0% found this document useful (0 votes)
12 views84 pages

Genet & Selam Final Boq

The document outlines the EFOYTA 2015 housing project, detailing the construction of three blocks with various structural components including sub-structure and super-structure work. It includes a breakdown of costs associated with excavation, concrete work, masonry, block work, and finishing, along with VAT calculations. The project is managed by HH Consulting Architects & Engineers plc, and the financial details are presented in Birr.

Uploaded by

bereket berhe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views84 pages

Genet & Selam Final Boq

The document outlines the EFOYTA 2015 housing project, detailing the construction of three blocks with various structural components including sub-structure and super-structure work. It includes a breakdown of costs associated with excavation, concrete work, masonry, block work, and finishing, along with VAT calculations. The project is managed by HH Consulting Architects & Engineers plc, and the financial details are presented in Birr.

Uploaded by

bereket berhe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 84

PROJECT:- EFOYTA 2015, GENET AND SELAM SEVENTEEN HOUSING CORPORATIVE ASSOCIATIONS

(3-BLOCKS ''B+G+9+T")
Consultant:-HH Consulting Architects & Engineers plc.
ITEM
DESCREPTION UNIT CONTRACT
NO
1 BLOCK-1 BIRR -
1 BLOCK-2 BIRR -
1 BLOCK-3 BIRR -
GRAND TOTAL………..A BIRR -

15% VAT BIRR -

GRAND TOTAL (A) inc vat BIRR -


PROJECT:- EFOYTA 2015, GENET AND SELAM SEVENTEEN HOUSING CORPORATIVE ASSOCIATIONS (3-
BLOCKS ''B+G+9+T")
CONSULTANT:- HH Consulting Architects & Engineers plc

UNIT CONTRACT

A . SUB – STRUCTURE

2. EXCAVATION & EARTH WORK BIRR -


3. CONCRETE WORK BIRR -
4. MASONRY WORK BIRR -

SUB TOTAL ………. (A) -

B. SUPER – STRUCTURE

1. CONCRETE WORK BIRR -


2. BLOCK WORK BIRR -
8. FINISHING WORKS BIRR -

SUB SURFACE DRAINAGE& WATERPROOFING BIRR -


SUPER TOTAL………..(B) BIRR -

GRAND TOTAL FOR COMPLEX BUILDING ………. (A) + (B) BIRR -


Item
no Description Unit Quantity Rate AMOUNT

A. SUB STRUCTURE
1. EXCAVATION AND EARTH WORK

1.01 Site clearing and removing the top 20cm thick soil. M2 1,617.58

Bulk excavation in ordinary soil to reduce level to the specified depth


1.02 on the drawing or as instructed by the Engineer up to an average M3 2,299.24
maximum depth of 1500 mm under site clearing.
Ditto but in weatherd soil exceeding 1500mm but not exceeding
1.03 M3 2,220.80
3000mm from reduced level.

1.04 Pit excavation in ordinary soil to the specified depth on the drawing. M3 781.69

Ditto but in weatherd soil exceeding 1500mm but not exceeding


1.05 M3 781.69
3000mm from reduced level.
Trench excavation for masonry foundation wall to an average depth of
1.06 M3 467.48
150cm from reduced level in ordinary soil
Fill around foundation from granular material imported from
1.07 outside( from quarry) and compact in layers not exceeding 20cm thick. M3 1,162.32

Fill around stone masonary to maintain the desired level with selected
1.08 borrowed non expansive material and compact by using rammer in M3 169.66
layers not exceeding 20cm.
Fill under hard core with non expansive selected material and compact
1.09 by 14ton drum roller in layers not exceeding 20cm thick by sprinkling M3 314.03
water to insure 100% modified AASHTO dry density.
Cart away
25cm thicksurplus
basalticexcavated material
or equivalent stonetohardcore,
a distance notrolled,
well exceeding
1.1 M3 7,701.00
5kms.
consolidated and blinded with crushed stone.

1.11 M2 1,256.13

TOTAL CARRIED TO SUMMARY ...................................................

2. CONCRETE
2.1 CAST-IN-PLACE CONCRETE

Particular attention is to be given to the following remarks along with


the technical specification and method of measurement. The quality of
ingredient materials must satisfy the standard quality requirements and
concrete design mixes shall be prepared and certified by laboratory
testing. During casting samples should be taken for laboratory testing
following specification requirements.
Pricing notes:
A) The costs of concrete shall include sampling, storing and testing of
concrete test cubes as required and providing cube moulds necessary
for the purpose and for submitting reports of tests to the consultant.
B) Price for concrete shall include placing of concrete with approved
methods & means, for vibrating with mechanical vibrators, curing.
Concrete:- The specified concrete strength must be confirmed by
laboratory test.
Reinforcement bars:- The specified strength and other related
properties of reinforcment bar must be confined either by
manufacturer's catalogue/manual or/ and by laboratory test.
50 mm lean concrete quality C-5, with minimum cement content of 150
2.1
kg /m3, of concrete; Type of Cement to be PPC
a) Under Footing pad M2 372.15
b) Under Ramp Slab M2 64.15
c) Under Liftshaft and shear wall M2 8.15
d)Under RC Retaining Wall pad M2 211.33
e) Under masonry M2 178.28

Reinforced concrete in class C-30 with a minimum OPC (Ordinary


Portland Cement) content of 420 kg/m3 ( with a 28 day 150 mm cube
2.2 crushing strength of 30 Mpa) and maximum aggregate size of 20mm
cast into formworks and vibrated around rod reinforcement bars.
(Formwork and reinforcement measured separately).
a) In Footing Pad M3 372.10
b) In Foundation column M3 28.97
c) In Basement Cloumn M3 47.05
d) In Basement Beam M3 51.97
e) in Ground floor Beam M3 50.73
f) in 150mm thick Basement floor slab M
2
1208.71
g) in 170mm thick ground floor slab M
2
1247.07
h) in Staircase and Landing M3 5.25
i) in Retaining Shearwall M3 86.64
j) in Lift shaft and shearwall M3 22.61
k) in Entrance Step M3 7.17
L) In disable Ramp M3 3.46
m) In parking Ramp M3 12.86
FORMWORK
2.3 Provide, cut and fix formwork which ever is appropriate; Formwork shall
be timbered / laminated plywood or steel or a combination of two,
sufficient to contain the wet concrete without leakage. Enough to
support temporary loading and pressure from placing compaction or
vibration without displacement or appreciable deflection

a) In Footing Pad M2 520.19


b) In Foundation column M2 195.14
c) In Basement Cloumn M2 310.84
d) In Basement Beam M2 391.68
e) in Ground Beam M2 374.91
f) in 170mm thick ground floor slab M2 1248.47
g) in Staircase and Landing M2 33.48
h) in Retaining Shearwall M2 874.35
i) in Lift shaft and shearwall M2 258.46
j) in Entrance Step M2 14.34
k) In disable Ramp M2 3.84

for bar diameter less than 12mm(Ø≤12mm) use Grade 40 (s-30)based on ASTM
A615 shall have minimum Yield strength of 300Mpa shows for bar diameter grater
than 12mm(Ø>12mm) use Grade 60 (s-60)based on ASTM A615 shall have
2.4 minimum Yield strength of 400Mpa steel bar reinforcement according to the
structural drawings. Reinforcement shall be free from dirt, oil, grease, paint, etc
and any other substance which may affect the reinforcement and concrete bond.
Price shall include cutting, bending, placing in position and tying wires.
b) Dia 8 mm deformed bar Kg 10,908.01
c) Dia 10mm deformed bar Kg 28,061.41
d) Dia 12 mm deformed bar Kg 8,032.00
e) Dia 14 mm deformed bar Kg 9,530.11
f) Dia 16 mm deformed bar Kg 11,801.00
g) Dia 20 mm deformed bar Kg 18,057.85
TOTAL CARRIED TO SUMMARY ...................................................

3. MASONRY WORK

3.1.1 Hard trachytic roughly dressed stone masonry foundation wall below ground level
bedded in cement mortar mix (1:3) as per the detail drawing M3 297.82

TOTAL CARRIED TO SUMMARY ...................................................

B-SUPER STRUCTURE
2 1. CONCRETE
2.1 1. CONCRETE WORK
Reinforced concrete Class C-32/40,with minimum cement content of 488 kg of
2.1.1 cement/m3 filled in to form work and vibrated around rod
reinforcement.(Formwork and reinforcement measured separately)

Pricing notes:
A) The costs of concrete shall include sampling, storing and testing of concrete
test cubes as required and providing cube moulds necessary for the purpose and
for submitting reports of tests to the consultant.
B) Price for concrete shall include placing of concrete with approved methods &
means, for vibrating with mechanical vibrators, curing.

Reinforced concrete in class C-30 with a minimum OPC (Ordinary Portland


Cement) content of 420 kg/m3 ( with a 28 day 150 mm cube crushing strength of
30 Mpa) and maximum aggregate size of 20mm cast into formworks and vibrated
around rod reinforcement bars. (Formwork and reinforcement measured
separately).

a) In elevation columns. M3 396.12


b) In floor beam M3 456.72
c) In terrace floor beams. M3 50.68
d) In 170mm thick typical solid floor slab . m
2
8921.19
e) In 170mm thick terrace floor and water tanker slab . m
2
1233.99
f) In Water tanker beam M3 12.42
g) In stair case and Landing M3 41.59
h) In lift shear wall & sw M3 235.38

2.2.1 Provide, cut and fix formwork which ever is appropriate;Formwork shall be
timbered / laminated plywood or steel or a combination of two, sufficient to
contain the wet concrete without leakage. Enough to support temporary loading
and pressure from placing compaction or vibration without displacement or
appreciable deflection
a) In elevation columns. m
2
3166.56
b) In floor beam m
2
4668.68
c) In terrace floor beams. m
2
492.45
d) In 170mm thick typical solid floor slab . m
2
8921.19
e) In 170mm thick terrace floor and water tanker slab . m
2
1233.99
f) In Water tanker beam m
2
126.99
g) In stair case and Landing m
2
316.41
h) In lift shear wall & sw m
2
1418.66
for bar diameter less than 12mm(Ø≤12mm) use Grade 40 (s-30)based on ASTM
A615 shall have minimum Yield strength of 300Mpa shows for bar diameter grater
than 12mm(Ø>12mm) use Grade 60 (s-60)based on ASTM A615 shall have
2.3.1 minimum Yield strength of 400Mpa steel bar reinforcement according to the
structural drawings. Reinforcement shall be free from dirt, oil, grease, paint, etc
and any other substance which may affect the reinforcement and concrete bond.
Price shall include cutting, bending, placing in position and tying wires.
a) Dia 6 mm plain bar Kg
b) Dia 8 mm deformed bar Kg 92,974.81
c) Dia 10mm deformed bar Kg 114,998.84
d) Dia 12 mm deformed bar Kg 3,115.10
e) Dia 14 mm deformed bar Kg 7,930.64
f) Dia 16 mm deformed bar Kg 48,969.94
g) Dia 20 mm deformed bar Kg 68,984.94

TOTAL CARRIED TO SUMMARY ...................................................


2. BLOCK WORK
Class B, 200mm thick HCB wall with the designed compressive strength , bedded
m2 6,716.68
2.1 in cement mortar (1:3).

2.2 Ditto 2.1 but 1500mm thick m2 1,091.05

2.3 Ditto as item 2-01 but 100mm thick m2 3,097.21

TOTAL CARRIED TO SUMMARY ...................................................

6. FINISHING WORK

4.1 PLASTERING
Supply prepare and apply two coats of Portland cement plaster to internal wall,
Column surfaces, Shear walls, Stair soffit, Parapet walls and ceiling surfaces
where indicated on the drawings and in accordance with the technical
specifications. The proportioning of the first two coats (Base Coats) shall be as
indicated on the specs. Portland Cement Shall comply with the requirements of
ASTM C 150, Type I. Sand Aggregates for Base Coats shall comply with the
requirements of ASTM C 897.
4.2 Price shall include pre-cleaning, groove work as per the design for exterior walls,
edge plastering, post cleaning and at the joints of block walls and concrete
surfaces it shall be racked to form key/shall use crack protection wire mesh to
make flush as per the selection of the Engineer, corner protection in 30x30x3mm
steel angle section or approved material and all preparation work of the surface.

4.2.1 Apply two coats of plastering in cement-sand mortar (1:3) to internal walls
surface. All wall concrete structure joints shall be well treated to avoid hairline
cracks.
a) To all internal HCB wall surfaces. M2 21,676.82
b) To all external HCB wall surfaces. M2 2,649.85
c) To Stair case and landing M2 316.41
d) To R.C. ceiling. M2 10,155.17
e) To exposed beam and column M2 8,213.07
f) To shear wall M2 2,029.62
TOTAL CARRIED TO SUMMARY ...................................................

5 SUB SURFACE DRAINAGE AND WATERPROOFING


5.1 Membrane Sheet
0.4mm thick 1m * 10 m wide imparted polymer based membrane for shear wall M2 346.7206
5.2 Perforated pipe around shear wall
Construct subsurface drainage system around the building where shown on the
drawing and according to the details.The drainage shall be by perforated PN-10
uPVC 250mm pipe ,the gravel pack & pipe covered by geosynthetic wooven
material the trench shall be back filled by red clay plastic to top50cm and the rest ML 169.134
filled by washed gravel of average size 50-75mm. The average depth of the
trench is 2500cm.Construct cleaning eye on a sub soil drainage pipe line as
where shown on the drawing.

5.3 pump sump(sunpit) M3 28.125


Construct pump sump out of 200mm thick R.c wall as per the sanitary detail NO 1
drawing and structural drawing size:- 2500*2500*4500mm length,breadth and
depth respectively
Submersible Pump
Supply,fix,test and commission submersible(dewatering) pump as where shown
on the drawing ,as per manufacturer's instruction and detail drawing given.Price
shall include float swicth(level swicth to on and stop the pump on the
predetermined water level), valves(one-way and stop valves ) and necessary
accessories and connecting pieces for the properfunctioning of the system.

Q = 3-5 l/sec.
H = 3-5 l/sec. NO 1
TOTAL CARRIED TO SUMMARY ...................................................
Title: Take off sheet

T D S Description
C-30 Concrete work
1. EXCAVATION AND EARTH WORK
1.1 Site clearing

1.00 52.00 b/n axis A-J and b/n axis 1' to 6'
30.03
1,561.56 m2

1.00 7.53 parking ramp Area


7.44
56.02 Cum
1,617.58 m2 total Area of item 1.1

1.2 Bulk excavation in ordinary soil to maximum depth


of 1500 mm under site clearing.
1.00 51.00 b/n axis A-J and b/n axis 1' to 6'
29.03
1.50
2,220.80 Cum
1.00 7.03 parking ramp Area
7.44
1.50
78.44 Cum
2,299.24 m2 total Area of item 1.2

1.3 Ditto but in weatherd soil exceeding 1500mm but


not exceeding 3000mm from reduced level.
b/n axis A-J and b/n axis 1' to 6'
1.00 29.03 L = 28.03+1= 29.03
51.00 W = 50+1=51
1.50 d = 1.5
2,220.80 total of 1.3
1.5 Pit excavation in ordinary soil to a depth not
exceeding 1500mm from reduced level(after bulk) .
F-1
12.00 1.70 L = 1.2+0.5
1.70 W= 1.2+0.5
1.50 d=1.5
52.02
F-2
4.00 2.60 L=2.1+0.5
2.60 W=2.1+0.5
1.50 d=1.5
40.56
F-3
7.00 2.80 L=2.3+0.5
2.80 W=2.3+0.5
1.50 d=1.5
82.32
F-4
6.00 3.00 L=2.5+0.5
3.00 W=2.5+0.5
1.50 d=1.5
81.00
F-5
12.00 3.30 L=2.8+0.5
3.30 W=2.8+0.5
1.50 d=1.5
196.02
F-6
3.00 3.30 L=2.8+0.5
3.70 W=3.2+0.5
1.50 d=1.5
54.95
F-7
4.00 3.70 L=3.2+0.5
3.70 W=3.2+0.5
1.50 d=1.5
82.14
F-8
4.00 2.05 L=1.55+0.5
5.95 W=5.452+0.5
1.50 d=1.5
73.21
MF-1
1.00 5.30 L=4.8+0.5
6.90 W=6.4+0.5
1.50 d=1.5
54.86
MF-2
1.00 3.75 L=3.75+0.5
4.88 W=4.378+0.5
1.50 d=1.5
27.44
CF-1
1.00 3.70 L=3.2+0.5
6.70 W=6.2+0.5
1.50 d=1.5
37.19
781.69 total of 1.5

1.5.1 Ditto but in soft rock exceeding 1500mm but not


exceeding 3000mm.
F-1
12.00 1.70 L = 1.2+0.5
1.70 W= 1.2+0.5
1.50 d=1.5
52.02
F-2
4.00 2.60 L=2.1+0.5
2.60 W=2.1+0.5
1.50 d=1.5
40.56
F-3
7.00 2.80 L=2.3+0.5
2.80 W=2.3+0.5
1.50 d=1.5
82.32
F-4
6.00 3.00 L=2.5+0.5
3.00 W=2.5+0.5
1.50 d=1.5
81.00
F-5
12.00 3.30 L=2.8+0.5
3.30 W=2.8+0.5
1.50 d=1.5
196.02
F-6
3.00 3.30 L=2.8+0.5
3.70 W=3.2+0.5
1.50 d=1.5
54.95
F-7
4.00 3.70 L=3.2+0.5
3.70 W=3.2+0.5
1.50 d=1.5
For Contractor For Consultant
________________ ________________
Title: Take off sheet

T D S Description
82.14
F-8
4.00 2.05 L=1.55+0.5
5.95 W=5.452+0.5
1.50 d=1.5
73.21
MF-1
1.00 5.30 L=4.8+0.5
6.90 W=6.4+0.5
1.50 d=1.5
54.86
MF-2
1.00 3.75 L=3.75+0.5
4.88 W=4.378+0.5
1.50 d=1.5
27.44
CF-1
1.00 3.70 L=3.2+0.5
6.70 W=6.2+0.5
1.50 d=1.5
37.19
781.69 M3 volume of item 1.5.1
1.6 Trench excavation for masonry foundation wall to an
average depth of 150cm from reduced level in ordinary soil

peripherial from axis A-J along axis 1' and 6'


2.00 50.50
1.80
1.50
272.70 m3

peripherial along axis A and J b/n axis 1' and 6'


2.00 28.54
1.80
1.50
154.09 m3
along axis A and B
2.00 6.78
2.00
1.50
40.69

467.48 M3 volume of item 1.6


1.7 Fill around foundation from granular material imported from
outside( from quarry) and compact in layers not exceeding
20cm thick.

1.00 1,563.39 m3 tot pit exc


401.07 m3 tot pad and foundation column
1,162.32 m3 volume of item 1.7

1.8 Fill around stone masonary to maintain the desired level


with selected borrowed non expansive material and compact by
using rammer in layers not exceeding 20cm.
1.00 467.48 total trench
297.82 total masonry
169.66 m3 vol of item 1.8
1.9 Fill under hard core with non expansive selected material
and compact by 14ton drum roller in layers not exceeding 20cm
thick by sprinkling water to insure 100% modified AASHTO dry
density.
b/n axis 1-2 and b/n axis A-B, and I-J
2.00 5.94
3.94
0.25
11.70 m3
b/n axis 1-2 and b/n axis B-C &H-I
2.00 5.22
3.94
0.25
10.28 m3

1.00 3.89 b/n axis 1-2 and b/n axis C-D


3.94
0.25
3.83 m3
2.00 6.25 b/n axis 1-2 and b/n axis D-E AND F-G
3.94
0.25
12.31 m3

1.00 4.72 b/n axis 1-2 and b/n axis E-F


3.94
0.25
4.65 m3

1.00 3.90 b/n axis 1-2 and b/n axis G-H


3.94
0.25
3.84 m3

b/n axis 2-3 & 4-5 and b/n axis A-B, and I-J
4.00 6.31
5.94
0.25
37.48 m3
b/n axis 2-3 *4-5 and b/n axis B-C &H-I
4.00 6.31
5.22
0.25
32.94 m3

2.00 6.31 b/n axis 2-3 & 4-5 and b/n axis C-D
3.89
0.25
12.27 m3
4.00 6.31 b/n axis 2-3 &4-5 and b/n axis D-E AND F-G
6.25
0.25
39.44 m3

2.00 6.31 b/n axis 2-3 &4-5 and b/n axis E-F
4.72
0.25
14.89 m3

2.00 6.31 b/n axis 2-3 & 4-5 and b/n axis G-H
3.90
0.25
12.30 m3

b/n axis 3-4 and b/n axis A-B, and I-J


2.00 6.06
5.94
0.25
18.00 m3
b/n axis 3-4 and b/n axis B-C &H-I
2.00 6.06
5.22
0.25
15.82 m3

1.00 6.06 b/n axis 3-4 and b/n axis C-D


3.89
0.25
5.89 m3
2.00 6.06 b/n axis 3-4 and b/n axis D-E AND F-G
6.25
0.25
For Contractor For Consultant
________________ ________________
Title: Take off sheet

T D S Description
18.94 m3

1.00 6.06 b/n axis 3-4 and b/n axis E-F


4.72
0.25
7.15 m3

1.00 6.06 b/n axis 3-4 and b/n axis G-H


3.90
0.25
5.91 m3
b/n axis 5-6 and b/n axis A-B, and I-J
2.00 3.92
5.94
0.25
11.64 m3
b/n axis 5-6 and b/n axis B-C &H-I
2.00 3.92
5.22
0.25
10.23 m3

1.00 3.92 b/n axis 5-6 and b/n axis C-D


3.89
0.25
3.81 m3
2.00 3.92 b/n axis 5-6 and b/n axis D-E AND F-G
6.25
0.25
12.25 m3

1.00 3.92 b/n axis 5-6 and b/n axis E-F


4.72
0.25
4.63 m3

1.00 3.92 b/n axis 5-6 and b/n axis G-H


3.90
0.25
3.82 m3
314.03 m3 Vol of Item 1.09

1.10 Cart away surplus excavated material to a distance not


exceeding 5kms.
Total Vol of Excavation
1.00 1,617.58 Site clearing

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
4,520.03 tot Volume of Bulk
1,563.39 pit 25cm thick basaltic or equivalent stone hardcore, well
1.11
7,701.00 rolled,
m3 Volume of item and
consolidated 1.10 blinded with crushed stone.

b/n axis 1-2 and b/n axis A-B, and I-J


2.00 5.94
3.94
46.81 m2
b/n axis 1-2 and b/n axis B-C &H-I
2.00 5.22
3.94
41.13 m2

1.00 3.89 b/n axis 1-2 and b/n axis C-D


3.94
15.32 m2
2.00 6.25 b/n axis 1-2 and b/n axis D-E AND F-G
3.94
49.25 m2

1.00 4.72 b/n axis 1-2 and b/n axis E-F


3.94
18.60 m2

1.00 3.90 b/n axis 1-2 and b/n axis G-H


3.94
15.37 m2

b/n axis 2-3 & 4-5 and b/n axis A-B, and I-J
4.00 6.31
5.94
149.93 m2
b/n axis 2-3 *4-5 and b/n axis B-C &H-I
4.00 6.31
5.22
131.75 m2

2.00 6.31 b/n axis 2-3 & 4-5 and b/n axis C-D
3.89
49.09 m2
4.00 6.31 b/n axis 2-3 &4-5 and b/n axis D-E AND F-G
6.25
157.75 m2

2.00 6.31 b/n axis 2-3 &4-5 and b/n axis E-F
4.72
59.57 m2

2.00 6.31 b/n axis 2-3 & 4-5 and b/n axis G-H
3.90
49.22 m2

b/n axis 3-4 and b/n axis A-B, and I-J


2.00 6.06
5.94
71.99 m2
b/n axis 3-4 and b/n axis B-C &H-I
2.00 6.06
5.22
63.27 m2

1.00 6.06 b/n axis 3-4 and b/n axis C-D


3.89
23.57 m2
2.00 6.06 b/n axis 3-4 and b/n axis D-E AND F-G
6.25
75.75 m2

1.00 6.06 b/n axis 3-4 and b/n axis E-F


4.72
28.60 m2

1.00 6.06 b/n axis 3-4 and b/n axis G-H


3.90
23.63 m2
b/n axis 5-6 and b/n axis A-B, and I-J
2.00 3.92
5.94
46.57 m2
b/n axis 5-6 and b/n axis B-C &H-I
2.00 3.92
5.22
40.92 m2

1.00 3.92 b/n axis 5-6 and b/n axis C-D


3.89
15.25 m2
2.00 3.92 b/n axis 5-6 and b/n axis D-E AND F-G
6.25
49.00 m2

1.00 3.92 b/n axis 5-6 and b/n axis E-F


4.72
18.50 m2

1.00 3.92 b/n axis 5-6 and b/n axis G-H


3.90
15.29 m2
1,256.13 M2 volume of item 1.11
2. CONCRETE
2.1 50 mm thick lean concrete quality C-5, with minimum
cement content of 150
kg /m3, of concrete:
a) Under Footing pad
12.00 1.20 section A-A (F1)
1.20
17.28 m2

4.00 2.10 section B-B (F2)


2.10
17.64 m2

7.00 2.30 section C-C (F3)


2.30
37.03 m2

6.00 2.50 section D-D (F4)


2.50
37.50 m2

12.00 2.80 section E-E ( F5)


2.80
94.08 m2

3.00 3.20 section F-F (F6)


2.80
26.88 m2

4.00 3.20 section G-G (F7)


3.20
40.96 m2

4.00 5.45 section H-H (F8)


1.55
33.80 m2

1.00 6.40 section J-J (MF-1)


