beam.

Division-7
135 Golapganj A2 Pending No Work
(Sylhet)

1. Installation formwork for RF beam.


141 Lalmai A2 On-going
2. Dismantle formwork for 1F slab.
Division Site Type Status Main Activities

1. Plastering work for GF.


142 Hajigonj A2 On-going 2. Brick work for GF.
3. Installation sanitary concealed work for GF.
Division-8
(Chittagong)
1. Plastering work for 1F.
143 Haimchar A2 On-going 2. Brick work for GF.
3. Installation formwork for staircase room slab.

144 Chandpur Sadar A2 Pending No work.

Pending 8 sites
Total 24 sites
On-going 16 sites
February 17, 2025

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

None

None

None

None

None

None

An official letter from BANBEIS is required to obtain a work permit from UNO.
Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

None

None

An official letter from BANBEIS is required to obtain a work permit from UNO.
Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

There is an issue with the workers, and it is being resolved. The arrangement will be completed within three days.

None

None

None

An official letter from BANBEIS is required to obtain a work permit from UNO.

None

Commencement of work is pending due to JAKS issue.

None
Issues

None

None

An official letter from BANBEIS is required to obtain a work permit from UNO.
Daily Site Report

Site No. 16 Commencement Pending


Site Fakirhate Weather
Date February 17, 2025 Sub-Contractor Amanat Enterprise
Division Khulna Site Engineer
Foundation Type A3 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer - 79 8 mm Kg - -
Pile Driver - - 10 mm Kg - -
Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -
Concrete Worker - - 20 mm Kg - -
Mason - - 25 mm Kg - -
Electrician - - Stone Cft - -
Plumber - - Local Cft - -
Sand
Painter - - Sylhet Cft - -
Tile Layer - - Cement Bag - -
General Worker - 20 Bricks Nos - -
Security Guard - - Brick Chips Cft - -
Operator - - 300*300 Sqm - -
Total - 99 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
No Work (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
No Work Pile Driving Nos - -
Roof Hoist Nos - -
Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 40 Commencement Sep 18, 2024 on-going


Site Shathia Weather Sunny / 17
Date February 17, 2025 Sub-Contractor BOF Korea
Division Rajshahi Site Engineer Madehi Hasan
Foundation Type A3 Mobile No. +880 1754-210839
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 154 8 mm Kg - -
Pile Driver - - 10 mm Kg - 10,644
Carpenter 3 171 12 mm Kg - 9,568
Rebar
Rebar Worker 5 260 16 mm Kg - 8,191
Concrete Worker - 171 20 mm Kg - 6,202
Mason - 14 25 mm Kg - -
Electrician - 23 Stone Cft - 5,324
Plumber - 9 Local Cft - 7,167
Sand
Painter - - Sylhet Cft - 4,189
Tile Layer - - Cement Bag - 1,245
General Worker - 103 Bricks Nos - 22,300
Security Guard - 1 Brick Chips Cft - 832
Operator - 18 300*300 Sqm - -
Total 9 924 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
1. Installation formwork and rebar for 1F column.
(Heavy) Equipment
(15/20 ea)
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Installation formwork and rebar for 1F column.
Pile Driving Nos - -
2. Concrete casting for 1F column.
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 50 Commencement Sep 14, 2024 on-going


Site Dhamoirhat Weather Sunny / 22
Date February 17, 2025 Sub-Contractor BOF Korea
Division Rajshahi Site Engineer Mahmud Ahmed
Foundation Type A2 Mobile No. 01874-997634
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 176 8 mm Kg - -
Pile Driver - - 10 mm Kg - 6,764
Carpenter 3 122 12 mm Kg - 2,844
Rebar
Rebar Worker - 182 16 mm Kg - 6,921
Concrete Worker 3 189 20 mm Kg - 4,242
Mason - 10 25 mm Kg - -
Electrician - 14 Stone Cft - 5,176
Plumber - 4 Local Cft - 24,803
Sand
Painter - - Sylhet Cft - 3,144
Tile Layer - - Cement Bag - 1,220
General Worker - 118 Bricks Nos - 20,400
Security Guard - - Brick Chips Cft - 580
Operator 1 25 300*300 Sqm - -
Total 8 840 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
1. Installation formwork for 1F column. Paint Sqm - -
(9/20 ea)
(Heavy) Equipment
2. Concrete casting for 1F column.
(9/20 ea) Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos 1 -
1. Installation formwork and rebar for 1F column. Pile Driving Nos - -
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 53 Commencement May 13, 2024 Pending


