Daily Summary Report 20250225

The document is a daily log for manpower, materials, and equipment procurement for various construction sites across different divisions in Bangladesh, dated February 25, 2025. It details the total manpower utilized, types of materials delivered, and specific activities conducted at each site. The total manpower recorded for the day is 149, with various materials listed as not delivered or in limited quantities.

Uploaded by

ashraf.tcsk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views44 pages

Daily Summary Report 20250225

The document is a daily log for manpower, materials, and equipment procurement for various construction sites across different divisions in Bangladesh, dated February 25, 2025. It details the total manpower utilized, types of materials delivered, and specific activities conducted at each site. The total manpower recorded for the day is 149, with various materials listed as not delivered or in limited quantities.

Uploaded by

ashraf.tcsk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 44

[UITRCE Phase Ⅱ] Daily Manpower & Material & Equipment Procurement Log

February 25, 2025


Division 2 (Khulna) 3 (Rajshahi) 4 (Rangpur) 5 (Dhaka) 7(Sylhet) 8 (Chittagong)

Site No. 16 17 18 19 27 40 50 53 58 64 70 73 77 82 87 92 95 97 101 135 141 142 143 144 Total

Type A3 22.5m 28.5m 22.5m 18m A3 A2 A1 13.5m A3 A1 A1 A1 18m 18m 13.5m A2 A2 18m A2 A2 A2 A2 A2