4.80
For Contractor For Consultant
________________ ________________
Title: Take off sheet

T D S Description
30.72 m2

1.00 4.38 section K-K (MF-2)


3.75
16.42 m2

1.00 6.20 section L-L (CF-1)


3.20
19.84 m2

372.15 M2 area of item 2.1 a


b) Under Ramp Slab

1.00 10.80 on axis I b/n 6-1


5.94
64.15 M2 area of item 2.1 b

c) Under Liftshaft and shear wall


1.00 15.00 sw1
0.25
3.75 m2
4.00 4.15 sw2
0.25
4.15 m2
1.00 1.23 sw3
0.20
0.25 m2
8.15 M2 area of item 2.1 c
d) Under RC Retaining Wall pad
2.00 50.00 Along Axis 1'&6' b/n A-J
1.25
125.00 m2

2.00 28.00 Along Axis A&J b/n 1'-6'


1.25
70.00 m2
2.00 6.53 Along Axis A&B
1.25
16.33 m2
211.33 M2 area of item 2.1 d

e) Under masonry

peripherial from axis A-J along axis 1' and 6'


2.00 50.00
1.30
130.00 m2

peripherial along axis A and J b/n axis 1' and 6'


2.00 28.00
1.30
31.30 m2
2.00 6.53 Along Axis A&B
1.30
16.98 m2
178.28 M2 area of item 2.1 e
2.1 Reinforced concrete Class C-30,)
a) In Foting Pad
12.00 1.20 (F1)
1.20
0.50
8.64 m3

4.00 2.10 (F2)


2.10
0.70
12.35 m3

7.00 2.30 (F3)


2.30
0.90
33.33 m3

6.00 2.50 (F4)


2.50
1.00
37.50 m3

12.00 2.80 ( F5)


2.80
1.10
103.49 m3

3.00 3.20 (F6)


2.80
1.20
32.26 m3

4.00 3.20 (F7)


3.20
1.20
49.15 m3

4.00 5.45 (F8)


1.55
0.60
20.28 m3

1.00 6.40 (MF-1)


4.80
1.20
36.86 m3

1.00 4.38 (MF-2)


3.75
1.00
16.42 m3

1.00 6.20 (CF-1)


3.20
1.10
21.82 m3

372.10 M3 Volume of item 2.1 a

b) In Foundation column
4.00 0.60 C1 axis E,F,G and 3,4 intersection,
0.80
1.45
2.78 m3

C2 axis 4and B intersection, Axis 3 &B intersection and


4.00 0.65
3&I and intersection b/n axis 4-I
0.85
1.45
3.20 m3

2.00 0.65 C2' axis 3and D intersection, Axis 4 &D intersection


0.85
1.35
1.49 m3

2.00 0.80 C3 axis 5and B intersection,Axis 5 &i intersection


0.50
1.45
1.16 m3

1.00 0.50 C3' axis 2and G intersection,


0.80
1.55
For Contractor For Consultant
________________ ________________
Title: Take off sheet

T D S Description
0.62 m3

10.00 0.50 C4 axis 6-B, 1-B, 1-I and 6-I intersection,


0.70
1.65
5.77 m3

1.00 0.50 C4' axis 2-F intersection,


0.70
1.65
0.58 m3

1.00 0.50 C5 axis 3-G intersection,


0.80
1.45
0.58 m3

1.00 0.50 C6 axis 4-H intersection,


0.80
1.45
0.58 m3

3.00 0.55 C7 axis 3-C, 4-C & 3-H intersection,


0.80
1.45
1.91 m3

4.00 0.55 C8 axis 2-C, 5-C, 2-H & 5-H intersection,


0.70
1.55
2.39 m3
C9' axis 2-D intersection,
1.00 0.80
0.55
1.45 0.64 m3

4.00 0.80 C9 axis 2-C, 5-C, 2-H & 5-H intersection,


0.55
1.55
2.73 m3

1.00 0.70 C-10 axis 2-E, intersection,


0.55
1.55
0.60 m3

12.00 0.40 C-11 axis 1',-C,D,E,F,G,H & 6'-C,D,E,F,G,H


0.40
2.05
3.94 m3
28.97 M3 Volume of item 2.1 b

c) In Basement Cloumn
4.00 0.80 C1
0.60
2.55
4.90 m3
4.00 0.85 C2
0.65
2.55
5.64 m3

2.00 0.85 C2'


0.65
2.55
2.82 m3
2.00 0.80 C3
0.50
2.55
2.04 m3

1.00 0.80 C3'


0.50
2.55
1.02 m3

10.00 0.70 C4
0.50
2.55
8.92 m3
1.00 0.70 C4'
0.50
2.55
0.89 m3

1.00 0.80 C5
0.50
2.55
1.02 m3

1.00 0.80 C6
0.50
2.55
1.02 m3

3.00 0.80 C7
0.55
2.55
3.37 m3

4.00 0.70 C8
0.55
2.55
3.93 m3

1.00 0.80 C9 '


0.55
2.55
1.12 m3

4.00 0.80 C9
0.55
2.55
4.49 m3

1.00 0.70 C-10


0.55
2.55
0.98 m3

12.00 0.40 C-11


0.40
2.55
4.90 m3
47.05 M3 Volume of item 2.1 c
d) In Basement Beam
1.00 6.84 Axis 1 b/n A-B
0.45
0.25
0.77 m3

1.00 6.84 Axis 1 b/n I-J


0.45
0.25
0.77 m3

1.00 6.84 Axis 6 b/n I-J


0.45
0.25
0.77 m3

1.00 6.84 Axis 6 b/n A-B


0.45

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
0.25
0.77 m3
1.00 49.60 Axis 2 b/n A-J
0.45
0.25
5.58 m3
1.00 23.98 Axis 3 b/n A-E
0.45
0.25
2.70 m3
1.00 17.19 Axis 3 b/n G-J
0.45
0.25
1.93 m3
1.00 4.72 Axis 3' B/N E-F
0.45
0.25
0.53 m3
1.00 49.60 Axis 4 B/N A-J
0.45
0.25
5.58 m3
1.00 49.60 Axis 5 B/N A-J
0.45
0.25
5.58 m3
1.00 25.65 Axis 'B' B/N 1'-6
0.45
0.25
2.89 m3

2.00 26.79 Axis Cand H B/N 1'-6


0.45
0.25
6.03 m3

2.00 26.79 Axis D B/N 1'-6


0.45
0.25
6.03 m3

1.00 26.79 Axis E B/N 1'-6


0.45
0.25
3.01 m3

1.00 26.79 Axis F B/N 1'-6


0.45
0.25
3.01 m3

1.00 26.79 Axis G B/N 1'-6


0.45
0.25
3.01 m3

1.00 26.79 Axis I B/N 1'-6


0.45
0.25
3.01 m3
51.97 M3 Volume of item 2.1 D

e) in Ground floor Beam


1.00 6.19 Axis 1 b/n A-B
0.45
0.25
0.70 m3

1.00 6.19 Axis 1 b/n I-J


0.45
0.25
0.70 m3

1.00 6.84 Axis 6 b/n I-J


0.45
0.25
0.77 m3

1.00 49.60 Axis 2 b/n A-J


0.45
0.25
5.58 m3
1.00 23.98 Axis 3 b/n A-E
0.45
0.25
2.70 m3
1.00 17.69 Axis 3 b/n G-J
0.45
0.25
1.99 m3
1.00 4.97 Axis 3' B/N E-F
0.45
0.25
0.56 m3
1.00 49.60 Axis 4 B/N A-J
0.45
0.25
5.58 m3
1.00 49.60 Axis 5 B/N A-J
0.45
0.25
5.58 m3
1.00 27.15 Axis 'B' B/N 1'-6
0.45
0.25
3.05 m3

3.00 28.18 Axis C ,G and H B/N 1'-6


0.45
0.25
9.51 m3

1.00 28.19 Axis D B/N 1'-6


0.45
0.25
3.17 m3

1.00 28.19 Axis E B/N 1'-6


0.45
0.25
3.17 m3

1.00 28.19 Axis F B/N 1'-6


0.45
0.25
3.17 m3

1.00 26.54 Axis I B/N 1'-6


0.45
0.25
2.99 m3

2.00 6.76 Axis B' & I' B/N 3-4


0.45
0.25
1.52 m3
50.73 M3 Volume of item 2.1 E

f) in 150mm thick Basement floor slab


2.00 5.94 b/n axis A-B & I-J and b/n Axis 1'-1
0.775
9.21 m2

1.00 5.94 b/n axis A-B and b/n Axis 1-2


2.92
For Contractor For Consultant
________________ ________________
Title: Take off sheet

T D S Description
17.34 m2

1.00 5.94 b/n axis A-B and b/n Axis 2-3


6.31
37.48 m2

1.00 5.94 b/n axis A-B and b/n Axis 3-4


6.06
36.00 m2

1.00 5.94 b/n axis A-B and b/n Axis 4-5


6.31
37.48 m2

1.00 5.22 b/n axis B-C and b/n Axis 1-2


3.87
20.20 m2

1.00 5.22 b/n axis B-C and b/n Axis 2-3


6.31
32.94 m2

1.00 5.22 b/n axis B-C and b/n Axis 3-4


6.06
31.63 m2

1.00 5.22 b/n axis B-C and b/n Axis 4-5


6.31
32.94 m2

1.00 5.22 b/n axis B-C and b/n Axis 5-6


3.92
20.46 m2

1.00 3.90 b/n axis C-D and b/n Axis 1-2


3.94
15.37 m2

1.00 3.90 b/n axis C-D and b/n Axis 2-3


6.31
24.61 m2

1.00 3.90 b/n axis C-D and b/n Axis 3-4


6.06
23.63 m2

1.00 3.90 b/n axis C-D and b/n Axis 4-5


6.31
24.61 m2

1.00 3.90 b/n axis C-D and b/n Axis 5-6


3.92
15.29 m2

1.00 6.25 b/n axis D-E and b/n Axis 1-2


3.87
24.19 m2

1.00 6.25 b/n axis D-E and b/n Axis 2-3


6.31
39.44 m2

1.00 6.25 b/n axis D-E and b/n Axis 3-4


6.06
37.88 m2

1.00 6.25 b/n axis D-E and b/n Axis 4-5


6.31
39.44 m2

1.00 6.25 b/n axis D-E and b/n Axis 5-6


3.92
24.50 m2

1.00 4.72 b/n axis E-F and b/n Axis 1-2


3.87
18.27 m2

1.00 4.72 b/n axis E-F and b/n Axis 2-3


6.31
29.78 m2

1.00 4.72 b/n axis E-F and b/n Axis 3-3'


1.70
8.02 m2

1.00 (4.11) DDT stair type s1


3.14
(12.91) m2

1.00 4.72 b/n axis E-F and b/n Axis 3'-4


4.10
19.35 m2

1.00 4.72 b/n axis E-F and b/n Axis 4-5


6.31
29.78 m2

1.00 4.72 b/n axis E-F and b/n Axis 5-6


3.92
18.50 m2

1.00 6.25 b/n axis F-G and b/n Axis 1-2


3.87
24.19 m2

1.00 6.25 b/n axis F-G and b/n Axis 2-3


6.31
39.44 m2

1.00 (4.80) DDT LIFT opening


2.25
(10.80) m2

1.00 6.25 b/n axis F-G and b/n Axis 3-4


6.06
37.88 m2

1.00 6.25 b/n axis F-G and b/n Axis 4-5


6.31
39.44 m2

1.00 6.25 b/n axis F-G and b/n Axis 5-6


3.92
24.50 m2

1.00 3.90 b/n axis G-H and b/n Axis 1-2


3.87
15.09 m2

1.00 3.90 b/n axis G-H and b/n Axis 2-3


6.31
24.61 m2

1.00 3.90 b/n axis G-H and b/n Axis 3-4


6.06
23.63 m2

1.00 3.90 b/n axis G-H and b/n Axis 4-5


6.31
24.61 m2

1.00 3.90 b/n axis G-H and b/n Axis 5-6


3.92
15.29 m2

1.00 5.22 b/n axis H-I and b/n Axis 1-2


3.87
20.20 m2

1.00 5.22 b/n axis H-I and b/n Axis 2-3


6.31
32.94 m2

1.00 5.22 b/n axis H-I and b/n Axis 3-4


6.06

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
31.63 m2

1.00 5.22 b/n axis H-I and b/n Axis 4-5


6.31
32.94 m2

1.00 5.22 b/n axis H-I and b/n Axis 5-6


3.92
20.46 m2

1.00 5.94 b/n axis I-J and b/n Axis 1-2


3.87
22.99 m2

1.00 5.94 b/n axis I-J and b/n Axis 2-3


6.31
37.48 m2

1.00 5.94 b/n axis I-J and b/n Axis 3-4


6.06
36.00 m2

1.00 5.94 b/n axis I-J and b/n Axis 4-5


6.31
37.48 m2

1.00 5.94 b/n axis I-J and b/n Axis 5-6


3.92
23.28 m2
1208.71 m2 Total Area of item f

g) in 170mm thick ground floor slab


2.00 5.94 b/n axis A-B & I-J and b/n Axis 1'-1
1.03
12.24 m2

1.00 5.862 b/n axis A-B and b/n Axis 1-2


2.92
17.12 m2

1.00 5.862 b/n axis A-B and b/n Axis 2-3


6.31
36.99 m2

1.00 5.862 b/n axis A-B and b/n Axis 3-4


6.06
35.52 m2

1.00 (2.50) ddt stair case b/n axis A-B' and b/n axis 3'-4
4.8
(12.00) m2

1.00 5.862 b/n axis A-B and b/n Axis 4-5


6.31
36.99 m2

1.00 5.22 b/n axis B-C and b/n Axis 1-2


4.20
21.92 m2

1.00 5.22 b/n axis B-C and b/n Axis 2-3


6.31
32.94 m2

1.00 5.22 b/n axis B-C and b/n Axis 3-4


6.06
31.63 m2

1.00 5.22 b/n axis B-C and b/n Axis 4-5


6.31
32.94 m2

1.00 5.22 b/n axis B-C and b/n Axis 5-6


4.17
21.77 m2

1.00 3.90 b/n axis C-D and b/n Axis 1-2


4.20
16.38 m2

1.00 3.90 b/n axis C-D and b/n Axis 2-3


6.31
24.61 m2

1.00 3.90 b/n axis C-D and b/n Axis 3-4


6.06
23.63 m2

1.00 3.90 b/n axis C-D and b/n Axis 4-5


6.31
24.61 m2

1.00 3.90 b/n axis C-D and b/n Axis 5-6


4.17
16.26 m2

1.00 6.25 b/n axis D-E and b/n Axis 1-2


4.2
26.25 m2

1.00 6.25 b/n axis D-E and b/n Axis 2-3


6.31
39.44 m2

1.00 6.25 b/n axis D-E and b/n Axis 3-4


6.06
37.88 m2

1.00 6.25 b/n axis D-E and b/n Axis 4-5


6.31
39.44 m2

1.00 6.25 b/n axis D-E and b/n Axis 5-6


4.17
26.06 m2

1.00 6.25 b/n axis-E-F and b/n Axis 1-2


4.2
26.25 m2

1.00 6.25 b/n axis E-F and b/n Axis 2-3


6.31
39.44 m2

1.00 (5.10) ddt stair case b/n axis 2-3' & axis E-F
3.10
-15.81 m2

1.00 (1.32) ddt duct opening axis 3-3'& axis E-F


0.80
(1.06) m2

1.00 6.25 b/n axis E-F and b/n Axis 3-4


6.06
37.88 m2

1.00 6.25 b/n axis E-F and b/n Axis 4-5


6.31
39.44 m2

1.00 6.25 b/n axis E-F and b/n Axis 5-6


4.14
25.87 m2

1.00 6.25 b/n axis F-G and b/n Axis 1-2


4.2
26.25 m2

1.00 6.25 b/n axis F-G and b/n Axis 2-3


6.31
39.44 m2

1.00 (4.67) DDT LIFT opening


2.25
(10.51) m2

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
1.00 6.25 b/n axis F-G and b/n Axis 3-4
6.06
37.88 m2

1.00 6.25 b/n axis F-G and b/n Axis 4-5


6.31
39.44 m2

1.00 6.25 b/n axis F-G and b/n Axis 5-6


4.17
26.06 m2

1.00 3.90 b/n axis G-H and b/n Axis 1-2


4.20
16.38 m2

1.00 3.90 b/n axis G-H and b/n Axis 2-3


6.31
24.61 m2

1.00 3.90 b/n axis G-H and b/n Axis 3-4


6.06
23.63 m2

1.00 3.90 b/n axis G-H and b/n Axis 4-5


6.31
24.61 m2

1.00 3.90 b/n axis G-H and b/n Axis 5-6


4.17
16.26 m2

1.00 5.22 b/n axis H-I and b/n Axis 1-2


4.20
21.92 m2

1.00 5.22 b/n axis H-I and b/n Axis 2-3


6.31
32.94 m2

1.00 5.22 b/n axis H-I and b/n Axis 3-4


6.06
31.63 m2

1.00 5.22 b/n axis H-I and b/n Axis 4-5


6.31
32.94 m2

1.00 5.22 b/n axis H-I and b/n Axis 5-6


4.17
21.77 m2

1.00 5.94 b/n axis I-J and b/n Axis 1-2


4.20
24.95 m2

1.00 5.94 b/n axis I-J and b/n Axis 2-3


6.31
37.48 m2

1.00 5.94 b/n axis I-J and b/n Axis 3-4


6.06
36.00 m2

1.00 (4.80) DDT stair Case b/n axis i-j and b/n axis 3-4
2.50
(12.00) m2

1.00 5.94 b/n axis I-J and b/n Axis 4-5


6.31
37.48 m2

1.00 5.94 b/n axis I-J and b/n Axis 5-6


3.92
23.28 m2
1247.07 m2 Total Area of item g

h) in Staircase and Landing


stair case 1 ( b/n axis E-F )

1.00 3.57 landing beam 1 (B-1)


0.40
0.20
0.29 m3

1.00 4.97 landing beam 2 (B-2)


0.45
0.25
0.56 m3

1.00 4.32 sofit slab (waist slab) -3 to -2


1.50
0.18
1.17 m3
1.00 4.32 sofit slab (waist slab) -2 to 0+00
1.50
0.18
1.17 m3

1.00 3.10 Landing 1


0.56
0.15
0.26 m3
1.00 1.50 Landing 2
1.35
0.15
0.30 m3
2.00 1.50 stepfrom level -3 to -2
0.5 0.59
0.16
0.14 m3
4.00 1.50 stepfrom level -3 to -2
0.5 0.30
0.16
0.29 m3
2.00 1.50 step from level -2 to 0+00
0.5 0.59
0.16
0.28 m3
11.00 1.50 stepfrom level -3 to -2
0.5 0.30
0.16
0.79 m3

5.25 m3 tot item h

i) in Retaining Shearwall and pad


2.00 50 along axis 1' &6' b/n A-J
2.05
0.25
51.25 m3

2.00 28 along axis A&J b/n 1'-6'


2.05
0.25
28.70 m3

2.00 6.53 along axis A&B


2.05
0.25
6.69 m3

86.64 m3 tot item i


j) in Lift shaft and shearwall
basement to ground
Elevator Shaft Wall (sw-1)
1.00 5.00 Along SECTION A'-A'
0.25
3.00
3.75 m3
2.00 2.00 Along Axis b/n axis 3 & F
0.25
3.00
3.00 m3

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
2.00 0.81 Along Axis 3
0.25
3.00
1.21 m3

1.00 0.99 Along Axis 3


0.25
3.00
0.74 m3

2.00 1.20 top Above door opening


0.25
1.20
0.72 m3
Shear wall (SW-2)
4.00 4.15 b/n axis 2-1 and 5-6
0.25
3.00
12.46 m3
Shear wall (SW-3)
1.00 1.23 b/n axis 2-1 and 5-6
0.2
3.00
0.74 m3
22.61 m3 tot item j
k) in Entrance Step

2.00 3.48 beam


0.40
0.20
0.56 m3

2.00 3.47 soffit slab


0.18
4.00
5.00 m3

18.00 4.00 step


0.5 0.15
0.30
1.62 m3
7.17 m3 tot item k
L) In disable Ramp
2.00 8.00 ramp (1st and 2nd flight)
1.20
0.18
3.46 m3 tot item L
m) In parking Ramp
1 10.9
5.9
0.2
12.86 m3 tot item m
MASONRY WORK
peripherial from axis A-J along axis 1 and 6
2.00 38.59
1.00
1.50
115.77 m3

peripherial along axis A and J b/n axis 1 and 5


2.00 12.63
1.00
1.50
37.89 m3
along axis 3 b/n axis A-J
2.00 19.15
1.00
1.50
57.45 m3

Along axis E b/n axis 1-5


2.00 14.45
2.00
1.50
86.71 m3
297.82 M3 volume of item 1

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
B-SUPER STRUCTURE
1. CONCRETE WORK
a) In elevation columns.
4.00 0.80 C-1
0.60 GROUND FLOOR
3.39
6.51 m3
4.00 0.80 C-1
2.00 0.60 1st floor,2nd
2.75
10.56 m3
4.00 0.70 C-1
4.00 0.50 3rd, 4th, 5th,6th
2.75
15.40 m3

4.00 0.60 C-1


4.00 0.40 7th, 8th,9th& terrace
2.75
10.56 m3
4.00 0.85 C-2
0.65 GROUND FLOOR
3.39
7.49 m3
4.00 0.85 C-2
3.00 0.65 1st, 2nd, 3rd
2.75
18.23 m3
4.00 0.70 C-2
3.00 0.50 4th,5th,6th
2.75
11.55 m3

4.00 0.60 C-2


3.00 0.40 7th, 8th,9th
2.75
7.92 m3

2.00 0.85 C-2'


0.65 GROUND FLOOR
3.39
3.75 m3
2.00 0.85 C-2'
3.00 0.65 1st floor,2nd,3rd
2.75
9.12 m3
2.00 0.70 C-2'
3.00 0.50 4th, 5th,6th
2.75
5.77 m3

2.00 0.60 C-2'


4.00 0.40 7th, 8th,9th& terrace
2.75
5.28 m3

2.00 0.80 C-3


0.50 Ground
3.39
2.71 m3

2.00 0.80 C-3


2.00 0.50 1st and 2nd
2.75
4.40 m3
2.00 0.70 C-3
4.00 0.50 3rd, 4th, 5th and 6th
2.75
7.70 m3

2.00 0.50 C-3


3.00 0.40 7th,8th and 9th
2.75
3.30 m3

1.00 0.80 C-3'


0.50 Ground
3.39
1.36 m3

1.00 0.80 C-3'


2.00 0.50 1st and 2nd
2.75
2.20 m3
1.00 0.70 C-3'
4.00 0.50 3rd, 4th, 5th and 6th
2.75
3.85 m3

1.00 0.50 C-3'


4.00 0.40 7th,8th and 9th & terrace
2.75
2.20 m3

10.00 0.70 C-4


0.50 Ground
3.39
11.87 m3

10.00 0.70 C-4


0.50 1st
2.75
9.63 m3

10.00 0.70 C-4


6.00 0.50 1st-6th
2.75
57.75 m3

10.00 0.60 C-4


3.00 0.40 7th-9th
2.75
19.80 m3

1.00 0.70 C-4'


0.50 Ground
3.39
1.19 m3

1.00 0.70 C-4'


0.50 1st
2.75
0.96 m3

1.00 0.70 C-4'


6.00 0.50 1st-6th
2.75
5.77 m3

1.00 0.60 C-4'


4.00 0.40 7th-terrace
2.75
2.64 m3

1.00 0.80 C-5'


0.50 Ground
3.39
1.36 m3

1.00 0.80 C-5'


2.00 0.50 1st -2nd
2.75
2.20 m3

1.00 0.70 C-5'


4.00 0.50 3rd-6th
2.75
3.85 m3

1.00 0.60 C-5'


4.00 0.40 7th-terrace
2.75
2.64 m3

1.00 0.80 C-6


0.50 Ground

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
3.39
1.36 m3

1.00 0.80 C-6


0.50 1ST
2.75
1.10 m3
1.00 0.70 C-6
5.00 0.50 2nd-6th
2.75
0.96 m3

1.00 0.60 C-6


5.00 0.40 7th-9th
2.75
3.30 m3

3.00 0.80 C-7


0.55 Ground
3.39
4.47 m3

3.00 0.80 C-7


2.00 0.55 1st -2nd
2.75
7.26 m3
3.00 0.70 C-7
4.00 0.50 3rd-6th
2.75
11.55 m3

3.00 0.60 C-7


5.00 0.40 7th-9th
2.75
9.90 m3
4.00 0.70 C-8
0.55 Ground
3.39
5.22 m3
4.00 0.70 C-8
2.00 0.55 1st-2nd
2.75
8.47 m3
4.00 0.70 C-8
4.00 0.50 3rd-6th
2.75
15.40 m3
4.00 0.50 C-8
3.00 0.40 7th-9th
2.75
6.60 m3
1.00 0.80 C-9'
0.55 Ground
3.39
1.49 m3
1.00 0.80 C-9'
2.00 0.55 1st-2nd
2.75
2.42 m3
1.00 0.70 C-9'
4.00 0.50 3rd-6th
2.75
3.85 m3
1.00 0.50 C-9'
4.00 0.40 7th-terrace
2.75
2.20 m3
4.00 0.80 C-9
0.55 Ground
3.39
5.97 m3
4.00 0.80 C-9
2.00 0.55 1st-2nd
2.75
9.68 m3
4.00 0.70 C-9
4.00 0.50 3rd-6th
2.75
15.40 m3
4.00 0.50 C-9
3.00 0.40 7th-9th
2.75
6.60 m3
1.00 0.70 C-10
0.55 Ground
3.39
1.31 m3
1.00 0.70 C-10
2.00 0.55 1st-2nd
3.39
2.61 m3

