Final Project Status Report Example

The status report for the ABC Company All Hands Meeting indicates that the project is overall on track, with the schedule in good health but some concerns regarding the budget and scope. Key needs include finalizing the speaker agenda and identifying an alternative caterer, while recent issues include higher food costs and the need for a motivational speaker's placement in the agenda. Recent decisions have resolved AV issues and identified a motivational speaker.

Uploaded by

Silga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Final Project Status Report Example

The status report for the ABC Company All Hands Meeting indicates that the project is overall on track, with the schedule in good health but some concerns regarding the budget and scope. Key needs include finalizing the speaker agenda and identifying an alternative caterer, while recent issues include higher food costs and the need for a motivational speaker's placement in the agenda. Recent decisions have resolved AV issues and identified a motivational speaker.

Uploaded by

Silga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Status Report

Project: ABC Company All Hands Meeting

Date: 31 March 20XX


Name/Organization Sarah Wilson/Operations
Overall Status of Project Deliverables
Deliverable Status Objectives Current Health Forecast/Trending
(Red, Yellow, Green)
• Green: On track for Scope Yellow Yellow
completion as planned
• Yellow: Some risks and Schedule Green Green
issues present
• Red: Will not achieve Budget Green Red
desired results
Must Have: Need to finalize speaker agenda/CEO
Help Needed and Operations Manager
(Requirement and Sources) Should Have: Need to identify alternative caterer
to meet some dietary needs/Operations Manager
Describe as Must Have, Should
Have, and Like to Have
Must Have: May need additional $2000. Initial
refreshment estimate too low/Finance Lead
Risks • Add: Key personnel absences
(New risks and changes since
• Add: Limited gluten free food choices
last report (Add, Change,
Delete)) • Delete: AV configuration issues
Issues • Food cost estimates higher than planned
(Risks that occurred or
questions you need responses
• Need to know where to fit motivational
for) speaker in agenda
Recent/Pending Decisions
Finalization of required speakers is needed to
Impacting Project
plan agenda

• AV issues resolved
Comments
• Motivational speaker identified