Site Godagari Weather
Date February 17, 2025 Sub-Contractor
Division Rajshahi Site Engineer
Foundation Type A1 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer - 86 8 mm Kg - -
Pile Driver - - 10 mm Kg - -
Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -
Concrete Worker - - 20 mm Kg - -
Mason - - 25 mm Kg - -
Electrician - - Stone Cft - -
Plumber - - Local Cft - -
Sand
Painter - - Sylhet Cft - -
Tile Layer - - Cement Bag - -
General Worker - 1 Bricks Nos - -
Security Guard - - Brick Chips Cft - -
Operator - - 300*300 Sqm - -
Total - 87 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
No Work (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
No Work Pile Driving Nos - -
Roof Hoist Nos - -
Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 64 Commencement Sep 21, 2024 on-going


Site Patgram Weather Sunny / 17
Date February 17, 2025 Sub-Contractor Masud & Brothers
Division Rangpur Site Engineer Mohammad Ali
Foundation Type A3 Mobile No. 01722-213900
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 248 8 mm Kg - -
Pile Driver - - 10 mm Kg - 10,572
Carpenter 4 393 12 mm Kg - 4,105
Rebar
Rebar Worker - 402 16 mm Kg - 9,761
Concrete Worker 4 256 20 mm Kg - 5,711
Mason 11 375 25 mm Kg - -
Electrician - 47 Stone Cft - 9,400
Plumber - 10 Local Cft - 27,150
Sand
Painter - - Sylhet Cft - 7,200
Tile Layer - - Cement Bag - 1,790
General Worker - 147 Bricks Nos - 45,000
Security Guard - 2 Brick Chips Cft - -
Operator - 22 300*300 Sqm - -
Total 20 1,902 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
1. Concrete casting for septic tank bottom slab. Paint Sqm - -
(Last night work_16 Feb)
(Heavy) Equipment
2. Brick work for septic tank and GF.
3. Installation formwork for 1F false slab. Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Brick work for septic tank and GF.
Pile Driving Nos - -
2. Installation rebar for 1F false slab.
Roof Hoist Nos - -

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 70 Commencement Dec 23, 2024 On-going


Site Nilphamari Sadar Weather Sunny / 24
Date February 17, 2025 Sub-Contractor BOF Korea
Division Rangpur Site Engineer Md Alamgir Hossain
Foundation Type A1 Mobile No. 01798-775449
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 156 8 mm Kg - -
Pile Driver - - 10 mm Kg - 6,708
Carpenter - 136 12 mm Kg - 2,465
Rebar
Rebar Worker 2 201 16 mm Kg - 6,227
Concrete Worker - 162 20 mm Kg - 4,575
Mason - 8 25 mm Kg - -
Electrician - 25 Stone Cft - 4,906
Plumber - 12 Local Cft - 7,150
Sand
Painter - - Sylhet Cft - 3,560
Tile Layer - - Cement Bag - 1,261
General Worker 2 40 Bricks Nos - 16,500
Security Guard - 4 Brick Chips Cft -
Operator - 18 300*300 Sqm - -
Total 5 762 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
1. Installation rebar for 1F column.
(Heavy) Equipment
2. Concrete curing for 1F slab.
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Installation rebar for 1F column.
Pile Driving Nos - -
2. Concrete curing for 1F slab.
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 73 Commencement Pending


Site Dinajpur Sadar Weather
Date February 17, 2025 Sub-Contractor Masud & Brothers
Division Rangpur Site Engineer
Foundation Type A1 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer - 62 8 mm Kg - -
Pile Driver - - 10 mm Kg - -
Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -
Concrete Worker - - 20 mm Kg - -
Mason - - 25 mm Kg - -
Electrician - - Stone Cft - -
Plumber - - Local Cft - -
Sand
Painter - - Sylhet Cft - -
Tile Layer - - Cement Bag - -
General Worker - - Bricks Nos - -
Security Guard - - Brick Chips Cft - -
Operator - - 300*300 Sqm - -
Total - 62 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
No Work (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
No Work Pile Driving Nos - -
Roof Hoist Nos - -
Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 77 Commencement Pending