1. Today's Manpower Total - 13 23 5 6 9 9 - - 18 10 - - 7 11 6 - - 6 - 9 6 11 - 149

Site Engineer - 1 1 1 1 1 1 - - 1 1 - - 1 1 1 - - 1 - 1 1 1 - 15

Temp. Work - - 4 4 - - - - - - - - - - - - - - 2 - - - - - 10

Pile Rebar - - - - - - - - - - - - - - - - - - - - - - - -

Pile Formwork - - - - - - - - - - - - - - - - - - - - - - - -

Pile Casting - - - - - - - - - - - - - - - - - - - - - - -

Test Pile Driving - - - - - - - - - - - - - - - - - - - - - - - -

Pile Load-Test - - - - - - - - - - - - - - - - - - - - - - - -

Service Pile Driving - - - - - - - - - - - - - - - - - - - - - - - -

Excavation - - - - - - - - - - - - - - - - - - - - - - - -

Foundation Rebar - - - - - - - - - - - - - - - - - - - - - - - -

Foundation Formwork - - - - - - - - - - - - - - - - - - - - - - - -

Foundation Casting - - - - - - - - - - - - - - - - - - - - - - - -

Backfilling - - - - - - - - - - - - - 6 - - - - - - - - - - 6

Sand Fill - - - - - - - - - - - - - - - - - - - - - - - -

GF Rebar - - - - - - - - - - - - - - - - - - - - - - - -

GF Formwork - - - - - - - - - - - - - - - - - - - - 1 - - 1

GF Casting - - - - - - - - - - - - - - - - - - - - - - 3 - 3

1F Rebar - - 4 - - - - - - - 3 - - - - 3 - - - - - - - 10

1F Formwork - - 2 - - - - - - - - - - - - 2 - - - - - - - 4

1F Casting - - - - - - - - - - 6 - - - - - - - - - - - - 6

Activity RF Rebar - - - - - 3 2 - - - - - - - 10 - - - - - - - - 15

RF Formwork - 3 - - - 5 6 - - - - - - - - - - 3 - 8 - - - 25

RF Casting - - - - - - - - - - - - - - - - - - - - - - - -

GF Brick - - - - - - - - - - - - - - - - - - - - - - - - -

1F Brick - 5 - - 5 - - - - - - - - - - - - - - - 1 3 - 14

Lime Terracing - - - - - - - - - - - - - - - - - - - - - - - - -

GF Plaster - - - - - - - - - - - - - - - - - - - - - 2 - - 2

1F Plaster - 4 - - - - - - - 8 - - - - - - - - - - - - 4 - 16

W.Grill & V.Railing - - - - - - - - - - - - - - - - - - - - - - - - -

Door & Window - - - - - - - - - - - - - - - - - - - - - - - - -

Stair Railing - - - - - - - - - - - - - - - - - - - - - - - - -

GF Tile Work - - - - - - - - - - - - - - - - - - - - - - - - -

1F Tile Work - - - - - - - - - - - - - - - - - - - - - - - - -

GF Paint Work - - - - - - - - - - - - - - - - - - - - - - - - -

1F Paint Work - - - - - - - - - - - - - - - - - - - - - - - - -

GF Aluminum Work - - - - - - - - - - - - - - - - - - - - - - - - -

1F Aluminum Work - - - - - - - - - - - - - - - - - - - - - - - - -

Septic Tank & Soak Well - - - - - - - - - 9 - - - - - - - - - - - - - - 9

Generator Room - - - - - - - - - - - - - - - - - - - - - - - - -

Sanitary Room - - 12 - - - - - - - - - - - - - - - - - - - - - 12

Electrical Work - - - - - - - - - - - - - - - - - - - - - 1 - - 1
Division 2 (Khulna) 3 (Rajshahi) 4 (Rangpur) 5 (Dhaka) 7(Sylhet) 8 (Chittagong)

Site No. 16 17 18 19 27 40 50 53 58 64 70 73 77 82 87 92 95 97 101 135 141 142 143 144 Total

Type A3 22.5m 28.5m 22.5m 18m A3 A2 A1 13.5m A3 A1 A1 A1 18m 18m 13.5m A2 A2 18m A2 A2 A2 A2 A2

2. Today's Materials Delivered

Type of Material Unit Daily Quantity Total

8 mm Kg - - - - - - - - - - - - - - - - - - - - - - - - -

10 mm Kg - - - - - - - - - - - - - - - - - - - - - - - - -

12 mm Kg - - - - - - - - - - - - - - - - - - - - - - - - -

Rebar
16 mm Kg - - - - - - - - - - - - - - - - - - - - - - - - -

20 mm Kg - - - - - - - - - - - - - - - - - - - - - - - - -

25 mm Kg - - - - - - - - - - - - - - - - - - - - - - - - -

Stone Cft - - - - - - - - - - - - - - - - - - - - - - - - -

Local Cft - 1,100 - - 300 - - - - - - - - - - - - - - - - - - - 1,400


Delivered
Sand
Sylhet Cft - - - 400 - - - - - - - - - - - - - - - - - - - - 400

Cement Bag - - - - - - - - - - - - - - - - - - - - - - - - -

Bricks Nos - - - - 2,000 - - - - - - - - - - - - - - - - - 1,000 - 3,000

Brick Chips Cft - - - - - - - - - - - - - - - - - - - - - - - - -

300*300 Sqm - - - - - - - - - - - - - - - - - - - - - - - - -

Tile 600*600 Sqm - - - - - - - - - - - - - - - - - - - - - - - - -

250*300 Sqm - - - - - - - - - - - - - - - - - - - - - - - - -

Paint 250*300 Sqm - - - - - - - - - - - - - - - - - - - - - - - - -

3. Today's Equipment Utilization

Type of Equipment Unit Daily Quantity Total

Excavator Nos - - - - - - - - - - - - - - - - - - - - - - - - -

Mixture Machine Nos - - - - - - - - - - 1 - - - - - - - - - - - - - 1


Utilization

Pile Driving Nos - - - - - - - - - - - - - - - - - - - - - - - - -

Roof Hoist Nos - - - - - - - - - - - - - - - - - - - - - - - - -

Note ※ 7 sites to be cancelled : #49(Restricted area), #113(Pond area), #98(Undemolished existing building), #128(Restricted area), #129(Pond area), #138(Pond area), #148(Island area)
[UITRCE Phase Ⅱ] Daily Work & Issues
February 25, 2025

Division Site Type Status Main Activities Issues

16 Fakirhate A3 Pending No Work An official letter from BANBEIS is required to obtain a work permit from UNO.

1. Plastering work for 1F.


17 Bagherhat Sadar 22.5m On-going 2. Brick work for RF. None
3. Installation formwork for staircase room slab.

1. Installation formwork and rebar for 1F column.


Division-2 (2/20 ea)
18 Dacope 28.5m On-going None
(Khulna) 2. Concrete curing for 1F slab.
3. Installation deep tubewell for water supply.

