This document outlines the Inspection and Test Plan for the MOV DB project under the EPC for SARB Accelerated Growth Project by Penta Global. It details various inspection activities, acceptance criteria, and responsible parties for verifying compliance with approved drawings and standards. The plan includes visual, dimensional, assembly, functional tests, and documentation reviews to ensure quality and safety of the equipment.

Uploaded by

aaijaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views3 pages

Itp Movdb

This document outlines the Inspection and Test Plan for the MOV DB project under the EPC for SARB Accelerated Growth Project by Penta Global. It details various inspection activities, acceptance criteria, and responsible parties for verifying compliance with approved drawings and standards. The plan includes visual, dimensional, assembly, functional tests, and documentation reviews to ensure quality and safety of the equipment.

Uploaded by

aaijaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

INSPECTION AND TEST PLAN

FOR
MOV DB
PROJECT : EPC for SARB ACCELERATED GROWTH PROJECT PENTA GLOBAL JOB NO: PG102

ADNOC CONTRACT NO: 4700022388 DOCUMENT NO: RSSGCQP-24-049 Rev : 01


CONTRACTOR: PENTA GLOBAL SUPPLIER : R.STAHL PRIVATE LIMITED, Singaperumal Koil, Tamilnadu H- Hold Point
COMPANY: ADNOC OFFSHORE R - Review of Documents, A: Approval
ITEM DESCRIPTION: 8150/5 Distribution Panel W- Witness(1 no / Line), M - Monitoring
ITEM TAG NUMBER: S-Surveillance
EQUIPMENT CRITICALITY RATING : 3 INSPECTION LEVEL : 3
ACTIVITY DESCRIPTION OF REFERENCE RESPONSIBLE INSPECTION TEST CODE
CHARACTERISTICS TO BE VERIFIED ACCEPTANCE CRITERIA VERIFYING DOCUMENT REMARKS
NO. ACTIVITIES DOCUMENTS PERSON Supplier PENTA ADNOC

Compliance to Approved Project


PIM (Pre-Inspection Meeting) Approved GAD, ITP Review as per approved ITP / GAD Approved Drawing & ITP H H H
ITP / GAD Co-ordinator

Visual inspection for finish of enclosure (Shade & DFT Verification)


Visual inspection for finish of internal components, gaskets, gland
A Visual Inspection Approved Drawing As per Approved Drawing Approved Drawing Inspector H H W
plates, cable entries, Hazloc. rating plate, tag plates whichever
applicable.
Check for Overall dimension, Mounting dimension, Cable entry & No. of
B Dimensional Inspection Approved Drawing As per Approved Drawing Approved Drawing Inspector H H W
Entries.
Check for mounting of internal components, gaskets, gland plates,
cable glands & plugs whichever applicable.
C Assembly Inspection Approved Drawing Check for mechanical operation of doors, hinge,lock whichever As per Approved Drawing Approved Drawing Inspector H H W
applicable
Check the wiring is effectively clamped.
Check for continuity between PE Points.
Check for wiring continuity See Note 2
Approved Drawing
Power ON Check at rated voltage, Actuation check whichever
applicable
D Functional Test As per Approved Drawing Approved Drawing Inspector H H W
Insulation Resistance (Before & After HV), 500VDC, R : <5 MΩ
IEC 60079 Series
Dielectric Test See Note 2
Test Voltage : 2KV for 1 Sec.
Review of type approval Certificates - ATEX / IECEX, ECAS (24-09-
E Documentation Approved Drawing As per Approved Drawing Approved Drawing Inspector R R R
122530/E24-08-126572/NB0001) & PMI report for SS Sheet
R. STAHL standard R. STAHL standard R. STAHL standard
F Packing (See Note 3) Packing inspection (If Applicable) Inspector R R R
packing packing packing
G Inspection Release Note Approved Drawing Inspector H H A
Note : 1. For accessories like Cable glands, plugs , spare components - Extent of witness is model no. verification and certification review (If applicable)
2. Applicable only if factory installed wiring is provided .
3. Packing inspection if witness shall be 1 No. sample for the complete lot.

Karthikeyan Subramani
R. STAHL PRIVATE LIMITED,
Plot No. 5, Malrosapuram Main Road, Sengundram Indl Area, Singaperumal koil, Chengalpattu Dist.- 603204, Tamilnadu, India