1.00 0.70 C-10


4.00 0.50 3rd-6th
3.39
4.75 m3

1.00 0.70 C-10


4.00 0.50 7th-Terrace
3.39
4.75 m3
396.12 m3 Vol tot item 1.1 a

b) In floor beam
1st floor beam

1.00 6.19 beam on axis 1 b/n A-B


0.45
0.25
0.70 m3

1.00 6.19 beam on axis 1 b/n I-J


0.45
0.25
0.70 m3

1.00 49.60 beam on axis 2 b/n A-J


0.45
0.25
5.58 m3

1.00 23.98 beam on axis 3 A-E


0.45
0.25
2.70 m3

1.00 17.69 beam on axis 3 G-J


0.45
0.25
1.99 m3

1.00 4.97 beam on axis 3' E-F


0.45
0.25
0.56 m3

1.00 49.60 beam on axis 4 b/n A-J


0.45
0.25
5.58 m3

1.00 22.31 beam on axis 5 b/n A-E


0.45
0.25
2.51 m3

1.00 22.31 beam on axis 5 b/n F-G


0.45
0.25
2.51 m3

1.00 6.19 beam on axis 6 b/n A-B


0.45
0.25
0.70 m3

1.00 6.19 beam on axis 6 b/n I-J


For Contractor For Consultant
________________ ________________
Title: Take off sheet

T D S Description
0.45
0.25
0.70 m3

2.00 12.00 beam on axis A&J b/n axis 4-6


0.45
0.25
2.70 m3

2.00 11.98 beam on axis A&J b/n axis 1-3


0.45
0.25
2.70 m3

1.00 26.57 beam on axis B b/n axis 1-6


0.45
0.25
2.99 m3

4.00 20.68 beam on axis C,D,G&H b/n axis 1-5


0.45
0.25
9.30 m3

1.00 22.43 beam on axis E b/n axis 2-5


0.45
0.25
2.52 m3

1.00 22.43 beam on axis F b/n axis 2-5


0.45
0.25
2.52 m3

1.00 26.58 beam on axis I b/n axis 1-6


0.45
0.25
2.99 m3
2.00 5.81 beam on axis B'&I' b/n axis 3-4
0.45
0.25
1.31 m3
2ND TO 9TH

1.00 6.19 beam on axis 1 b/n A-B


8.00 0.45
0.25
5.57 m3

1.00 6.19 beam on axis 1 b/n I-J


8.00 0.45
0.25
5.57 m3

1.00 22.31 beam on axis 2 b/n A-E


8.00 0.45
0.25
20.08 m3
1.00 22.31 beam on axis 2 b/n F-J
8.00 0.45
0.25
20.08 m3

1.00 23.98 beam on axis 3 A-E


8.00 0.45
0.25
21.59 m3

1.00 17.69 beam on axis 3 G-J


8.00 0.45
0.25
15.92 m3

1.00 4.97 beam on axis 3' E-F


8.00 0.45
0.25
4.48 m3

1.00 49.60 beam on axis 4 b/n A-J


8.00 0.45
0.25
44.64 m3

1.00 22.31 beam on axis 5 b/n A-E


8.00 0.45
0.25
20.08 m3

1.00 22.31 beam on axis 5 b/n F-G


8.00 0.45
0.25
20.08 m3
1.00 6.19 beam on axis 6 b/n A-B
8.00 0.45
0.25
5.57 m3

1.00 6.19 beam on axis 6 b/n I-J


8.00 0.45
0.25
5.57 m3

2.00 12.00 beam on axis A&J b/n axis 4-6


8.00 0.45
0.25
21.59 m3

2.00 11.98 beam on axis A&J b/n axis 1-3


8.00 0.45
0.25
21.57 m3

1.00 26.57 beam on axis B b/n axis 1-6


8.00 0.45
0.25
23.92 m3

2.00 20.68 beam on axis C,&H b/n axis 1-5


8.00 0.45
0.25
37.22 m3
2.00 20.68 beam on axis D,&G b/n axis 1-5
8.00 0.45
0.25
37.22 m3

1.00 22.43 beam on axis E b/n axis 2-5


8.00 0.45
0.25
20.18 m3

1.00 22.43 beam on axis F b/n axis 2-5


8.00 0.45
0.25
20.18 m3

1.00 26.58 beam on axis I b/n axis 1-6


8.00 0.45 NOT SHOWN ON DESIGN FROM 2ND TO 8TH BUT HAVE BEAM ON PLAN
0.25
23.92 m3
2.00 5.81 beam on axis B'&I' b/n axis 3-4
8.00 0.45
0.25
10.46
456.719 m3 Vol tot item 1.1 b

c) In terrace floor beams.


Terrace floor beam
1.00 6.19 beam on axis 1 b/n A-B
0.45
0.25
0.70 m3

1.00 6.19 beam on axis 1 b/n I-J


0.45
0.25

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
0.70 m3

1.00 22.31 beam on axis 2 b/n A-E


0.45
0.25
2.51 m3

1.00 22.31 beam on axis 2 b/n F-J


0.45
0.25
2.51 m3
1.00 23.98 beam on axis 3 A-E
0.45
0.25
2.70 m3

1.00 17.69 beam on axis 3 G-J


0.45
0.25
1.99 m3

1.00 4.97 beam on axis 3' E-F


0.45
0.25
0.56 m3

1.00 49.60 beam on axis 4 b/n A-J


0.45
0.25
5.58 m3

1.00 22.31 beam on axis 5 b/n A-E


0.45
0.25
2.51 m3

1.00 22.31 beam on axis 5 b/n F-G


0.45
0.25
2.51 m3

1.00 6.19 beam on axis 6 b/n A-B


0.45
0.25
0.70 m3

1.00 6.19 beam on axis 6 b/n I-J


0.45
0.25
0.70 m3

2.00 12.00 beam on axis A&J b/n axis 4-6


0.45
0.25
2.70 m3

2.00 11.98 beam on axis A&J b/n axis 1-3


0.45
0.25
2.70 m3

2.00 26.57 beam on axis B &I b/n axis 1-6


0.45
0.25
5.98 m3

2.00 20.68 beam on axis C&H b/n axis 1-5


0.45
0.25
4.65 m3

2.00 20.68 beam on axis D&G b/n axis 1-5


0.45
0.25
4.65 m3
1.00 22.43 beam on axis E b/n axis 2-5
0.45
0.25
2.52 m3

1.00 22.43 beam on axis F b/n axis 2-5


0.45
0.25
2.52 m3

2.00 5.81 beam on axis B'&I' b/n axis 3-4


0.45
0.25
1.31 m3
50.68 m3 Vol tot item 1.1 C

d) In 170mm thick typical solid floor slab .


2.00 3.53 b/n A-B & i-j and b/n 1-2
5.93
41.87 m2

2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
1.00
8.48 m2

1.00 54.11 b/n B-I b/n 1-2 cantliver


1.00
54.11 m2

2.00 6.31 b/n A-B & i-j & 2-3


5.93
74.84 m2

2.00 6.06 b/n A-B & i-j & 3-4


5.93
71.87 m2

2.00 (4.56) ddt stair -4


2.50
(22.80) m2
2.00 6.31 b/n A-B & i-j & 4-5
5.93
74.84 m2

2.00 2.91 b/n A-B & i-j & 4-5


5.93
34.51 m2

2.00 5.22 b/n B-C &H-I & 2-3


6.31
65.88 m2

2.00 5.22 b/n B-C &H-I & 3-4


6.06
63.27 m2

2.00 5.22 b/n B-C &H-I & 4-5


6.31
65.88 m2

2.00 3.90 b/n C-D&G-H & & 2-3


6.31
49.22 m2

2.00 3.90 b/n C-D&G-H & & 3-4


6.06
47.27 m2

2.00 3.90 b/n C-D&G-H & & 4-5


6.31
49.22 m2

1.00 6.24 b/n D-E & 2-3


6.31
39.37 m2

1.00 6.24 b/n D-E & 3-4


6.06
37.81 m2

1.00 6.24 b/n D-E & 4-5

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
6.31
39.37 m2

1.00 6.24 b/n E-F & 2-3


6.31
39.37 m2

1.00 6.24 b/n E-F & 3-4


6.06
37.81 m2

1.00 (5.10) DDT STAIR 2


3.10
(15.81) m2
1.00 (1.32) ddt duct oppening b/n axis 3'-3
0.80
(1.06) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


0.56
(0.53) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


0.68
(0.64) m2

1.00 6.25 b/N F-G & 2-3


6.31
39.44 m2

1.00 6.25 b/n F-G & 3-4


6.06
37.88 m2

1.00 6.25 b/n F-G & 4-5


6.31
39.44 m2
1.00 (5.00) ddt lift opening
2.50
(12.50) m2
2.00 6.52 cantliver b/n A-B and i-j & 6-6'
1.00
13.04 m2
1.00 22.78 B-E and b/n 5-6
1.00
22.78 m2

1.00 22.28 F-I and b/n 5-6


1.00
22.28 m2
2nd to 9th floor slab

2.00 3.53 b/n A-B & i-j and b/n 1-2


8.00 5.93
334.93 m2

2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
8.00 1.00
67.84 m2

1.00 54.11 b/n B-I b/n 1-2 cantliver


8.00 1.00
432.88 m2
1.00 (9.25) ddt cantliver b/n 1-2 axis E-F
8.00 1.00
(74.00) m2

2.00 6.31 b/n A-B & i-j & 2-3


8.00 5.93
598.69 m2

2.00 6.06 b/n A-B & i-j & 3-4


8.00 5.93
574.97 m2

2.00 (4.56) ddt stair -4


8.00 2.50
(182.40) m2
2.00 6.31 b/n A-B & i-j & 4-5
8.00 5.93
598.69 m2

2.00 2.91 b/n A-B & i-j & 5-6


8.00 5.93
276.10 m2

2.00 5.22 b/n B-C &H-I & 2-3


8.00 6.31
527.01 m2

2.00 5.22 b/n B-C &H-I & 3-4


8.00 6.06
506.13 m2

2.00 5.22 b/n B-C &H-I & 4-5


8.00 6.31
527.01 m2

2.00 3.90 b/n C-D&G-H & & 2-3


8.00 6.31
393.74 m2

2.00 3.90 b/n C-D&G-H & & 3-4


8.00 6.06
378.14 m2

2.00 3.90 b/n C-D&G-H & & 4-5


8.00 6.31
393.74 m2

1.00 6.24 b/n D-E & 2-3


8.00 6.31
315.00 m2

1.00 6.24 b/n D-E & 3-4


8.00 6.06
302.52 m2

1.00 6.24 b/n D-E & 4-5


8.00 6.31
315.00 m2

1.00 6.24 b/n E-F & 2-3


8.00 6.31
315.00 m2
1.00 (18.75) b/n E-F & 2-3 ddt oppening
8.00 1.00
(150.00) m2

1.00 6.24 b/n E-F & 3-4


8.00 6.06
302.52 m2

1.00 (5.10) DDT STAIR 2


8.00 3.10
(126.48) m2
1.00 (1.32) ddt duct oppening b/n axis 3'-3
8.00 0.80
(8.46) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


8.00 0.56
(4.21) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


8.00 0.68
(5.11) m2

1.00 6.25 b/N F-G & 2-3


8.00 6.31
315.50 m2

1.00 6.25 b/n F-G & 3-4


8.00 6.06
303.00 m2

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
1.00 6.25 b/n F-G & 4-5
8.00 6.31
315.50 m2
1.00 (5.00) ddt lift opening
8.00 2.50
(100.00) m2
2.00 6.52 cantliver b/n A-B and i-j & 6-6'
8.00 1.00
104.32 m2
1.00 22.78 B-E and b/n 5-6
8.00 1.00
182.24 m2

1.00 21.86 F-I and b/n 5-6


8.00 1.00
174.88 m2
8921.19 m2 Area of item 1.1 d

e) In 170mm thick terrace floor and water tanker slab .

2.00 3.53 b/n A-B & i-j and b/n 1-2


5.93
41.87 m2

2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
1.00
8.48 m2

1.00 54.11 b/n B-I b/n 1-2 cantliver


1.00
54.11 m2
1.00 (9.25) ddt cantliver b/n 1-2 axis E-F
1.00
(9.25) m2

2.00 6.31 b/n A-B & i-j & 2-3


5.93
74.84 m2

2.00 6.06 b/n A-B & i-j & 3-4


5.93
71.87 m2

2.00 (4.56) ddt stair -4


2.50
(22.80) m2
2.00 6.31 b/n A-B & i-j & 4-5
5.93
74.84 m2

2.00 2.91 b/n A-B & i-j & 5-6


5.93
34.51 m2

2.00 5.22 b/n B-C &H-I & 2-3


6.31
65.88 m2

2.00 5.22 b/n B-C &H-I & 3-4


6.06
63.27 m2

2.00 5.22 b/n B-C &H-I & 4-5


6.31
65.88 m2

2.00 3.90 b/n C-D&G-H & & 2-3


6.31
49.22 m2

2.00 3.90 b/n C-D&G-H & & 3-4


6.06
47.27 m2

2.00 3.90 b/n C-D&G-H & & 4-5


6.31
49.22 m2

1.00 6.24 b/n D-E & 2-3


6.31
39.37 m2

1.00 6.24 b/n D-E & 3-4


6.06
37.81 m2

1.00 6.24 b/n D-E & 4-5


6.31
39.37 m2

1.00 6.24 b/n E-F & 2-3


6.31
39.37 m2
1.00 (18.75) b/n E-F & 2-3 ddt oppening
1.00
(18.75) m2

1.00 6.24 b/n E-F & 3-4


6.06
37.81 m2

1.00 (5.10) DDT STAIR 2


3.10
(15.81) m2
1.00 (1.32) ddt duct oppening b/n axis 3'-3
0.80
(1.06) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


0.56
(0.53) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


0.68
(0.64) m2

1.00 6.25 b/N F-G & 2-3


6.31
39.44 m2

1.00 6.25 b/n F-G & 3-4


6.06
37.88 m2

1.00 6.25 b/n F-G & 4-5


6.31
39.44 m2
1.00 (5.00) ddt lift opening
2.50
(12.50) m2
2.00 6.52 cantliver b/n A-B and i-j & 6-6'
1.00
13.04 m2
1.00 22.78 B-E and b/n 5-6
1.00
22.78 m2

1.00 21.86 F-I and b/n 5-6


1.00
21.86 m2
water Tanker slab
2.00 6.25 b/n axis D-E & F-G & axis 1-2
1.91
23.88 m2
2.00 6.25 b/n axis D-E & F-G & axis 2-3
6.31
78.88 m2
2.00 6.25 b/n axis D-E & F-G & axis 3-4
6.06
75.75 m2

1.00 4.72 b/n axis E-F & axis 1-2


1.91
9.02 m2
1.00 4.72 b/n axis E-F & axis 2-3
6.31

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
29.78 m2
1.00 4.72 b/n axis E-F & axis 3-4
6.06
28.60 m2
1233.99 m2 area of item 1.1e

f) In Water tanker beam


1.00 17.97 on Axis 2 b/n axis D-G
0.45
0.25
2.02 m3

1.00 17.97 on Axis 3 b/n axis D-G


0.45
0.25
2.02 m3

1.00 17.97 on Axis 4 b/n axis D-G


0.45
0.25
2.02 m3

2.00 14.13 on b/n Axis 2-4 & on axis D&G


0.45
0.25
3.18 m3

1.00 14.13 on b/n Axis 2-4 & on axis E


0.45
0.25
1.59 m3

1.00 14.13 on b/n Axis 2-4 & on axis F


0.45
0.25
1.59 m3
12.42 m3 tot vol of item 1.1 f

g) In stair case and Landing


stair case 1 ( b/n axis E-F ) ground to 1st

1.00 3.48 landing beam 1 (B-1)


0.40
0.20
0.28 m3

1.00 4.47 landing beam 2 (B-2)


0.45
0.25
0.50 m3

1.00 4.41 sofit slab (waist slab) 0.00 to 1.92


1.50
0.18
1.19 m3
1.00 3.69 sofit slab (waist slab) +1.92 to +3.84
1.50
0.18
1.00 m3
1.00 3.10 Landing
1.60
0.18
0.89 m3
12.00 1.50 stepfrom level 0.00 to 1.92
0.5 0.30
0.16
0.43 m3
12.00 1.50 stepfrom level +1.92 to +3.84
0.5 0.30
0.16
0.43 m3
stair case 1 ( b/n axis E-F ) 1st to Terrace

9.00 3.48 landing beam 1 (B-1)


0.40
0.20
2.51 m3

9.00 4.47 landing beam 2 (B-2)


0.45
0.25
4.53 m3

9.00 3.40 sofit slab (waist slab) 0.00 to 1.92


1.50
0.18
8.26 m3
9.00 3.07 sofit slab (waist slab) +1.92 to +3.84
1.50
0.18
7.46 m3
9.00 3.10 Landing
1.60
0.18
8.04 m3
90.00 1.50 stepfrom level +3.84 to +5.44
0.5 0.30
0.15
3.04 m3
90.00 1.50 stepfrom level +1.92 to +3.84
0.5 0.30
0.15
3.04 m3

41.59 m3 tot item 1.1 g

h) In lift shear wall & sw


Ground to 4th
Elevator Shaft Wall (sw-1)
1.00 5.00 Along Axis 3
0.25
3.84
4.80 m3
2.00 2.00 Along Axis b/n axis 3 & F
0.25
3.84
3.84 m3

2.00 0.81 Along Axis 3


0.25
3.84
1.55 m3

1.00 0.99 Along Axis 3


0.25
3.84
0.95 m3

2.00 1.20 top Above door opening


0.25
3.84
2.30 m3
1st to 4th
Elevator Shaft Wall (sw-1)
1.00 5.00 Along Axis 3
4.00 0.25
3.20
16.00 m3
2.00 2.00 Along Axis b/n axis 3 & F
4.00 0.25
3.20
12.80 m3

2.00 0.81 Along Axis 3


4.00 0.25
3.20
5.15 m3

1.00 0.99 Along Axis 3


4.00 0.25
3.20
3.16 m3

2.00 1.20 top Above door opening


4.00 0.25
0.91
For Contractor For Consultant
________________ ________________
Title: Take off sheet

T D S Description
2.18 m3
5th to water tanker
Elevator Shaft Wall (sw-1)
1.00 5.00 Along Axis 3
6.00 0.25
3.20
24.00 m3
2.00 2.00 Along Axis b/n axis 3 & F
6.00 0.25
3.20
19.20 m3

2.00 0.81 Along Axis 3


6.00 0.25
3.20
7.73 m3

1.00 0.99 Along Axis 3


6.00 0.25
3.20
4.75 m3

2.00 1.20 top Above door opening


6.00 0.25
0.91
3.28 m3
Shear wall (SW-2)
4.00 4.15 b/n axis 2-1 and 5-6 ground to 1st
0.25
3.39
14.08 m3
16.00 4.15 b/n axis 2-1 and 5-6 1st to 4th
0.25
2.75
45.67 m3
20.00 4.15 b/n axis 2-1 and 5-6 5th to terrace
0.25
2.75
57.09 m3
Shear wall (SW-3)
1.00 1.23 b/n axis 2-1 and 5-6 ground to 1st
0.2
3.67
0.90 m3
4.00 1.23 b/n axis 2-1 and 5-6 1st to 4th
0.2
3.03
2.97 m3
4.00 1.23 b/n axis 2-1 and 5-6 5th to 9th
0.2
3.03
2.97 m3
235.38 m3 tot item h

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
2. CONCRETE
Provide, cut and fix formwork which ever is appropriate
a) In Foting Pad
12.00 4.80 (F1)
0.50
28.80 m2

4.00 8.40 (F2)


0.70
23.52 m2

7.00 9.20 (F3)


0.90
57.96 m2

6.00 10.00 (F4)


1.00
60.00 m2

12.00 11.20 ( F5)


1.10
147.84 m2

3.00 12.00 (F6)


1.20
43.20 m2

4.00 12.80 (F7)


1.20
61.44 m2

4.00 14.00 (F8)


0.60
33.61 m2

1.00 22.40 (MF-1)


1.20
26.88 m2

1.00 16.26 (MF-2)


1.00
16.26 m2

1.00 18.80 (CF-1)


1.10
20.68 m2

520.19 M2 Area of item 2.3 a

b) In Foundation column
C1 axis E and and 4 intersection, axis F and 4
2.00 2.80
intersection,
1.45
8.12 m2

1.00 2.80 C1, axis G & 4 intersection and axis E and 3 intersection
1.35
3.78 m2

1.00 2.80 C1 axis E and 3 intersection


1.55
4.34 m2

C2 axis 4and B intersection, Axis 3 &B intersection and


4.00 3.00
3&I and intersection b/n axis 4-I
1.35
16.20 m2

2.00 3.00 C2' axis 3and D intersection, Axis 4 &D intersection


1.35
8.10 m2

2.00 2.60 C3 axis 5and B intersection,Axis 5 &i intersection


1.45
7.54 m2

1.00 2.60 C3' axis 2and G intersection,


1.55
4.03 m2

6.00 2.40 C4 axis 5-E, 5-F, 4-J ,3-J ,A-3 and A-4 intersection,
1.65
23.76 m2

4.00 2.40 C4 axis 6-B, 1-B, 1-I and 6-I intersection,


1.65
15.84 m2

1.00 2.40 C4' axis 2-F intersection,


1.65
3.96 m2

1.00 2.60 C5 axis 3-G intersection,


1.65
4.29 m2

1.00 2.60 C6 axis 4-H intersection,


1.45
3.77 m2

3.00 2.70 C7 axis 3-C, 4-C & 3-H intersection,


1.45
11.75 m2

4.00 2.50 C8 axis 2-C, 5-C, 2-H & 5-H intersection,


1.55
15.50 m2
1.00 2.70 C9' axis 2-D intersection,
1.55
4.19 m2

4.00 2.70 C9 axis 2-C, 5-C, 2-H & 5-H intersection,


1.55
16.74 m2

1.00 2.50 C-10 axis 2-E, intersection,


1.55
3.87 m2

12.00 1.60 C-11 axis 1',-C,D,E,F,G,H & 6'-C,D,E,F,G,H


2.05
39.36 m2
195.14 M2 Area of item 2.1 b

c) In Basement Cloumn
4.00 2.80 C1
2.55
28.56 m2
4.00 3.00 C2
2.55
30.60 m2

2.00 3.00 C2'


2.55
15.30 m2
2.00 2.60 C3
2.55
13.26 m2

1.00 2.60 C3'


2.55
6.63 m2

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description

10.00 2.40 C4
2.55
61.20 m2
1.00 2.40 C4'
2.55
6.12 m2

1.00 2.60 C5
2.55
6.63 m2

1.00 2.60 C6
2.55
6.63 m2

3.00 2.70 C7
2.55
20.66 m2

4.00 2.50 C8
2.55
25.50 m2

1.00 2.70 C9 '


2.55
6.89 m2

4.00 2.70 C9
2.55
27.54 m2

1.00 2.50 C-10


2.55
6.38 m2

12.00 1.60 C-11


2.55
48.96 m2
310.84 M2 Area of item 2.1 c
d) In Basement Beam
1.00 6.84 Axis 1 b/n A-B
0.90
6.15 m2

1.00 6.84 Axis 1 b/n I-J


0.90
6.15 m2

1.00 6.84 Axis 6 b/n I-J


0.90
6.15 m2

1.00 6.84 Axis 6 b/n A-B


0.90
6.15 m2
1.00 49.60 Axis 2 b/n A-J
0.90
44.64 m2
1.00 23.98 Axis 3 b/n A-E
0.90
21.59 m2
1.00 17.19 Axis 3 b/n G-J
0.90
15.47 m2
1.00 4.72 Axis 3' B/N E-F
0.90
4.25 m2
1.00 49.60 Axis 4 B/N A-J
0.90
44.64 m2
1.00 49.60 Axis 5 B/N A-J
0.90
44.64 m2
1.00 25.65 Axis 'B' B/N 1'-6
0.90
23.09 m2

2.00 26.79 Axis Cand H B/N 1'-6


0.90
48.22 m2

1.00 26.79 Axis D B/N 1'-6


0.90
24.11 m2

1.00 26.79 Axis E B/N 1'-6


0.90
24.11 m2

1.00 26.79 Axis F B/N 1'-6


0.90
24.11 m2

1.00 26.79 Axis G B/N 1'-6


0.90
24.11 m2

1.00 26.79 Axis I B/N 1'-6


0.90
24.11 m2
391.68 M2 Area of item 2.1 d
e) in Ground floor Beam
1.00 6.19 Axis 1 b/n A-B
0.85
5.26 m2

1.00 6.19 Axis 1 b/n I-J


0.85
5.26 m2

1.00 6.84 Axis 6 b/n I-J


0.85
5.81 m2

1.00 49.60 Axis 2 b/n A-J


0.85
42.16 m2
1.00 23.98 Axis 3 b/n A-E
0.85
20.39 m2
1.00 17.69 Axis 3 b/n G-J
0.85
15.03 m2
1.00 4.97 Axis 3' B/N E-F
0.85
4.23 m2
1.00 49.60 Axis 4 B/N A-J
0.85
42.16 m2
1.00 49.60 Axis 5 B/N A-J
0.85
42.16 m2
1.00 26.54 Axis 'B' B/N 1'-6
0.85
22.56 m2

3.00 26.79 Axis C ,G and H B/N 1'-6


0.85
68.31 m2

1.00 26.79 Axis D B/N 1'-6


0.85
22.77 m2

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
1.00 26.79 Axis E B/N 1'-6
0.85
22.77 m2

1.00 26.79 Axis F B/N 1'-6


0.85
22.77 m2

1.00 26.54 Axis I B/N 1'-6


0.85
22.56 m2

2.00 6.31 Axis B' & I' B/N 3-4


0.85
10.73 m2
374.91 M2 Area of item 2.1 E
f) in 170mm thick ground floor slab
2.00 5.94 b/n axis A-B & I-J and b/n Axis 1'-1
1.03
12.24 m2

1.00 5.862 b/n axis A-B and b/n Axis 1-2


2.92
17.12 m2

1.00 5.862 b/n axis A-B and b/n Axis 2-3


6.31
36.99 m2

1.00 5.862 b/n axis A-B and b/n Axis 3-4


6.06
35.52 m2

1.00 (2.50) ddt stair case b/n axis A-B' and b/n axis 3'-4
4.56
(11.40) m2

1.00 5.862 b/n axis A-B and b/n Axis 4-5


6.31
36.99 m2

1.00 5.22 b/n axis B-C and b/n Axis 1-2


4.20
21.92 m2

1.00 5.22 b/n axis B-C and b/n Axis 2-3


6.31
32.94 m2

1.00 5.22 b/n axis B-C and b/n Axis 3-4


6.06
31.63 m2

1.00 5.22 b/n axis B-C and b/n Axis 4-5


6.31
32.94 m2

1.00 5.22 b/n axis B-C and b/n Axis 5-6


4.17
21.77 m2

1.00 3.90 b/n axis C-D and b/n Axis 1-2


4.20
16.38 m2

1.00 3.90 b/n axis C-D and b/n Axis 2-3


6.31
24.61 m2

1.00 3.90 b/n axis C-D and b/n Axis 3-4


6.06
23.63 m2

1.00 3.90 b/n axis C-D and b/n Axis 4-5


6.31
24.61 m2

1.00 3.90 b/n axis C-D and b/n Axis 5-6


4.17
16.26 m2

1.00 6.25 b/n axis D-E and b/n Axis 1-2


4.2
26.25 m2

1.00 6.25 b/n axis D-E and b/n Axis 2-3


6.31
39.44 m2

1.00 6.25 b/n axis D-E and b/n Axis 3-4


6.06
37.88 m2

1.00 6.25 b/n axis D-E and b/n Axis 4-5


6.31
39.44 m2

1.00 6.25 b/n axis D-E and b/n Axis 5-6


4.17
26.06 m2

1.00 6.25 b/n axis-E-F and b/n Axis 1-2


4.2
26.25 m2

1.00 6.25 b/n axis E-F and b/n Axis 2-3


6.31
39.44 m2

1.00 (5.10) ddt stair case b/n axis 2-3' & axis E-F
3.10
-15.81 m2

1.00 (1.32) ddt duct opening axis 3-3'& axis E-F


0.80
(1.06) m2

1.00 6.25 b/n axis E-F and b/n Axis 3-4


6.06
37.88 m2

1.00 6.25 b/n axis E-F and b/n Axis 4-5


6.31
39.44 m2

1.00 6.25 b/n axis E-F and b/n Axis 5-6


4.14
25.87 m2

1.00 6.25 b/n axis F-G and b/n Axis 1-2


4.2
26.25 m2

1.00 6.25 b/n axis F-G and b/n Axis 2-3


6.31
39.44 m2

1.00 (4.67) DDT LIFT opening


2.25
(10.51) m2

1.00 6.25 b/n axis F-G and b/n Axis 3-4


6.06
37.88 m2

1.00 6.25 b/n axis F-G and b/n Axis 4-5


6.31
39.44 m2

1.00 6.25 b/n axis F-G and b/n Axis 5-6


4.17
26.06 m2

1.00 3.90 b/n axis G-H and b/n Axis 1-2


4.20

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
16.38 m2

1.00 3.90 b/n axis G-H and b/n Axis 2-3


6.31
24.61 m2

1.00 3.90 b/n axis G-H and b/n Axis 3-4


6.06
23.63 m2

1.00 3.90 b/n axis G-H and b/n Axis 4-5


6.31
24.61 m2

1.00 3.90 b/n axis G-H and b/n Axis 5-6


4.17
16.26 m2

1.00 5.22 b/n axis H-I and b/n Axis 1-2


4.20
21.92 m2

1.00 5.22 b/n axis H-I and b/n Axis 2-3


6.31
32.94 m2

1.00 5.22 b/n axis H-I and b/n Axis 3-4


6.06
31.63 m2

1.00 5.22 b/n axis H-I and b/n Axis 4-5


6.31
32.94 m2

1.00 5.22 b/n axis H-I and b/n Axis 5-6


4.17
21.77 m2

1.00 5.94 b/n axis I-J and b/n Axis 1-2


4.20
24.95 m2

1.00 5.94 b/n axis I-J and b/n Axis 2-3


6.31
37.48 m2

1.00 5.94 b/n axis I-J and b/n Axis 3-4


6.06
36.00 m2

1.00 (4.48) DDT stair Case b/n axis i-j and b/n axis 3-4
2.50
(11.20) m2

1.00 5.94 b/n axis I-J and b/n Axis 4-5


6.31
37.48 m2

1.00 5.94 b/n axis I-J and b/n Axis 5-6


3.92
23.28 m2

1248.47 m2 Total Area of item f

h) in Staircase and Landing


stair case 1 ( b/n axis E-F )

1.00 3.48 landing beam 1 (B-1)


1.05
3.65 m2

1.00 4.47 landing beam 2 (B-2)


1.15
5.14 m2

1.00 4.32 sofit slab (waist slab) -3 to -2


1.86
8.04 m2
1.00 3.10 sofit slab (waist slab) -2 to 0+00
1.86
5.77 m2

1.00 3.10 Landing


2.04
6.32 m2
6.00 1.50 stepfrom level -3 to -2
0.16
1.44 m2
2.00 1.50 step from level -2 to 0+00
0.16
0.48 m2
11.00 1.50 stepfrom level -3 to -2
0.16
2.64 m2

33.48 m2 tot item 9


h) in Retaining Shearwall
2.00 49.99 along axis 1' A-J
2.05
204.96 m2

2.00 43.56 along axis 6' A-J


2.05
178.60 m2

2.00 34.10 along axis A, 1'-6'


2.05
139.81 m2

2.00 27.53 along axis J, 1'-6'


2.05
112.87 m2

2.00 10.37 along axis B, 5'-6'


2.05
42.52 m2

2.00 6.40 along axis B/n axis A-B for ramp


2.05
26.24 m2 tot item h
beam pad
2 169.35
0.5
169.35 m2
874.35 m2 tot item h
i) in Lift shaft and shearwall
basement to ground
Elevator Shaft Wall (sw-1)
2.00 5.00 Along Axis 3
2.75
27.50 m2
2.00 2.00 Along Axis b/n axis 3 & F
2.75
11.00 m2

2.00 8.05 Along Axis 3


2.75
44.28 m2

2.00 8.05 Along Axis 3


2.75
44.28 m2

2.00 0.99 Along Axis 3


2.75
5.44 m2

2.00 2.40 top Above door opening


1.20
5.76 m2
Shear wall (SW-2)
8.00 4.65 b/n axis 2-1 and 5-6
3.00
111.65 m2
Shear wall (SW-3)
2.00 1.43 b/n axis 2-1 and 5-6
For Contractor For Consultant
________________ ________________
Title: Take off sheet

T D S Description
3.00
8.56 m2
258.46 m2 tot item i
j) in Entrance Step

2.00 3.48 beam


1.00
6.96 m2

2.00 2.72 soffit slab


0.18
4 0.98 m2

2.00 0.80 step


4.00
6.40 m2
14.34 m3 tot item j
k) In Ramp
4.00 0.80 ramp (1st and 2nd flight)
1.20
3.84 m2 tot item k

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
B-SUPER STRUCTURE
1. CONCRETE WORK
a) In elevation columns.
4.00 2.80 C-1
3.39 GROUND FLOOR
37.97 m2
4.00 2.80 C-1
2.00 2.75 1st floor,2nd
61.60 m2
4.00 2.40 C-1
4.00 2.75 3rd, 4th, 5th,6th
105.60 m2

4.00 2.00 C-1


4.00 2.75 7th, 8th,9th& terrace
88.00 m2
4.00 3.00 C-2
3.39 GROUND FLOOR
0.00 m2
4.00 3.00 C-2
3.00 2.75 1st, 2nd, 3rd
99.00 m2
4.00 2.40 C-2
3.00 2.75 4th,5th,6th
79.20 m2

4.00 2.00 C-2


3.00 2.75 7th, 8th,9th
66.00 m2

2.00 3.00 C-2'


3.39 GROUND FLOOR
20.34 m2
2.00 3.00 C-2'
3.00 2.75 1st floor,2nd,3rd
49.50 m2
2.00 2.40 C-2'
3.00 2.75 4th, 5th,6th
39.60 m2

2.00 2.00 C-2'


4.00 2.75 7th, 8th,9th& terrace
44.00 m2

2.00 2.60 C-3


3.39 Ground
17.63 m2

2.00 2.60 C-3


2.00 2.75 1st and 2nd
28.60 m2
2.00 2.40 C-3
4.00 2.75 3rd, 4th, 5th and 6th
52.80 m2

2.00 1.80 C-3


3.00 2.75 7th,8th and 9th
9.90 m2

1.00 2.60 C-3'


3.39 Ground
8.81 m2

1.00 2.60 C-3'


2.00 2.75 1st and 2nd
14.30 m2
1.00 2.40 C-3'
4.00 2.75 3rd, 4th, 5th and 6th
26.40 m2

1.00 1.80 C-3'


4.00 2.75 7th,8th and 9th & terrace
19.80 m2

10.00 2.40 C-4


3.39 Ground
81.36 m2

10.00 2.40 C-4


2.75 1st
66.00 m2

10.00 2.40 C-4


6.00 2.75 1st-6th
396.00 m2

10.00 2.00 C-4


3.00 2.75 7th-9th
165.00 m2

1.00 2.40 C-4'


3.39 Ground
8.14 m2

1.00 2.40 C-4'


2.75 1st
6.60 m2

1.00 2.40 C-4'


6.00 2.75 1st-6th
39.60 m2

1.00 2.00 C-4'


4.00 2.75 7th-terrace
22.00 m2

1.00 2.60 C-5'


3.39 Ground
0.00 m2

1.00 2.60 C-5'


2.00 2.75 1st -2nd
14.30 m2

1.00 2.40 C-5'


4.00 2.75 3rd-6th
26.40 m2

1.00 2.00 C-5'


4.00 2.75 7th-terrace
22.00 m2

1.00 2.60 C-6


3.39 Ground
8.81 m2

1.00 2.60 C-6


2.75 1ST
7.15 m2
1.00 2.40 C-6
5.00 2.75 2nd-6th
33.00 m2

1.00 2.00 C-6


5.00 2.75 7th-9th
27.50 m2

3.00 2.70 C-7


3.39 Ground
27.46 m2

3.00 2.70 C-7


2.00 2.75 1st -2nd
44.55 m2
3.00 2.40 C-7
4.00 2.75 3rd-6th
79.20 m2

3.00 2.00 C-7


5.00 2.75 7th-9th
82.50 m2
4.00 0.70 C-8
3.39 Ground
0.00 m2
4.00 2.50 C-8
2.00 2.75 1st-2nd

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
55.00 m2
4.00 2.40 C-8
4.00 2.75 3rd-6th
105.60 m2
4.00 1.80 C-8
3.00 2.75 7th-9th
59.40 m2
1.00 2.70 C-9'
3.39 Ground
0.00 m2
1.00 2.70 C-9'
2.00 2.75 1st-2nd
14.85 m2
1.00 2.40 C-9'
4.00 2.75 3rd-6th
26.40 m2
1.00 1.80 C-9'
4.00 2.75 7th-terrace
19.80 m2
4.00 2.70 C-9
3.39 Ground
0.00 m2
4.00 2.70 C-9
2.00 2.75 1st-2nd
59.40 m2
4.00 2.40 C-9
4.00 2.75 3rd-6th
105.60 m2
4.00 1.80 C-9
3.00 2.75 7th-9th
59.40 m2
1.00 2.50 C-10
3.39 Ground
0.00 m2
1.00 2.50 C-10
2.00 3.39 1st-2nd
16.95 m2

1.00 2.40 C-10


4.00 3.39 3rd-6th
32.54 m2

1.00 2.40 C-10


4.00 3.39 7th-Terrace
32.54 m2
2614.11 m2 tot item 1.1 a

b) In floor beam
1st floor beam

1.00 6.19 beam on axis 1 b/n A-B


1.15
7.12 m2

1.00 6.19 beam on axis 1 b/n I-J


1.15
7.12 m2

1.00 49.60 beam on axis 2 b/n A-J


1.15
57.04 m2

1.00 23.98 beam on axis 3 A-E


1.15
27.58 m2

1.00 17.69 beam on axis 3 G-J


1.15
20.34 m2

1.00 4.97 beam on axis 3' E-F


1.15
5.72 m2

1.00 49.60 beam on axis 4 b/n A-J


1.15
57.04 m2

1.00 22.31 beam on axis 5 b/n A-E


1.15
25.66 m2

1.00 22.31 beam on axis 5 b/n F-G


1.15
25.66 m2

1.00 6.19 beam on axis 6 b/n A-B


1.15
7.12 m2

1.00 6.19 beam on axis 6 b/n I-J


1.15
7.12 m2

2.00 12.00 beam on axis A&J b/n axis 4-6


1.15
27.59 m2

2.00 11.98 beam on axis A&J b/n axis 1-3


1.15
27.56 m2

1.00 26.57 beam on axis B b/n axis 1-6


1.15
30.56 m2

4.00 20.68 beam on axis C,D,G&H b/n axis 1-5


1.15
95.11 m2

1.00 22.43 beam on axis E b/n axis 2-5


1.15
25.79 m2

1.00 22.43 beam on axis F b/n axis 2-5


1.15
25.79 m2

1.00 26.58 beam on axis I b/n axis 1-6


1.15
30.56 m2
2.00 5.81 beam on axis B'&I' b/n axis 3-4
1.15
13.37 m2
2ND TO 9TH

1.00 6.19 beam on axis 1 b/n A-B


8.00 1.15
56.93 m2

1.00 6.19 beam on axis 1 b/n I-J


8.00 1.15
56.93 m2

1.00 22.31 beam on axis 2 b/n A-E


8.00 1.15
205.26 m2
1.00 22.31 beam on axis 2 b/n F-J
8.00 1.15
205.27 m2

1.00 23.98 beam on axis 3 A-E


8.00 1.15
220.65 m2

1.00 17.69 beam on axis 3 G-J


8.00 1.15
162.72 m2

1.00 4.97 beam on axis 3' E-F


8.00 1.15
45.76 m2

1.00 49.60 beam on axis 4 b/n A-J


8.00 1.15
456.29 m2

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
1.00 22.31 beam on axis 5 b/n A-E
8.00 1.15
205.26 m2

1.00 22.31 beam on axis 5 b/n F-G


8.00 1.15
205.27 m2
1.00 6.19 beam on axis 6 b/n A-B
8.00 1.15
56.93 m2

1.00 6.19 beam on axis 6 b/n I-J


8.00 1.15
56.93 m2

2.00 12.00 beam on axis A&J b/n axis 4-6


8.00 1.15
220.71 m2

2.00 11.98 beam on axis A&J b/n axis 1-3


8.00 1.15
220.51 m2

1.00 26.57 beam on axis B b/n axis 1-6


8.00 1.15
244.48 m2

2.00 20.68 beam on axis C,&H b/n axis 1-5


8.00 1.15
380.44 m2
2.00 20.68 beam on axis D,&G b/n axis 1-5
8.00 1.15
380.44 m2

1.00 22.43 beam on axis E b/n axis 2-5


8.00 1.15
206.31 m2

1.00 22.43 beam on axis F b/n axis 2-5


8.00 1.15
206.31 m2

1.00 26.58 beam on axis I b/n axis 1-6


8.00 1.15 NOT SHOWN ON DESIGN FROM 2ND TO 8TH BUT HAVE BEAM ON PLAN
244.50 m2
2.00 5.81 beam on axis B'&I' b/n axis 3-4
8.00 1.15
106.96 m2
4668.685 m2 tot item 1.1 b

c) In terrace floor beams.


Terrace floor beam
1.00 6.19 beam on axis 1 b/n A-B
1.15
7.12 m2

1.00 6.19 beam on axis 1 b/n I-J


1.15
7.12 m2

1.00 22.31 beam on axis 2 b/n A-E


1.15 0.00 m2

1.00 22.31 beam on axis 2 b/n F-J


1.15
25.66 m2
1.00 23.98 beam on axis 3 A-E
1.15
27.58 m2

1.00 17.69 beam on axis 3 G-J


1.15
20.34 m2

1.00 4.97 beam on axis 3' E-F


1.15
5.72 m2

1.00 49.60 beam on axis 4 b/n A-J


1.15
57.04 m2

1.00 22.31 beam on axis 5 b/n A-E


1.15
25.66 m2

1.00 22.31 beam on axis 5 b/n F-G


1.15
25.66 m2

1.00 6.19 beam on axis 6 b/n A-B


1.15
7.12 m2

1.00 6.19 beam on axis 6 b/n I-J


1.15
7.12 m2

2.00 12.00 beam on axis A&J b/n axis 4-6


1.15
27.59 m2

2.00 11.98 beam on axis A&J b/n axis 1-3


1.15
27.56 m2

2.00 26.57 beam on axis B &I b/n axis 1-6


1.15
61.12 m2

2.00 20.68 beam on axis C&H b/n axis 1-5


1.15
47.55 m2

2.00 20.68 beam on axis D&G b/n axis 1-5


1.15
47.55 m2
1.00 22.43 beam on axis E b/n axis 2-5
1.15
25.79 m2

1.00 22.43 beam on axis F b/n axis 2-5


1.15
25.79 m2

2.00 5.81 beam on axis B'&I' b/n axis 3-4


1.15
13.37 m2
492.45 m3 Vol tot item 1.1 C

d) In 170mm thick typical solid floor slab .


2.00 3.53 b/n A-B & i-j and b/n 1-2
5.93
41.87 m2

2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
1.00
8.48 m2

1.00 54.11 b/n B-I b/n 1-2 cantliver


1.00
54.11 m2

2.00 6.31 b/n A-B & i-j & 2-3


5.93
74.84 m2

2.00 6.06 b/n A-B & i-j & 3-4


5.93
71.87 m2

2.00 (4.56) ddt stair -4


2.50
(22.80) m2
2.00 6.31 b/n A-B & i-j & 4-5
5.93

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
74.84 m2

2.00 2.91 b/n A-B & i-j & 4-5


5.93
34.51 m2

2.00 5.22 b/n B-C &H-I & 2-3


6.31
65.88 m2

2.00 5.22 b/n B-C &H-I & 3-4


6.06
63.27 m2

2.00 5.22 b/n B-C &H-I & 4-5


6.31
65.88 m2

2.00 3.90 b/n C-D&G-H & & 2-3


6.31
49.22 m2

2.00 3.90 b/n C-D&G-H & & 3-4


6.06
47.27 m2

2.00 3.90 b/n C-D&G-H & & 4-5


6.31
49.22 m2

1.00 6.24 b/n D-E & 2-3


6.31
39.37 m2

1.00 6.24 b/n D-E & 3-4


6.06
37.81 m2

1.00 6.24 b/n D-E & 4-5


6.31
39.37 m2

1.00 6.24 b/n E-F & 2-3


6.31
39.37 m2

1.00 6.24 b/n E-F & 3-4


6.06
37.81 m2

1.00 (5.10) DDT STAIR 2


3.10
(15.81) m2
1.00 (1.32) ddt duct oppening b/n axis 3'-3
0.80
(1.06) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


0.56
(0.53) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


0.68
(0.64) m2

1.00 6.25 b/N F-G & 2-3


6.31
39.44 m2

1.00 6.25 b/n F-G & 3-4


6.06
37.88 m2

1.00 6.25 b/n F-G & 4-5


6.31
39.44 m2
1.00 (5.00) ddt lift opening
2.50
(12.50) m2
2.00 6.52 cantliver b/n A-B and i-j & 6-6'
1.00
13.04 m2
1.00 22.78 B-E and b/n 5-6
1.00
22.78 m2

1.00 22.28 F-I and b/n 5-6


1.00
22.28 m2
2nd to 9th floor slab

2.00 3.53 b/n A-B & i-j and b/n 1-2


8.00 5.93
334.93 m2

2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
8.00 1.00
67.84 m2

1.00 54.11 b/n B-I b/n 1-2 cantliver


8.00 1.00
432.88 m2
1.00 (9.25) ddt cantliver b/n 1-2 axis E-F
8.00 1.00
(74.00) m2

2.00 6.31 b/n A-B & i-j & 2-3


8.00 5.93
598.69 m2

2.00 6.06 b/n A-B & i-j & 3-4


8.00 5.93
574.97 m2

2.00 (4.56) ddt stair -4


8.00 2.50
(182.40) m2
2.00 6.31 b/n A-B & i-j & 4-5
8.00 5.93
598.69 m2

2.00 2.91 b/n A-B & i-j & 5-6


8.00 5.93
276.10 m2

2.00 5.22 b/n B-C &H-I & 2-3


8.00 6.31
527.01 m2

2.00 5.22 b/n B-C &H-I & 3-4


8.00 6.06
506.13 m2

2.00 5.22 b/n B-C &H-I & 4-5


8.00 6.31
527.01 m2

2.00 3.90 b/n C-D&G-H & & 2-3


8.00 6.31
393.74 m2

2.00 3.90 b/n C-D&G-H & & 3-4


8.00 6.06
378.14 m2

2.00 3.90 b/n C-D&G-H & & 4-5


8.00 6.31
393.74 m2

1.00 6.24 b/n D-E & 2-3


8.00 6.31
315.00 m2

1.00 6.24 b/n D-E & 3-4


8.00 6.06
302.52 m2

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description

1.00 6.24 b/n D-E & 4-5


8.00 6.31
315.00 m2

1.00 6.24 b/n E-F & 2-3


8.00 6.31
315.00 m2
1.00 (18.75) b/n E-F & 2-3 ddt oppening
8.00 1.00
(150.00) m2

1.00 6.24 b/n E-F & 3-4


8.00 6.06
302.52 m2

1.00 (5.10) DDT STAIR 2


8.00 3.10
(126.48) m2
1.00 (1.32) ddt duct oppening b/n axis 3'-3
8.00 0.80
(8.46) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


8.00 0.56
(4.21) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


8.00 0.68
(5.11) m2

1.00 6.25 b/N F-G & 2-3


8.00 6.31
315.50 m2

1.00 6.25 b/n F-G & 3-4


8.00 6.06
303.00 m2

1.00 6.25 b/n F-G & 4-5


8.00 6.31
315.50 m2
1.00 (5.00) ddt lift opening
8.00 2.50
(100.00) m2
2.00 6.52 cantliver b/n A-B and i-j & 6-6'
8.00 1.00
104.32 m2
1.00 22.78 B-E and b/n 5-6
8.00 1.00
182.24 m2

1.00 21.86 F-I and b/n 5-6


8.00 1.00
174.88 m2
8921.19 m2 Area of item 1.1 d

e) In 170mm thick terrace floor and water tanker slab .