19 Batiaghata 22.5m On-going 1. Concrete curing for 1F slab. None

27 Keshabpur 18m On-going 1. Brick work for 1F. None

40 Shathia A3 on-going 1. Installation formwork and rebar for RF beam. None

50 Dhamoirhat A2 on-going 1. Installation formwork and rebar for RF beam. None

Division-3
(Rajshahi)

53 Godagari A1 Pending No Work An official letter from BANBEIS is required to obtain a work permit from UNO.

58 Singra 13.5m Pending No Work An official letter from BANBEIS is required to obtain a work permit from UNO.

1. Plastering work for outside wall.


64 Patgram A3 on-going 2. Installation formwork and rebar for septic tank top slab. None
3. Concrete casting for septic tank top slab.

1. Concrete casting for 1F column.


Division-4
70 Nilphamari Sadar A1 On-going (20/20 ea) None
(Rangpur)
2. Installation rebar for 1F staircase.

73 Dinajpur Sadar A1 Pending No Work An official letter from BANBEIS is required to obtain a work permit from UNO.
Division Site Type Status Main Activities Issues

Division-4
77 Thakurgaon Sadar A1 Pending No Work An official letter from BANBEIS is required to obtain a work permit from UNO.
(Rangpur)

82 Kotalipara 18m On-going 1. Backfilling for GF slab. None

1. Installation rebar for RF beam.


87 Nagarkanda 18m On-going None
2. Installation rebar for 1F staircase.

1. Installation formwork and rebar for 1F column.


92 Gazaria 13.5m On-going None
(11/20 ea)
Division-5
(Dhaka)

95 Keranigonj A2 On-going No Work None

97 Gazipur Sadar A2 Pending No Work An official letter from BANBEIS is required to obtain a work permit from UNO.

1. Installation formwork for RF beam.


101 Ghior 18m On-going None
2. Making block for RF slab.

Division-7
135 Golapganj A2 Pending No Work Commencement of work is pending due to JAKS issue.
(Sylhet)

141 Lalmai A2 On-going 1. Installation formwork for RF slab. None

1. Plastering work for GF.


2. Brick work for 1F
142 Hajigonj A2 On-going None
3. Installation door frame for 1F.
4. Installation electrical conduit pipe for 1F.
Division-8
(Chittagong)
1. Concrete casting for lintel and sunshade.
143 Haimchar A2 On-going None
2. Plastering work for 1F.

144 Chandpur Sadar A2 Pending No work. An official letter from BANBEIS is required to obtain a work permit from UNO.

Pending 8 sites
Total 24 sites
On-going 16 sites
Daily Site Report

Site No. 16 Commencement Pending

Site Fakirhate Weather


Date February 25, 2025 Sub-Contractor Amanat Enterprise

Division Khulna Site Engineer


Foundation Type A3 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 79 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - 20 Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 99 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 40 Commencement Sep 18, 2024 on-going

Site Shathia Weather Sunny / 17℃

Date February 25, 2025 Sub-Contractor BOF Korea

Division Rajshahi Site Engineer Madehi Hasan

Foundation Type A3 Mobile No. +880 1754-210839

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 162 8 mm Kg - -

Pile Driver - - 10 mm Kg - 10,644

Carpenter 5 213 12 mm Kg - 9,568


Rebar
Rebar Worker 3 271 16 mm Kg - 8,191

Concrete Worker - 179 20 mm Kg - 6,202

Mason - 14 25 mm Kg - -

Electrician - 23 Stone Cft - 5,324

Plumber - 9 Local Cft - 7,167


Sand
Painter - - Sylhet Cft - 4,189

Tile Layer - - Cement Bag - 1,245

General Worker - 103 Bricks Nos - 22,300

Security Guard - 1 Brick Chips Cft - 832

Operator - 20 300*300 Sqm - -

Total 9 995 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

1. Installation formwork and rebar for RF beam. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

1. Installation formwork and rebar for RF beam. Pile Driving Nos - -

Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 50 Commencement Sep 14, 2024 on-going

