Oil and Natural Gas Corporation Ltd. Evening Drilling Reports DTD: 9 MARCH 2025 - 1800 HRS/NRS
The evening drilling report from ONGC on March 9, 2025, details operations across multiple wells, including S/BHUSHAN, S/GAURAV, S/JYOTI, S/KIRAN, and S/RATNA. Key activities include testing and maintenance of drilling equipment, fluid analysis, and logistical requirements for ongoing operations. Weather conditions and personnel on board are also noted, with no accidents reported.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
24 views4 pages
Oil and Natural Gas Corporation Ltd. Evening Drilling Reports DTD: 9 MARCH 2025 - 1800 HRS/NRS
The evening drilling report from ONGC on March 9, 2025, details operations across multiple wells, including S/BHUSHAN, S/GAURAV, S/JYOTI, S/KIRAN, and S/RATNA. Key activities include testing and maintenance of drilling equipment, fluid analysis, and logistical requirements for ongoing operations. Weather conditions and personnel on board are also noted, with no accidents reported.