Genet & Selam Final Boq
Genet & Selam Final Boq
(3-BLOCKS ''B+G+9+T")
Consultant:-HH Consulting Architects & Engineers plc.
ITEM
DESCREPTION UNIT CONTRACT
NO
1 BLOCK-1 BIRR -
1 BLOCK-2 BIRR -
1 BLOCK-3 BIRR -
GRAND TOTAL………..A BIRR -
UNIT CONTRACT
A . SUB – STRUCTURE
B. SUPER – STRUCTURE
A. SUB STRUCTURE
1. EXCAVATION AND EARTH WORK
1.01 Site clearing and removing the top 20cm thick soil. M2 1,617.58
1.04 Pit excavation in ordinary soil to the specified depth on the drawing. M3 781.69
Fill around stone masonary to maintain the desired level with selected
1.08 borrowed non expansive material and compact by using rammer in M3 169.66
layers not exceeding 20cm.
Fill under hard core with non expansive selected material and compact
1.09 by 14ton drum roller in layers not exceeding 20cm thick by sprinkling M3 314.03
water to insure 100% modified AASHTO dry density.
Cart away
25cm thicksurplus
basalticexcavated material
or equivalent stonetohardcore,
a distance notrolled,
well exceeding
1.1 M3 7,701.00
5kms.
consolidated and blinded with crushed stone.
1.11 M2 1,256.13
2. CONCRETE
2.1 CAST-IN-PLACE CONCRETE
for bar diameter less than 12mm(Ø≤12mm) use Grade 40 (s-30)based on ASTM
A615 shall have minimum Yield strength of 300Mpa shows for bar diameter grater
than 12mm(Ø>12mm) use Grade 60 (s-60)based on ASTM A615 shall have
2.4 minimum Yield strength of 400Mpa steel bar reinforcement according to the
structural drawings. Reinforcement shall be free from dirt, oil, grease, paint, etc
and any other substance which may affect the reinforcement and concrete bond.
Price shall include cutting, bending, placing in position and tying wires.
b) Dia 8 mm deformed bar Kg 10,908.01
c) Dia 10mm deformed bar Kg 28,061.41
d) Dia 12 mm deformed bar Kg 8,032.00
e) Dia 14 mm deformed bar Kg 9,530.11
f) Dia 16 mm deformed bar Kg 11,801.00
g) Dia 20 mm deformed bar Kg 18,057.85
TOTAL CARRIED TO SUMMARY ...................................................
3. MASONRY WORK
3.1.1 Hard trachytic roughly dressed stone masonry foundation wall below ground level
bedded in cement mortar mix (1:3) as per the detail drawing M3 297.82
B-SUPER STRUCTURE
2 1. CONCRETE
2.1 1. CONCRETE WORK
Reinforced concrete Class C-32/40,with minimum cement content of 488 kg of
2.1.1 cement/m3 filled in to form work and vibrated around rod
reinforcement.(Formwork and reinforcement measured separately)
Pricing notes:
A) The costs of concrete shall include sampling, storing and testing of concrete
test cubes as required and providing cube moulds necessary for the purpose and
for submitting reports of tests to the consultant.
B) Price for concrete shall include placing of concrete with approved methods &
means, for vibrating with mechanical vibrators, curing.
2.2.1 Provide, cut and fix formwork which ever is appropriate;Formwork shall be
timbered / laminated plywood or steel or a combination of two, sufficient to
contain the wet concrete without leakage. Enough to support temporary loading
and pressure from placing compaction or vibration without displacement or
appreciable deflection
a) In elevation columns. m
2
3166.56
b) In floor beam m
2
4668.68
c) In terrace floor beams. m
2
492.45
d) In 170mm thick typical solid floor slab . m
2
8921.19
e) In 170mm thick terrace floor and water tanker slab . m
2
1233.99
f) In Water tanker beam m
2
126.99
g) In stair case and Landing m
2
316.41
h) In lift shear wall & sw m
2
1418.66
for bar diameter less than 12mm(Ø≤12mm) use Grade 40 (s-30)based on ASTM
A615 shall have minimum Yield strength of 300Mpa shows for bar diameter grater
than 12mm(Ø>12mm) use Grade 60 (s-60)based on ASTM A615 shall have
2.3.1 minimum Yield strength of 400Mpa steel bar reinforcement according to the
structural drawings. Reinforcement shall be free from dirt, oil, grease, paint, etc
and any other substance which may affect the reinforcement and concrete bond.
Price shall include cutting, bending, placing in position and tying wires.
a) Dia 6 mm plain bar Kg
b) Dia 8 mm deformed bar Kg 92,974.81
c) Dia 10mm deformed bar Kg 114,998.84
d) Dia 12 mm deformed bar Kg 3,115.10
e) Dia 14 mm deformed bar Kg 7,930.64
f) Dia 16 mm deformed bar Kg 48,969.94
g) Dia 20 mm deformed bar Kg 68,984.94
6. FINISHING WORK
4.1 PLASTERING
Supply prepare and apply two coats of Portland cement plaster to internal wall,
Column surfaces, Shear walls, Stair soffit, Parapet walls and ceiling surfaces
where indicated on the drawings and in accordance with the technical
specifications. The proportioning of the first two coats (Base Coats) shall be as
indicated on the specs. Portland Cement Shall comply with the requirements of
ASTM C 150, Type I. Sand Aggregates for Base Coats shall comply with the
requirements of ASTM C 897.
4.2 Price shall include pre-cleaning, groove work as per the design for exterior walls,
edge plastering, post cleaning and at the joints of block walls and concrete
surfaces it shall be racked to form key/shall use crack protection wire mesh to
make flush as per the selection of the Engineer, corner protection in 30x30x3mm
steel angle section or approved material and all preparation work of the surface.
4.2.1 Apply two coats of plastering in cement-sand mortar (1:3) to internal walls
surface. All wall concrete structure joints shall be well treated to avoid hairline
cracks.
a) To all internal HCB wall surfaces. M2 21,676.82
b) To all external HCB wall surfaces. M2 2,649.85
c) To Stair case and landing M2 316.41
d) To R.C. ceiling. M2 10,155.17
e) To exposed beam and column M2 8,213.07
f) To shear wall M2 2,029.62
TOTAL CARRIED TO SUMMARY ...................................................
Q = 3-5 l/sec.
H = 3-5 l/sec. NO 1
TOTAL CARRIED TO SUMMARY ...................................................
Title: Take off sheet
T D S Description
C-30 Concrete work
1. EXCAVATION AND EARTH WORK
1.1 Site clearing
1.00 52.00 b/n axis A-J and b/n axis 1' to 6'
30.03
1,561.56 m2
T D S Description
82.14
F-8
4.00 2.05 L=1.55+0.5
5.95 W=5.452+0.5
1.50 d=1.5
73.21
MF-1
1.00 5.30 L=4.8+0.5
6.90 W=6.4+0.5
1.50 d=1.5
54.86
MF-2
1.00 3.75 L=3.75+0.5
4.88 W=4.378+0.5
1.50 d=1.5
27.44
CF-1
1.00 3.70 L=3.2+0.5
6.70 W=6.2+0.5
1.50 d=1.5
37.19
781.69 M3 volume of item 1.5.1
1.6 Trench excavation for masonry foundation wall to an
average depth of 150cm from reduced level in ordinary soil
b/n axis 2-3 & 4-5 and b/n axis A-B, and I-J
4.00 6.31
5.94
0.25
37.48 m3
b/n axis 2-3 *4-5 and b/n axis B-C &H-I
4.00 6.31
5.22
0.25
32.94 m3
2.00 6.31 b/n axis 2-3 & 4-5 and b/n axis C-D
3.89
0.25
12.27 m3
4.00 6.31 b/n axis 2-3 &4-5 and b/n axis D-E AND F-G
6.25
0.25
39.44 m3
2.00 6.31 b/n axis 2-3 &4-5 and b/n axis E-F
4.72
0.25
14.89 m3
2.00 6.31 b/n axis 2-3 & 4-5 and b/n axis G-H
3.90
0.25
12.30 m3
T D S Description
18.94 m3
T D S Description
4,520.03 tot Volume of Bulk
1,563.39 pit 25cm thick basaltic or equivalent stone hardcore, well
1.11
7,701.00 rolled,
m3 Volume of item and
consolidated 1.10 blinded with crushed stone.
b/n axis 2-3 & 4-5 and b/n axis A-B, and I-J
4.00 6.31
5.94
149.93 m2
b/n axis 2-3 *4-5 and b/n axis B-C &H-I
4.00 6.31
5.22
131.75 m2
2.00 6.31 b/n axis 2-3 & 4-5 and b/n axis C-D
3.89
49.09 m2
4.00 6.31 b/n axis 2-3 &4-5 and b/n axis D-E AND F-G
6.25
157.75 m2
2.00 6.31 b/n axis 2-3 &4-5 and b/n axis E-F
4.72
59.57 m2
2.00 6.31 b/n axis 2-3 & 4-5 and b/n axis G-H
3.90
49.22 m2
T D S Description
30.72 m2
e) Under masonry
b) In Foundation column
4.00 0.60 C1 axis E,F,G and 3,4 intersection,
0.80
1.45
2.78 m3
T D S Description
0.62 m3
c) In Basement Cloumn
4.00 0.80 C1
0.60
2.55
4.90 m3
4.00 0.85 C2
0.65
2.55
5.64 m3
10.00 0.70 C4
0.50
2.55
8.92 m3
1.00 0.70 C4'
0.50
2.55
0.89 m3
1.00 0.80 C5
0.50
2.55
1.02 m3
1.00 0.80 C6
0.50
2.55
1.02 m3
3.00 0.80 C7
0.55
2.55
3.37 m3
4.00 0.70 C8
0.55
2.55
3.93 m3
4.00 0.80 C9
0.55
2.55
4.49 m3
T D S Description
0.25
0.77 m3
1.00 49.60 Axis 2 b/n A-J
0.45
0.25
5.58 m3
1.00 23.98 Axis 3 b/n A-E
0.45
0.25
2.70 m3
1.00 17.19 Axis 3 b/n G-J
0.45
0.25
1.93 m3
1.00 4.72 Axis 3' B/N E-F
0.45
0.25
0.53 m3
1.00 49.60 Axis 4 B/N A-J
0.45
0.25
5.58 m3
1.00 49.60 Axis 5 B/N A-J
0.45
0.25
5.58 m3
1.00 25.65 Axis 'B' B/N 1'-6
0.45
0.25
2.89 m3
T D S Description
17.34 m2
T D S Description
31.63 m2
1.00 (2.50) ddt stair case b/n axis A-B' and b/n axis 3'-4
4.8
(12.00) m2
1.00 (5.10) ddt stair case b/n axis 2-3' & axis E-F
3.10
-15.81 m2
T D S Description
1.00 6.25 b/n axis F-G and b/n Axis 3-4
6.06
37.88 m2
1.00 (4.80) DDT stair Case b/n axis i-j and b/n axis 3-4
2.50
(12.00) m2
T D S Description
2.00 0.81 Along Axis 3
0.25
3.00
1.21 m3
T D S Description
B-SUPER STRUCTURE
1. CONCRETE WORK
a) In elevation columns.
4.00 0.80 C-1
0.60 GROUND FLOOR
3.39
6.51 m3
4.00 0.80 C-1
2.00 0.60 1st floor,2nd
2.75
10.56 m3
4.00 0.70 C-1
4.00 0.50 3rd, 4th, 5th,6th
2.75
15.40 m3
T D S Description
3.39
1.36 m3
b) In floor beam
1st floor beam
T D S Description
0.45
0.25
0.70 m3
T D S Description
0.70 m3
2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
1.00
8.48 m2
T D S Description
6.31
39.37 m2
2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
8.00 1.00
67.84 m2
T D S Description
1.00 6.25 b/n F-G & 4-5
8.00 6.31
315.50 m2
1.00 (5.00) ddt lift opening
8.00 2.50
(100.00) m2
2.00 6.52 cantliver b/n A-B and i-j & 6-6'
8.00 1.00
104.32 m2
1.00 22.78 B-E and b/n 5-6
8.00 1.00
182.24 m2
2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
1.00
8.48 m2
T D S Description
29.78 m2
1.00 4.72 b/n axis E-F & axis 3-4
6.06
28.60 m2
1233.99 m2 area of item 1.1e
T D S Description
2.18 m3
5th to water tanker
Elevator Shaft Wall (sw-1)
1.00 5.00 Along Axis 3
6.00 0.25
3.20
24.00 m3
2.00 2.00 Along Axis b/n axis 3 & F
6.00 0.25
3.20
19.20 m3
T D S Description
2. CONCRETE
Provide, cut and fix formwork which ever is appropriate
a) In Foting Pad
12.00 4.80 (F1)
0.50
28.80 m2
b) In Foundation column
C1 axis E and and 4 intersection, axis F and 4
2.00 2.80
intersection,
1.45
8.12 m2
1.00 2.80 C1, axis G & 4 intersection and axis E and 3 intersection
1.35
3.78 m2
6.00 2.40 C4 axis 5-E, 5-F, 4-J ,3-J ,A-3 and A-4 intersection,
1.65
23.76 m2
c) In Basement Cloumn
4.00 2.80 C1
2.55
28.56 m2
4.00 3.00 C2
2.55
30.60 m2
T D S Description
10.00 2.40 C4
2.55
61.20 m2
1.00 2.40 C4'
2.55
6.12 m2
1.00 2.60 C5
2.55
6.63 m2
1.00 2.60 C6
2.55
6.63 m2
3.00 2.70 C7
2.55
20.66 m2
4.00 2.50 C8
2.55
25.50 m2
4.00 2.70 C9
2.55
27.54 m2
T D S Description
1.00 26.79 Axis E B/N 1'-6
0.85
22.77 m2
1.00 (2.50) ddt stair case b/n axis A-B' and b/n axis 3'-4
4.56
(11.40) m2
1.00 (5.10) ddt stair case b/n axis 2-3' & axis E-F
3.10
-15.81 m2
T D S Description
16.38 m2
1.00 (4.48) DDT stair Case b/n axis i-j and b/n axis 3-4
2.50
(11.20) m2
T D S Description
3.00
8.56 m2
258.46 m2 tot item i
j) in Entrance Step
T D S Description
B-SUPER STRUCTURE
1. CONCRETE WORK
a) In elevation columns.
4.00 2.80 C-1
3.39 GROUND FLOOR
37.97 m2
4.00 2.80 C-1
2.00 2.75 1st floor,2nd
61.60 m2
4.00 2.40 C-1
4.00 2.75 3rd, 4th, 5th,6th
105.60 m2
T D S Description
55.00 m2
4.00 2.40 C-8
4.00 2.75 3rd-6th
105.60 m2
4.00 1.80 C-8
3.00 2.75 7th-9th
59.40 m2
1.00 2.70 C-9'
3.39 Ground
0.00 m2
1.00 2.70 C-9'
2.00 2.75 1st-2nd
14.85 m2
1.00 2.40 C-9'
4.00 2.75 3rd-6th
26.40 m2
1.00 1.80 C-9'
4.00 2.75 7th-terrace
19.80 m2
4.00 2.70 C-9
3.39 Ground
0.00 m2
4.00 2.70 C-9
2.00 2.75 1st-2nd
59.40 m2
4.00 2.40 C-9
4.00 2.75 3rd-6th
105.60 m2
4.00 1.80 C-9
3.00 2.75 7th-9th
59.40 m2
1.00 2.50 C-10
3.39 Ground
0.00 m2
1.00 2.50 C-10
2.00 3.39 1st-2nd
16.95 m2
b) In floor beam
1st floor beam
T D S Description
1.00 22.31 beam on axis 5 b/n A-E
8.00 1.15
205.26 m2
2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
1.00
8.48 m2
T D S Description
74.84 m2
2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
8.00 1.00
67.84 m2
T D S Description
2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
1.00
8.48 m2
T D S Description
6.31
39.44 m2
T D S Description
4.00 3.20
41.22 m3
14 4 16 3.200 204.80
14 4 16 3.200 204.80
F-3
14 7 24 3.800 638.40
14 7 24 3.800 638.40
F-4
16 6 19 4.200 478.80
16 6 19 4.200 478.80
F-5
16 12 23 4.700 1,297.20
16 12 23 4.700 1,297.20
F-6
16 3 25 4.900 367.50
16 3 25 4.900 367.50
F-7
16 4 28 5.300 593.60
16 4 28 5.300 593.60
F-8
top bar
12 4 14 6.352 355.71
12 4 47 1.550 291.40
bottom bar
14 4 14 6.352 355.71
14 4 47 1.550 291.40
MF-1
top bar 20 1 41 6.400 262.40
14 1 44 4.800 211.20
bottom bar
20 1 41 8.500 348.50
14 1 44 6.900 303.60
MF-2
top bar 20 1 26 4.378 113.83
14 1 31 3.750 116.25
bottom bar
20 1 26 6.078 158.03
14 1 31 5.450 168.95
CF-1
top bar 20 1 33 6.200 204.60
14 1 53 3.200 169.60
bottom bar
20 1 33 7.900 260.70
14 1 53 4.900 259.70
FOOTING COLUMN
C1
20 4 12 4.512 216.58
20 4 6 4.512 108.29
stirap
10 4 12 9.045 434.16
C2
20 4 12 4.512 216.58
20 4 6 4.512 108.29
stirap
10 4 10 10.183 407.32
C2'
20 2 12 4.512 108.29
20 2 6 4.512 54.14
stirap
10 2 10 10.183 203.66
C3
20 2 10 4.512 90.24
20 2 6 4.512 54.14
stirap
10 2 12 5.570 133.68
C3'
20 1 10 4.512 45.12
20 1 6 4.512 27.07
stirap
10 1 12 5.570 66.84
C4
20 10 10 4.512 451.20
20 10 6 4.512 270.72
stirap
10 1 24 6.289 150.94
C4'
20 1 10 4.512 45.12
20 1 4 4.512 18.05
stirap
10 10 12 6.289 754.68
C5
20 1 6 4.512 27.07
20 1 10 4.512 45.12
stirap
10 1 12 5.870 70.44
C6
20 1 6 4.512 27.07
20 1 10 4.512 45.12
stirap
10 1 12 5.870 70.44
C7
20 3 6 4.512 81.22
20 3 10 4.512 135.36
stirap
10 3 12 6.950 250.20
C8
20 4 4 4.512 72.19
20 4 10 4.512 180.48
stirap
10 4 15 4.820 289.20
C9'
20 1 6 4.512 27.07
20 1 10 4.512 45.12
stirap
10 1 13 5.672 73.74
C9
20 4 6 4.512 108.29
20 4 10 4.512 180.48
stirap
10 4 15 5.720 343.20
C10
20 1 4 4.512 18.05
20 1 10 4.512 45.12
stirap
10 1 12 6.580 78.96
C11
16 12 4 4.512 216.58
16 12 6 4.512 324.86
stirap
10 12 16 6.580 1,263.36
20 4 18 4.000 288.00
stirap
on C2' 10 4 19 10.183 773.91
20 2 18 4.000 144.00
stirap
on C3 10 2 19 10.183 386.95
20 2 16 4.000 128.00
stirap
on C3' 10 2 19 5.570 211.66
20 1 16 4.000 64.00
stirap
10 1 19 5.570 105.83
C4
20 10 14 4.000 560.00
stirap
10 10 24 6.289 1,509.36
C4'
20 1 14 4.000 56.00
stirap
10 1 24 6.289 150.94
C5
20 1 16 4.000 64.00
stirap
10 1 24 5.870 140.88
C6
20 1 16 4.000 64.00
stirap
10 1 24 5.870 140.88
C7
20 3 16 4.000 192.00
stirap
10 3 24 6.950 500.40
C8
20 4 14 4.000 224.00
stirap
10 4 24 4.820 462.72
C9'
20 1 16 4.000 64.00
stirap
10 1 24 5.670 136.08
C9
20 4 16 4.000 256.00
stirap
10 4 24 5.670 544.32
C10
20 1 12 4.000 48.00
stirap
10 1 24 6.580 157.92
C11
16 1 10 3.325 33.25
stirap
10 1 24 3.170 76.08
14 1 1 20.279 20.28
16 1 2 7.381
stirap
8 1 326 1.300 423.80
on Axis 3 b/n A-E
top bar
20 1 2 10.050 20.10
20 1 2 5.812
20 1 3 6.387
20 1 3 5.736
bottom bar
16 1 4 7.013 28.05
16 1 4 6.374
16 1 2 5.149
16 1 4 8.748
negative bar
12 1 1 3.208 3.21
14 1 1 3.553
14 1 1 4.218
16 1 1 3.887
16 1 1 2.562
stirap
8 1 152 1.300 197.60
on Axis 3 b/n G-J
top bar
16 1 3 20.287 60.86
bottom bar
16 1 3 6.50
16 1 4 6.274 25.10
16 1 4 6.913
negative bar
12 1 1 3.63
12 1 1 3.21
16 1 1 3.887 3.89
16 1 1 2.687
stirap
8 1 119 1.300 154.70
on Axis 3' b/n E-F
top bar
16 1 3 5.974 17.92
bottom bar
16 1 3 5.274 15.82
stirap
8 1 32 1.300 41.60
negative bar
14 1 2 3.21
16 1 1 2.562 2.56
16 1 2 3.887
16 1 1 2.687
20 1 4 3.553
20 1 4 3.828
stirap
8 1 326 1.300 423.80
on Axis 5 b/n A-J
top bar
20 1 2 57.870 115.74
bottom bar
12 1 1 6.788
16 1 7 6.788 47.52
16 1 7 6.274
16 1 2 4.949
16 1 4 7.300
16 1 2 5.674
16 1 4 7.300
16 1 3 4.950
negative bar
14 1 1 3.887 3.89
14 1 2.562
16 1 4 3.553
16 1 4 3.828
stirap
8 1 149 1.300 193.70
on Axis B b/n 6-1
top bar
20 1 3 33.800 101.40
bottom bar
14 1 1 7.313 7.31
16 1 6 4.867
16 1 3 4.894
20 1 6 7.556
20 1 2 7.313
negative bar
16 1 1 15.053
stirap
8 1 168 1.300 218.40
on Axis C,G and H b/n 6-1'
top bar
20 3 2 25.076 150.46
bottom bar
12 3 2 7.356
16 3 8 7.356 176.54
16 3 4 4.875
16 3 4 4.843
negative bar
20 3 1 15.053
on Axis D b/n 6'-1'
top bar
20 1 2 31.943 63.89
bottom bar
12 1 2 7.356
16 1 8 7.356 58.85
16 1 4 4.875
16 1 4 4.843
16 1 4 7.113
negative bar
20 1 1 15.053
stirap
8 4 129 1.300 670.80
on Axis E b/n 6'-1'
top bar
20 1 2 33.943 67.89
bottom bar
12 1 1 7.356
16 1 8 7.356 58.85
16 1 3 4.875
16 1 2 4.843
16 1 3 7.113
negative bar
14 1 1 7.874
20 1 1 7.874
stirap
8 1 141 1.300 183.30
on Axis F b/n 6'-1'
top bar
20 1 3 12.000 36.00
bottom bar
12 1 1 7.356
16 1 7 7.356 51.49
16 1 3 4.875
16 1 2 4.843
16 1 3 7.113
negative bar
14 1 1 7.874
20 1 1 7.874
stirap
8 1 141 1.300 183.30
on Axis I b/n 6-1'
top bar
16 1 9 12.000 108.00
bottom bar
12 1 2 7.356
16 1 8 7.356 58.85
16 1 2 4.794
16 1 4 7.113
negative bar
14 1 2 7.600
stirap
8 1 141 1.300 183.30
on Axis B'& I' b/n 4-3
top bar
16 2 4 7.563 60.50
bottom bar
16 2 4 6.963 55.70
negative bar
14 2 4 2.729
stirap
8 2 43 1.300 111.80
onPANEL S11
Main bar
10 2 26 6.562 341.22
10 2 39 5.724 446.47
onPANEL S12
Main bar
10 2 44 6.562 577.46
10 2 39 6.750 526.50
onPANEL S13
Main bar
10 2 39 4.399 343.12
10 2 29 6.562 380.60
onPANEL S14
Main bar
10 1 36 5.224 188.06
10 1 33 5.435 179.36
onPANEL S15
Main bar
10 1 33 6.718 221.69
10 1 33 6.010 198.33
10 1 32 5.224 167.17
DISTRIBUTION BAR 10 1 32 4.318 138.18
on axis A
10 1 158 2.350 371.30
on axis B
10 1 129 3.888 501.55
10 1 19 2.135 40.57
10 1 39 4.834 188.53
10 1 26 3.441 89.47
on axis C
10 1 138 3.208 442.70
on axis D
10 1 160 3.553 568.48
on axis E
10 1 237 3.828 907.24
on axis F
10 1 223 3.828 853.64
on axis G
10 1 252 3.550 894.60
on axis H
10 1 176 3.205 564.08
on axis I
10 1 129 3.892 502.07
10 1 39 4.834 188.53
10 1 26 3.529 91.75
on axis J
10 1 193 2.350 453.55
on axis 1
10 1 101 2.327 235.03
on axis 2
10 1 329 3.238 1,065.30
10 1 33 2.530 83.49
on axis 3
12 1 313 4.289 1,342.46
10 1 60 4.201 252.06
10 1 14 2.420 33.88
on axis 3'
10 1 15.5 1.943 30.12
10 1 31.96 1.624 51.90
on axis 4
10 1 330 4.289 1,415.37
12 1 15.3
12 1 40 4.201 168.04
on axis 5
10 1 276 3.238 893.69
10 1 50 2.420 121.00
on axis 6
10 1 344 2.298 790.51
RETAINING WALL
BEAM 12 1 1216 1.950 2,371.20
14 1 160 12.000 1,920.00
WALL
10 1 280 12.000 3,360.00
12 1 1216 3.295 4,006.72
SHEAR WALL
SW2
BASEMENT TO GROUND FLOOR
8 4 102 4.492 1,832.74
T D S UNIT DESCRIPTION
BASEMENT FLOOR (20CM)
On axis 2 b/n A and B
1.00 6.24
2.55 15.91 M2
On axis B b/n 1' and 2
1.00 4.61
2.55 11.76 M2
On axis 2 b/n I and J
1.00 6.24
2.55 15.91 M2
On axis I b/n 1' and 2
1.00 4.61
2.55 11.76 M2
On axis 5 b/n I and J
1.00 6.49
2.55 16.55 M2
On axis I b/n 5 and 6'
1.00 3.99
2.55 10.17 M2
On axis E b/n 3 and 3'
1.00 3.42
2.55 8.72 M2
On axis 4 b/n E and F
1.00 4.27
2.55 10.89 M2
DDT
6.00 2.70 W5
0.80 (12.96)
DDT
3.00 2.00 SLIDING DOOR
2.10 (12.60)
DDT
1.00 0.75 DOOR
2.10 (1.58)
DDT
3.00 0.70 COLUMN(C4)
0.50 (1.05)
DDT
2.00 0.80 COLUMN(C9)
0.55 (0.88)
DDT
1.00 0.80 COLUMN(C1)
0.60 (0.48)
DDT
1.00 0.80 COLUMN(C3)
0.50 (0.40)
6.00 DDT
W5
DDT
1.00 (0.60) COLUMN
0.60 (0.36) M2
250.02 m2 TOTAL
No.of Total Length of Reinforcement Bar (m)
Bar Qun. Length
Structural Member Shape membe
Dia. (pcs) (m) 6mm 8mm 10mm 12mm 14mm 16mm 20mm 24mm
r
Ground elevation column
C1
20 4 12 4.840 232.32
20 4 6 4.840 116.16
stirap
10 4 23 9.045 832.14
C2
20 4 12 4.840 232.32
20 4 6 4.840 116.16
stirap
10 4 23 10.183 936.84
C2'
20 2 12 4.840 116.16
20 2 6 4.840 58.08
stirap
10 2 23 10.183 468.42
C3
20 2 10 4.840 96.80
20 2 6 4.840 58.08
stirap
10 2 24 5.570 267.36
C3'
20 1 10 4.840 48.40
20 1 6 4.840 29.04
stirap
10 1 24 5.570 133.68
C4
20 10 10 4.840 484.00
20 10 4 4.840 193.60
stirap
10 10 24 6.289 1,509.36
C4'
20 1 10 4.840 48.40
20 1 4 4.840 19.36
stirap
10 1 24 6.289 150.94
C5
20 1 6 4.840 29.04
20 1 10 4.840 48.40
stirap
10 1 24 5.870 140.88
C6
20 1 6 4.840 29.04
20 1 10 4.840 48.40
stirap
10 1 24 5.870 140.88
C7
20 3 6 4.840 87.12
20 3 10 4.840 145.20
stirap
10 3 24 6.950 500.40
C8
20 4 4 4.840 77.44
20 4 10 4.840 193.60
stirap
10 4 24 4.820 462.72
C9'
20 1 6 4.840 29.04
20 1 10 4.840 48.40
stirap
10 1 24 5.670 136.08
C9
20 4 6 4.840 116.16
20 4 10 4.840 193.60
stirap
10 4 24 5.670 544.32
C10
20 1 4 4.840 19.36
20 1 10 4.840 48.40
stirap
10 1 24 6.580 157.92
1st-2nd Floor column
C1
20 8 12 4.200 403.20
20 8 6 4.200 201.60
stirap
10 8 21 9.045 1,519.56
C2
20 8 12 4.200 403.20
20 8 6 4.200 201.60
stirap
10 8 21 10.183 1,710.74
C2'
20 4 12 4.200 201.60
20 4 6 4.200 100.80
stirap
10 4 21 10.183 855.37
C3
20 4 10 4.200 168.00
20 4 6 4.200 100.80
stirap
10 4 21 5.570 467.88
C3'
20 2 10 4.200 84.00
20 2 6 4.200 50.40
stirap
10 2 21 5.570 233.94
C4
20 20 10 4.200 840.00
20 20 4 4.200 336.00
stirap
10 20 21 6.289 2,641.38
C4'
20 2 10 4.200 84.00
20 2 4 4.200 33.60
stirap
10 2 21 6.289 264.14
C5
20 2 6 4.200 50.40
20 2 10 4.200 84.00
stirap
10 2 21 5.870 246.54
C6
20 2 6 4.200 50.40
20 2 10 4.200 84.00
stirap
10 2 21 5.870 246.54
C7
20 6 6 4.200 151.20
20 6 10 4.200 252.00
stirap
10 6 21 6.950 875.70
C8
20 8 4 4.200 134.40
20 8 10 4.200 336.00
stirap
10 8 21 4.820 809.76
C9'
20 2 6 4.200 50.40
20 2 10 4.200 84.00
stirap
10 2 21 5.670 238.14
C9
20 8 6 4.200 201.60
20 8 10 4.200 336.00
stirap
10 8 21 5.670 952.56
C10
20 2 4 4.200 33.60
20 2 10 4.200 84.00
stirap
10 2 21 6.580 276.36
3rd-6th Floor column
C1
20 16 10 4.200 672.00
20 16 4 4.200 268.80
stirap
10 16 20 6.289 2,012.48
C2
20 16 10 4.200 672.00
20 16 4 4.200 268.80
stirap
10 16 20 6.289 2,012.48
C2'
20 8 4 4.200 134.40
20 8 10 4.200 336.00
stirap
10 8 20 6.289 1,006.24
C3
20 8 10 4.200 336.00
20 8 4 4.200 134.40
stirap
10 8 21 4.570 767.76
C3'
20 4 10 4.200 168.00
20 4 4 4.200 67.20
stirap
10 4 21 4.570 383.88
C4
20 40 10 4.200 1,680.00
20 40 4 4.200 672.00
stirap
10 40 21 6.289 5,282.76
C4'
20 4 10 4.200 168.00
20 4 4 4.200 67.20
stirap
10 4 21 6.289 528.28
C5
20 4 4 4.200 67.20
20 4 10 4.200 168.00
stirap
10 4 21 6.289 528.28
C6
20 4 4 4.200 67.20
20 4 10 4.200 168.00
stirap
10 8 21 6.289 1,056.55
C7
20 12 4 4.200 201.60
20 12 10 4.200 504.00
stirap
10 12 21 6.289 1,584.83
C8
20 16 4 4.200 268.80
20 16 10 4.200 672.00
stirap
10 16 21 4.570 1,535.52
C9'
20 4 4 4.200 67.20
20 4 10 4.200 168.00
stirap
10 4 21 4.570 383.88
C9
20 16 4 4.200 268.80
20 16 10 4.200 672.00
stirap
10 16 21 4.570 1,535.52
C10
20 4 4 4.200 67.20
20 4 10 4.200 168.00
stirap
10 4 21 6.289 528.28
7th-9th Floor column
C1
20 12 6 4.200 302.40
20 12 4 4.200 201.60
stirap
10 12 20 3.796 911.04
C2
20 8 6 4.200 201.60
20 8 4 4.200 134.40
stirap
10 8 20 3.796 607.36
C2'
20 6 4 4.200 100.80
20 6 6 4.200 151.20
stirap
10 6 20 3.796 455.52
C3
20 4 6 4.200 100.80
20 4 4 4.200 67.20
stirap
10 4 21 3.428 287.95
C3'
20 3 6 4.200 75.60
20 3 4 4.200 50.40
stirap
10 3 21 4.570 287.91
C4
20 20 6 4.200 504.00
20 20 4 4.200 336.00
stirap
10 20 21 3.796 1,594.32
C4'
20 3 6 4.200 75.60
20 3 4 4.200 50.40
stirap
10 3 21 3.796 239.15
C5
20 3 4 4.200 50.40
20 3 6 4.200 75.60
stirap
10 3 21 3.796 239.15
C6
20 2 4 4.200 33.60
20 2 6 4.200 50.40
stirap
10 2 21 3.796 159.43
C7
20 6 4 4.200 100.80
20 6 6 4.200 151.20
stirap
10 6 21 3.796 478.30
C8
20 8 4 4.200 134.40
20 8 6 4.200 201.60
stirap
10 8 21 4.570 767.76
C9'
20 3 4 4.200 50.40
20 3 6 4.200 75.60
stirap
10 3 21 4.570 287.91
C9
20 8 4 4.200 134.40
20 8 6 4.200 201.60
stirap
10 8 21 4.570 767.76
C10
20 3 4 4.200 50.40
20 3 6 4.200 75.60
stirap
10 3 21 3.796 239.15
C2
20 4 6 3.525 84.60
20 4 4 3.525 56.40
stirap
10 4 20 3.796 303.68
C3
20 2 6 3.525 42.30
20 2 4 3.525 28.20
stirap
10 2 21 4.570 191.94
C4
20 10 6 3.525 211.50
20 10 4 3.525 141.00
stirap
10 10 21 3.796 797.16
C6
20 1 4 3.525 14.10
20 1 6 3.525 21.15
stirap
10 1 21 3.796 79.72
C7
20 3 4 3.525 42.30
20 3 6 3.525 63.45
stirap
10 3 21 3.796 239.15
C8
20 4 4 3.525 56.40
20 4 6 3.525 84.60
stirap
10 4 21 4.570 383.88
C8
20 4 4 3.525 56.40
20 4 6 3.525 84.60
stirap
10 4 21 4.570 383.88
Terrace column
C1
20 4 6 3.525 84.60
20 4 4 3.525 56.40
stirap
10 4 20 3.796 303.68
C2
20 2 6 3.525 42.30
20 2 4 3.525 28.20
stirap
10 2 20 3.796 151.84
C3'
20 1 6 3.525 21.15
20 1 4 3.525 14.10
stirap
10 1 20 3.428 68.56
C4'
20 1 6 3.525 21.15
20 1 4 3.525 14.10
stirap
10 1 20 3.796 75.92
C9'
20 1 6 3.525 21.15
20 1 4 3.525 14.10
stirap
10 1 20 3.428 68.56
C10
20 1 6 3.525 21.15
20 1 4 3.525 14.10
stirap
10 1 20 3.796 75.92
1ST floor beam
on Axis 1 b/n A-B
top bar
16 1 4 7.313 29.25
bottom bar
16 1 3 6.713 20.14
negative bar
12 1 1 2.687 2.69
stirap
8 1 41 1.300 53.30
on Axis 1 b/n I-J
top bar
16 1 4 7.313 29.25
bottom bar
16 1 3 6.713 20.14
negative bar
12 1 1 2.687 2.69
stirap
8 1 41 1.300 53.30
on Axis 2 b/n A-J
top bar
20 1 2 57.597 115.19
bottom bar
12 1 1 7.30
16 1 3 6.788 20.36
16 1 3 6.274
16 1 2 4.949
16 1 4 7.300
16 1 2 5.674
16 1 3 7.300
16 1 2 4.950
16 1 3 6.174
16 1 3 6.788
negative bar
16 1 2 7.381 14.76
20 1 1 7.381
stirap
8 1 326 1.300 423.80
on Axis 3 b/n A-E
top bar
20 1 2 27.985 55.97
bottom bar
16 1 4 6.913 27.65
16 1 2 6.274 12.55
16 1 2 4.949 9.90
16 1 4 8.648 34.59
negative bar
16 1 2 2.687 5.37
20 1 1 7.771
stirap
8 1 152 1.300 197.60
on Axis 3 b/n G-J
top bar
16 1 3 20.287 60.86
bottom bar
16 1 3 19.687 59.06
negative bar
14 1 2 2.687 5.37
stirap
8 1 119 1.300 154.70
on Axis 3' b/n E-F
top bar
16 1 3 5.974 17.92
bottom bar
16 1 3 5.274 15.82
stirap
8 1 32 1.300 41.60
16 1 3 23.676 71.03
negative bar
16 1 2 4.666
16 1 1 4.289
14 1 1 4.289
16 1 1 4.585
stirap
8 1 141 1.300 183.30
on Axis I b/n 6-1
top bar
16 1 3 33.800 101.40
bottom bar
16 1 2 4.805 9.61
16 1 3 7.356 22.07
16 1 3 7.113 21.34
16 1 3 7.356 22.07
16 1 2 4.794 9.59
negative bar
14 1 3 3.238
16 1 2 3.347
16 1 2 4.289
16 1 2 4.289
stirap
8 1 141 1.300 183.30
on Axis B'& I' b/n 4-3
top bar
16 2 3 7.563 45.38
bottom bar
16 2 3 6.963 41.78
stirap
8 2 43 1.300 111.80
2nd to 9th floor beam
stirap
8 8 178 1.300 1,851.20
on Axis 3 b/n G-J
top bar
16 8 3 27.584 662.02
bottom bar
16 8 3 6.500 156.00
16 8 3 6.274 150.58
16 8 4 6.913 221.22
negative bar
14 8 3 2.687 64.49
16 8 2 11.658
stirap
8 8 178 1.300 1,851.20
on Axis 3' b/n E-F
top bar
16 8 3 5.974 143.38
bottom bar
16 8 3 5.274 126.58
stirap
8 8 32 1.300 332.80
on Axis 4 b/n A-J
top bar
20 8 3 10.050 241.20
20 8 2 5.812 92.99
20 8 2 6.387 102.19
20 8 2 6.674 106.78
20 8 2 6.637 106.19
20 8 2 6.325 101.20
20 8 2 5.812 92.99
20 8 3 10.050 241.20
bottom bar
16 8 4 6.913 221.22
16 8 3 6.274 150.58
16 8 2 4.849 77.58
16 8 4 7.300 233.60
16 8 2 5.674 90.78
16 8 4 7.300 233.60
16 8 3 6.174 148.18
16 8 4 6.913 221.22
16 8 2 4.950 79.20
negative bar
14 8 1 2.687
14 8 1 2.687
14 8 2 3.553
16 8 2 3.553
16 8 2 3.828
16 8 2 3.828
stirap
8 8 326 1.300 3,390.40
on Axis 5 b/n A-E
top bar
20 8 2 9.925 158.80
20 8 2 5.812 92.99
20 8 3 6.387 153.29
20 8 3 4.313 103.51
bottom bar
16 8 3 6.788 162.91
16 8 3 6.274 150.58
16 8 2 4.949 79.18
16 8 4 7.225 231.20
negative bar
12 8 2 6.348 101.57
stirap
8 8 149 1.300 1,549.60
on Axis 5 b/n F-J
top bar
20 8 2 36.362 581.79
bottom bar
16 8 4 7.225 231.20
16 8 2 4.950 79.20
16 8 3 6.274 150.58
16 8 3 6.788 162.91
negative bar
12 8 2 2.687
12 8 1 3.887
12 8 1 3.601
12 8 2 2.687
stirap
8 8 151 1.300 1,570.40
on axis 4
12 1 17 4.289 72.91
10 1 263 4.289 1,128.01
10 1 40 4.201 168.04
10 1 50 2.423 121.15
on axis 5
10 1 100 3.238 323.80
10 1 95.4 3.615 344.87
10 1 46 4.398 202.31
10 1 34 4.302 146.27
10 1 96 3.609 346.46
on axis 6
10 1 100 2.435 243.50
TYPICAL 2nd TO 9th floor slab
on Panel S-1
Main bar
8 32 40 4.524 5,790.72
8 32 27 6.547 5,656.61
on Panel S-5
Main bar
8 32 65 6.493 13,505.44
8 32 50 6.806 10,889.60
on Panel S-8
Main bar
8 32 56 5.724 10,257.41
8 32 36 7.982 9,195.26
on Panel S-6
Main bar
8 32 51 4.399 7,179.17
8 32 27 7.982 6,896.45
on Panel S-9
Main bar
8 32 46 8.756 12,888.83
8 32 45 6.750 9,720.00
onPANEL S10
Main bar
8 16 34 5.224 2,841.86
8 16 35 5.435 3,043.60
onPANEL S11
Main bar
8 16 38 6.562 3,989.70
8 16 45 5.724 4,121.28
onPANEL S12
Main bar
8 16 46 6.562 4,829.63
8 16 45 6.750 4,860.00
onPANEL S13
Main bar
8 16 42 4.399 2,956.13
8 16 29 6.562 3,044.77
onPANEL S15
Main bar
8 8 33 6.718 1,773.55
8 8 33 6.010 1,586.64
8 8 32 5.224 1,337.34
DISTRIBUTION BAR 8 8 32 4.318 1,105.41
on axis A
10 8 7 2.172 121.63
10 8 35 2.340 655.20
10 8 158 2.350 2,970.40
on axis B
10 8 8 2.368 151.55
10 8 117 3.888 3,639.17
10 8 158 2.350 2,970.40
10 8 39 4.834 1,508.21
10 8 26 3.919 815.15
on axis C
10 8 120 3.208 3,079.68
on axis D
10 8 160 3.553 4,547.84
10 8 6 4.270 204.96
on axis E
10 8 23 3.828 704.35
10 8 12 1.514 145.34
10 8 50 2.473 989.20
10 8 50 2.490 996.00
10 8 15 2.480 297.60
10 8 7 2.478 138.77
10 8 11 2.483 218.50
on axis F
10 8 43 2.486 855.18
10 8 12 1.514 145.34
10 8 23 3.808 700.67
10 8 50 2.490 996.00
10 8 7 2.479 138.82
on axis G
10 8 117 3.550 3,322.80
10 8 11 3.995 351.56
10 8 20 2.100 336.00
on axis H
10 8 11 3.888 342.14
10 8 120 3.205 3,076.80
on axis I
10 8 117 3.892 3,642.91
10 8 166 2.350 3,120.80
10 8 39 4.834 1,508.21
10 8 26 3.919 815.15
on axis J
10 8 201 2.350 3,778.80
on axis 1
10 8 50 2.433 973.20
10 8 50 2.423 969.20
on axis 2
10 8 80 3.238 2,072.32
10 8 166 3.616 4,802.05
10 8 33 4.388 1,158.43
10 8 72 4.390 2,528.64
on axis 3
12 8 60 4.289 2,058.72
10 8 178 4.289 6,107.54
10 8 60 4.202 2,016.96
10 8 13 4.410 458.64
10 8 14 2.420 271.04
10 8 60 4.361 2,093.28
on axis 3'
10 8 15.5 1.949 241.68
10 8 31.96 1.624 415.22
on axis 4
12 8 17 4.289 583.30
10 8 263 4.289 9,024.06
10 8 40 4.201 1,344.32
10 8 50 2.423 969.20
on axis 5
10 8 100 3.238 2,590.40
10 8 95.4 3.615 2,758.97
10 8 46 4.398 1,618.46
10 8 34 4.302 1,170.14
10 8 96 3.609 2,771.71
on axis 6
10 8 100 2.435 1,948.00
Terrace floor slab
on Panel S-1
Main bar
8 4 40 4.524 723.84
8 4 27 6.547 707.08
on Panel S-5
Main bar
8 4 65 6.493 1,688.18
8 4 50 6.806 1,361.20
on Panel S-8
Main bar
8 4 56 5.724 1,282.18
8 4 36 7.982 1,149.41
on Panel S-6
Main bar
8 4 51 4.399 897.40
8 4 27 7.982 862.06
on Panel S-9
Main bar
8 4 46 8.756 1,611.10
8 4 45 6.750 1,215.00
onPANEL S10
Main bar
8 2 34 5.224 355.23
8 2 35 5.435 380.45
onPANEL S11
Main bar
8 2 38 6.562 498.71
8 2 45 5.724 515.16
onPANEL S12
Main bar
8 2 46 6.562 603.70
8 2 45 6.750 607.50
onPANEL S13
Main bar
8 2 42 4.399 369.52
8 2 29 6.562 380.60
onPANEL S15
Main bar
8 1 33 6.718 221.69
8 1 33 6.010 198.33
8 1 32 5.224 167.17
DISTRIBUTION BAR 8 1 32 4.318 138.18
on axis A
10 1 7 2.172 15.20
10 1 35 2.340 81.90
10 1 158 2.350 371.30
on axis B
10 1 8 2.368 18.94
10 1 117 3.888 454.90
10 1 158 2.350 371.30
10 1 39 4.834 188.53
10 1 26 3.919 101.89
on axis C
10 1 120 3.208 384.96
on axis D
10 1 160 3.553 568.48
10 1 6 4.270 25.62
on axis E
10 1 23 3.828 88.04
10 1 12 1.514 18.17
10 1 50 2.473 123.65
10 1 50 2.490 124.50
10 1 15 2.480 37.20
10 1 7 2.478 17.35
10 1 11 2.483 27.31
on axis F
10 1 43 2.486 106.90
10 1 12 1.514 18.17
10 1 23 3.808 87.58
10 1 50 2.490 124.50
10 1 7 2.479 17.35
on axis G
10 1 117 3.550 415.35
10 1 11 3.995 43.95
10 1 20 2.100 42.00
on axis H
10 1 11 3.888 42.77
10 1 120 3.205 384.60
on axis I
10 1 117 3.892 455.36
10 1 166 2.350 390.10
10 1 39 4.834 188.53
10 1 26 3.919 101.89
on axis J
10 1 201 2.350 472.35
on axis 1
10 1 50 2.433 121.65
10 1 50 2.423 121.15
on axis 2
10 1 80 3.238 259.04
10 1 166 3.616 600.26
10 1 33 4.388 144.80
10 1 72 4.390 316.08
on axis 3
12 1 60 4.289 257.34
10 1 178 4.289 763.44
10 1 60 4.202 252.12
10 1 13 4.410 57.33
10 1 14 2.420 33.88
10 1 60 4.361 261.66
on axis 3'
10 1 15.5 1.949 30.21
10 1 31.96 1.624 51.90
on axis 4
12 1 17 4.289 72.91
10 1 263 4.289 1,128.01
10 1 40 4.201 168.04
10 1 50 2.423 121.15
on axis 5
10 1 100 3.238 323.80
10 1 95.4 3.615 344.87
10 1 46 4.398 202.31
10 1 34 4.302 146.27
10 1 96 3.609 346.46
on axis 6
10 1 100 2.435 243.50
Water tank supported slab
on Panel S-9
Main bar
10 2 46 8.756 805.55
10 2 45 6.750 607.50
onPANEL S12
Main bar
10 2 46 6.562 603.70
10 2 45 6.750 607.50
onPANEL S14
Main bar
10 1 36 5.224 188.06
10 1 33 5.435 179.36
DISTRIBUTION BAR
on axis D
10 1 91 2.534 230.59
on axis E
10 1 91 3.828 348.35
on axis F
10 1 76 3.828 290.93
on axis G
10 1 91 2.526 229.87
on axis 2
10 1 141 4.327 610.11
10 1 51 3.238 165.14
on axis 3
10 1 79 4.289 338.83
on axis 4
10 1 111 2.427 269.40
STAIR CASE
GROUND TO FIRST
8 1 21 1.500 31.50
8 1 12 1.500 18.00
8 1 11 1.500 16.50
8 1 72 0.994 71.57
14 1 11 1.911 21.02
14 1 10 1.441 14.41
14 1 10 5.850 58.50
14 1 10 3.048 30.48
14 2 10 2.086 41.72
8 1 28 1.500 42.00
8 1 12 1.500 18.00
8 1 11 1.500 16.50
8 1 72 0.994 71.57
14 1 11 2.880 31.68
14 1 10 1.070 10.70
14 1 10 5.773 57.73
14 1 10 1.830 18.30
14 1 10 2.938 29.38
LANDING BEAM
LB1
8 1 25 1.300 32.50
14 1 2 4.326 8.65
16 1 3 4.326 12.98
16 1 3 3.726 11.18
LB2
8 1 31 1.300 40.30
14 1 4 2.300 9.20
16 1 3 5.425 16.28
16 1 3 6.224 18.67
FIRST TO TERRACE
8 10 28 1.500 420.00
8 10 12 1.500 180.00
8 10 11 1.500 165.00
8 10 72 0.994 715.68
14 10 11 1.490 163.90
14 10 10 1.621 162.10
14 10 10 5.202 520.20
14 10 10 2.480 248.00
14 10 10 2.700 270.00
8 10 28 1.500 420.00
8 10 12 1.500 180.00
8 10 11 1.500 165.00
8 10 72 0.994 715.68
14 10 11 2.845 312.95
14 10 10 2.700 270.00
14 10 10 5.300 530.00
14 10 10 1.282 128.20
14 10 10 1.788 178.80
LANDING BEAM
LB1
8 1 25 1.300 32.50
14 1 2 4.326 8.65
16 1 3 4.326 12.98
16 1 3 3.726 11.18
LB2
8 1 31 1.300 40.30
14 1 4 2.300 9.20
16 1 3 5.425 16.28
16 1 3 6.224 18.67
SHEAR WALL
SW2
GROUND TO FOURTH FLOOR
8 4 278 4.492 4,995.10
8 4 3892 0.315 4,903.92
8 4 139 1.400 778.40
10 4 56 4.440 994.56
10 4 224 3.800 3,404.80
14 4 16 4.440 284.16
14 4 64 3.900 998.40
FROM 5th floor TO .TERRACE
8 4 230 4.492 4,132.64
8 4 3220 0.315 4,057.20
8 4 115 1.400 644.00
10 4 224 3.800 3,404.80
10 4 56 3.375 756.00
14 4 64 3.900 998.40
14 4 16 3.375 216.00
SW3
GROUND TO 9TH FLOOR
8 1 544 1.467 798.05
8 1 2176 0.250 544.00
8 1 544 0.800 435.20
10 1 14 4.540 63.56
10 1 112 3.900 436.80
10 1 14 3.325 46.55
14 1 8 4.640 37.12
14 1 64 4.000 256.00
14 1 8 3.325 26.60
T D S Description
PLASTERING
a - 20 cm thick HCB Block
GR floor
1 32.264 L=32.264
3.84 D=3.84
123.89376
1st floor
1 45.098 L= 45.098
3.2 D=3.2
144.3136
Typical 2nd to 9th floor
8 45.098 L=45.098
3.2 D=3.2
1154.5088 **
Terrace floor
2 191.74 L=191.74
3.2 D=3.2
1227.136
2649.85 TOTAL EXTERNAL PLASTERING
INTERNAL PLASTERING
1 a - 20 cm thick HCB Block
6200 6200.00
2 3550.15
7100.30
2 1091.05 B - 15 cm thick HCB Block
2182.10
2 3097.21 C - 10 cm thick HCB Block
6194.42
21676.82 TOTAL INTERNAL PLASTERING
316.41 m2
d) To R.C. ceiling.
typical solid floor slab .
2.00 3.53 b/n A-B & i-j and b/n 1-2
5.93
41.87 m2
2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
1.00
8.48 m2
T D S Description
1.00 6.24 b/n E-F & 3-4
6.06
37.81 m2
2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
8.00 1.00
67.84 m2
T D S Description
8.00 1.00
182.24 m2
2.00 4.24 b/n A-B & i-j and b/n 1-2 cantliver
1.00
8.48 m2
T D S Description
10.00 2.40 C4
2.55
61.20 m2
1.00 2.40 C4'
2.55
6.12 m2
1.00 2.60 C5
2.55
6.63 m2
1.00 2.60 C6
2.55
6.63 m2
3.00 2.70 C7
2.55
20.66 m2
4.00 2.50 C8
2.55
25.50 m2
4.00 2.70 C9
2.55
27.54 m2
T D S Description
1.00 2.60 C-5'
3.39 Ground
0.00 m2
T D S Description
1.15
25.79 m2
T D S Description
2.00 20.68 beam on axis D&G b/n axis 1-5
1.15
47.55 m2
1.00 22.43 beam on axis E b/n axis 2-5
1.15
25.79 m2
T D S Description
Shear wall (SW-2)
4.00 4.15 b/n axis 2-1 and 5-6 ground to 1st
3.39
56.30 m3
16.00 4.15 b/n axis 2-1 and 5-6 1st to 4th
2.75
182.69 m3
20.00 4.15 b/n axis 2-1 and 5-6 5th to terrace
2.75
228.36 m3
Shear wall (SW-3)
4.00 1.23 b/n axis 2-1 and 5-6 ground to 1st
3.67
18.01 m3
8.00 1.23 b/n axis 2-1 and 5-6 1st to 4th
3.03
29.74 m3
8.00 1.23 b/n axis 2-1 and 5-6 5th to 9th
3.03
29.74 m3
2029.62 m2 tot item F
34.57
169.13 m total length of perforated pipe
pump sump
Construct with 200mm thick R.c wall as ahown on drawings