Site Dhamoirhat Weather Sunny / 22℃

Date February 25, 2025 Sub-Contractor BOF Korea

Division Rajshahi Site Engineer Mahmud Ahmed

Foundation Type A2 Mobile No. 01874-997634

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 184 8 mm Kg - -

Pile Driver - - 10 mm Kg - 6,764

Carpenter 6 144 12 mm Kg - 2,844


Rebar
Rebar Worker 2 187 16 mm Kg - 6,921

Concrete Worker - 205 20 mm Kg - 4,242

Mason - 10 25 mm Kg - -

Electrician - 14 Stone Cft - 5,176

Plumber - 4 Local Cft - 24,803


Sand
Painter - - Sylhet Cft - 3,144

Tile Layer - - Cement Bag - 1,220

General Worker - 118 Bricks Nos - 20,400

Security Guard - - Brick Chips Cft - 580

Operator - 28 300*300 Sqm - -

Total 9 894 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

1. Installation formwork and rebar for RF beam. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

1. Installation formwork for RF beam. Pile Driving Nos - -

Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 53 Commencement May 13, 2024 Pending

Site Godagari Weather


Date February 25, 2025 Sub-Contractor
Division Rajshahi Site Engineer
Foundation Type A1 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 86 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - 1 Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 87 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 64 Commencement Sep 21, 2024 on-going

Site Patgram Weather Sunny / 17℃

Date February 25, 2025 Sub-Contractor Masud & Brothers

Division Rangpur Site Engineer Mohammad Ali

Foundation Type A3 Mobile No. 01722-213900

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 254 8 mm Kg - -

Pile Driver - - 10 mm Kg - 10,572

Carpenter 3 406 12 mm Kg - 4,105


Rebar
Rebar Worker 3 417 16 mm Kg - 9,761

Concrete Worker 3 259 20 mm Kg - 5,711

Mason 8 466 25 mm Kg - -

Electrician - 47 Stone Cft - 9,400

Plumber - 10 Local Cft - 27,150


Sand
Painter - - Sylhet Cft - 7,200

Tile Layer - - Cement Bag - 1,790

General Worker - 147 Bricks Nos - 45,000

Security Guard - 2 Brick Chips Cft - -

Operator - 22 300*300 Sqm - -

Total 18 2,030 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Plastering work for outside wall.
2. Installation formwork and rebar for septic tank top slab. (Heavy) Equipment
3. Concrete casting for septic tank top slab.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Plastering work for outside wall.
2. Installation window grill for GF. Pile Driving Nos - -
3. Installation sanitary concealed work for GF.
Roof Hoist Nos - -

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 70 Commencement Dec 23, 2024 On-going

Site Nilphamari Sadar Weather Sunny / 24℃

Date February 25, 2025 Sub-Contractor BOF Korea

Division Rangpur Site Engineer Md Alamgir Hossain

Foundation Type A1 Mobile No. 01798-775449

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 164 8 mm Kg - -

Pile Driver - - 10 mm Kg - 6,779

Carpenter - 155 12 mm Kg - 2,465


Rebar
Rebar Worker 3 227 16 mm Kg - 6,227

Concrete Worker 5 175 20 mm Kg - 4,658

Mason - 8 25 mm Kg - -

Electrician - 25 Stone Cft - 4,906

Plumber - 12 Local Cft - 7,150


Sand
Painter - - Sylhet Cft - 3,560

Tile Layer - - Cement Bag - 1,261

General Worker - 41 Bricks Nos - 16,500

Security Guard - 4 Brick Chips Cft -

Operator 1 20 300*300 Sqm - -

Total 10 831 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Concrete casting for 1F column.
(20/20 ea) (Heavy) Equipment
2. Installation rebar for 1F staircase.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos 1 -
1. Concrete casting for 1F staircase.
Pile Driving Nos - -
2. Installation formwork for RF beam.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 73 Commencement Pending