Site Thakurgaon Sadar Weather
Date February 17, 2025 Sub-Contractor Masud & Brothers
Division Rangpur Site Engineer
Foundation Type A1 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer - 103 8 mm Kg - -
Pile Driver - - 10 mm Kg - -
Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -
Concrete Worker - - 20 mm Kg - -
Mason - - 25 mm Kg - -
Electrician - - Stone Cft - -
Plumber - - Local Cft - -
Sand
Painter - - Sylhet Cft - -
Tile Layer - - Cement Bag - -
General Worker - 6 Bricks Nos - -
Security Guard - - Brick Chips Cft - -
Operator - - 300*300 Sqm - -
Total - 109 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
No Work (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
No Work Pile Driving Nos - -
Roof Hoist Nos - -
Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 95 Commencement June 6, 2024 On-going


Site Keranigonj Weather Sunny / 18
Date February 17, 2025 Sub-Contractor BOF Korea
Division Dhaka Site Engineer MD. Aoshan Habib
Foundation Type A2 Mobile No. +880 1783-266065
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer - 275 8 mm Kg - 99
Pile Driver - - 10 mm Kg - 11,123
Carpenter - 345 12 mm Kg - 3,073
Rebar
Rebar Worker - 364 16 mm Kg - 7,990
Concrete Worker - 190 20 mm Kg - 5,856
Mason - 580 25 mm Kg - -
Electrician (Welder) - 158 Stone Cft - 6,203
Plumber - 122 Local Cft - 10,021
Sand
Painter - 151 Sylhet Cft - 3,833
Tile Layer - 116 Cement Bag - 2,417
General Worker - 808 Bricks Nos - 55,000
Security Guard - 111 Brick Chips Cft - 1,560
Operator - 12 300*300 Sqm - 375
Total - 3,232 Tile 600*600 Sqm - 414
Today's Work 200*300 Sqm - 223
Paint Sqm - 2,453
No work. (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
No Work. Pile Driving Nos - -
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 97 Commencement Jun 18, 2024 Pending


Site Gazipur Sadar Weather
Date February 17, 2025 Sub-Contractor Masud & Brothers
Division Dhaka Site Engineer
Foundation Type A2 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer - 7 8 mm Kg - -
Pile Driver - - 10 mm Kg - -
Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -
Concrete Worker - - 20 mm Kg - -
Mason - - 25 mm Kg - -
Electrician - - Stone Cft - -
Plumber - - Local Cft - -
Sand
Painter - - Sylhet Cft - -
Tile Layer - - Cement Bag - -
General Worker - - Bricks Nos - -
Security Guard - - Brick Chips Cft - -
Operator - - 300*300 Sqm - -
Total - 7 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
No Work (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
No Work Pile Driving Nos - -
Roof Hoist Nos - -
Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 135 Commencement Pending


Site Golapganj Weather
Date February 17, 2025 Sub-Contractor
Division Sylhet Site Engineer
Foundation Type A2 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer - 93 8 mm Kg - -
Pile Driver - - 10 mm Kg - -
Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -
Concrete Worker - - 20 mm Kg - -
Mason - - 25 mm Kg - -
Electrician - - Stone Cft - -
Plumber - - Local Cft - -
Sand
Painter - - Sylhet Cft - -
Tile Layer - - Cement Bag - -
General Worker - - Bricks Nos - -
Security Guard - - Brick Chips Cft - -
Operator - - 300*300 Sqm - -
Total - 93 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
No Work (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
No Work Pile Driving Nos - -
Roof Hoist Nos - -
Issues

Commencement of work is pending due to JAKS issue.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 141 Commencement On-going


Site Lalmai Weather Sunny / 21
Date February 17, 2025 Sub-Contractor Provat Kumar Kundu
Division Chittagong Site Engineer Nahid Ahmed Shamim
Foundation Type A2 Mobile No. 01917-793780
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 242 8 mm Kg - -
Pile Driver - - 10 mm Kg - 10,826
Carpenter 6 281 12 mm Kg - 3,215
Rebar
Rebar Worker - 339 16 mm Kg - 7,184
Concrete Worker - 157 20 mm Kg - 6,461
Mason - 13 25 mm Kg - -
Electrician - 20 Stone Cft - 5,257
Plumber - 7 Local Cft - 18,414
Sand
Painter - - Sylhet Cft - 2,200
Tile Layer - - Cement Bag - 995
General Worker - 149 Bricks Nos - 2,500
Security Guard - - Brick Chips Cft - 600
Operator - 18 300*300 Sqm - -
Total 7 1,226 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
1. Installation formwork for RF beam.
(Heavy) Equipment
2. Dismantle formwork for 1F slab.
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Installation formwork for RF beam. Pile Driving Nos - -
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 142 Commencement May 26, 2024 On-going


