Mark Labs Revised

Shamenek Investments Ltd has provided a quotation for lab fit outs to Mark, dated April 29, 2024, with a total cost of 75,000.00 after a discount. The quotation includes design, supply, and installation of various components such as cabinetry, sliding doors, and plumbing items. A payment plan is outlined with a balance due of 15,000.00 to be paid in installments over the next few months.

Uploaded by

lucbrouillard381
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views1 page

Mark Labs Revised

Shamenek Investments Ltd has provided a quotation for lab fit outs to Mark, dated April 29, 2024, with a total cost of 75,000.00 after a discount. The quotation includes design, supply, and installation of various components such as cabinetry, sliding doors, and plumbing items. A payment plan is outlined with a balance due of 15,000.00 to be paid in installments over the next few months.

Uploaded by

lucbrouillard381
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

General Construction and Property Development

Building Renovation Interior works Demolishion Specialised works


Shamenek Investments Ltd

Quotation
As requested, below is the quotation. kindly contact us for more details
Issued to Date
Mark 29th April 2024
Validity period Draw check to
30 days Shamenek investiments ltd
Delivery to Terms
409 fortis suites Nbi

Item Particulars Qty Unit Unit cost Amount

Quotation for: Lab fit outs

1. Design the proposed lab cabinetry layout ,supply and fix 18mm thick white particle boards
with the neccasary accessories, supply and fix sliding door and aluminium partition to
specifications.

A. Design layout 00,000.00


B. Supply and fix lab fitouts 31,000.00

n
C. Supply and fix slidind door set 18,000.00

o
d. Supply and fix aluminium partition complete with window film 9,000.00

i
e. Supply plumbing items 2,100.00

s
f. Supply name plaque 1,800.00

r
g. labor and logistics 18,000.00

e
Sub total 79,900.00
Discounted 4,900.00

V
d
Grannd total 75,000.00
Amount issued 60,000.00

Balance payment plan:

i s e
v
June 2024 5,000.00

e
JULY 2024 5,000.00
August 2024 5,000.00

Prepared by:
sil accounts team Balance due 15,000.00