Project Proposal-WPS Office
Project Proposal-WPS Office
Bato, Catanduanes
I. BASIC INFORMATION
PROJECT TITLE :
PROJECT LOCATION :
PROPONENT :
CONTACT PERSONS :
BENEFICIARIES :
SOURCE OF FUND :
The farget area for road concreting serves now as a major route of farmers going to
mountain areas of Guinobatan and Sipi. The ease that the project will give to farmers
will encourage them to increase their production.
Situated near the foot of the mountain where there is an abundant supply of water,
growth of other agriculture-boned business such as livestock and poultry raising
expected emerged. The target area is also located near the industrial zone of the
municipality as such commercial establishments are expected to sprout in the area.
Concreting of the road will also lift passersby particularly the pupils going to Quinobatan
Blementary School from the danger brought about by the usual muddy and slippery
condition of the road.
The foregoing economic advantages are expected to reduce househoids with income
below poverty threshold from 57.58% to 40% or from 133 HHs to 92 HHs by the end of
2017.
2. Project objective
In line with the National thrusts and the LOU's present administration goal of reducing
the poverty in the countryside through more improved rood network, the main
objective of the proposed project it to provide an easy and better access road to
residents and to famen. Such advantage will encourage farmers to produce more crops,
emergence of livestock and poultry raising business, and growth of other
entrepreneurial undertakings since the area is situated near the industrial zone of the
municipality,
3. Expected Output
80 linear meter road concreting with a width of 4.0m and thickness of 0.15m and 50
meter ripraping. Said road concreting should connect to the Catanduanes
Circumferential Road.
5. Target Beneficiaries
The beneficiaries of the project are the whole residents of Barangay Guinobatan more
particularly the farmers, the would-be entrepreneurs who would invest in the area and
the pupils who attend to school weekdays.
6. Project Partners
The administration of the Project will be a joint undertaking of the Department of the
Interior and Local Government. the Municipal Government of Bato and Barangay
Guinobatan, in the barangay level, the direct partner during the construction phase is
the Barangay Council. Other organizations in the barangay such as the purok and youth
organization will contribute to labor component of project construction. Municipal
Govemment shall foclitate all necessary undertakings to assure the sound
Implementation of the Project.
III. Project Components and Implementation Schedule
Project
Component/
Particular
A. Pre-
Implementation
Phase
1. Conduct of
Rood
Assessment and
community
consultation
2. Preparation
and submission
of Project
Proposal.
Program of Work
and Detalled
Engineering
Design
3. Freporation,
submission and
approval of
other necessary
documents and
materials
Sub-Total
B.
Implementation
Phase
1. Procurement
and Delivery of
Supplies and
Materials
2. Rood
Concreting and
Loving of Stone
Masonry
Subtotal
C. Project
Monitoring/
Monitoring/ Post
implementation
Phase
1. Project
Monitoring
Sub-Total
TOTAL PROJECT
COST
V. Project Sustainability
Once completed, the project shall be fumed over to Barangay Guinobatan through the
Barangay Council. For the sustainability of the project, the Municipal Local Govemment
Unit thru the Municipal Engineering Office shall ensure that Detailed Engineering Design
and Specifications are carefully followed. Maintenance of project after completion will
be shouldered by the municipal government through its Economic Development Fund.