Site Dinajpur Sadar Weather


Date February 25, 2025 Sub-Contractor Masud & Brothers

Division Rangpur Site Engineer


Foundation Type A1 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 62 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - - Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 62 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 77 Commencement Pending

Site Thakurgaon Sadar Weather


Date February 25, 2025 Sub-Contractor Masud & Brothers

Division Rangpur Site Engineer


Foundation Type A1 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 103 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - 6 Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 109 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 95 Commencement June 6, 2024 On-going

Site Keranigonj Weather Sunny / 18℃

Date February 25, 2025 Sub-Contractor BOF Korea

Division Dhaka Site Engineer MD. Aoshan Habib

Foundation Type A2 Mobile No. +880 1783-266065

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 275 8 mm Kg - 99

Pile Driver - - 10 mm Kg - 11,123

Carpenter - 345 12 mm Kg - 3,073


Rebar
Rebar Worker - 364 16 mm Kg - 7,990

Concrete Worker - 190 20 mm Kg - 5,856

Mason - 580 25 mm Kg - -

Electrician (Welder) - 158 Stone Cft - 6,203

Plumber - 122 Local Cft - 10,021


Sand
Painter - 151 Sylhet Cft - 3,833

Tile Layer - 116 Cement Bag - 2,417

General Worker - 808 Bricks Nos - 55,000

Security Guard - 111 Brick Chips Cft - 1,560

Operator - 12 300*300 Sqm - 375

Total - 3,232 Tile 600*600 Sqm - 414

Today's Work 200*300 Sqm - 223


Paint Sqm - 2,453

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 97 Commencement Jun 18, 2024 Pending

Site Gazipur Sadar Weather


Date February 25, 2025 Sub-Contractor Masud & Brothers

Division Dhaka Site Engineer


Foundation Type A2 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 7 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - - Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 7 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 135 Commencement Pending

Site Golapganj Weather


Date February 25, 2025 Sub-Contractor
Division Sylhet Site Engineer
Foundation Type A2 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 93 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - - Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 93 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

Commencement of work is pending due to JAKS issue.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 141 Commencement On-going

Site Lalmai Weather Sunny / 21℃

Date February 25, 2025 Sub-Contractor Provat Kumar Kundu

Division Chittagong Site Engineer Nahid Ahmed Shamim

Foundation Type A2 Mobile No. 01917-793780

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 248 8 mm Kg - -

Pile Driver - - 10 mm Kg - 10,826

Carpenter 8 319 12 mm Kg - 3,215


Rebar
Rebar Worker - 339 16 mm Kg - 7,184

Concrete Worker - 157 20 mm Kg - 6,461

Mason - 13 25 mm Kg - -

Electrician - 20 Stone Cft - 5,257

Plumber - 7 Local Cft - 18,414


Sand
Painter - - Sylhet Cft - 2,200

Tile Layer - - Cement Bag - 995

General Worker - 149 Bricks Nos - 2,500

Security Guard - - Brick Chips Cft - 600

Operator - 18 300*300 Sqm - -

Total 9 1,270 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

1. Installation formwork for RF slab. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

1. Installation rebar for RF slab. Pile Driving Nos - -

Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 142 Commencement May 26, 2024 On-going

Site Hajigonj Weather Sunny / 21℃

Date February 25, 2025 Sub-Contractor Provat Kumar Kundu

Division Chittagong Site Engineer Sibgatullah Bipul

Foundation Type A2 Mobile No. 0164848-9852

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 310 8 mm Kg - -

Pile Driver - - 10 mm Kg - 7,314

Carpenter 1 313 12 mm Kg - 2,672


Rebar
Rebar Worker - 414 16 mm Kg - 8,801

Concrete Worker - 191 20 mm Kg - 4,362

Mason 3 444 25 mm Kg - -

Electrician 1 50 Stone Cft - 5,596

Plumber - 30 Local Cft - 3,500


Sand
Painter - - Sylhet Cft - 2,650

Tile Layer - - Cement Bag - 1,499

General Worker - 500 Bricks Nos - 33,000

Security Guard - - Brick Chips Cft - 400

Operator - 18 300*300 Sqm - -

Total 6 2,270 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -

1. Plastering work for GF. Paint Sqm - -


2. Brick work for 1F
(Heavy) Equipment
3. Installation door frame for 1F.
4. Installation electrical conduit pipe for 1F. Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Plastering work for GF.
2. Installation window grill for 1F. Pile Driving Nos - -
3. Installation electrical conduit pipe for 1F.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 143 Commencement May 15, 2024 On-going

Site Haimchar Weather Sunny/ 17℃

Date February 25, 2025 Sub-Contractor Provat Kumar Kundu

Division Chittagong Site Engineer Ahmed Sumon

Foundation Type A2 Mobile No. 0177107-9483

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 285 8 mm Kg - -

Pile Driver - - 10 mm Kg - 10,864

Carpenter - 331 12 mm Kg - 3,398


Rebar
Rebar Worker - 399 16 mm Kg - 7,635

Concrete Worker 3 199 20 mm Kg - 6,290

Mason 7 225 25 mm Kg - -

Electrician - 30 Stone Cft - 6,720

Plumber - - Local Cft - 12,750


Sand
Painter - - Sylhet Cft - 2,600

Tile Layer - - Cement Bag - 1,160

General Worker - 213 Bricks Nos 1,000 22,000

Security Guard - - Brick Chips Cft - 750

Operator - 24 300*300 Sqm - -

Total 11 1,706 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Concrete casting for lintel and sunshade.
(Heavy) Equipment
2. Plastering work for 1F.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Brick and plastering work for 1F.
Pile Driving Nos - -
2. Installation rebar for GF false slab and lintel.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 144 Commencement Pending

Site Chandpur Sadar Weather Sunny / 28℃

Date February 25, 2025 Sub-Contractor Provat Kumar Kundu

Division Chittagong Site Engineer


Foundation Type A2 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 142 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - 20 Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 162 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No work. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 17 Commencement May 07, 2024 On-going

Site Bagherhat Sadar Weather Cloudy/ 21℃

Date February 25, 2025 Sub-Contractor Amanat Enterprise

Division Khulna Site Engineer Md Hasan Sheikh

Foundation Type 22.5m Mobile No. 01937-740949

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 304 8 mm Kg - 120

Pile Driver - 226 10 mm Kg - 16,239

Carpenter 3 298 12 mm Kg - 2,557


Rebar
Rebar Worker - 528 16 mm Kg - 17,217

Concrete Worker - 296 20 mm Kg - 7,328

Mason 9 259 25 mm Kg - 80

Electrician - 17 Stone Cft - 8,171

Plumber - - Local Cft 1,100 11,080


Sand
Painter - - Sylhet Cft - 7,780

Tile Layer - - Cement Bag - 2,436

General Worker - 386 Bricks Nos - 33,200

Security Guard - 28 Brick Chips Cft - -

Operator - 36 300*300 Sqm - -

Total 13 2,378 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Plastering work for 1F.
2. Brick work for RF. (Heavy) Equipment
3. Installation formwork for staircase room slab.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Brick work for 1F.
2. Installation formwork 1F sunshade and lintel. Pile Driving Nos - -
3. Installation formwork for staircase room slab.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Issues
Daily Site Report