Site Hajigonj Weather Sunny / 21
Date February 17, 2025 Sub-Contractor Provat Kumar Kundu
Division Chittagong Site Engineer Sibgatullah Bipul
Foundation Type A2 Mobile No. 0164848-9852
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 304 8 mm Kg - -
Pile Driver - - 10 mm Kg - 7,314
Carpenter - 313 12 mm Kg - 2,672
Rebar
Rebar Worker - 414 16 mm Kg - 8,801
Concrete Worker - 191 20 mm Kg - 4,362
Mason 4 427 25 mm Kg - -
Electrician - 44 Stone Cft - 5,596
Plumber 2 17 Local Cft - 3,500
Sand
Painter - - Sylhet Cft - 2,650
Tile Layer - - Cement Bag - 1,437
General Worker - 500 Bricks Nos - 33,000
Security Guard - - Brick Chips Cft - 400
Operator - 18 300*300 Sqm - -
Total 7 2,228 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
1. Plastering work for GF.
2. Brick work for GF. (Heavy) Equipment
3. Installation sanitary concealed work for GF.
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Plastering work for GF.
Pile Driving Nos - -
2. Installation sanitary concealed work for 1F.
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 143 Commencement May 15, 2024 On-going


Site Haimchar Weather Sunny/ 17
Date February 17, 2025 Sub-Contractor Provat Kumar Kundu
Division Chittagong Site Engineer Ahmed Sumon
Foundation Type A2 Mobile No. 0177107-9483
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 278 8 mm Kg - -
Pile Driver - - 10 mm Kg - 10,864
Carpenter 3 314 12 mm Kg - 3,398
Rebar
Rebar Worker - 397 16 mm Kg - 7,635
Concrete Worker - 196 20 mm Kg - 6,290
Mason 8 173 25 mm Kg - -
Electrician - 30 Stone Cft - 6,720
Plumber - - Local Cft 150 12,750
Sand
Painter - - Sylhet Cft - 2,600
Tile Layer - - Cement Bag - 1,110
General Worker - 213 Bricks Nos - 18,000
Security Guard - - Brick Chips Cft - 750
Operator - 24 300*300 Sqm - -
Total 12 1,625 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
1. Plastering work for 1F.
2. Brick work for GF. (Heavy) Equipment
3. Installation formwork for staircase room slab.
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Plastering work for 1F.
2. Brick work for GF. Pile Driving Nos - -
3. Installation rebar for staircase room slab.
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 144 Commencement Pending


Site Chandpur Sadar Weather Sunny / 28℃
Date February 17, 2025 Sub-Contractor Provat Kumar Kundu
Division Chittagong Site Engineer
Foundation Type A2 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer - 142 8 mm Kg - -
Pile Driver - - 10 mm Kg - -
Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -
Concrete Worker - - 20 mm Kg - -
Mason - - 25 mm Kg - -
Electrician - - Stone Cft - -
Plumber - - Local Cft - -
Sand
Painter - - Sylhet Cft - -
Tile Layer - - Cement Bag - -
General Worker - 20 Bricks Nos - -
Security Guard - - Brick Chips Cft - -
Operator - - 300*300 Sqm - -
Total - 162 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
No work. (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
No Work Pile Driving Nos - -
Roof Hoist Nos - -
Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 17 Commencement May 07, 2024 On-going


Site Bagherhat Sadar Weather Cloudy/ 21
Date February 17, 2025 Sub-Contractor Amanat Enterprise
Division Khulna Site Engineer Md Hasan Sheikh
Foundation Type 22.5m Mobile No. 01937-740949
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 297 8 mm Kg - 120
Pile Driver - 226 10 mm Kg - 16,239
Carpenter 3 282 12 mm Kg - 2,557
Rebar
Rebar Worker - 519 16 mm Kg - 17,217
Concrete Worker - 292 20 mm Kg - 7,328
Mason 8 187 25 mm Kg - 80
Electrician - 17 Stone Cft - 8,171
Plumber - - Local Cft - 9,980
Sand
Painter - - Sylhet Cft - 7,780
Tile Layer - - Cement Bag - 2,436
General Worker 2 386 Bricks Nos - 27,200
Security Guard - 28 Brick Chips Cft - -
Operator - 36 300*300 Sqm - -
Total 14 2,270 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
1. Brick work for GF and 1F.
2. Installation formwork for GF lintel. (Heavy) Equipment
3. Excavation for soak well.
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Brick work for 1F.
2. Plastering work for 1F ceiling. Pile Driving Nos - -
3. Installation rebar for GF lintel.
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Issues
Daily Site Report

