Source list
Source list
The source list is used to manage a list of sources for a material in a particular plant and for
particular time periods. Each source is defined by a source list record. The source list has the
following purposes:
1. Plant
2. material
3. vendor
Note : If source list is to be made mandatory for each plant then we can do that in
purchasing view of material master and
Validity period
Period within which the settings made in the source list are valid. With manual source
determination, the period always refers to the delivery date of a requirement. With source
determination using material requirements planning (MRP), however, it always refers to the
requirements date. With materials that are procured using the manual reorder point
procedure, the requirement date is the current date.
Number of the vendor and the responsible purchasing organization (info records) or number
and item of the outline agreement (scheduling agreement or contract) representing the source
of supply for the material.
Fixed source
Select the Fixed field to define a source as a fixed source for the purposes of source
determination. The fixed source of supply is used in all cases except the planning run.Only one
source of the same type (info record or outline agreement item) can be marked as fixed at one
time. If both an info record and an outline agreement item are marked as fixed, the outline
agreement item has priority.
Procurement plant
If the material is to be procured from another plant, enter the number of the plant in the field
PPI and leave the fields for the supplier number and contract number blank. The plant is only
determined as part of source determination for a purchase requisition item with the item type
U (stock transfer).
Blocked source
Select the Blocked field to block a source of supply. The info record or outline agreement item
is not used during the source determination process, and no PO or requisition can be created
with this source.
MRP
You use the MRP (MRP-relevant) indicator to control whether a source should be found during
the planning run (indicator 1). If this source is a scheduling agreement item, you can also
generate scheduling agreement schedule lines directly (indicator 2). You can mark multiple
source list entries as MRP-relevant if you want to use them in quota arrangement.
1. Manually ( ME01)
2. Automatic ( ME05)
3. From PIR ( ME11- extras - source list )
4. From Outline agreements ( me31k – items-Maintain sourcelist )
1. Quota arrangement
2. Source list
3. Outline agreements
4. PIR
Note- If QA is not maintained it will fetch the source from sourcelist , in case its not
maintained it will fetch from agreements and at last it will fetch from PIR if agreements are
not maintained .
Table for Source list
Configuration
Define Source List Requirement at Plant Level - plants for which we wish to specify a
source list requirement.
Through customizing we can define that a source list record must exist for all materials
belonging to a certain plant. To define the source list requirement at plant level, use transaction
code OME5 or use the customizing path below in transaction code SPRO:
Materials Management – Purchasing – Source List – Define Source List Requirement at Plant
Level
To require a source list only for specific materials, forego the plant level configuration and
maintain the source list requirement at the material level. This can be set in the material master
record as an indicator that enforces a source list to be maintained in order to create a purchase
order for that particular material. Pull up the applicable materials in change mode via
transaction code MM02. Then click the Purchasing tab and tick the Source list indicator as
demonstrated below:
Manual Creation of Source List
Manually creating a source list record is suitable when you need to create a single new record
or maintain additional lists within an existing record
Menu path Logistics – Materials Management – Purchasing – Master Data – Source List
– Maintain