Site No. 18 Commencement May 14, 2024 On-going

Site Dacope Weather Cloudy/ 22℃

Date February 25, 2025 Sub-Contractor BOF Korea

Division Khulna Site Engineer SM Nasir Rahman

Foundation Type 28.5m Mobile No. 01312-340760

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 275 8 mm Kg - -

Pile Driver - 202 10 mm Kg - 12,744

Carpenter 2 240 12 mm Kg - 3,064


Rebar
Rebar Worker 4 540 16 mm Kg - 21,217

Concrete Worker - 262 20 mm Kg - 6,901

Mason - 38 25 mm Kg - 90

Electrician - 23 Stone Cft - 7,722

Plumber 12 39 Local Cft - 14,957


Sand
Painter - - Sylhet Cft - 5,440

Tile Layer - - Cement Bag - 1,905

General Worker 4 371 Bricks Nos - 7,900

Security Guard - 42 Brick Chips Cft - 115

Operator - 33 300*300 Sqm - -

Total 23 2,065 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -

1. Installation formwork and rebar for 1F column. Paint Sqm - -


(2/20 ea)
(Heavy) Equipment
2. Concrete curing for 1F slab.
3. Installation deep tubewell for water supply. Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Installation formwork and rebar for 1F column.
Pile Driving Nos - -
2. Installation deep tubewell for water supply.
Roof Hoist Nos - -

General Worker

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 19 Commencement May 07, 2024 On-going

Site Batiaghata Weather Cloudy/ 23℃

Date February 25, 2025 Sub-Contractor KTM

Division Khulna Site Engineer Kawsar Hossen Khan

Foundation Type 22.5m Mobile No. 01648-489852

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 271 8 mm Kg - -

Pile Driver - 92 10 mm Kg - 10,564

Carpenter - 297 12 mm Kg - 1,982


Rebar
Rebar Worker - 493 16 mm Kg - 15,326

Concrete Worker - 204 20 mm Kg - 4,641

Mason - 19 25 mm Kg - 80

Electrician - 26 Stone Cft - 6,299

Plumber - 2 Local Cft - 29,194


Sand
Painter - - Sylhet Cft 400 3,797

Tile Layer - - Cement Bag - 1,200

General Worker 4 332 Bricks Nos - 9,600

Security Guard - 28 Brick Chips Cft - -

Operator - 19 300*300 Sqm - -

Total 5 1,783 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

1. Concrete curing for 1F slab. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Installation rebar for 1F column.
Pile Driving Nos - -
2. Concrete curing for 1F slab.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 27 Commencement May 9, 2024 On-going

Site Keshabpur Weather Cloudy/ 22℃

Date February 25, 2025 Sub-Contractor Amanat Enterprise

Division Khulna Site Engineer Shamshu Ali

Foundation Type 18m Mobile No. 01978-584811

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 282 8 mm Kg - -

Pile Driver - 96 10 mm Kg - 13,066

Carpenter - 375 12 mm Kg - 3,855


Rebar
Rebar Worker - 605 16 mm Kg - 18,838

Concrete Worker - 317 20 mm Kg - 6,545

Mason 5 92 25 mm Kg - -

Electrician - 35 Stone Cft - 7,520

Plumber - - Local Cft 300 4,550


Sand
Painter - Sylhet Cft - 5,713

Tile Layer - - Cement Bag - 2,010

General Worker - 783 Bricks Nos 2,000 16,400

Security Guard - 44 Brick Chips Cft - 350

Operator - 37 300*300 Sqm - -

Total 6 2,666 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

1. Brick work for 1F. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

1. Brick work for 1F. Pile Driving Nos - -

Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 58 Commencement Pending

Site Singra Weather Cloudy / 28℃

Date February 25, 2025 Sub-Contractor KTM

Division Rajshahi Site Engineer


Foundation Type 13.5m Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 83 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - - Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 83 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 82 Commencement May 12, 2024 On-going

Site Kotalipara Weather Cloudy/ 24℃

Date February 25, 2025 Sub-Contractor Ahmed Traders.