Site No. 18 Commencement May 14, 2024 On-going


Site Dacope Weather Cloudy/ 22
Date February 17, 2025 Sub-Contractor BOF Korea
Division Khulna Site Engineer SM Nasir Rahman
Foundation Type 28.5m Mobile No. 01312-340760
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 267 8 mm Kg - -
Pile Driver - 202 10 mm Kg - 12,744
Carpenter - 228 12 mm Kg - 3,064
Rebar
Rebar Worker 11 486 16 mm Kg - 21,217
Concrete Worker - 225 20 mm Kg - 6,901
Mason - 38 25 mm Kg - 90
Electrician - 6 Stone Cft - 6,765
Plumber - 3 Local Cft - 14,957
Sand
Painter - - Sylhet Cft - 4,940
Tile Layer - - Cement Bag - 1,705
General Worker - 367 Bricks Nos - 7,900
Security Guard - 42 Brick Chips Cft - 115
Operator - 31 300*300 Sqm - -
Total 12 1,895 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
1. Installation rebar for 1F beam. (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Installation rebar for 1F beam. Pile Driving Nos - -
Roof Hoist Nos - -
General Worker

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 19 Commencement May 07, 2024 On-going


Site Batiaghata Weather Cloudy/ 23
Date February 17, 2025 Sub-Contractor KTM
Division Khulna Site Engineer Kawsar Hossen Khan
Foundation Type 22.5m Mobile No. 01648-489852
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 264 8 mm Kg - -
Pile Driver - 92 10 mm Kg - 10,564
Carpenter - 289 12 mm Kg - 1,982
Rebar
Rebar Worker - 486 16 mm Kg - 15,326
Concrete Worker - 181 20 mm Kg - 4,641
Mason - 15 25 mm Kg - 80
Electrician 5 26 Stone Cft - 4,915
Plumber - 2 Local Cft - 29,194
Sand
Painter - - Sylhet Cft - 2,797
Tile Layer - - Cement Bag - 1,200
General Worker - 328 Bricks Nos - 7,600
Security Guard - 28 Brick Chips Cft - -
Operator - 17 300*300 Sqm - -
Total 6 1,728 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
1. Installation electrical pipe for 1F slab. (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Installation formwork for 1F staircase. Pile Driving Nos - -
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 27 Commencement May 9, 2024 On-going


Site Keshabpur Weather Cloudy/ 22
Date February 17, 2025 Sub-Contractor Amanat Enterprise
Division Khulna Site Engineer Shamshu Al i
Foundation Type 18m Mobile No. 01978- 584811
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 274 8 mm Kg - -
Pile Driver - 96 10 mm Kg - 13,066
Carpenter - 365 12 mm Kg - 3,855
Rebar
Rebar Worker - 605 16 mm Kg - 18,721
Concrete Worker - 314 20 mm Kg - 6,545
Mason - 54 25 mm Kg - -
Electrician - 35 Stone Cft - 7,520
Plumber - - Local Cft 100 4,050
Sand
Painter - Sylhet Cft - 5,713
Tile Layer - - Cement Bag - 1,935
General Worker 7 775 Bricks Nos 1,000 10,400
Security Guard - 44 Brick Chips Cft 100 350
Operator - 37 300*300 Sqm - -
Total 8 2,599 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
1. Dewatering and excavation for septic tank. (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Dewatering and excavation for septic tank.
Pile Driving Nos - -
2. Concrete casting for septic tank bottom slab.
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 58 Commencement Pending


Site Singra Weather Cloudy / 28
Date February 17, 2025 Sub-Contractor KTM
Division Rajshahi Site Engineer
Foundation Type 13.5m Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer - 83 8 mm Kg - -
Pile Driver - - 10 mm Kg - -
Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -
Concrete Worker - - 20 mm Kg - -
Mason - - 25 mm Kg - -
Electrician - - Stone Cft - -
Plumber - - Local Cft - -
Sand
Painter - - Sylhet Cft - -
Tile Layer - - Cement Bag - -
General Worker - - Bricks Nos - -
Security Guard - - Brick Chips Cft - -
Operator - - 300*300 Sqm - -
Total - 83 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
No Work (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
No Work Pile Driving Nos - -
Roof Hoist Nos - -
Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 82 Commencement May 12, 2024 On-going


Site Kotalipara Weather Cloudy/ 24
Date February 17, 2025 Sub-Contractor Ahmed Traders.
Division Dhaka Site Engineer Ashraf Uddin
Foundation Type 18m Mobile No. 01793-092038
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 2 255 8 mm Kg - -
Pile Driver - 196 10 mm Kg - 5,390
Carpenter - 22 12 mm Kg - 2,193
Rebar
Rebar Worker - 213 16 mm Kg - 13,507
Concrete Worker - 114 20 mm Kg - 5,173
Mason - 8 25 mm Kg - -
Electrician - 2 Stone Cft - 3,852
Plumber - - Local Cft - 6,910
Sand
Painter - - Sylhet Cft - 2,150
Tile Layer - - Cement Bag - 901
General Worker - 357 Bricks Nos - 4,350
Security Guard - 11 Brick Chips Cft - 115
Operator - 52 300*300 Sqm - -
Total 2 1,230 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
No work (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
No work Pile Driving Nos - -
Roof Hoist Nos - -
Issues

There is an issue with the workers, and it is being resolved. The arrangement will be completed within three days.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 87 Commencement June 1, 2024 On-going


Site Nagarkanda Weather Cloudy/ 25
Date February 17, 2025 Sub-Contractor Ahmed Traders.
Division Dhaka Site Engineer Md Ripon Mia
Foundation Type 18m Mobile No. 01768-478645
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 267 8 mm Kg - -
Pile Driver - 239 10 mm Kg - 11,830
Carpenter 10 254 12 mm Kg - 2,441
Rebar
Rebar Worker - 337 16 mm Kg - 14,879
Concrete Worker - 242 20 mm Kg - 6,154
Mason - 21 25 mm Kg - -
Electrician - 20 Stone Cft - 6,201
Plumber - 4 Local Cft - 27,800
Sand
Painter - - Sylhet Cft - 3,900
Tile Layer - - Cement Bag - 1,480
General Worker - 383 Bricks Nos - 5,450
Security Guard - 45 Brick Chips Cft - 240
Operator - 57 300*300 Sqm - -
Total 11 1,869 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
1. Installation formwork for RF beam. (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Installation formwork for RF beam.
Pile Driving Nos - -
2. Installation rebar for RF staircase.
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 92 Commencement June 12, 2024 On-going


Site Gazaria Weather Cloudy/ 19
Date February 17, 2025 Sub-Contractor BOF Korea
Division Dhaka Site Engineer Fuyad Hasan Khan
Foundation Type 13.5m Mobile No. 01959-535416
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 249 8 mm Kg - -
Pile Driver - 131 10 mm Kg - 9,907
Carpenter 2 65 12 mm Kg - 2,589
Rebar
Rebar Worker - 188 16 mm Kg - 11,373
Concrete Worker - 166 20 mm Kg - 5,025
Mason - 12 25 mm Kg - -
Electrician - 11 Stone Cft - 5,648
Plumber - 6 Local Cft - 5,300
Sand
Painter - - Sylhet Cft - 3,050
Tile Layer - - Cement Bag - 1,592
General Worker - 263 Bricks Nos - 7,500
Security Guard - 30 Brick Chips Cft - 400
Operator - 35 300*300 Sqm - -
Total 3 1,156 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
1. Installation formwork for 1F column.
(Heavy) Equipment
2. Concrete curing for 1F slab.
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Installation rebar for 1F column.
Pile Driving Nos - -
2. Concrete curing for 1F slab.
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 101 Commencement May 09, 2024 On-going


Site Ghior Weather Cloudy/ 23
Date February 17, 2025 Sub-Contractor KTM
Division Dhaka Field Engineer Md. Mahmud
Foundation Type 18m Mobile No. 01829-968545
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative
Site Engineer 1 266 8 mm Kg - -
Pile Driver - 153 10 mm Kg - 9,538
Carpenter 7 279 12 mm Kg - 2,810
Rebar
Rebar Worker - 354 16 mm Kg - 13,038
Concrete Worker - 247 20 mm Kg - 5,682
Mason - 24 25 mm Kg - -
Electrician - 32 Stone Cft - 6,388
Plumber - - Local Cft - 12,100
Sand
Painter - - Sylhet Cft - 4,010
Tile Layer - - Cement Bag - 1,643
General Worker - 350 Bricks Nos - 12,300
Security Guard - 54 Brick Chips Cft - 200
Operator - 40 300*300 Sqm - -
Total 8 1,799 Tile 600*600 Sqm - -
Today's Work 200*300 Sqm - -
Paint Sqm - -
1. Installation formwork for RF beam. (Heavy) Equipment
Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -
1. Installation formwork for RF beam. Pile Driving Nos - -
Roof Hoist Nos - -
Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem