Project Proposal-WPS Office

The project proposal outlines a road concreting initiative in Barangay Guinobatan, Bato, aimed at improving access for farmers and enhancing agricultural productivity. It targets a reduction in poverty levels by facilitating better transportation and encouraging entrepreneurial activities in the area. The project will be a collaborative effort between local government and community organizations, with a focus on sustainability and active community participation.

Uploaded by

abdulkadiryasmir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views5 pages

Project Proposal-WPS Office

The project proposal outlines a road concreting initiative in Barangay Guinobatan, Bato, aimed at improving access for farmers and enhancing agricultural productivity. It targets a reduction in poverty levels by facilitating better transportation and encouraging entrepreneurial activities in the area. The project will be a collaborative effort between local government and community organizations, with a focus on sustainability and active community participation.

Uploaded by

abdulkadiryasmir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Municipal Government of Bato

Bato, Catanduanes

Bottom-up Budgeting Counterpart Project

DETAILED PROJECT PROPOSAL

I. BASIC INFORMATION

PROJECT TITLE :

PROJECT LOCATION :

PROPONENT :

CONTACT PERSONS :

BENEFICIARIES :

TOTAL PROJECT COST :

SOURCE OF FUND :

II. PROJECT DECSRIPTION

1. Brief Summary of the Project

The farget area for road concreting serves now as a major route of farmers going to
mountain areas of Guinobatan and Sipi. The ease that the project will give to farmers
will encourage them to increase their production.

Situated near the foot of the mountain where there is an abundant supply of water,
growth of other agriculture-boned business such as livestock and poultry raising
expected emerged. The target area is also located near the industrial zone of the
municipality as such commercial establishments are expected to sprout in the area.
Concreting of the road will also lift passersby particularly the pupils going to Quinobatan
Blementary School from the danger brought about by the usual muddy and slippery
condition of the road.
The foregoing economic advantages are expected to reduce househoids with income
below poverty threshold from 57.58% to 40% or from 133 HHs to 92 HHs by the end of
2017.

2. Project objective

In line with the National thrusts and the LOU's present administration goal of reducing
the poverty in the countryside through more improved rood network, the main
objective of the proposed project it to provide an easy and better access road to
residents and to famen. Such advantage will encourage farmers to produce more crops,
emergence of livestock and poultry raising business, and growth of other
entrepreneurial undertakings since the area is situated near the industrial zone of the
municipality,

3. Expected Output

80 linear meter road concreting with a width of 4.0m and thickness of 0.15m and 50
meter ripraping. Said road concreting should connect to the Catanduanes
Circumferential Road.

4. Total Project Cost

Source of Fund Amount % Share

5. Target Beneficiaries

The beneficiaries of the project are the whole residents of Barangay Guinobatan more
particularly the farmers, the would-be entrepreneurs who would invest in the area and
the pupils who attend to school weekdays.

6. Project Partners

The administration of the Project will be a joint undertaking of the Department of the
Interior and Local Government. the Municipal Government of Bato and Barangay
Guinobatan, in the barangay level, the direct partner during the construction phase is
the Barangay Council. Other organizations in the barangay such as the purok and youth
organization will contribute to labor component of project construction. Municipal
Govemment shall foclitate all necessary undertakings to assure the sound
Implementation of the Project.
III. Project Components and Implementation Schedule

A. Time table of Activities

Activities Date Responsible Agency/Office

B. Work and Financial Plan

Project
Component/
Particular

A. Pre-
Implementation
Phase

1. Conduct of
Rood
Assessment and
community
consultation

2. Preparation
and submission
of Project
Proposal.
Program of Work
and Detalled
Engineering
Design

3. Freporation,
submission and
approval of
other necessary
documents and
materials

Sub-Total

B.
Implementation
Phase

1. Procurement
and Delivery of
Supplies and
Materials

2. Rood
Concreting and
Loving of Stone
Masonry

Subtotal

C. Project
Monitoring/
Monitoring/ Post
implementation
Phase

1. Project
Monitoring

Sub-Total

TOTAL PROJECT
COST

Project Share (%)

IV. Project Management

The Municipal Engineering Office shall be the in-charge in implementation of the


Project, Safety and health in the undertakings shall be ensured of all times during the
construction phase. The Project Monitoring Committee of the Municipal Development
Council and the CSO project monitoring team shall also monitor the project in its
Implementation phase up to its completion to ensure the appropriateness of
construction.

V. Project Sustainability

Achieving a sustainable rural infrastructure project is a key to poverty alleviation.


Furthermore, community organizing and the active participation of beneficiaries and
other stakeholders in various activities during project planning and implementation can
encourage sustainability in the realization of the project.

Once completed, the project shall be fumed over to Barangay Guinobatan through the
Barangay Council. For the sustainability of the project, the Municipal Local Govemment
Unit thru the Municipal Engineering Office shall ensure that Detailed Engineering Design
and Specifications are carefully followed. Maintenance of project after completion will
be shouldered by the municipal government through its Economic Development Fund.