Division Dhaka Site Engineer MD. Aoshan Habib

Foundation Type 18m Mobile No. +880 1783-266065

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 262 8 mm Kg - -

Pile Driver - 196 10 mm Kg - 5,390

Carpenter - 22 12 mm Kg - 2,193
Rebar
Rebar Worker - 217 16 mm Kg - 13,507

Concrete Worker - 114 20 mm Kg - 5,173

Mason - 8 25 mm Kg - -

Electrician - 2 Stone Cft - 3,852

Plumber - - Local Cft - 7,890


Sand
Painter - - Sylhet Cft - 2,150

Tile Layer - - Cement Bag - 901

General Worker 6 380 Bricks Nos - 4,350

Security Guard - 11 Brick Chips Cft - 115

Operator - 52 300*300 Sqm - -

Total 7 1,264 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

1. Backfilling for GF slab. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Installation rebar for UGWR wall.
Pile Driving Nos - -
2. Backfilling for GF slab.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 87 Commencement June 1, 2024 On-going

Site Nagarkanda Weather Cloudy/ 25℃

Date February 25, 2025 Sub-Contractor Ahmed Traders.

Division Dhaka Site Engineer Md Ripon Mia

Foundation Type 18m Mobile No. 01768-478645

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 275 8 mm Kg - -

Pile Driver - 239 10 mm Kg - 14,880

Carpenter - 290 12 mm Kg - 3,014


Rebar
Rebar Worker 10 373 16 mm Kg - 16,904

Concrete Worker - 242 20 mm Kg - 8,163

Mason - 29 25 mm Kg - -

Electrician - 20 Stone Cft - 6,201

Plumber - 4 Local Cft - 27,800


Sand
Painter - - Sylhet Cft - 3,900

Tile Layer - - Cement Bag - 1,485

General Worker - 383 Bricks Nos - 5,450

Security Guard - 45 Brick Chips Cft - 240

Operator - 57 300*300 Sqm - -

Total 11 1,957 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Installation rebar for RF beam.
(Heavy) Equipment
2. Installation rebar for 1F staircase.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Installation rebar for RF beam.
2. Concrete casting for 1F staircase. Pile Driving Nos - -
3. Brick work for GF.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 92 Commencement June 12, 2024 On-going

Site Gazaria Weather Cloudy/ 19℃

Date February 25, 2025 Sub-Contractor BOF Korea

Division Dhaka Site Engineer Fuyad Hasan Khan

Foundation Type 13.5m Mobile No. 01959-535416

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 255 8 mm Kg - -

Pile Driver - 131 10 mm Kg - 9,907

Carpenter 2 67 12 mm Kg - 2,589
Rebar
Rebar Worker 3 205 16 mm Kg - 11,373

Concrete Worker - 168 20 mm Kg - 5,025

Mason - 12 25 mm Kg - -

Electrician - 11 Stone Cft - 5,648

Plumber - 25 Local Cft - 5,300


Sand
Painter - - Sylhet Cft - 3,050

Tile Layer - - Cement Bag - 1,592

General Worker - 266 Bricks Nos - 7,500

Security Guard - 30 Brick Chips Cft - 400

Operator - 35 300*300 Sqm - -

Total 6 1,205 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Installation formwork and rebar for 1F column.
(Heavy) Equipment
(11/20 ea)
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Installation formwork and rebar for 1F column.
Pile Driving Nos - -
2. Concrete casting for 1F column.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 101 Commencement May 09, 2024 On-going

Site Ghior Weather Cloudy/ 23℃

Date February 25, 2025 Sub-Contractor KTM

Division Dhaka Field Engineer Md. Mahmud

Foundation Type 18m Mobile No. 01829-968545

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 272 8 mm Kg - -

Pile Driver - 153 10 mm Kg - 9,538

Carpenter 3 325 12 mm Kg - 2,810


Rebar
Rebar Worker - 354 16 mm Kg - 13,038

Concrete Worker - 247 20 mm Kg - 5,682

Mason - 24 25 mm Kg - -

Electrician - 32 Stone Cft - 6,388

Plumber - - Local Cft - 12,100


Sand
Painter - - Sylhet Cft - 4,010

Tile Layer - - Cement Bag - 1,643

General Worker 2 352 Bricks Nos - 12,300

Security Guard - 54 Brick Chips Cft - 200

Operator - 40 300*300 Sqm - -

Total 6 1,853 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Installation formwork for RF beam.
(Heavy) Equipment
2. Making block for RF slab.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

1. Installation rebar for RF beam. Pile Driving Nos - -

Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection