Class Test

The document outlines a series of project management tasks including network diagram creation, critical path analysis, and float calculations for various activities. It also includes demand forecasting methods such as Moving Average and Exponential Smoothing, along with calculations for Mean Squared Error and Mean Absolute Deviation. Additionally, it discusses project duration estimation and Gantt chart plotting for a manufacturing project.

Uploaded by

thomasshelb2626
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

Class Test

The document outlines a series of project management tasks including network diagram creation, critical path analysis, and float calculations for various activities. It also includes demand forecasting methods such as Moving Average and Exponential Smoothing, along with calculations for Mean Squared Error and Mean Absolute Deviation. Additionally, it discusses project duration estimation and Gantt chart plotting for a manufacturing project.

Uploaded by

thomasshelb2626
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

2.

The utility data for a network are given below:


Activity 1-2 1-3 2-3 2-4 3-4 3-5 4-5 4-8 5-6 5-7 6-7 6-8 7-8
Duration 8 10 4 0 5 6 4 8 5 7 3 5 3
(Months)

i. Draw network diagram and find Critical Path & Critical Time.
ii. Find EST, EFT, LST & LFT for each activity.
iii. Find Total Float, Free Float, Independent Float & Interference Float for all activities.

P.T.O

1
3.
Month 1 2 3 4 5 6
Demand 32 29 27 36 34 32

(a) Calculate Mean Squared Error and sales for month 7 using Moving Average method with
period 3 .
(b) Calculate Mean Absolute Deviation and estimated sales for month 7 using exponential
smoothing method with smoothing constant 0.2.
(c) Find Mean Absolute Percentage Error as a measure of accuracy in forecasting.

4. The details of various activities of a project are given below.

Activity Predecessor To Tm Tp
A ---- 1 3 7
B ---- 1 2 4
C A 2 4 8
D A 2 5 11
E B 3 6 12
F C,D 3 7 15
G D,E 1 4 10
H F,G 2 6 14

a. Draw network diagram and find critical path & critical time.
b. What will be the probability of completing the project in 20 days?
c. Find Total Float, Free Float, Independent Float & Interference Float for all activities

5. Consider following data of a small project given below:

Activity A B C D E F G H I J K
Immediate - - - A D E B G& C C J
Predecessors I
Completion Time 2 9 4 5 8 3 4 11 5 7 5

(a) Calculate critical path and project duration.


(b) Plot a Gantt chart.
P.T.O

2
6. A company is into manufacturing of Industrial Vacuum cleaning systems for many years. The time
estimates for each activity is given below:
Activity Immediate Time Estimates(weeks)
Predecessors T1 T2 T3
A - 12 4 5
B - 5 1 1.5
C A 4 2 3
D A 11 3 4
E A 4 2 3
F C 2.5 1.5 2
G D 4.5 1.5 3
H B,E 7.5 2.5 3.5
I H 2.5 1.5 2
J F,G,I 3 1 2

a. Compute the expected project duration.


b. What is the probability that the project will be completed within 20 weeks?
c. At 95% probability, what would be the expected project duration?
d. Compute the probability that each path will be completed in the desired 20-week period.
e. Find the following from the same:
i. Start and Finish Times,
ii. Total and Free Floats.

P.T.O

3
4