2.00 3.53 b/n A-B & i-j and b/n 1-2


5.93
41.87 m2

2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
1.00
8.48 m2

1.00 54.11 b/n B-I b/n 1-2 cantliver


1.00
54.11 m2
1.00 (9.25) ddt cantliver b/n 1-2 axis E-F
1.00
(9.25) m2

2.00 6.31 b/n A-B & i-j & 2-3


5.93
74.84 m2

2.00 6.06 b/n A-B & i-j & 3-4


5.93
71.87 m2

2.00 (4.56) ddt stair -4


2.50
(22.80) m2
2.00 6.31 b/n A-B & i-j & 4-5
5.93
74.84 m2

2.00 2.91 b/n A-B & i-j & 5-6


5.93
34.51 m2

2.00 5.22 b/n B-C &H-I & 2-3


6.31
65.88 m2

2.00 5.22 b/n B-C &H-I & 3-4


6.06
63.27 m2

2.00 5.22 b/n B-C &H-I & 4-5


6.31
65.88 m2

2.00 3.90 b/n C-D&G-H & & 2-3


6.31
49.22 m2

2.00 3.90 b/n C-D&G-H & & 3-4


6.06
47.27 m2

2.00 3.90 b/n C-D&G-H & & 4-5


6.31
49.22 m2

1.00 6.24 b/n D-E & 2-3


6.31
39.37 m2

1.00 6.24 b/n D-E & 3-4


6.06
37.81 m2

1.00 6.24 b/n D-E & 4-5


6.31
39.37 m2

1.00 6.24 b/n E-F & 2-3


6.31
39.37 m2
1.00 (18.75) b/n E-F & 2-3 ddt oppening
1.00
(18.75) m2

1.00 6.24 b/n E-F & 3-4


6.06
37.81 m2

1.00 (5.10) DDT STAIR 2


3.10
(15.81) m2
1.00 (1.32) ddt duct oppening b/n axis 3'-3
0.80
(1.06) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


0.56
(0.53) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


0.68
(0.64) m2

1.00 6.25 b/N F-G & 2-3

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
6.31
39.44 m2

1.00 6.25 b/n F-G & 3-4


6.06
37.88 m2

1.00 6.25 b/n F-G & 4-5


6.31
39.44 m2
1.00 (5.00) ddt lift opening
2.50
(12.50) m2
2.00 6.52 cantliver b/n A-B and i-j & 6-6'
1.00
13.04 m2
1.00 22.78 B-E and b/n 5-6
1.00
22.78 m2

1.00 21.86 F-I and b/n 5-6


1.00
21.86 m2
water Tanker slab
2.00 6.25 b/n axis D-E & F-G & axis 1-2
1.91
23.88 m2
2.00 6.25 b/n axis D-E & F-G & axis 2-3
6.31
78.88 m2
2.00 6.25 b/n axis D-E & F-G & axis 3-4
6.06
75.75 m2

1.00 4.72 b/n axis E-F & axis 1-2


1.91
9.02 m2
1.00 4.72 b/n axis E-F & axis 2-3
6.31
29.78 m2
1.00 4.72 b/n axis E-F & axis 3-4
6.06
28.60 m2
1233.99 m2 area of item 1.1e

f) In Water tanker beam


1.00 17.97 on Axis 2 b/n axis D-G
1.15
20.67 m3

1.00 17.97 on Axis 3 b/n axis D-G


1.15
20.67 m3

1.00 17.97 on Axis 4 b/n axis D-G


1.15
20.67 m3

2.00 14.13 on b/n Axis 2-4 & on axis D&G


1.15
32.49 m3

1.00 14.13 on b/n Axis 2-4 & on axis E


1.15
16.24 m3

1.00 14.13 on b/n Axis 2-4 & on axis F


1.15
16.24 m3
126.99 m2 tot of item 1.1 f

g) In stair case and Landing


stair case 1 ( b/n axis E-F ) ground to 1st

1.00 3.48 landing beam 1 (B-1)


1.00
3.48 m2

1.00 4.47 landing beam 2 (B-2)


1.15
5.14 m2

1.00 4.41 sofit slab (waist slab) 0.00 to 1.92


1.86
8.20 m2
1.00 3.69 sofit slab (waist slab) +1.92 to +3.84
1.86
6.86 m2
1.00 3.10 Landing
1.90
5.89 m2
12.00 1.50 stepfrom level 0.00 to 1.92
0.16
2.88 m2
12.00 1.50 stepfrom level +1.92 to +3.84
0.16
2.88 m2
stair case 1 ( b/n axis E-F ) 1st to Terrace

9.00 3.48 landing beam 1 (B-1)


1.00
31.32 m2

9.00 4.47 landing beam 2 (B-2)


1.15
46.26 m2

9.00 3.40 sofit slab (waist slab) 0.00 to 1.92


1.86
56.92 m2
9.00 3.07 sofit slab (waist slab) +1.92 to +3.84
1.86
51.39 m2
9.00 3.10 Landing
1.96
54.68 m2
90.00 1.50 stepfrom level +3.84 to +5.44
0.15
20.25 m2
90.00 1.50 stepfrom level +1.92 to +3.84
0.15
20.25 m2

316.41 m3 tot item 1.1 g

h) In lift shear wall & sw


Ground to 4th
Elevator Shaft Wall (sw-1)
2.00 5.00 Along Axis 3
3.84
38.40 m3
2.00 2.00 Along Axis b/n axis 3 & F
3.84
15.36 m3

4.00 0.81 Along Axis 3


3.84
12.36 m3

2.00 1.24 Along Axis 3


3.84
9.52 m3

2.00 2.40 top Above door opening


1.20
5.76 m3
1st to 4th
Elevator Shaft Wall (sw-1)
2.00 5.00 Along Axis 3
4.00 3.20
128.00 m3
4.00 2.00 Along Axis b/n axis 3 & F
4.00 3.20
102.40 m3

4.00 0.81 Along Axis 3


For Contractor For Consultant
________________ ________________
Title: Take off sheet

T D S Description
4.00 3.20
41.22 m3

2.00 1.24 Along Axis 3


4.00 3.20
31.72 m3

2.00 2.40 top Above door opening


4.00 0.91
17.47 m3
5th to water tanker
Elevator Shaft Wall (sw-1)
2.00 5.00 Along Axis 3
6.00 3.20
192.00 m3
4.00 2.00 Along Axis b/n axis 3 & F
6.00 3.20
153.60 m3

4.00 0.81 Along Axis 3


6.00 3.20
61.82 m3

2.00 0.99 Along Axis 3


6.00 3.20
37.98 m3

2.00 2.40 top Above door opening


6.00 0.91
26.21 m3
Shear wall (SW-2)
4.00 4.15 b/n axis 2-1 and 5-6 ground to 1st
3.39
56.30 m3
16.00 4.15 b/n axis 2-1 and 5-6 1st to 4th
2.75
182.69 m3
20.00 4.15 b/n axis 2-1 and 5-6 5th to terrace
2.75
228.36 m3
Shear wall (SW-3)
4.00 1.23 b/n axis 2-1 and 5-6 ground to 1st
3.67
18.01 m3
8.00 1.23 b/n axis 2-1 and 5-6 1st to 4th
3.03
29.74 m3
8.00 1.23 b/n axis 2-1 and 5-6 5th to 9th
3.03
29.74 m3
1418.66 m2 tot item h

For Contractor For Consultant


________________ ________________
Shap Bar NO of Length Total Length of Reinforcement Bar (m)
Structural Member No of bar
e Dia. member (m) 6mm 8mm 10mm 12mm 14mm 16mm 20mm 24mm
SUB STRUCTURE
FOOTING PAD
F-1
12 12 7 1.900 159.60
12 12 7 1.900 159.60
F-2

14 4 16 3.200 204.80
14 4 16 3.200 204.80
F-3
14 7 24 3.800 638.40
14 7 24 3.800 638.40
F-4
16 6 19 4.200 478.80
16 6 19 4.200 478.80
F-5
16 12 23 4.700 1,297.20
16 12 23 4.700 1,297.20
F-6
16 3 25 4.900 367.50
16 3 25 4.900 367.50
F-7
16 4 28 5.300 593.60
16 4 28 5.300 593.60
F-8
top bar
12 4 14 6.352 355.71
12 4 47 1.550 291.40
bottom bar
14 4 14 6.352 355.71
14 4 47 1.550 291.40
MF-1
top bar 20 1 41 6.400 262.40
14 1 44 4.800 211.20
bottom bar
20 1 41 8.500 348.50
14 1 44 6.900 303.60
MF-2
top bar 20 1 26 4.378 113.83
14 1 31 3.750 116.25
bottom bar
20 1 26 6.078 158.03
14 1 31 5.450 168.95
CF-1
top bar 20 1 33 6.200 204.60
14 1 53 3.200 169.60
bottom bar
20 1 33 7.900 260.70
14 1 53 4.900 259.70

FOOTING COLUMN
C1
20 4 12 4.512 216.58
20 4 6 4.512 108.29
stirap
10 4 12 9.045 434.16

C2
20 4 12 4.512 216.58
20 4 6 4.512 108.29
stirap
10 4 10 10.183 407.32
C2'
20 2 12 4.512 108.29
20 2 6 4.512 54.14
stirap
10 2 10 10.183 203.66
C3
20 2 10 4.512 90.24
20 2 6 4.512 54.14
stirap
10 2 12 5.570 133.68
C3'
20 1 10 4.512 45.12
20 1 6 4.512 27.07
stirap
10 1 12 5.570 66.84
C4
20 10 10 4.512 451.20
20 10 6 4.512 270.72
stirap
10 1 24 6.289 150.94
C4'
20 1 10 4.512 45.12
20 1 4 4.512 18.05

stirap
10 10 12 6.289 754.68
C5
20 1 6 4.512 27.07
20 1 10 4.512 45.12
stirap
10 1 12 5.870 70.44
C6
20 1 6 4.512 27.07
20 1 10 4.512 45.12
stirap
10 1 12 5.870 70.44
C7
20 3 6 4.512 81.22
20 3 10 4.512 135.36
stirap
10 3 12 6.950 250.20
C8
20 4 4 4.512 72.19
20 4 10 4.512 180.48
stirap
10 4 15 4.820 289.20
C9'
20 1 6 4.512 27.07
20 1 10 4.512 45.12
stirap
10 1 13 5.672 73.74

C9
20 4 6 4.512 108.29
20 4 10 4.512 180.48
stirap
10 4 15 5.720 343.20

C10
20 1 4 4.512 18.05
20 1 10 4.512 45.12
stirap
10 1 12 6.580 78.96

C11
16 12 4 4.512 216.58
16 12 6 4.512 324.86
stirap
10 12 16 6.580 1,263.36

basement floor beam


on Axis 1,6 b/n A-B
top bar
14 2 2 7.313 29.25
bottom bar
14 2 2 6.713 26.85
stirap
8 2 36 1.300 93.60
on Axis 1,6 b/n I-J
top bar
14 2 2 7.263 29.05
bottom bar
14 2 2 6.713 26.85
stirap
8 2 36 1.300 93.60
on Axis 2,4,5 b/n A-J
top bar
14 3 2 55.422 332.53
bottom bar
14 3 2 55.497 332.98
stirap
8 3 303 1.300 1,181.70
on Axis 3 b/n A-E
top bar
14 1 2 27.085 54.17
bottom bar
14 1 2 26.484 52.97
stirap
8 1 150 1.300 195.00
on Axis 3 b/n G-J
top bar
14 3 2 22.100 132.60
bottom bar
14 3 2 23.700 142.20
stirap
8 108 4 1.300 561.60
on Axis 3' b/n E-F
top bar
14 1 2 5.974 11.95
bottom bar
14 1 2 5.274 10.55
stirap
8 1 31 1.300 40.30

on Axis- B, b/n 6-1'


top bar
14 1 2 5.974 11.95
bottom bar
14 1 2 5.274 10.55
stirap
8 1 31 1.300 40.30
on Axis C&H,G,I b/n 6-1'
top bar
14 4 2 5.974 47.79
bottom bar
14 4 2 5.274 42.19
stirap
8 1 31 1.300 40.30
on Axis D,E,F b/n 6'-1'
top bar
14 3 2 31.043 186.26
bottom bar
14 3 2 31.187 187.12
stirap
8 3 31 1.300 120.90
Basement FLOOR SLAB
on Panel S-1
top bar
8 3 21 3.944 248.47
bottom bar
8 3 31 5.938 552.23
on Panel S-2
top bar
8 4 21 3.944 331.30
bottom bar
8 4 21 3.900 327.60
on Panel S-3
top bar
8 4 21 3.944 331.30
bottom bar
8 4 27.000 5.220 563.76
on Panel S-3
top bar
8 4 20.720 3.944 326.88
bottom bar
8 4 27.1 5.220 565.85
on Panel S-4
top bar
8 4 20.590 3.917 322.60
bottom bar
8 4 32.250 6.250 806.25
on Panel S-5
top bar
8 4 31.150 6.030 751.34
bottom bar
8 4 31.650 6.130 776.06
on Panel S-6
top bar
8 4 31.150 6.900 859.74
bottom bar
8 4 31.650 6.310 798.85
on Panel S-7
top bar
8 2 24.620 4.724 232.61
bottom bar
8 2 20.620 3.944 162.65
on Panel S-8
top bar
8 4 32.500 6.300 819.00
bottom bar
8 4 27.120 5.224 566.70
on Panel S-9
top bar
8 4 32.500 6.300 819.00
bottom bar
8 4 32.150 6.250 803.75
8 4 27.120 5.224 566.70
on Panel S-10
top bar
8 2 31.300 6.060 379.36
bottom bar
8 2 31.010 6.013 372.93
on Panel S-11
top bar
8 2 31.300 6.060 379.36
bottom bar
8 2 27.120 5.224 283.35
8 2 31.010 6.013 372.93
on Panel S-12
top bar
8 2 32.250 6.250 403.13
bottom bar
8 2 27.120 5.224 283.35
on Panel S-13
top bar
8 2 31.050 6.010 373.22
bottom bar
8 2 20.620 3.944 162.65
on Panel S-14
top bar
8 1 33 6.300 204.75
bottom bar
8 1 25 4.700 115.15
on Panel S-15
top bar
8 1 32.500 6.060 196.95
bottom bar
8 1 25 4.700 115.15
on ramp slab
ramp beam
TOP 16 1 3 7.188 21.56
BOTTOM 16 1 3 6.588
STIRRUPS 8 1 41 1.300 53.30
BEAM ON AXIS A&B 16 2 3 10.648
8 2 69 1.300
16 2 4 9.923
16 2 4 6.835
SLAB
10 1 42 11.073
10 1 75 6.438
STAIR CASE
BASEMENT TO GROUND
8 1 33 0.957 31.58
8 1 33 6.010 198.33
8 1 32 6.224 199.17
8 1 32 4.318 138.18
14 1 10 2.726 27.26
14 1 10 1.439 14.39
14 1 10 1.237 12.37
14 1 10 1.200 12.00
14 2 10 1.956 39.12
LANDING BEAM
LB1
8 1 25 1.300 32.50
14 1 2 4.326 8.65
16 1 3 4.326 12.98
16 1 3 3.726 11.18
LB2
8 1 31 1.300 40.30
14 1 4 2.300 9.20
16 1 3 5.425 16.28
16 1 3 6.224 18.67
Basement column
on C1
20 4 18 4.000 288.00
stirap
on c2 10 4 19 9.045 687.42

20 4 18 4.000 288.00
stirap
on C2' 10 4 19 10.183 773.91

20 2 18 4.000 144.00
stirap
on C3 10 2 19 10.183 386.95

20 2 16 4.000 128.00
stirap
on C3' 10 2 19 5.570 211.66

20 1 16 4.000 64.00

stirap
10 1 19 5.570 105.83
C4
20 10 14 4.000 560.00
stirap
10 10 24 6.289 1,509.36
C4'
20 1 14 4.000 56.00
stirap
10 1 24 6.289 150.94
C5
20 1 16 4.000 64.00
stirap
10 1 24 5.870 140.88
C6
20 1 16 4.000 64.00
stirap
10 1 24 5.870 140.88
C7
20 3 16 4.000 192.00
stirap
10 3 24 6.950 500.40
C8
20 4 14 4.000 224.00
stirap
10 4 24 4.820 462.72
C9'
20 1 16 4.000 64.00
stirap
10 1 24 5.670 136.08
C9
20 4 16 4.000 256.00
stirap
10 4 24 5.670 544.32
C10
20 1 12 4.000 48.00
stirap
10 1 24 6.580 157.92
C11
16 1 10 3.325 33.25
stirap
10 1 24 3.170 76.08

GROUND FLOOR BEAM


on Axis 1 b/n A-B
top bar
14 1 2 7.263 14.53
bottom bar
14 1 2 6.713 13.43
stirap
8 1 43 1.300 55.90
on Axis 1 b/n I-J
top bar
14 1 2 7.313 14.63
bottom bar
14 1 2 6.713 13.43
stirap
8 1 41 1.300 53.30
on Axis 2 b/n A-J
top bar
16 1 3 57.597 172.79
bottom bar
12 1 2 6.788 13.58
16 1 3 63.697
negative bar

14 1 1 20.279 20.28
16 1 2 7.381
stirap
8 1 326 1.300 423.80
on Axis 3 b/n A-E
top bar
20 1 2 10.050 20.10
20 1 2 5.812
20 1 3 6.387
20 1 3 5.736

bottom bar
16 1 4 7.013 28.05
16 1 4 6.374
16 1 2 5.149
16 1 4 8.748
negative bar
12 1 1 3.208 3.21
14 1 1 3.553
14 1 1 4.218
16 1 1 3.887
16 1 1 2.562
stirap
8 1 152 1.300 197.60
on Axis 3 b/n G-J
top bar
16 1 3 20.287 60.86

bottom bar
16 1 3 6.50
16 1 4 6.274 25.10
16 1 4 6.913
negative bar
12 1 1 3.63
12 1 1 3.21
16 1 1 3.887 3.89
16 1 1 2.687
stirap
8 1 119 1.300 154.70
on Axis 3' b/n E-F
top bar
16 1 3 5.974 17.92
bottom bar
16 1 3 5.274 15.82
stirap
8 1 32 1.300 41.60

on Axis 4 b/n A-J


top bar
20 1 2 57.870 115.74
bottom bar
16 1 4 6.913 27.65
16 1 4 6.274 25.10
16 1 3 4.949 14.85
16 1 5 7.286 36.43
16 1 3 5.687 17.06
16 1 5 7.300 36.50
16 1 3 4.950 14.85
16 1 4 6.274 25.10
16 1 4 6.913 27.65

negative bar
14 1 2 3.21
16 1 1 2.562 2.56
16 1 2 3.887
16 1 1 2.687
20 1 4 3.553
20 1 4 3.828
stirap
8 1 326 1.300 423.80
on Axis 5 b/n A-J
top bar
20 1 2 57.870 115.74
bottom bar
12 1 1 6.788
16 1 7 6.788 47.52
16 1 7 6.274
16 1 2 4.949
16 1 4 7.300
16 1 2 5.674
16 1 4 7.300
16 1 3 4.950
negative bar
14 1 1 3.887 3.89
14 1 2.562
16 1 4 3.553
16 1 4 3.828
stirap
8 1 149 1.300 193.70
on Axis B b/n 6-1
top bar
20 1 3 33.800 101.40
bottom bar
14 1 1 7.313 7.31
16 1 6 4.867
16 1 3 4.894
20 1 6 7.556
20 1 2 7.313
negative bar
16 1 1 15.053
stirap
8 1 168 1.300 218.40
on Axis C,G and H b/n 6-1'
top bar
20 3 2 25.076 150.46
bottom bar
12 3 2 7.356
16 3 8 7.356 176.54
16 3 4 4.875
16 3 4 4.843
negative bar
20 3 1 15.053
on Axis D b/n 6'-1'
top bar
20 1 2 31.943 63.89
bottom bar
12 1 2 7.356
16 1 8 7.356 58.85
16 1 4 4.875
16 1 4 4.843
16 1 4 7.113
negative bar
20 1 1 15.053
stirap
8 4 129 1.300 670.80
on Axis E b/n 6'-1'
top bar
20 1 2 33.943 67.89
bottom bar
12 1 1 7.356
16 1 8 7.356 58.85
16 1 3 4.875
16 1 2 4.843
16 1 3 7.113
negative bar
14 1 1 7.874
20 1 1 7.874
stirap
8 1 141 1.300 183.30
on Axis F b/n 6'-1'
top bar
20 1 3 12.000 36.00
bottom bar
12 1 1 7.356
16 1 7 7.356 51.49
16 1 3 4.875
16 1 2 4.843
16 1 3 7.113
negative bar
14 1 1 7.874
20 1 1 7.874
stirap
8 1 141 1.300 183.30
on Axis I b/n 6-1'
top bar
16 1 9 12.000 108.00
bottom bar
12 1 2 7.356
16 1 8 7.356 58.85
16 1 2 4.794
16 1 4 7.113
negative bar
14 1 2 7.600
stirap
8 1 141 1.300 183.30
on Axis B'& I' b/n 4-3
top bar
16 2 4 7.563 60.50
bottom bar
16 2 4 6.963 55.70

negative bar
14 2 4 2.729
stirap
8 2 43 1.300 111.80

GROUND FLOOR SLAB


on Panel S-1
Main bar
10 3 40 4.428 531.36
10 3 27 6.493 525.93
on Panel S-2
Main bar
10 4 19 4.428 336.53
10 4 22 4.399 387.11
on Panel S-3
Main bar
10 4 36 4.428 637.63
10 4 22 5.724 503.71
on Panel S-4
Main bar
10 4 31 4.428 549.07
10 4 22 6.750 594.00
on Panel S-5
Main bar
10 4 65 6.493 1,688.18
10 4 50 6.806 1,361.20
on Panel S-7
Main bar
10 2 24 4.428 212.54
10 2 22 5.224 229.86
on Panel S-8
Main bar
10 4 32 5.724 732.67
10 4 26 6.806 707.82
on Panel S-6
Main bar
10 4 32 4.399 563.07
10 4 19 6.806 517.26
on Panel S-9
Main bar
10 4 44 6.806 1,197.86
10 4 45 6.750 1,215.00
onPANEL S10
Main bar
10 2 34 5.224 355.23
10 2 35 5.435 380.45

onPANEL S11
Main bar
10 2 26 6.562 341.22
10 2 39 5.724 446.47
onPANEL S12
Main bar
10 2 44 6.562 577.46
10 2 39 6.750 526.50
onPANEL S13
Main bar
10 2 39 4.399 343.12
10 2 29 6.562 380.60
onPANEL S14
Main bar
10 1 36 5.224 188.06
10 1 33 5.435 179.36
onPANEL S15
Main bar
10 1 33 6.718 221.69
10 1 33 6.010 198.33
10 1 32 5.224 167.17
DISTRIBUTION BAR 10 1 32 4.318 138.18
on axis A
10 1 158 2.350 371.30
on axis B
10 1 129 3.888 501.55
10 1 19 2.135 40.57
10 1 39 4.834 188.53
10 1 26 3.441 89.47
on axis C
10 1 138 3.208 442.70
on axis D
10 1 160 3.553 568.48
on axis E
10 1 237 3.828 907.24
on axis F
10 1 223 3.828 853.64
on axis G
10 1 252 3.550 894.60
on axis H
10 1 176 3.205 564.08
on axis I
10 1 129 3.892 502.07
10 1 39 4.834 188.53
10 1 26 3.529 91.75
on axis J
10 1 193 2.350 453.55
on axis 1
10 1 101 2.327 235.03
on axis 2
10 1 329 3.238 1,065.30
10 1 33 2.530 83.49
on axis 3
12 1 313 4.289 1,342.46
10 1 60 4.201 252.06
10 1 14 2.420 33.88
on axis 3'
10 1 15.5 1.943 30.12
10 1 31.96 1.624 51.90

on axis 4
10 1 330 4.289 1,415.37
12 1 15.3
12 1 40 4.201 168.04
on axis 5
10 1 276 3.238 893.69
10 1 50 2.420 121.00
on axis 6
10 1 344 2.298 790.51

RETAINING WALL
BEAM 12 1 1216 1.950 2,371.20
14 1 160 12.000 1,920.00
WALL
10 1 280 12.000 3,360.00
12 1 1216 3.295 4,006.72

SHEAR WALL

SW2
BASEMENT TO GROUND FLOOR
8 4 102 4.492 1,832.74

8 4 1400 0.315 1,764.00


8 4 51 1.400 285.60
10 4 56 7.024 1,573.38
14 4 16 7.143 457.15
SW3
BASEMENT TO GROUND FLOOR
10 1 16 7.133 114.13
14 1 8 7.233 57.86
8 1 400 0.250 100.00
8 1 102 0.800 81.60
8 1 102 1.467 149.63

ELEVATOR SHAFT WALL


BASEMENT TO GROUND FLOOR
SECTION A''- A''
8 1 122 5.350 652.70
8 1 122 2.010 245.22
8 1 122 2.378 290.12
8 1 122 1.400 170.80
10 1 70 7.030 492.10
16 1 16 7.230 115.68
SECTION B- B
8 2 80 2.850 456.00
10 2 44 7.030 618.64
SECTION c'- c'
8 1 80 2.010 160.80
8 1 40 2.378 95.12
10 1 20 2.720 54.40
10 1 18 7.030 126.54
12 1 24 7.230 173.52

- ### ### 9,045.04 ### 7,473.72 7,310.87 -


0.222 0.395 0.617 0.888 1.21 1.579 2.47
- ### ### 8,032.00 ### ### ### -

6mm 8mm 10mm 12mm 14mm 16mm 20mm 24mm


BLOCK-WORK

T D S UNIT DESCRIPTION
BASEMENT FLOOR (20CM)
On axis 2 b/n A and B
1.00 6.24
2.55 15.91 M2
On axis B b/n 1' and 2
1.00 4.61
2.55 11.76 M2
On axis 2 b/n I and J
1.00 6.24
2.55 15.91 M2
On axis I b/n 1' and 2
1.00 4.61
2.55 11.76 M2
On axis 5 b/n I and J
1.00 6.49
2.55 16.55 M2
On axis I b/n 5 and 6'
1.00 3.99
2.55 10.17 M2
On axis E b/n 3 and 3'
1.00 3.42
2.55 8.72 M2
On axis 4 b/n E and F
1.00 4.27
2.55 10.89 M2
DDT
6.00 2.70 W5
0.80 (12.96)
DDT
3.00 2.00 SLIDING DOOR
2.10 (12.60)
DDT
1.00 0.75 DOOR
2.10 (1.58)
DDT
3.00 0.70 COLUMN(C4)
0.50 (1.05)
DDT
2.00 0.80 COLUMN(C9)
0.55 (0.88)
DDT
1.00 0.80 COLUMN(C1)
0.60 (0.48)
DDT
1.00 0.80 COLUMN(C3)
0.50 (0.40)

GROUND FLOOR (20CM)


On axis A b/n 1 and 3
1.00 9.02
3.39 30.58 M2
1.00 6.59 On axis 3 b/n A and B
3.39 22.34 M2
1.00 6.59 On axis b/n 3 and 4 b/n A and B
3.39 22.34 M2

1.00 7.71 On axis A b/n 3 and 5 (toilet)


3.39 26.14 M2

6.00 DDT
W5

1.00 2.68 On axis b/n A and B


3.39 9.09 M2

2.00 2.08 On axis b/n 4 and 5 b/n A and B


3.39 14.10 m2

1.00 3.90 On axis b/n 4 and 5 b/n A and B


3.39 13.22 m2
1.00 6.59 On axis 5 b/n A and B
3.39 22.34 m2
32.00 2.70 261.79
3.03 M2
On axis b/n 2 and 3 b/n D and E
64.00 3.00 581.76
3.03 m2

32.00 5.60 542.98 On axis b/n 2 and 3 b/n D and E(kitchn)

1.00 10.15 On axis J b/n 1 and 4


3.39 34.41 m2

1.00 6.59 On axis b/n 3 and 4 b/n I and J


3.39 22.34 m2

1.00 11.05 On axis J b/n 4 and 6


3.39 37.46 m2

1.00 6.59 On axis 4 b/n I and J


3.39 22.34 M2

1.00 5.91 On axis E b/n 3 and 5


3.39 20.03 m2

DDT
1.00 (0.60) COLUMN
0.60 (0.36) M2

1.00 5.76 On axis b/n 3 and 4 b/n E and F


3.67 21.14 m2

1.00 0.60 DDT


(0.60) (0.36) M2 COLUMN

FIRST & TYPICAL FLOOR LEFT SIDE UP (20CM)


18.00 12.80 On axis A b/n 1 and 4
2.75 35.20 m2

96.00 (0.60) DDT


0.60 (34.56) m2 W5

18.00 3.37 On axis 1 b/n A and B (balcony)


2.75 166.82 m2

18.00 1.80 On axis b/n B and C b/n 2 and 3


3.03 98.17 M2

18.00 5.47 On axis b/n 3 and 4 b/n C and B( livingroom)


2.75 270.77 M2
18.00 1.20 DDT
2.10 (45.36) m2 DOOR

18.00 8.09 On axis C b/n 1 and 3


2.75 400.46 m2 1
18.00
18.00 (0.60) DDT
0.60 (6.48) m2 column

18.00 2.92 On axis b/n A and B b/n 2 and 3(BEDROOM)


2.75 144.54 m2

18.00 4.00 on axis 2 b/n B ans D


2.75 198.00 M2

18.00 1.14 On axis C b/n 1 and 2


2.75 56.43 M2
18.00 6.49 On axis A and B b/n 3 and 4
2.75 321.26 M2
18.00 2.00 On axis b/n 1 and 2 balcony
2.75 99.00 m2

18.00 6.89 On axis b/n 3 and 4 b/n D and E( livingroom)


2.75 341.06 m2

18.00 2.02 On axis b/n 1 and 2 b/n D and E


2.75 99.99 M2

18.00 6.44 On axis E b/n 1 and 4


2.75 318.78 m2

18.00 1.20 On axis D b/n 2 and 1


2.75 59.40 m2

18.00 1.70 On axis D b/n 3 and 4


2.75 84.15 M2

18.00 1.62 On axis E b/n 1 and 4


2.75 80.19 M2

18.00 2.20 On axis b/n 3 and 4


2.75 108.90 m2

18.00 2.00 On axis b/n 3 and 4


2.75 99.00 m2

FIRST & TYPICAL FLOOR RIGHT SIDE (20CM)


18.00 8.72 On axis F b/n 1 and 4
2.75 431.64 m2
DDT
18.00 0.60 COLUMN
(0.60) (6.48) m2
W5
18.00 (0.60)
0.60 (6.48) m2
On axis b/n 1 and 2 b/n F and G
18.00 1.32
2.75 65.34 m2
On axis b/n 1 and 2 b/n F and G
18.00 2.60
2.75 128.70 m2
On axis b/n 1 and 2 b/n F and G(kitchen)
18.00 2.84
2.75 140.58 m2
DDT
18.00 0.80 DOOR
(0.80) (11.52) m2

On axis G b/n 1 and 3


18.00 1.51
2.75 74.75 m2
DDT
18.00 (0.60) column
0.60 (6.48) m2

On axis 2 b/n G and H


72.00 4.35
2.75 861.30 m2 DDT
18.00 (3.45) DOOR
0.60 (37.26) m2

On axis I b/n 1 and 4


18.00 7.14
2.75 353.43 m2
DDT
Column
18.00 (0.55)
0.80 (7.92) m2
On axis J b/n 1 and 4
36.00 12.80
2.75 35.20 m2 DDT
54.00 (2.70) W5
0.80 (116.64) m2 DDT
54.00 (0.50) COLUMN
0.70 (18.90) m2

On axis b/n 3 and 4


18.00 15.81
2.75 782.59 m2
DDT
36.00 (1.20) DOOR
2.10 (90.72) m2 On axis H b/n 1 and 3
18.00 8.09
2.75 400.46 m2
DDT
18.00 (0.55) column
0.80 7.92 m2
Terrace floor
1.00 191.74
2.27 435.25
6,716.68 Class C, 200mm thick HCB wall

a - 15 cm thick HCB Block


GR floor On axis E b/n 1 and 3
2.00 5.36
2.75 29.48 m2 DDT
2.00 (0.55) column
0.80 (0.88) m2
On axis F b/n 1 and 3
2.00 5.36
2.75 29.48 m2 DDT
2.00 (0.55) column
0.80 (0.88) m2
On axis E and F b/n 2 and 3
2.00 5.29
2.75 29.10 m2
On axis E and F b/n 2 and 4
2.00 5.15
2.75 28.33 m2
On axis F and G b/n 3 and 4
2.00 4.25
2.75 23.38 m2
DDT
2.00 (0.75) DOOR
2.10 3.15 m2

1st floor On axis B b/n 1 and 4


2.00 5.12
2.75 28.16 m2 DDT
4.00 (0.55) COLUMN
0.80 1.76 m2
On axis D&E b/n 3 and 4
2.00 4.28
2.75 23.54 m2
On axis F&G b/n 1 and 3
2.00 4.77
2.75 26.24 m2
On axis F&G b/n 1 and 4
2.00 2.35
2.75 12.93 m2
On axis I b/n 2 and 4
2.00 2.35
2.75 12.93 m2
Typical 2nd to 9th floor
On axis b/n 1 and 4
16.00 5.12
2.75 225.28 m2 DDT
32.00 (0.55) COLUMN
0.80 14.08 m2
On axis D&E b/n 3 and 4
16.00 4.28
2.75 188.32 m2
On axis F&G b/n 1 and 3
16.00 4.77
2.75 209.88 m2
On axis F&G b/n 1 and 4
16.00 2.35
2.75 103.40 m2
On axis I b/n 2 and 4
16.00 2.35
2.75 103.40 m2
1,091.05 Class C, 150mm thick HCB wall
T D S UNIT DESCRIPTION

GROUND FLOOR (10CM)


1.00 7.75 On axis E b/n 4 and 6
3.39 26.27 m2
partition(toilet)
4.00 1.51 On axis b/n 4 and 5b/n Aand B
3.67 22.17 m2
1.00 2.68 On axis b/n A and B b/n 4 and 5
3.67 9.84 m2
1.00 11.66
3.39 39.53 m2 On axis I b/n 1 and 4

2.00 (0.60) DDT


0.60 (0.72) m2 Column

1.00 (2.00) door


2.90 (5.80) m2

1.00 13.78 On axis b/n B and E b/n 3 and 4


3.39 46.71 M2

1.00 9.43 On axis b/n F and I b/n 3 and 4


3.39 31.97 M2

1.00 7.75 On axis F b/n 4 and 6


3.39 26.27 m2
1.00 4.05 On axis 4 b/n F and G
3.39 13.73 m2

1.00 5.88 On axis 4 and 3 b/n F and G


3.39
19.93 m2

FIRST / SECOND AND TYPICAL FLOOR UP (10CM)


36.00 9.58 On axis b/n A and B b/n 1 and 2
2.75 948.42 M2
DDT
72.00 (2.10) DOOR
0.80 (120.96)
M2
On axis b/n 3 and 2 b/n A and B( KITCHEN)
36.00 6.07
2.75 600.93 M2
DDT
72.00 (0.80) DOOR
2.50 (144.00) M2
On axis b/n 3 and 4 b/n A and B( KITCHEN)
36.00 6.07
2.75 600.93 m2
On axis A b/n 3 and 4 (store)
36.00 1.63
2.75 161.37 M2
On axis A and B b/n 3 and 4 (store)
36.00 1.80
2.75 178.20 M2
On axis 3 b/n A and B
36.00 2.04
2.75 201.96 M2
DDT
72.00 (0.80) DOOR
2.50 (144.00) m2
On axis B b/n 3 and 4(kitchen)
36.00 3.02
2.75 298.98 M2
DDT
72.00 0.60 COLUMN
(0.60) (25.92) m2
On axis D b/n 2 and 3
36.00 2.60
2.75 257.40 m2
On axis b/n D and E b/n 1 and 3
3.03 m2
DDT
72.00 (0.80) door
2.50 (144.00) M2
On axis b/n D and E b/n 2 and 3
36.00 2.00
2.75 198.00 m2

3,097.21 Class C, 100mm thick HCB wall


-

Construct single brick wall bedded on cement mortar 1:3

1.00 49.99 along axis 1' A-J


2.05 102.48 m2
1.00 43.56 along axis 6' A-J
2.05 89.30 m2

1.00 34.10 along axis A, 1'-6'


2.05 69.91 m2

1.00 27.53 along axis J, 1'-6'


2.05 56.44 m2

1.00 10.37 along axis B, 5'-6'


2.05 21.26 m2
1.00 6.40 along axis B/n axis A-B for ramp
2.05 13.12 m2

250.02 m2 TOTAL
No.of Total Length of Reinforcement Bar (m)
Bar Qun. Length
Structural Member Shape membe
Dia. (pcs) (m) 6mm 8mm 10mm 12mm 14mm 16mm 20mm 24mm
r
Ground elevation column
C1
20 4 12 4.840 232.32
20 4 6 4.840 116.16
stirap
10 4 23 9.045 832.14
C2
20 4 12 4.840 232.32
20 4 6 4.840 116.16
stirap
10 4 23 10.183 936.84
C2'
20 2 12 4.840 116.16
20 2 6 4.840 58.08
stirap
10 2 23 10.183 468.42
C3
20 2 10 4.840 96.80
20 2 6 4.840 58.08
stirap
10 2 24 5.570 267.36
C3'
20 1 10 4.840 48.40
20 1 6 4.840 29.04
stirap
10 1 24 5.570 133.68
C4
20 10 10 4.840 484.00
20 10 4 4.840 193.60
stirap
10 10 24 6.289 1,509.36

C4'
20 1 10 4.840 48.40
20 1 4 4.840 19.36
stirap
10 1 24 6.289 150.94
C5
20 1 6 4.840 29.04
20 1 10 4.840 48.40
stirap
10 1 24 5.870 140.88

C6
20 1 6 4.840 29.04
20 1 10 4.840 48.40
stirap
10 1 24 5.870 140.88

C7
20 3 6 4.840 87.12
20 3 10 4.840 145.20
stirap
10 3 24 6.950 500.40
C8
20 4 4 4.840 77.44
20 4 10 4.840 193.60
stirap
10 4 24 4.820 462.72
C9'
20 1 6 4.840 29.04
20 1 10 4.840 48.40
stirap
10 1 24 5.670 136.08
C9
20 4 6 4.840 116.16
20 4 10 4.840 193.60
stirap
10 4 24 5.670 544.32
C10
20 1 4 4.840 19.36
20 1 10 4.840 48.40
stirap
10 1 24 6.580 157.92
1st-2nd Floor column

C1
20 8 12 4.200 403.20
20 8 6 4.200 201.60
stirap
10 8 21 9.045 1,519.56
C2
20 8 12 4.200 403.20
20 8 6 4.200 201.60
stirap
10 8 21 10.183 1,710.74
C2'
20 4 12 4.200 201.60
20 4 6 4.200 100.80
stirap
10 4 21 10.183 855.37
C3
20 4 10 4.200 168.00
20 4 6 4.200 100.80
stirap
10 4 21 5.570 467.88
C3'
20 2 10 4.200 84.00
20 2 6 4.200 50.40
stirap
10 2 21 5.570 233.94
C4
20 20 10 4.200 840.00
20 20 4 4.200 336.00
stirap
10 20 21 6.289 2,641.38

C4'
20 2 10 4.200 84.00
20 2 4 4.200 33.60
stirap
10 2 21 6.289 264.14
C5
20 2 6 4.200 50.40
20 2 10 4.200 84.00
stirap
10 2 21 5.870 246.54

C6
20 2 6 4.200 50.40
20 2 10 4.200 84.00
stirap
10 2 21 5.870 246.54

C7
20 6 6 4.200 151.20
20 6 10 4.200 252.00
stirap
10 6 21 6.950 875.70
C8
20 8 4 4.200 134.40
20 8 10 4.200 336.00
stirap
10 8 21 4.820 809.76
C9'
20 2 6 4.200 50.40
20 2 10 4.200 84.00
stirap
10 2 21 5.670 238.14
C9
20 8 6 4.200 201.60
20 8 10 4.200 336.00
stirap
10 8 21 5.670 952.56
C10
20 2 4 4.200 33.60
20 2 10 4.200 84.00
stirap
10 2 21 6.580 276.36
3rd-6th Floor column

C1
20 16 10 4.200 672.00
20 16 4 4.200 268.80
stirap
10 16 20 6.289 2,012.48
C2
20 16 10 4.200 672.00
20 16 4 4.200 268.80
stirap
10 16 20 6.289 2,012.48
C2'
20 8 4 4.200 134.40
20 8 10 4.200 336.00
stirap
10 8 20 6.289 1,006.24
C3
20 8 10 4.200 336.00
20 8 4 4.200 134.40
stirap
10 8 21 4.570 767.76
C3'
20 4 10 4.200 168.00
20 4 4 4.200 67.20
stirap
10 4 21 4.570 383.88
C4
20 40 10 4.200 1,680.00
20 40 4 4.200 672.00
stirap
10 40 21 6.289 5,282.76

C4'
20 4 10 4.200 168.00
20 4 4 4.200 67.20
stirap
10 4 21 6.289 528.28
C5
20 4 4 4.200 67.20
20 4 10 4.200 168.00
stirap
10 4 21 6.289 528.28

C6
20 4 4 4.200 67.20
20 4 10 4.200 168.00
stirap
10 8 21 6.289 1,056.55

C7
20 12 4 4.200 201.60
20 12 10 4.200 504.00
stirap
10 12 21 6.289 1,584.83
C8
20 16 4 4.200 268.80
20 16 10 4.200 672.00
stirap
10 16 21 4.570 1,535.52
C9'
20 4 4 4.200 67.20
20 4 10 4.200 168.00
stirap
10 4 21 4.570 383.88
C9
20 16 4 4.200 268.80
20 16 10 4.200 672.00
stirap
10 16 21 4.570 1,535.52
C10
20 4 4 4.200 67.20
20 4 10 4.200 168.00
stirap
10 4 21 6.289 528.28
7th-9th Floor column

C1
20 12 6 4.200 302.40
20 12 4 4.200 201.60
stirap
10 12 20 3.796 911.04
C2
20 8 6 4.200 201.60
20 8 4 4.200 134.40
stirap
10 8 20 3.796 607.36
C2'
20 6 4 4.200 100.80
20 6 6 4.200 151.20
stirap
10 6 20 3.796 455.52
C3
20 4 6 4.200 100.80
20 4 4 4.200 67.20
stirap
10 4 21 3.428 287.95
C3'
20 3 6 4.200 75.60
20 3 4 4.200 50.40
stirap
10 3 21 4.570 287.91
C4
20 20 6 4.200 504.00
20 20 4 4.200 336.00
stirap
10 20 21 3.796 1,594.32

C4'
20 3 6 4.200 75.60
20 3 4 4.200 50.40
stirap
10 3 21 3.796 239.15
C5
20 3 4 4.200 50.40
20 3 6 4.200 75.60
stirap
10 3 21 3.796 239.15

C6
20 2 4 4.200 33.60
20 2 6 4.200 50.40
stirap
10 2 21 3.796 159.43

C7
20 6 4 4.200 100.80
20 6 6 4.200 151.20
stirap
10 6 21 3.796 478.30
C8
20 8 4 4.200 134.40
20 8 6 4.200 201.60
stirap
10 8 21 4.570 767.76
C9'
20 3 4 4.200 50.40
20 3 6 4.200 75.60
stirap
10 3 21 4.570 287.91
C9
20 8 4 4.200 134.40
20 8 6 4.200 201.60
stirap
10 8 21 4.570 767.76
C10
20 3 4 4.200 50.40
20 3 6 4.200 75.60
stirap
10 3 21 3.796 239.15

9th Floor column

C2
20 4 6 3.525 84.60
20 4 4 3.525 56.40
stirap
10 4 20 3.796 303.68
C3
20 2 6 3.525 42.30
20 2 4 3.525 28.20
stirap
10 2 21 4.570 191.94
C4
20 10 6 3.525 211.50
20 10 4 3.525 141.00
stirap
10 10 21 3.796 797.16
C6
20 1 4 3.525 14.10
20 1 6 3.525 21.15
stirap
10 1 21 3.796 79.72

C7
20 3 4 3.525 42.30
20 3 6 3.525 63.45
stirap
10 3 21 3.796 239.15
C8
20 4 4 3.525 56.40
20 4 6 3.525 84.60
stirap
10 4 21 4.570 383.88

C8
20 4 4 3.525 56.40
20 4 6 3.525 84.60
stirap
10 4 21 4.570 383.88
Terrace column

C1
20 4 6 3.525 84.60
20 4 4 3.525 56.40
stirap
10 4 20 3.796 303.68

C2
20 2 6 3.525 42.30
20 2 4 3.525 28.20
stirap
10 2 20 3.796 151.84

C3'
20 1 6 3.525 21.15
20 1 4 3.525 14.10
stirap
10 1 20 3.428 68.56
C4'
20 1 6 3.525 21.15
20 1 4 3.525 14.10
stirap
10 1 20 3.796 75.92
C9'
20 1 6 3.525 21.15
20 1 4 3.525 14.10
stirap
10 1 20 3.428 68.56
C10
20 1 6 3.525 21.15
20 1 4 3.525 14.10
stirap
10 1 20 3.796 75.92
1ST floor beam
on Axis 1 b/n A-B
top bar
16 1 4 7.313 29.25
bottom bar
16 1 3 6.713 20.14
negative bar
12 1 1 2.687 2.69
stirap
8 1 41 1.300 53.30
on Axis 1 b/n I-J
top bar
16 1 4 7.313 29.25
bottom bar
16 1 3 6.713 20.14
negative bar
12 1 1 2.687 2.69
stirap
8 1 41 1.300 53.30
on Axis 2 b/n A-J
top bar
20 1 2 57.597 115.19
bottom bar
12 1 1 7.30
16 1 3 6.788 20.36
16 1 3 6.274
16 1 2 4.949
16 1 4 7.300
16 1 2 5.674
16 1 3 7.300
16 1 2 4.950
16 1 3 6.174
16 1 3 6.788
negative bar
16 1 2 7.381 14.76
20 1 1 7.381
stirap
8 1 326 1.300 423.80
on Axis 3 b/n A-E
top bar
20 1 2 27.985 55.97
bottom bar
16 1 4 6.913 27.65
16 1 2 6.274 12.55
16 1 2 4.949 9.90
16 1 4 8.648 34.59

negative bar
16 1 2 2.687 5.37
20 1 1 7.771
stirap
8 1 152 1.300 197.60
on Axis 3 b/n G-J
top bar
16 1 3 20.287 60.86
bottom bar
16 1 3 19.687 59.06
negative bar
14 1 2 2.687 5.37
stirap
8 1 119 1.300 154.70
on Axis 3' b/n E-F
top bar
16 1 3 5.974 17.92
bottom bar
16 1 3 5.274 15.82
stirap
8 1 32 1.300 41.60

on Axis 4 b/n A-J


top bar
20 1 3 57.870 173.61
bottom bar
16 1 3 6.913 20.74
16 1 2 6.274 12.55
16 1 3 4.949 14.85
16 1 4 7.300 29.20
16 1 3 5.674 17.02
16 1 3 7.300 21.90
16 1 2 4.950 9.90
16 1 3 6.274 18.82
16 1 3 6.913 20.74
negative bar
14 1 1 13.896 13.90
stirap
8 1 326 1.300 423.80
on Axis 5 b/n A-E
top bar
20 1 2 27.985 55.97
bottom bar
16 1 3 6.788 20.36
16 1 3 6.274 18.82
16 1 2 4.949 9.90
16 1 4 7.225 28.90
negative bar
14 1 3 2.795 8.39
16 1 2 3.553
stirap
8 1 149 1.300 193.70
on Axis 5 b/n F-J
top bar
20 1 2 26.437 52.87
bottom bar
16 1 4 7.225 28.90
16 1 2 4.950 9.90
16 1 3 6.274 18.82
16 1 3 6.788 20.36
negative bar
16 1 2 6.240
stirap
8 1 151 1.300 196.30
on Axis 6 b/n A-B
top bar
20 1 3 7.313 21.94
bottom bar
16 1 3 6.713 20.14
stirap
8 1 41 1.300 53.30
on Axis 6 b/n I-J
top bar
20 1 3 7.313 21.94
bottom bar
16 1 3 6.713 20.14
stirap
8 1 41 1.300 53.30
on Axis A&J b/n 6-4
top bar
16 2 3 15.095 90.57
bottom bar
16 2 3 13.695 82.17
negative bar
14 2 2 3.237
stirap
8 2 85 1.300 221.00
on Axis A&J b/n 3-1
top bar
16 2 3 15.095 90.57
bottom bar
16 2 3 13.684 82.10
negative bar
14 2 1 4.419
14 2 2 3.238
stirap
8 2 83 1.300 215.80
on Axis B b/n 6-1
top bar
20 2 2 33.800 135.20
bottom bar
16 2 3 31.400 188.40
negative bar
16 2 2 15.053
stirap
8 2 168 1.300 436.80
on Axis C,D,G and H b/n 5-2
top bar
16 4 3 25.076 300.91
bottom bar
16 4 3 23.676 284.11
negative bar
14 4 2 16.278
stirap
8 4 129 1.300 670.80
on Axis E b/n 5-2
top bar
16 1 3 26.575 79.73
bottom bar
16 1 3 23.676 71.03
negative bar
14 1 3 4.289
16 2 4.585
16 1 2 4.289
16 1 2 4.666
stirap
8 1 141 1.300 183.30
on Axis F b/n 5-2
top bar
16 1 3 26.575 79.73
bottom bar

16 1 3 23.676 71.03
negative bar
16 1 2 4.666
16 1 1 4.289
14 1 1 4.289
16 1 1 4.585
stirap
8 1 141 1.300 183.30
on Axis I b/n 6-1
top bar
16 1 3 33.800 101.40
bottom bar
16 1 2 4.805 9.61
16 1 3 7.356 22.07
16 1 3 7.113 21.34
16 1 3 7.356 22.07
16 1 2 4.794 9.59
negative bar
14 1 3 3.238
16 1 2 3.347
16 1 2 4.289
16 1 2 4.289

stirap
8 1 141 1.300 183.30
on Axis B'& I' b/n 4-3
top bar
16 2 3 7.563 45.38
bottom bar
16 2 3 6.963 41.78
stirap
8 2 43 1.300 111.80
2nd to 9th floor beam

on Axis 1 b/n A-B


top bar
16 8 4 7.313 234.02
bottom bar
16 8 3 6.713 161.11
negative bar
12 8 1 2.687 21.50
stirap
8 8 41 1.300 426.40
on Axis 1 b/n I-J
top bar
16 8 4 7.313 234.02
bottom bar
16 8 3 6.713 161.11
negative bar
12 8 1 2.687 21.50
stirap
8 8 41 1.300 426.40
on Axis 2 b/n A-E
top bar
20 8 2 9.925 158.80
20 8 2 5.812 92.99
20 8 3 6.387 153.29
20 8 3 4.313 103.51
bottom bar
16 8 13 23.636 2,458.14
negative bar
14 8 2 5.948 95.17
stirap
8 8 163 1.300 1,695.20
on Axis 2 b/n F-J
top bar
20 8 3 9.700 232.80
20 8 2 5.812 92.99
20 8 2 9.925 158.80
bottom bar
16 8 4 7.225 231.20
16 8 3 4.950 118.80
16 8 3 6.274 150.58
16 8 3 6.788 162.91
stirap
8 8 147 1.300 1,528.80
on Axis 3 b/n A-E
top bar
16 8 3 27.584 662.02
bottom bar
16 8 4 6.913 221.22
16 8 3 6.274 150.58
16 8 2 4.949 79.18
16 8 4 8.648 276.74
negative bar
14 8 3 2.687 64.49
16 8 1 3.887
16 8 2 3.553
16 8 2 4.218

stirap
8 8 178 1.300 1,851.20
on Axis 3 b/n G-J
top bar
16 8 3 27.584 662.02
bottom bar
16 8 3 6.500 156.00
16 8 3 6.274 150.58
16 8 4 6.913 221.22
negative bar
14 8 3 2.687 64.49
16 8 2 11.658

stirap
8 8 178 1.300 1,851.20
on Axis 3' b/n E-F
top bar
16 8 3 5.974 143.38
bottom bar
16 8 3 5.274 126.58
stirap
8 8 32 1.300 332.80
on Axis 4 b/n A-J
top bar
20 8 3 10.050 241.20
20 8 2 5.812 92.99
20 8 2 6.387 102.19
20 8 2 6.674 106.78
20 8 2 6.637 106.19
20 8 2 6.325 101.20
20 8 2 5.812 92.99
20 8 3 10.050 241.20
bottom bar
16 8 4 6.913 221.22
16 8 3 6.274 150.58
16 8 2 4.849 77.58
16 8 4 7.300 233.60
16 8 2 5.674 90.78
16 8 4 7.300 233.60
16 8 3 6.174 148.18
16 8 4 6.913 221.22
16 8 2 4.950 79.20

negative bar
14 8 1 2.687
14 8 1 2.687
14 8 2 3.553
16 8 2 3.553
16 8 2 3.828
16 8 2 3.828

stirap
8 8 326 1.300 3,390.40
on Axis 5 b/n A-E
top bar
20 8 2 9.925 158.80
20 8 2 5.812 92.99
20 8 3 6.387 153.29
20 8 3 4.313 103.51
bottom bar
16 8 3 6.788 162.91
16 8 3 6.274 150.58
16 8 2 4.949 79.18
16 8 4 7.225 231.20
negative bar
12 8 2 6.348 101.57
stirap
8 8 149 1.300 1,549.60
on Axis 5 b/n F-J
top bar
20 8 2 36.362 581.79
bottom bar
16 8 4 7.225 231.20
16 8 2 4.950 79.20
16 8 3 6.274 150.58
16 8 3 6.788 162.91
negative bar
12 8 2 2.687
12 8 1 3.887
12 8 1 3.601
12 8 2 2.687
stirap
8 8 151 1.300 1,570.40

on Axis 6 b/n A-B


top bar
16 8 4 7.313 234.02
bottom bar
16 8 3 6.713 161.11
negative bar
12 8 1 2.687
stirap
8 8 41 1.300 426.40
on Axis 6 b/n I-J
top bar
16 8 4 7.313 234.02
bottom bar
16 8 3 6.713 161.11
negative bar
12 8 1 2.687
stirap
8 8 41 1.300 426.40
on Axis A&J b/n 6-4
top bar
20 16 2 15.495 495.84
bottom bar
16 16 2 13.695 438.24
negative bar
12 16 2 4.419
16 16 1 3.156
stirap
8 16 85 1.300 1,768.00
on Axis A&J b/n 3-1
top bar
16 16 2 15.095 483.04
bottom bar
16 16 2 13.684 437.89
negative bar
12 16 2 4.419
14 16 2 3.238
stirap
8 16 83 1.300 1,726.40
on Axis B&I b/n 6-1
top bar
20 16 2 33.800 1,081.60
bottom bar
16 16 3 31.400 1,507.20
negative bar
14 16 2 2.561
16 16 2 2.561
14 16 2 4.289
14 16 2 4.289
14 16 2 2.588
16 16 2 3.238
stirap
8 16 168 1.300 3,494.40
on Axis C and H b/n 5-2
top bar
16 16 3 25.076 1,203.65
bottom bar
16 16 3 23.676 1,136.45
negative bar
16 16 1 15.578
stirap
8 16 129 1.300 2,683.20
on Axis D and G b/n 5-2
top bar
16 16 4 25.076 1,604.86
bottom bar
16 16 3 23.676 1,136.45
negative bar
12 16 1 11.910
stirap
8 16 129 1.300 2,683.20
on Axis E b/n 5-2
top bar
16 8 3 26.600 638.40
bottom bar
16 8 3 25.200 604.80
negative bar
12 8 1 8.578
14 8 2 4.560
stirap
8 8 141 1.300 1,466.40
on Axis F b/n 5-2
top bar
16 8 3 26.600 638.40
bottom bar
16 8 3 25.200 604.80
negative bar
12 8 2 4.289
16 8 1 4.289
stirap
8 8 141 1.300 1,466.40
on Axis B'& I' b/n 4-3
top bar
16 16 3 7.613 365.42
bottom bar
16 16 3 6.963 334.22
stirap
8 16 41 1.300 852.80
Terrace floor beam
on Axis 1 b/n A-B
top bar
14 1 3 7.313 21.94
bottom bar
14 1 3 6.713 20.14
stirap
8 1 41 1.300 53.30
on Axis 1 b/n I-J
top bar
14 1 3 7.313 21.94
bottom bar
14 1 3 6.713 20.14
stirap
8 1 41 1.300 53.30
on Axis 2 b/n A-E
top bar
16 1 4 27.985 111.94
bottom bar
12.00 1.00 1.00 7.30
14 1 3 6.274 18.82
16 1 3 6.788
16 1 2 4.949
16 1 3 7.300
negative bar
12 1 1 2.395 2.40
12 1 1 3.553 3.55
stirap
8 1 163 1.300 211.90
on Axis 2 b/n F-J
top bar
16 1 2 26.037 52.07
bottom bar
16 1 3 24.837 74.51
negative bar
16 1 2 6.348
stirap
8 1 151 1.300 196.30
on Axis 3 b/n A-E
top bar
16 1 3 33.000 99.00
bottom bar
14 1 1 6.963 6.96
16 1 4 26.784
negative bar
14 1 2 4.219 8.44
16 1 3 6.240
stirap
8 1 178 1.300 231.40
on Axis 3 b/n G-J
top bar
16 1 3 27.584 82.75
bottom bar
16 1 10 26.984 269.84
negative bar
12 1 2 6.574 13.15
stirap
8 1 178 1.300 231.40
on Axis 3' b/n E-F
top bar
14 1 3 5.974 17.92
bottom bar
16 1 3 5.274 15.82
stirap
8 1 32 1.300 41.60
on Axis 4 b/n A-J
top bar
20 1 4 57.870 231.48
bottom bar
14 1 1 13.826 13.83
16 1 3 56.670
negative bar
14 1 8 8.927 71.42
stirap
8 1 326 1.300 423.80
on Axis 5 b/n A-E
top bar
16 1 3 27.985 83.96
bottom bar
14 1 6 11.223 67.34
16 1 6 14.013
negative bar
12 1 2 14.600 29.20
stirap
8 1 149 1.300 193.70
on Axis 5 b/n F-J
top bar
16 1 3 26.437 79.31
bottom bar
14 1 3 11.223 33.67
16 1 3 14.013
negative bar
12 1 1 6.240
stirap
8 1 151 1.300 196.30
on Axis A&J b/n 6-4
top bar
16 2 9 15.495 278.91
bottom bar
16 2 4 13.695 109.56
negative bar
12 2 1 3.237
stirap
8 2 85 1.300 221.00
on Axis 6 b/n A-B
top bar
16 1 3 7.313 21.94
bottom bar
14 1 3 6.713 20.14
stirap
8 1 41 1.300 53.30
on Axis 6 b/n I-J
top bar
16 1 3 7.313 21.94
bottom bar
14 1 3 6.713 20.14
stirap
8 1 41 1.300 53.30
on Axis A&J b/n 6-4
top bar
16 2 3 15.095 90.57
bottom bar
16 2 2 13.684 54.74
negative bar
12 2 1 3.238
stirap
8 2 83 1.300 215.80
on Axis A&J b/n 3-1
top bar
16 2 3 15.095 90.57
bottom bar
16 2 2 13.684 54.74
negative bar
12 2 1 3.238
stirap
8 2 83 1.300 215.80
on Axis B&I b/n 6-1
top bar
16 2 3 32.800 196.80
bottom bar
16 2 3 31.400 188.40
negative bar
16 2 1 14.972
stirap
8 2 168 1.300 436.80
on Axis C and H b/n 5-2
top bar
16 2 3 25.076 150.46
bottom bar
16 2 3 23.676 142.06
negative bar
12 2 1 16.199
stirap
8 2 129 1.300 335.40
on Axis D and G b/n 5-2
top bar
16 2 3 25.076 150.46
bottom bar
16 2 3 23.676 142.06
negative bar
14 2 2 7.325
16 2 1 8.789
stirap
8 2 129 1.300 335.40
on Axis E b/n 5-2
top bar
16 1 3 27.400 82.20
bottom bar
16 1 3 26.000 78.00
negative bar
12 1 1 8.578
stirap
8 1 141 1.300 183.30
on Axis f b/n 5-2
top bar
16 1 4 27.400 109.60
bottom bar
16 1 3 26.000 78.00
negative bar
14 1 1 8.578
stirap
8 1 141 1.300 183.30
on Axis B'& I' b/n 4-3
top bar
16 2 3 7.613 45.68
bottom bar
16 2 3 6.963 41.78
stirap
8 2 41 1.300 106.60
Water tank floor beam

on Axis 2 b/n D-G


top bar
16 1 3 21.674 65.02
bottom bar
16 1 2 27.499 55.00
negative bar
12 1 1 6.623
stirap
8 1 121 1.300 157.30
on Axis 3 b/n D-G
top bar
16 1 12 21.674 260.09
bottom bar
12 1 1 7.225 7.23
16 1 9 20.123 181.11
negative bar
12 1 4 13.246
stirap
8 1 121 1.300 157.30
on Axis 4 b/n D-G
top bar
16 1 12 21.674 260.09
bottom bar
16 1 6 20.123 120.74
stirap
8 1 121 1.300 157.30
on Axis D&G b/n 4-2
top bar
16 2 6 17.500 210.00
bottom bar
16 2 4 16.100 128.80
negative bar
12 2 1 4.289
stirap
8 2 102 1.300 265.20
on Axis E b/n 4-2
top bar
16 1 9 17.500 157.50
bottom bar
16 1 6 16.100 96.60
negative bar
12 1 1 4.591
16 1 2 7.018
stirap
8 1 102 1.300 132.60
on Axis F b/n 4-2
top bar
16 1 9 17.500 157.50
bottom bar
16 1 6 16.100 96.60
negative bar
12 1 1 4.591
14 1 2 4.289
16 1 1 2.729
stirap
8 1 102 1.300 132.60

First floor slab


on Panel S-1
Main bar
8 4 40 4.524 723.84
8 4 27 6.547 707.08
on Panel S-5
Main bar
8 4 65 6.493 1,688.18
8 4 50 6.806 1,361.20
on Panel S-8
Main bar
8 4 56 5.724 1,282.18
8 4 36 7.982 1,149.41
on Panel S-6
Main bar
8 4 51 4.399 897.40
8 4 27 7.982 862.06
on Panel S-9
Main bar
8 4 46 8.756 1,611.10
8 4 45 6.750 1,215.00
onPANEL S10
Main bar
8 2 34 5.224 355.23
8 2 35 5.435 380.45
onPANEL S11
Main bar
8 2 38 6.562 498.71
8 2 45 5.724 515.16
onPANEL S12
Main bar
8 2 46 6.562 603.70
8 2 45 6.750 607.50
onPANEL S13
Main bar
8 2 42 4.399 369.52
8 2 29 6.562 380.60
onPANEL S14
Main bar
8 1 36 5.224 188.06
8 1 33 5.435 179.36
onPANEL S15
Main bar
8 1 33 6.718 221.69
8 1 33 6.010 198.33
8 1 32 5.224 167.17
DISTRIBUTION BAR 8 1 32 4.318 138.18
on axis A
10 1 7 2.172 15.20
10 1 35 2.340 81.90
10 1 158 2.350 371.30
on axis B
10 1 8 2.368 18.94
10 1 117 3.888 454.90
10 1 158 2.350 371.30
10 1 39 4.834 188.53
10 1 26 3.919 101.89
on axis C
10 1 120 3.208 384.96
on axis D
10 1 160 3.553 568.48
on axis E
10 1 20 1.965 39.30
10 1 12 1.523 18.28
10 1 8 2.510 20.08
10 1 31 2.994 92.81
10 1 87 3.828 333.04
10 1 17 2.480 42.16
on axis F
10 1 39 2.490 97.11
10 1 12 1.514 18.17
10 1 13 3.808 49.50
10 1 67 3.828 256.48
on axis G
10 1 117 3.550 415.35
10 1 11 3.995 43.95
10 1 20 2.100 42.00
on axis H
10 1 11 3.888 42.77
10 1 120 3.205 384.60
on axis I
10 1 117 3.892 455.36
10 1 166 2.350 390.10
10 1 39 4.834 188.53
10 1 26 3.919 101.89
on axis J
10 1 201 2.350 472.35
on axis 1
10 1 50 2.433 121.65
10 1 50 2.423 121.15
on axis 2
10 1 80 3.238 259.04
10 1 166 3.616 600.26
10 1 33 4.388 144.80
10 1 72 4.390 316.08
on axis 3
12 1 60 4.289 257.34
10 1 178 4.289 763.44
10 1 60 4.202 252.12
10 1 13 4.410 57.33
10 1 14 2.420 33.88
10 1 60 4.361 261.66
on axis 3'
10 1 15.5 1.949 30.21
10 1 31.96 1.624 51.90

on axis 4
12 1 17 4.289 72.91
10 1 263 4.289 1,128.01
10 1 40 4.201 168.04
10 1 50 2.423 121.15
on axis 5
10 1 100 3.238 323.80
10 1 95.4 3.615 344.87
10 1 46 4.398 202.31
10 1 34 4.302 146.27
10 1 96 3.609 346.46
on axis 6
10 1 100 2.435 243.50
TYPICAL 2nd TO 9th floor slab
on Panel S-1
Main bar
8 32 40 4.524 5,790.72
8 32 27 6.547 5,656.61
on Panel S-5
Main bar
8 32 65 6.493 13,505.44
8 32 50 6.806 10,889.60
on Panel S-8
Main bar
8 32 56 5.724 10,257.41
8 32 36 7.982 9,195.26
on Panel S-6
Main bar
8 32 51 4.399 7,179.17
8 32 27 7.982 6,896.45
on Panel S-9
Main bar
8 32 46 8.756 12,888.83
8 32 45 6.750 9,720.00
onPANEL S10
Main bar
8 16 34 5.224 2,841.86
8 16 35 5.435 3,043.60

onPANEL S11
Main bar
8 16 38 6.562 3,989.70
8 16 45 5.724 4,121.28
onPANEL S12
Main bar
8 16 46 6.562 4,829.63
8 16 45 6.750 4,860.00
onPANEL S13
Main bar
8 16 42 4.399 2,956.13
8 16 29 6.562 3,044.77
onPANEL S15
Main bar
8 8 33 6.718 1,773.55
8 8 33 6.010 1,586.64
8 8 32 5.224 1,337.34
DISTRIBUTION BAR 8 8 32 4.318 1,105.41
on axis A
10 8 7 2.172 121.63
10 8 35 2.340 655.20
10 8 158 2.350 2,970.40
on axis B
10 8 8 2.368 151.55
10 8 117 3.888 3,639.17
10 8 158 2.350 2,970.40
10 8 39 4.834 1,508.21
10 8 26 3.919 815.15
on axis C
10 8 120 3.208 3,079.68
on axis D
10 8 160 3.553 4,547.84
10 8 6 4.270 204.96
on axis E
10 8 23 3.828 704.35
10 8 12 1.514 145.34
10 8 50 2.473 989.20
10 8 50 2.490 996.00
10 8 15 2.480 297.60
10 8 7 2.478 138.77
10 8 11 2.483 218.50
on axis F
10 8 43 2.486 855.18
10 8 12 1.514 145.34
10 8 23 3.808 700.67
10 8 50 2.490 996.00
10 8 7 2.479 138.82

on axis G
10 8 117 3.550 3,322.80
10 8 11 3.995 351.56
10 8 20 2.100 336.00
on axis H
10 8 11 3.888 342.14
10 8 120 3.205 3,076.80
on axis I
10 8 117 3.892 3,642.91
10 8 166 2.350 3,120.80
10 8 39 4.834 1,508.21
10 8 26 3.919 815.15
on axis J
10 8 201 2.350 3,778.80
on axis 1
10 8 50 2.433 973.20
10 8 50 2.423 969.20
on axis 2
10 8 80 3.238 2,072.32
10 8 166 3.616 4,802.05
10 8 33 4.388 1,158.43
10 8 72 4.390 2,528.64
on axis 3
12 8 60 4.289 2,058.72
10 8 178 4.289 6,107.54
10 8 60 4.202 2,016.96
10 8 13 4.410 458.64
10 8 14 2.420 271.04
10 8 60 4.361 2,093.28
on axis 3'
10 8 15.5 1.949 241.68
10 8 31.96 1.624 415.22

on axis 4
12 8 17 4.289 583.30
10 8 263 4.289 9,024.06
10 8 40 4.201 1,344.32
10 8 50 2.423 969.20
on axis 5
10 8 100 3.238 2,590.40
10 8 95.4 3.615 2,758.97
10 8 46 4.398 1,618.46
10 8 34 4.302 1,170.14
10 8 96 3.609 2,771.71
on axis 6
10 8 100 2.435 1,948.00
Terrace floor slab
on Panel S-1
Main bar
8 4 40 4.524 723.84
8 4 27 6.547 707.08
on Panel S-5
Main bar
8 4 65 6.493 1,688.18
8 4 50 6.806 1,361.20
on Panel S-8
Main bar
8 4 56 5.724 1,282.18
8 4 36 7.982 1,149.41
on Panel S-6
Main bar
8 4 51 4.399 897.40
8 4 27 7.982 862.06
on Panel S-9
Main bar
8 4 46 8.756 1,611.10
8 4 45 6.750 1,215.00
onPANEL S10
Main bar
8 2 34 5.224 355.23
8 2 35 5.435 380.45

onPANEL S11
Main bar
8 2 38 6.562 498.71
8 2 45 5.724 515.16
onPANEL S12
Main bar
8 2 46 6.562 603.70
8 2 45 6.750 607.50
onPANEL S13
Main bar
8 2 42 4.399 369.52
8 2 29 6.562 380.60
onPANEL S15
Main bar
8 1 33 6.718 221.69
8 1 33 6.010 198.33
8 1 32 5.224 167.17
DISTRIBUTION BAR 8 1 32 4.318 138.18
on axis A
10 1 7 2.172 15.20
10 1 35 2.340 81.90
10 1 158 2.350 371.30
on axis B
10 1 8 2.368 18.94
10 1 117 3.888 454.90
10 1 158 2.350 371.30
10 1 39 4.834 188.53
10 1 26 3.919 101.89
on axis C
10 1 120 3.208 384.96
on axis D
10 1 160 3.553 568.48
10 1 6 4.270 25.62
on axis E
10 1 23 3.828 88.04
10 1 12 1.514 18.17
10 1 50 2.473 123.65
10 1 50 2.490 124.50
10 1 15 2.480 37.20
10 1 7 2.478 17.35
10 1 11 2.483 27.31
on axis F
10 1 43 2.486 106.90
10 1 12 1.514 18.17
10 1 23 3.808 87.58
10 1 50 2.490 124.50
10 1 7 2.479 17.35

on axis G
10 1 117 3.550 415.35
10 1 11 3.995 43.95
10 1 20 2.100 42.00
on axis H
10 1 11 3.888 42.77
10 1 120 3.205 384.60
on axis I
10 1 117 3.892 455.36
10 1 166 2.350 390.10
10 1 39 4.834 188.53
10 1 26 3.919 101.89
on axis J
10 1 201 2.350 472.35
on axis 1
10 1 50 2.433 121.65
10 1 50 2.423 121.15
on axis 2
10 1 80 3.238 259.04
10 1 166 3.616 600.26
10 1 33 4.388 144.80
10 1 72 4.390 316.08
on axis 3
12 1 60 4.289 257.34
10 1 178 4.289 763.44
10 1 60 4.202 252.12
10 1 13 4.410 57.33
10 1 14 2.420 33.88
10 1 60 4.361 261.66
on axis 3'
10 1 15.5 1.949 30.21
10 1 31.96 1.624 51.90

on axis 4
12 1 17 4.289 72.91
10 1 263 4.289 1,128.01
10 1 40 4.201 168.04
10 1 50 2.423 121.15
on axis 5
10 1 100 3.238 323.80
10 1 95.4 3.615 344.87
10 1 46 4.398 202.31
10 1 34 4.302 146.27
10 1 96 3.609 346.46
on axis 6
10 1 100 2.435 243.50
Water tank supported slab
on Panel S-9
Main bar
10 2 46 8.756 805.55
10 2 45 6.750 607.50
onPANEL S12
Main bar
10 2 46 6.562 603.70
10 2 45 6.750 607.50
onPANEL S14
Main bar
10 1 36 5.224 188.06
10 1 33 5.435 179.36
DISTRIBUTION BAR

on axis D
10 1 91 2.534 230.59
on axis E
10 1 91 3.828 348.35
on axis F
10 1 76 3.828 290.93
on axis G
10 1 91 2.526 229.87
on axis 2
10 1 141 4.327 610.11
10 1 51 3.238 165.14
on axis 3
10 1 79 4.289 338.83
on axis 4
10 1 111 2.427 269.40
STAIR CASE
GROUND TO FIRST
8 1 21 1.500 31.50
8 1 12 1.500 18.00
8 1 11 1.500 16.50
8 1 72 0.994 71.57
14 1 11 1.911 21.02
14 1 10 1.441 14.41
14 1 10 5.850 58.50
14 1 10 3.048 30.48
14 2 10 2.086 41.72
8 1 28 1.500 42.00
8 1 12 1.500 18.00
8 1 11 1.500 16.50
8 1 72 0.994 71.57
14 1 11 2.880 31.68
14 1 10 1.070 10.70
14 1 10 5.773 57.73
14 1 10 1.830 18.30
14 1 10 2.938 29.38
LANDING BEAM
LB1
8 1 25 1.300 32.50
14 1 2 4.326 8.65
16 1 3 4.326 12.98
16 1 3 3.726 11.18
LB2
8 1 31 1.300 40.30
14 1 4 2.300 9.20
16 1 3 5.425 16.28
16 1 3 6.224 18.67
FIRST TO TERRACE
8 10 28 1.500 420.00
8 10 12 1.500 180.00
8 10 11 1.500 165.00
8 10 72 0.994 715.68
14 10 11 1.490 163.90
14 10 10 1.621 162.10
14 10 10 5.202 520.20
14 10 10 2.480 248.00
14 10 10 2.700 270.00
8 10 28 1.500 420.00
8 10 12 1.500 180.00
8 10 11 1.500 165.00
8 10 72 0.994 715.68
14 10 11 2.845 312.95
14 10 10 2.700 270.00
14 10 10 5.300 530.00
14 10 10 1.282 128.20
14 10 10 1.788 178.80
LANDING BEAM
LB1
8 1 25 1.300 32.50
14 1 2 4.326 8.65
16 1 3 4.326 12.98
16 1 3 3.726 11.18
LB2
8 1 31 1.300 40.30
14 1 4 2.300 9.20
16 1 3 5.425 16.28
16 1 3 6.224 18.67

SHEAR WALL

SW2
GROUND TO FOURTH FLOOR
8 4 278 4.492 4,995.10
8 4 3892 0.315 4,903.92
8 4 139 1.400 778.40
10 4 56 4.440 994.56
10 4 224 3.800 3,404.80
14 4 16 4.440 284.16
14 4 64 3.900 998.40
FROM 5th floor TO .TERRACE
8 4 230 4.492 4,132.64
8 4 3220 0.315 4,057.20
8 4 115 1.400 644.00
10 4 224 3.800 3,404.80
10 4 56 3.375 756.00
14 4 64 3.900 998.40
14 4 16 3.375 216.00
SW3
GROUND TO 9TH FLOOR
8 1 544 1.467 798.05
8 1 2176 0.250 544.00
8 1 544 0.800 435.20
10 1 14 4.540 63.56
10 1 112 3.900 436.80
10 1 14 3.325 46.55
14 1 8 4.640 37.12
14 1 64 4.000 256.00
14 1 8 3.325 26.60

ELEVATOR SHAFT WALL


SECTION A''- A''
GROUND TO FOURTH FLOOR 8 1 333 5.350 1,781.55
8 1 333 1.400 466.20
10 1 70 4.440 310.80
10 1 64 3.800 243.20
16 1 16 4.640 74.24
16 1 64 4.000 256.00
FROM 5th floor TO W.T
8 1 256 5.350 1,369.60
8 1 256 1.400 358.40
10 1 280 3.800 1,064.00
16 1 80 4.000 320.00
16 1 16 3.370 53.92
SECTION B - B
GROUND TO FOURTH FLOOR 8 2 166.4 2.850 948.48
10 2 42 4.440 372.96
10 2 168 3.800 1,276.80
FROM 5th floor TO W.T
8 2 256 2.850 1,459.20
10 2 105 3.800 798.00
16 2 21 3.370 141.54
SECTION C- C
GROUND TO FOURTH FLOOR
8 2 333 2.010 1,338.66
8 1 333 2.378 791.87
10 1 18 4.440 79.92
10 4 18 3.800 273.60
10 1 200 2.720
12 4 2 0.800
16 1 24 4.640 111.36
16 2 96 4.000 768.00
FROM 5th floor TO W.T
8 2 256 2.010 1,029.12
8 1 256 2.378 608.77
10 1 200 2.720
10 1 20 2.500
10 5 18 3.800 342.00
10 1 10 9.040 90.40
10 1 10 1.025
10 1 18 3.370
12 6 2 0.800
12 1 2 0.800
16 1 120 4.000 480.00
16 1 24 3.370 80.88

- 235,379.26 186,383.85 3,508.00 6,565.10 31,013.26 ### -


0.222 0.395 0.617 0.888 1.208 1.579 2.467
- 92,974.81 114,998.84 3,115.10 7,930.64 48,969.94 ### -

6mm 8mm 10mm 12mm 14mm 16mm 20mm 24mm


Title: Take off sheet

T D S Description
PLASTERING
a - 20 cm thick HCB Block
GR floor
1 32.264 L=32.264
3.84 D=3.84
123.89376
1st floor
1 45.098 L= 45.098
3.2 D=3.2
144.3136
Typical 2nd to 9th floor
8 45.098 L=45.098
3.2 D=3.2
1154.5088 **
Terrace floor
2 191.74 L=191.74
3.2 D=3.2
1227.136
2649.85 TOTAL EXTERNAL PLASTERING

INTERNAL PLASTERING
1 a - 20 cm thick HCB Block
6200 6200.00
2 3550.15
7100.30
2 1091.05 B - 15 cm thick HCB Block
2182.10
2 3097.21 C - 10 cm thick HCB Block
6194.42
21676.82 TOTAL INTERNAL PLASTERING

c) To Stair case and landing


stair case 1 ( b/n axis E-F ) ground to 1st

1.00 3.48 landing beam 1 (B-1)


1.00
3.48 m2

1.00 4.47 landing beam 2 (B-2)


1.15
5.14 m2

1.00 4.41 sofit slab (waist slab) 0.00 to 1.92


1.86
8.20 m2
1.00 3.69 sofit slab (waist slab) +1.92 to +3.84
1.86
6.86 m2
1.00 3.10 Landing
1.90
5.89 m2
12.00 1.50 stepfrom level 0.00 to 1.92
0.16
2.88 m2
12.00 1.50 stepfrom level +1.92 to +3.84
0.16
2.88 m2
stair case 1 ( b/n axis E-F ) 1st to Terrace

9.00 3.48 landing beam 1 (B-1) 9


1.00
31.32 m2

9.00 4.47 landing beam 2 (B-2)


1.15
46.26 m2

9.00 3.40 sofit slab (waist slab) 0.00 to 1.92


1.86
56.92 m2
9.00 3.07 sofit slab (waist slab) +1.92 to +3.84
1.86
51.39 m2
9.00 3.10 Landing
1.96
54.68 m2
90.00 1.50 stepfrom level +3.84 to +5.44
0.15
20.25 m2
90.00 1.50 stepfrom level +1.92 to +3.84
0.15
20.25 m2

316.41 m2
d) To R.C. ceiling.
typical solid floor slab .
2.00 3.53 b/n A-B & i-j and b/n 1-2
5.93
41.87 m2

2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
1.00
8.48 m2

1.00 54.11 b/n B-I b/n 1-2 cantliver


1.00
54.11 m2

2.00 6.31 b/n A-B & i-j & 2-3


5.93
74.84 m2

2.00 6.06 b/n A-B & i-j & 3-4


5.93
71.87 m2

2.00 (4.56) ddt stair -4


2.50
(22.80) m2
2.00 6.31 b/n A-B & i-j & 4-5
5.93
74.84 m2

2.00 2.91 b/n A-B & i-j & 4-5


5.93
34.51 m2

2.00 5.22 b/n B-C &H-I & 2-3


6.31
65.88 m2

2.00 5.22 b/n B-C &H-I & 3-4


6.06
63.27 m2

2.00 5.22 b/n B-C &H-I & 4-5


6.31
65.88 m2

2.00 3.90 b/n C-D&G-H & & 2-3


6.31
49.22 m2

2.00 3.90 b/n C-D&G-H & & 3-4


6.06
47.27 m2

2.00 3.90 b/n C-D&G-H & & 4-5


6.31
49.22 m2

1.00 6.24 b/n D-E & 2-3


6.31
39.37 m2

1.00 6.24 b/n D-E & 3-4


6.06
37.81 m2

1.00 6.24 b/n D-E & 4-5


6.31
39.37 m2

1.00 6.24 b/n E-F & 2-3


6.31
39.37 m2

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
1.00 6.24 b/n E-F & 3-4
6.06
37.81 m2

1.00 (5.10) DDT STAIR 2


3.10
(15.81) m2
1.00 (1.32) ddt duct oppening b/n axis 3'-3
0.80
(1.06) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


0.56
(0.53) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


0.68
(0.64) m2

1.00 6.25 b/N F-G & 2-3


6.31
39.44 m2

1.00 6.25 b/n F-G & 3-4


6.06
37.88 m2

1.00 6.25 b/n F-G & 4-5


6.31
39.44 m2
1.00 (5.00) ddt lift opening
2.50
(12.50) m2
2.00 6.52 cantliver b/n A-B and i-j & 6-6'
1.00
13.04 m2
1.00 22.78 B-E and b/n 5-6
1.00
22.78 m2

1.00 22.28 F-I and b/n 5-6


1.00
22.28 m2
2nd to 9th floor slab

2.00 3.53 b/n A-B & i-j and b/n 1-2


8.00 5.93
334.93 m2

2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
8.00 1.00
67.84 m2

1.00 54.11 b/n B-I b/n 1-2 cantliver


8.00 1.00
432.88 m2
1.00 (9.25) ddt cantliver b/n 1-2 axis E-F
8.00 1.00
(74.00) m2

2.00 6.31 b/n A-B & i-j & 2-3


8.00 5.93
598.69 m2

2.00 6.06 b/n A-B & i-j & 3-4


8.00 5.93
574.97 m2

2.00 (4.56) ddt stair -4


8.00 2.50
(182.40) m2
2.00 6.31 b/n A-B & i-j & 4-5
8.00 5.93
598.69 m2

2.00 2.91 b/n A-B & i-j & 5-6


8.00 5.93
276.10 m2

2.00 5.22 b/n B-C &H-I & 2-3


8.00 6.31
527.01 m2

2.00 5.22 b/n B-C &H-I & 3-4


8.00 6.06
506.13 m2

2.00 5.22 b/n B-C &H-I & 4-5


8.00 6.31
527.01 m2

2.00 3.90 b/n C-D&G-H & & 2-3


8.00 6.31
393.74 m2

2.00 3.90 b/n C-D&G-H & & 3-4


8.00 6.06
378.14 m2

2.00 3.90 b/n C-D&G-H & & 4-5


8.00 6.31
393.74 m2

1.00 6.24 b/n D-E & 2-3


8.00 6.31
315.00 m2

1.00 6.24 b/n D-E & 3-4


8.00 6.06
302.52 m2

1.00 6.24 b/n D-E & 4-5


8.00 6.31
315.00 m2

1.00 6.24 b/n E-F & 2-3


8.00 6.31
315.00 m2
1.00 (18.75) b/n E-F & 2-3 ddt oppening
8.00 1.00
(150.00) m2

1.00 6.24 b/n E-F & 3-4


8.00 6.06
302.52 m2

1.00 (5.10) DDT STAIR 2


8.00 3.10
(126.48) m2
1.00 (1.32) ddt duct oppening b/n axis 3'-3
8.00 0.80
(8.46) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


8.00 0.56
(4.21) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


8.00 0.68
(5.11) m2

1.00 6.25 b/N F-G & 2-3


8.00 6.31
315.50 m2

1.00 6.25 b/n F-G & 3-4


8.00 6.06
303.00 m2

1.00 6.25 b/n F-G & 4-5


8.00 6.31
315.50 m2
1.00 (5.00) ddt lift opening
8.00 2.50
(100.00) m2
2.00 6.52 cantliver b/n A-B and i-j & 6-6'
8.00 1.00
104.32 m2
1.00 22.78 B-E and b/n 5-6
For Contractor For Consultant
________________ ________________
Title: Take off sheet

T D S Description
8.00 1.00
182.24 m2

1.00 21.86 F-I and b/n 5-6


8.00 1.00
174.88 m2
thick terrace floor and water tanker slab .

2.00 3.53 b/n A-B & i-j and b/n 1-2


5.93
41.87 m2

2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
1.00
8.48 m2

1.00 54.11 b/n B-I b/n 1-2 cantliver


1.00
54.11 m2
1.00 (9.25) ddt cantliver b/n 1-2 axis E-F
1.00
(9.25) m2

2.00 6.31 b/n A-B & i-j & 2-3


5.93
74.84 m2

2.00 6.06 b/n A-B & i-j & 3-4


5.93
71.87 m2

2.00 (4.56) ddt stair -4


2.50
(22.80) m2
2.00 6.31 b/n A-B & i-j & 4-5
5.93
74.84 m2

2.00 2.91 b/n A-B & i-j & 5-6


5.93
34.51 m2

2.00 5.22 b/n B-C &H-I & 2-3


6.31
65.88 m2

2.00 5.22 b/n B-C &H-I & 3-4


6.06
63.27 m2

2.00 5.22 b/n B-C &H-I & 4-5


6.31
65.88 m2

2.00 3.90 b/n C-D&G-H & & 2-3


6.31
49.22 m2

2.00 3.90 b/n C-D&G-H & & 3-4


6.06
47.27 m2

2.00 3.90 b/n C-D&G-H & & 4-5


6.31
49.22 m2

1.00 6.24 b/n D-E & 2-3


6.31
39.37 m2

1.00 6.24 b/n D-E & 3-4


6.06
37.81 m2

1.00 6.24 b/n D-E & 4-5


6.31
39.37 m2

1.00 6.24 b/n E-F & 2-3


6.31
39.37 m2
1.00 (18.75) b/n E-F & 2-3 ddt oppening
1.00
(18.75) m2

1.00 6.24 b/n E-F & 3-4


6.06
37.81 m2

1.00 (5.10) DDT STAIR 2


3.10
(15.81) m2
1.00 (1.32) ddt duct oppening b/n axis 3'-3
0.80
(1.06) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


0.56
(0.53) m2

1.00 (0.94) ddt duct oppening b/n axis 3'-4


0.68
(0.64) m2

1.00 6.25 b/N F-G & 2-3


6.31
39.44 m2

1.00 6.25 b/n F-G & 3-4


6.06
37.88 m2

1.00 6.25 b/n F-G & 4-5


6.31
39.44 m2
1.00 (5.00) ddt lift opening
2.50
(12.50) m2
2.00 6.52 cantliver b/n A-B and i-j & 6-6'
1.00
13.04 m2
1.00 22.78 B-E and b/n 5-6
1.00
22.78 m2

1.00 21.86 F-I and b/n 5-6


1.00
21.86 m2
water Tanker slab
2.00 6.25 b/n axis D-E & F-G & axis 1-2
1.91
23.88 m2
2.00 6.25 b/n axis D-E & F-G & axis 2-3
6.31
78.88 m2
2.00 6.25 b/n axis D-E & F-G & axis 3-4
6.06
75.75 m2

1.00 4.72 b/n axis E-F & axis 1-2


1.91
9.02 m2
1.00 4.72 b/n axis E-F & axis 2-3
6.31
29.78 m2
1.00 4.72 b/n axis E-F & axis 3-4
6.06
28.60 m2
10155.17 m2
e) To exposed beam and column
c) In Basement Cloumn
4.00 2.80 C1
2.55
28.56 m2
4.00 3.00 C2
2.55
30.60 m2

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description

2.00 3.00 C2'


2.55
15.30 m2
2.00 2.60 C3
2.55
13.26 m2

1.00 2.60 C3'


2.55
6.63 m2

10.00 2.40 C4
2.55
61.20 m2
1.00 2.40 C4'
2.55
6.12 m2

1.00 2.60 C5
2.55
6.63 m2

1.00 2.60 C6
2.55
6.63 m2

3.00 2.70 C7
2.55
20.66 m2

4.00 2.50 C8
2.55
25.50 m2

1.00 2.70 C9 '


2.55
6.89 m2

4.00 2.70 C9
2.55
27.54 m2

1.00 2.50 C-10


2.55
6.38 m2

12.00 1.60 C-11


2.55
48.96 m2
In elevation columns.
4.00 2.80 C-1
3.39 GROUND FLOOR
37.97 m2
4.00 2.80 C-1
2.00 2.75 1st floor,2nd
61.60 m2
4.00 2.40 C-1
4.00 2.75 3rd, 4th, 5th,6th
105.60 m2

4.00 2.00 C-1


4.00 2.75 7th, 8th,9th& terrace
88.00 m2
4.00 3.00 C-2
3.39 GROUND FLOOR
0.00 m2
4.00 3.00 C-2
3.00 2.75 1st, 2nd, 3rd
99.00 m2
4.00 2.40 C-2
3.00 2.75 4th,5th,6th
79.20 m2

4.00 2.00 C-2


3.00 2.75 7th, 8th,9th
66.00 m2

2.00 3.00 C-2'


3.39 GROUND FLOOR
20.34 m2
2.00 3.00 C-2'
3.00 2.75 1st floor,2nd,3rd
49.50 m2
2.00 2.40 C-2'
3.00 2.75 4th, 5th,6th
39.60 m2

2.00 2.00 C-2'


4.00 2.75 7th, 8th,9th& terrace
44.00 m2

2.00 2.60 C-3


3.39 Ground
17.63 m2

2.00 2.60 C-3


2.00 2.75 1st and 2nd
28.60 m2
2.00 2.40 C-3
4.00 2.75 3rd, 4th, 5th and 6th
52.80 m2

2.00 1.80 C-3


3.00 2.75 7th,8th and 9th
9.90 m2

1.00 2.60 C-3'


3.39 Ground
8.81 m2

1.00 2.60 C-3'


2.00 2.75 1st and 2nd
14.30 m2
1.00 2.40 C-3'
4.00 2.75 3rd, 4th, 5th and 6th
26.40 m2

1.00 1.80 C-3'


4.00 2.75 7th,8th and 9th & terrace
19.80 m2

10.00 2.40 C-4


3.39 Ground
81.36 m2

10.00 2.40 C-4


2.75 1st
66.00 m2

10.00 2.40 C-4


6.00 2.75 1st-6th
396.00 m2

10.00 2.00 C-4


3.00 2.75 7th-9th
165.00 m2

1.00 2.40 C-4'


3.39 Ground
8.14 m2

1.00 2.40 C-4'


2.75 1st
6.60 m2

1.00 2.40 C-4'


6.00 2.75 1st-6th
39.60 m2

1.00 2.00 C-4'


4.00 2.75 7th-terrace
22.00 m2

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
1.00 2.60 C-5'
3.39 Ground
0.00 m2

1.00 2.60 C-5'


2.00 2.75 1st -2nd
14.30 m2

1.00 2.40 C-5'


4.00 2.75 3rd-6th
26.40 m2

1.00 2.00 C-5'


4.00 2.75 7th-terrace
22.00 m2

1.00 2.60 C-6


3.39 Ground
8.81 m2

1.00 2.60 C-6


2.75 1ST
7.15 m2
1.00 2.40 C-6
5.00 2.75 2nd-6th
33.00 m2

1.00 2.00 C-6


5.00 2.75 7th-9th
27.50 m2

3.00 2.70 C-7


3.39 Ground
27.46 m2

3.00 2.70 C-7


2.00 2.75 1st -2nd
44.55 m2
3.00 2.40 C-7
4.00 2.75 3rd-6th
79.20 m2

3.00 2.00 C-7


5.00 2.75 7th-9th
82.50 m2
4.00 0.70 C-8
3.39 Ground
0.00 m2
4.00 2.50 C-8
2.00 2.75 1st-2nd
55.00 m2
4.00 2.40 C-8
4.00 2.75 3rd-6th
105.60 m2
4.00 1.80 C-8
3.00 2.75 7th-9th
59.40 m2
1.00 2.70 C-9'
3.39 Ground
0.00 m2
1.00 2.70 C-9'
2.00 2.75 1st-2nd
14.85 m2
1.00 2.40 C-9'
4.00 2.75 3rd-6th
26.40 m2
1.00 1.80 C-9'
4.00 2.75 7th-terrace
19.80 m2
4.00 2.70 C-9
3.39 Ground
0.00 m2
4.00 2.70 C-9
2.00 2.75 1st-2nd
59.40 m2
4.00 2.40 C-9
4.00 2.75 3rd-6th
105.60 m2
4.00 1.80 C-9
3.00 2.75 7th-9th
59.40 m2
1.00 2.50 C-10
3.39 Ground
0.00 m2
1.00 2.50 C-10
2.00 3.39 1st-2nd
16.95 m2

1.00 2.40 C-10


4.00 3.39 3rd-6th
32.54 m2

1.00 2.40 C-10


4.00 3.39 7th-Terrace
32.54 m2
floor beam
1st floor beam

1.00 6.19 beam on axis 1 b/n A-B


1.15
7.12 m2

1.00 6.19 beam on axis 1 b/n I-J


1.15
7.12 m2

1.00 49.60 beam on axis 2 b/n A-J


1.15
57.04 m2

1.00 23.98 beam on axis 3 A-E


1.15
27.58 m2

1.00 17.69 beam on axis 3 G-J


1.15
20.34 m2

1.00 4.97 beam on axis 3' E-F


1.15
5.72 m2

1.00 49.60 beam on axis 4 b/n A-J


1.15
57.04 m2

1.00 22.31 beam on axis 5 b/n A-E


1.15
25.66 m2

1.00 22.31 beam on axis 5 b/n F-G


1.15
25.66 m2

1.00 6.19 beam on axis 6 b/n A-B


1.15
7.12 m2

1.00 6.19 beam on axis 6 b/n I-J


1.15
7.12 m2

2.00 12.00 beam on axis A&J b/n axis 4-6


1.15
27.59 m2

2.00 11.98 beam on axis A&J b/n axis 1-3


1.15
27.56 m2

1.00 26.57 beam on axis B b/n axis 1-6


1.15
30.56 m2

4.00 20.68 beam on axis C,D,G&H b/n axis 1-5


1.15
95.11 m2

1.00 22.43 beam on axis E b/n axis 2-5

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
1.15
25.79 m2

1.00 22.43 beam on axis F b/n axis 2-5


1.15
25.79 m2

1.00 26.58 beam on axis I b/n axis 1-6


1.15
30.56 m2
2.00 5.81 beam on axis B'&I' b/n axis 3-4
1.15
13.37 m2
2ND TO 9TH

1.00 6.19 beam on axis 1 b/n A-B


8.00 1.15
56.93 m2

1.00 6.19 beam on axis 1 b/n I-J


8.00 1.15
56.93 m2

1.00 22.31 beam on axis 2 b/n A-E


8.00 1.15
205.26 m2
1.00 22.31 beam on axis 2 b/n F-J
8.00 1.15
205.27 m2

1.00 23.98 beam on axis 3 A-E


8.00 1.15
220.65 m2

1.00 17.69 beam on axis 3 G-J


8.00 1.15
162.72 m2

1.00 4.97 beam on axis 3' E-F


8.00 1.15
45.76 m2

1.00 49.60 beam on axis 4 b/n A-J


8.00 1.15
456.29 m2

1.00 22.31 beam on axis 5 b/n A-E


8.00 1.15
205.26 m2

1.00 22.31 beam on axis 5 b/n F-G


8.00 1.15
205.27 m2
1.00 6.19 beam on axis 6 b/n A-B
8.00 1.15
56.93 m2

1.00 6.19 beam on axis 6 b/n I-J


8.00 1.15
56.93 m2

2.00 12.00 beam on axis A&J b/n axis 4-6


8.00 1.15
220.71 m2

2.00 11.98 beam on axis A&J b/n axis 1-3


8.00 1.15
220.51 m2

1.00 26.57 beam on axis B b/n axis 1-6


8.00 1.15
244.48 m2

2.00 20.68 beam on axis C,&H b/n axis 1-5


8.00 1.15
380.44 m2
2.00 20.68 beam on axis D,&G b/n axis 1-5
8.00 1.15
380.44 m2

1.00 22.43 beam on axis E b/n axis 2-5


8.00 1.15
206.31 m2

1.00 22.43 beam on axis F b/n axis 2-5


8.00 1.15
206.31 m2

1.00 26.58 beam on axis I b/n axis 1-6


8.00 1.15 NOT SHOWN ON DESIGN FROM 2ND TO 8TH BUT HAVE BEAM ON PLAN
244.50 m2
2.00 5.81 beam on axis B'&I' b/n axis 3-4
8.00 1.15
106.96 m2
In terrace floor beams.
Terrace floor beam
1.00 6.19 beam on axis 1 b/n A-B
1.15
7.12 m2

1.00 6.19 beam on axis 1 b/n I-J


1.15
7.12 m2

1.00 22.31 beam on axis 2 b/n A-E


1.15 0.00 m2

1.00 22.31 beam on axis 2 b/n F-J


1.15
25.66 m2
1.00 23.98 beam on axis 3 A-E
1.15
27.58 m2

1.00 17.69 beam on axis 3 G-J


1.15
20.34 m2

1.00 4.97 beam on axis 3' E-F


1.15
5.72 m2

1.00 49.60 beam on axis 4 b/n A-J


1.15
57.04 m2

1.00 22.31 beam on axis 5 b/n A-E


1.15
25.66 m2

1.00 22.31 beam on axis 5 b/n F-G


1.15
25.66 m2

1.00 6.19 beam on axis 6 b/n A-B


1.15
7.12 m2

1.00 6.19 beam on axis 6 b/n I-J


1.15
7.12 m2

2.00 12.00 beam on axis A&J b/n axis 4-6


1.15
27.59 m2

2.00 11.98 beam on axis A&J b/n axis 1-3


1.15
27.56 m2

2.00 26.57 beam on axis B &I b/n axis 1-6


1.15
61.12 m2

2.00 20.68 beam on axis C&H b/n axis 1-5


1.15
47.55 m2

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
2.00 20.68 beam on axis D&G b/n axis 1-5
1.15
47.55 m2
1.00 22.43 beam on axis E b/n axis 2-5
1.15
25.79 m2

1.00 22.43 beam on axis F b/n axis 2-5


1.15
25.79 m2

2.00 5.81 beam on axis B'&I' b/n axis 3-4


1.15
13.37 m2
Water tanker beam
1.00 17.97 on Axis 2 b/n axis D-G
1.15
20.67 m2

1.00 17.97 on Axis 3 b/n axis D-G


1.15
20.67 m2

1.00 17.97 on Axis 4 b/n axis D-G


1.15
20.67 m2

2.00 14.13 on b/n Axis 2-4 & on axis D&G


1.15
32.49 m2

1.00 14.13 on b/n Axis 2-4 & on axis E


1.15
16.24 m2

1.00 14.13 on b/n Axis 2-4 & on axis F


1.15
16.24 m2
8213.07 m2 tot item E
f) To shear wall
Retaining Shearwall
1.00 49.99 along axis 1' A-J
2.05
102.48 m2

1.00 43.56 along axis 6' A-J


2.05
89.30 m2

1.00 34.10 along axis A, 1'-6'


2.05
69.91 m2

1.00 27.53 along axis J, 1'-6'


2.05
56.44 m2

1.00 10.37 along axis B, 5'-6'


2.05
21.26 m2

1.00 6.40 along axis B/n axis A-B for ramp


2.05
13.12 m2 tot item h
in Lift shaft and shearwall
basement to ground
Elevator Shaft Wall (sw-1)
2.00 5.00 Along Axis 3
2.75
27.50 m2
2.00 2.00 Along Axis b/n axis 3 & F
2.75
11.00 m2

2.00 8.05 Along Axis 3


2.75
44.28 m2

2.00 8.05 Along Axis 3


2.75
44.28 m2

2.00 0.99 Along Axis 3


2.75
5.44 m2

2.00 2.40 top Above door opening


1.20
5.76 m2
Shear wall (SW-2)
8.00 4.65 b/n axis 2-1 and 5-6
3.00
111.65 m2
Shear wall (SW-3)
2.00 1.43 b/n axis 2-1 and 5-6
3.00
8.56 m2
In lift shear wall & sw
Ground to 4th
Elevator Shaft Wall (sw-1)
2.00 5.00 Along Axis 3
3.84
38.40 m3
2.00 2.00 Along Axis b/n axis 3 & F
3.84
15.36 m3

4.00 0.81 Along Axis 3


3.84
12.36 m3

2.00 1.24 Along Axis 3


3.84
9.52 m3

2.00 2.40 top Above door opening


1.20
5.76 m3
1st to 4th
Elevator Shaft Wall (sw-1)
2.00 5.00 Along Axis 3
4.00 3.20
128.00 m3
4.00 2.00 Along Axis b/n axis 3 & F
4.00 3.20
102.40 m3

4.00 0.81 Along Axis 3


4.00 3.20
41.22 m3

2.00 1.24 Along Axis 3


4.00 3.20
31.72 m3

2.00 2.40 top Above door opening


4.00 0.91
17.47 m3
5th to water tanker
Elevator Shaft Wall (sw-1)
2.00 5.00 Along Axis 3
6.00 3.20
192.00 m3
4.00 2.00 Along Axis b/n axis 3 & F
6.00 3.20
153.60 m3

4.00 0.81 Along Axis 3


6.00 3.20
61.82 m3

2.00 0.99 Along Axis 3


6.00 3.20
37.98 m3

2.00 2.40 top Above door opening


6.00 0.91
26.21 m3

For Contractor For Consultant


________________ ________________
Title: Take off sheet

T D S Description
Shear wall (SW-2)
4.00 4.15 b/n axis 2-1 and 5-6 ground to 1st
3.39
56.30 m3
16.00 4.15 b/n axis 2-1 and 5-6 1st to 4th
2.75
182.69 m3
20.00 4.15 b/n axis 2-1 and 5-6 5th to terrace
2.75
228.36 m3
Shear wall (SW-3)
4.00 1.23 b/n axis 2-1 and 5-6 ground to 1st
3.67
18.01 m3
8.00 1.23 b/n axis 2-1 and 5-6 1st to 4th
3.03
29.74 m3
8.00 1.23 b/n axis 2-1 and 5-6 5th to 9th
3.03
29.74 m3
2029.62 m2 tot item F

For Contractor For Consultant


________________ ________________
SUB SURFACE DRAINAGE AND WATERPROOFING
TIME DIMN TOTAL DESCRIPTION
1) BASEMENT TO GROUND FLOOR
Membrane Sheet
on axis 1'&6'
2 50.00 L =50
2.05 D=2.57
205.00 m²
on axis A& J
2 28.04 L =28.036
2.05 D=2.57
114.95 m²
on axis A& B
2 6.53 L =10.623
2.05 D=2.57
26.77 m²
346.72 m² Total Area of membrane sheet
Perforated pipe around shear wall
on axis 1'
1 50.00 L =50
50.00 m
on axis J
1 28.04 L =28.036
28.04 m
on axis 6'
1 50.00 L =50
50.00 m
on axis B
1 6.53 L =6.531
6.53 m
on axis A
1 34.57 L =34.567

34.57
169.13 m total length of perforated pipe

pump sump
Construct with 200mm thick R.c wall as ahown on drawings

Size:- 2500 x 2500 mm,depth=4500mm


1 2.50 L =2.5
2.50 W=2.5
4.50 D=4.5
28.13 m³