The document outlines the key roles and RACI designators for Project ABC, dated April 30, 20XX. It details the responsibilities of team members including the Project Manager, Core Team Budget Lead, and IT Technical Liaison, along with their specific tasks and accountability. The RACI framework is used to clarify who is Responsible, Accountable, Consulted, and Informed for various project deliverables.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
6 views1 page
Final Lab RACI Example
The document outlines the key roles and RACI designators for Project ABC, dated April 30, 20XX. It details the responsibilities of team members including the Project Manager, Core Team Budget Lead, and IT Technical Liaison, along with their specific tasks and accountability. The RACI framework is used to clarify who is Responsible, Accountable, Consulted, and Informed for various project deliverables.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
Key Roles and RACI - Potential Solution
Project: Project ABC
Date: April 30, 20XX
Team Member Name Assigned Role RACI Designator Assigned work tasks. Responsible for providing Ram Project Manager AI R Responsible project deliverables. Priya Core Team Budget Lead RACI Sam Core Team Budget Support RC A Accountable Accountable for the end result of the work.
Maurice IT Technical Liaison C Provide technical and operational guidance and
Hideki Sponsor AI C Consult direction as required. Provide access to all project communications. I Inform Requires status on all aspects of the project.