CRISP DM - Explained in Easy Way

CRISP-DM is a structured methodology for planning data mining projects, emphasizing flexibility and practicality. It consists of six phases: Business Understanding, Data Understanding, Data Preparation, Modeling, Evaluation, and Deployment, allowing for iterative processes. The methodology aids in aligning data mining goals with business objectives and ensures thorough assessment of data quality and project resources.

Uploaded by

Sanjeev Kulkarni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views12 pages

CRISP DM - Explained in Easy Way

CRISP-DM is a structured methodology for planning data mining projects, emphasizing flexibility and practicality. It consists of six phases: Business Understanding, Data Understanding, Data Preparation, Modeling, Evaluation, and Deployment, allowing for iterative processes. The methodology aids in aligning data mining goals with business objectives and ensures thorough assessment of data quality and project resources.

Uploaded by

Sanjeev Kulkarni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

What is the CRISP-DM methodology?

CRISP-DM stands for cross-industry process for data mining. The CRISP-DM methodology
provides a structured approach to planning a data mining project. It is a robust and well-proven
methodology. We do not claim any ownership over it. We did not invent it. We are however
evangelists of its powerful practicality, its flexibility and its usefulness when using analytics to
solve thorny business issues. It is the golden thread than runs through almost every client
engagement. The CRISP-DM model is shown on the right.

This model is an idealised sequence of events. In practice many of the tasks can be performed in
a different order and it will often be necessary to backtrack to previous tasks and repeat certain
actions. The model does not try to capture all possible routes through the data mining process.

You can jump to more information about each phase of the process here:

1. Business understanding
2. Data understanding
3. Data preparation
4. Modeling
5. Evaluation
6. Deployment

We have other CRISP DM resource available to help you with your data mining projects. You
can download our free guide to using CRISP DM to evaluate data mining tools or you can watch
the recording of our introduction to CRISP DM webinar.
Stage one – determine business objectives

The first stage of the CRISP-DM process is to understand what you want to accomplish from a
business perspective. Your organisation may have competing objectives and constraints that
must be properly balanced. The goal of this stage of the process is to uncover important factors
that could influence the outcome of the project. Neglecting this step can mean that a great deal of
effort is put into producing the right answers to the wrong questions.

What are the desired outputs of the project?

1. Set objectives - This means describing your primary objective from a business
perspective. There may also be other related questions that you would like to address. For
example, your primary goal might be to keep current customers by predicting when they
are prone to move to a competitor. Related business questions might be “Does
the channel used affect whether customers stay or go?” or “Will lower ATM fees
significantly reduce the number of high-value customers who leave?”
2. Produce project plan - Here you'll describe the plan for achieving the data mining and
business goals. The plan should specify the steps to be performed during the rest of the
project, including the initial selection of tools and techniques.
3. Business success criteria - Here you'll lay out the criteria that you'll use to determine
whether the project has been successful from the business point of view. These should
ideally be specific and measurable, for example reduction of customer churn to a certain
level, however sometimes it might be necessary to have more subjective criteria such as
“give useful insights into the relationships.” If this is the case then it needs to be clear
who it is that makes the subjective judgment.

Assess the current situation

This involves more detailed fact-finding about all of the resources, constraints, assumptions and
other factors that you'll need to consider when determining your data analysis goal and project
plan.

1. Inventory of resources - List the resources available to the project including:


o Personnel (business experts, data experts, technical support, data mining experts)
o Data (fixed extracts, access to live, warehoused, or operational data)
o Computing resources (hardware platforms)
o Software (data mining tools, other relevant software)
2. Requirements, assumptions and constraints - List all requirements of the project
including the schedule of completion, the required comprehensibility and quality of
results, and any data security concerns as well as any legal issues. Make sure that you are
allowed to use the data. List the assumptions made by the project. These may be
assumptions about the data that can be verified during data mining, but may also include
non-verifiable assumptions about the business related to the project. It is particularly
important to list the latter if they will affect the validity of the results. List the constraints
on the project. These may be constraints on the availability of resources, but may also
include technological constraints such as the size of data set that it is practical to use for
modelling.
3. Risks and contingencies - List the risks or events that might delay the project or cause it
to fail. List the corresponding contingency plans - what action will you take if these risks
or events take place?
4. Terminology - Compile a glossary of terminology relevant to the project. This will
generally have two components:
o A glossary of relevant business terminology, which forms part of the business
understanding available to the project. Constructing this glossary is a useful
“knowledge elicitation” and education exercise.
o A glossary of data mining terminology, illustrated with examples relevant to the
business problem in question.
5. Costs and benefits - Construct a cost-benefit analysis for the project which compares the
costs of the project with the potential benefits to the business if it is successful. This
comparison should be as specific as possible. For example, you should use financial
measures in a commercial situation.

Determine data mining goals

A business goal states objectives in business terminology. A data mining goal states project
objectives in technical terms. For example, the business goal might be “Increase catalogue sales
to existing customers.” A data mining goal might be “Predict how many widgets a customer will
buy, given their purchases over the past three years, demographic information (age, salary, city,
etc.), and the price of the item.”

1. Business success criteria - describe the intended outputs of the project that enable the
achievement of the business objectives.
2. Data mining success criteria - define the criteria for a successful outcome to the project
in technical terms—for example, a certain level of predictive accuracy or a propensity-to-
purchase profile with a given degree of “lift.” As with business success criteria, it may be
necessary to describe these in subjective terms, in which case the person or persons
making the subjective judgment should be identified.

Produce project plan

Describe the intended plan for achieving the data mining goals and thereby achieving the
business goals. Your plan should specify the steps to be performed during the rest of the project,
including the initial selection of tools and techniques.

1. Project plan - List the stages to be executed in the project, together with their duration,
resources required, inputs, outputs, and dependencies. Where possible, try and make
explicit the large-scale iterations in the data mining process, for example, repetitions of
the modelling and evaluation phases. As part of the project plan, it is also important to
analyze dependencies between time schedule and risks. Mark results of these analyses
explicitly in the project plan, ideally with actions and recommendations if the risks are
manifested. Decide at this point which evaluation strategy will be used in the evaluation
phase. Your project plan will be a dynamic document. At the end of each phase you'll
review progress and achievements and update the project plan accordingly. Specific
review points for these updates should be part of the project plan.
2. Initial assessment of tools and techniques - At the end of the first phase you should
undertake an initial assessment of tools and techniques. Here, for example, you select a
data mining tool that supports various methods for different stages of the process. It is
important to assess tools and techniques early in the process since the selection of tools
and techniques may influence the entire project.

Back to top of page

Stage two – data understanding

The second stage of the CRISP-DM process requires you to acquire the data listed in the project
resources. This initial collection includes data loading, if this is necessary for data understanding.
For example, if you use a specific tool for data understanding, it makes perfect sense to load your
data into this tool. If you acquire multiple data sources then you need to consider how and when
you're going to integrate these.

 Initial data collection report - List the data sources acquired together with their
locations, the methods used to acquire them and any problems encountered. Record
problems you encountered and any resolutions achieved. This will help both with future
replication of this project and with the execution of similar future projects.

Describe data

Examine the “gross” or “surface” properties of the acquired data and report on the results.

 Data description report - Describe the data that has been acquired including its format,
its quantity (for example, the number of records and fields in each table), the identities of
the fields and any other surface features which have been discovered. Evaluate whether
the data acquired satisfies your requirements.

Explore data

During this stage you'll address data mining questions using querying, data visualization and
reporting techniques. These may include:

 Distribution of key attributes (for example, the target attribute of a prediction task)
 Relationships between pairs or small numbers of attributes
 Results of simple aggregations
 Properties of significant sub-populations
 Simple statistical analyses
These analyses may directly address your data mining goals. They may also contribute to or
refine the data description and quality reports, and feed into the transformation and other data
preparation steps needed for further analysis.

 Data exploration report - Describe results of your data exploration, including first
findings or initial hypothesis and their impact on the remainder of the project. If
appropriate you could include graphs and plots here to indicate data characteristics that
suggest further examination of interesting data subsets.

Verify data quality

Examine the quality of the data, addressing questions such as:

 Is the data complete (does it cover all the cases required)?


 Is it correct, or does it contain errors and, if there are errors, how common are they?
 Are there missing values in the data? If so, how are they represented, where do they
occur, and how common are they?

Data quality report

List the results of the data quality verification. If quality problems exist, suggest possible
solutions. Solutions to data quality problems generally depend heavily on both data and business
knowledge.
There's more advice on understanding your data in this post on our blog.
Back to top of page

Stage three – data preparation

Select your data

This is the stage of the project where you decide on the data that you're going to use for analysis.
The criteria you might use to make this decision include the relevance of the data to your data
mining goals, the quality of the data, and also technical constraints such as limits on data volume
or data types. Note that data selection covers selection of attributes (columns) as well as selection
of records (rows) in a table.

 Rationale for inclusion/exclusion - List the data to be included/excluded and the reasons
for these decisions.

Clean your data

This task involves raise the data quality to the level required by the analysis techniques that
you've selected. This may involve selecting clean subsets of the data, the insertion of suitable
defaults, or more ambitious techniques such as the estimation of missing data by modelling.
 Data cleaning report - Describe what decisions and actions you took to address data
quality problems. Consider any transformations of the data made for cleaning purposes
and their possible impact on the analysis results.

Construct required data

This task includes constructive data preparation operations such as the production of derived
attributes or entire new records, or transformed values for existing attributes.

 Derived attributes - These are new attributes that are constructed from one or more
existing attributes in the same record, for example you might use the variables of length
and width to calculate a new variable of area.
 Generated records - Here you describe the creation of any completely new records. For
example you might need to create records for customers who made no purchase during
the past year. There was no reason to have such records in the raw data, but for modelling
purposes it might make sense to explicitly represent the fact that particular customers
made zero purchases.

Integrate data

These are methods whereby information is combined from multiple databases, tables or records
to create new records or values.

 Merged data - Merging tables refers to joining together two or more tables that have
different information about the same objects. For example a retail chain might have one
table with information about each store’s general characteristics (e.g., floor space, type of
mall), another table with summarised sales data (e.g., profit, percent change in sales from
previous year), and another with information about the demographics of the surrounding
area. Each of these tables contains one record for each store. These tables can be merged
together into a new table with one record for each store, combining fields from the source
tables.
 Aggregations - Aggregations refers to operations in which new values are computed by
summarising information from multiple records and/or tables. For example, converting a
table of customer purchases where there is one record for each purchase into a new table
where there is one record for each customer, with fields such as number of purchases,
average purchase amount, percent of orders charged to credit card, percent of items under
promotion etc.

Back to top of page

Stage four – modelling

Select modeling technique

As the first step in modelling, you'll select the actual modelling technique that you'll be using.
Although you may have already selected a tool during the business understanding phase, at this
stage you'll be selecting the specific modelling technique e.g. decision-tree building with C5.0,
or neural network generation with back propagation. If multiple techniques are applied, perform
this task separately for each technique.

 Modelling technique - Document the actual modelling technique that is to be used.


 Modelling assumptions - Many modelling techniques make specific assumptions about
the data, for example that all attributes have uniform distributions, no missing values
allowed, class attribute must be symbolic etc. Record any assumptions made.

Generate test design

Before you actually build a model you need to generate a procedure or mechanism to test the
model’s quality and validity. For example, in supervised data mining tasks such as classification,
it is common to use error rates as quality measures for data mining models. Therefore, you
typically separate the dataset into train and test sets, build the model on the train set, and estimate
its quality on the separate test set.

 Test design - Describe the intended plan for training, testing, and evaluating the models.
A primary component of the plan is determining how to divide the available dataset into
training, test and validation datasets.

Build model

Run the modelling tool on the prepared dataset to create one or more models.

 Parameter settings - With any modelling tool there are often a large number of
parameters that can be adjusted. List the parameters and their chosen values, along with
the rationale for the choice of parameter settings.
 Models - These are the actual models produced by the modelling tool, not a report on the
models.
 Model descriptions - Describe the resulting models, report on the interpretation of the
models and document any difficulties encountered with their meanings.

Assess model

Interpret the models according to your domain knowledge, your data mining success criteria and
your desired test design. Judge the success of the application of modelling and discovery
techniques technically, then contact business analysts and domain experts later in order to
discuss the data mining results in the business context. This task only considers models, whereas
the evaluation phase also takes into account all other results that were produced in the course of
the project.

At this stage you should rank the models and assess them according to the evaluation criteria.
You should take the business objectives and business success criteria into account as far as you
can here. In most data mining projects a single technique is applied more than once and data
mining results are generated with several different techniques.
 Model assessment - Summarise the results of this task, list the qualities of your
generated models (e.g.in terms of accuracy) and rank their quality in relation to each
other.
 Revised parameter settings - According to the model assessment, revise parameter
settings and tune them for the next modelling run. Iterate model building and assessment
until you strongly believe that you have found the best model(s). Document all such
revisions and assessments.

Back to top of page

Stage five – evaluation

Evaluate your results

Previous evaluation steps dealt with factors such as the accuracy and generality of the model.
During this step you'll assesses the degree to which the model meets your business objectives
and seek to determine if there is some business reason why this model is deficient. Another
option is to test the model(s) on test applications in the real application, if time and budget
constraints permit. The evaluation phase also involves assessing any other data mining results
you've generated. Data mining results involve models that are necessarily related to the original
business objectives and all other findings that are not necessarily related to the original business
objectives, but might also unveil additional challenges, information, or hints for future directions.

 Assessment of data mining results - Summarise assessment results in terms of business


success criteria, including a final statement regarding whether the project already meets
the initial business objectives.
 Approved models - After assessing models with respect to business success criteria, the
generated models that meet the selected criteria become the approved models.

Review process

At this point, the resulting models appear to be satisfactory and to satisfy business needs. It is
now appropriate for you to do a more thorough review of the data mining engagement in order to
determine if there is any important factor or task that has somehow been overlooked. This review
also covers quality assurance issues—for example: did we correctly build the model? Did we use
only the attributes that we are allowed to use and that are available for future analyses?

 Review of process - Summarise the process review and highlight activities that have
been missed and those that should be repeated.

Determine next steps

Depending on the results of the assessment and the process review, you now decide how to
proceed.Do you finish this project and move on to deployment, initiate further iterations, or set
up new data mining projects? You should also take stock of your remaining resources and budget
as this may influence your decisions.
 List of possible actions - List the potential further actions, along with the reasons for and
against each option.
 Decision - Describe the decision as to how to proceed, along with the rationale.

Back to top of page

Stage six – deployment

Plan deployment

In the deployment stage you'll take your evaluation results and determine a strategy for their
deployment. If a general procedure has been identified to create the relevant model(s), this
procedure is documented here for later deployment. It makes sense to consider the ways and
means of deployment during the business understanding phase as well, because deployment
is absolutely crucial to the success of the project. This is where predictive analytics really helps
to improve the operational side of your business.

 Deployment plan - Summarise your deployment strategy including the necessary steps
and how to perform them.

Plan monitoring and maintenance

Monitoring and maintenance are important issues if the data mining result becomes part of the
day-to-day business and its environment. The careful preparation of a maintenance strategy helps
to avoid unnecessarily long periods of incorrect usage of data mining results. In order to monitor
the deployment of the data mining result(s), the project needs a detailed monitoring process plan.
This plan takes into account the specific type of deployment.

 Monitoring and maintenance plan - Summarise the monitoring and maintenance


strategy, including the necessary steps and how to perform them.

Produce final report

At the end of the project you will write up a final report. Depending on the deployment plan, this
report may be only a summary of the project and its experiences (if they have not already been
documented as an ongoing activity) or it may be a final and comprehensive presentation of the
data mining result(s).

 Final report - This is the final written report of the data mining engagement. It includes
all of the previous deliverables, summarising and organising the results.
 Final presentation - There will also often be a meeting at the conclusion of the project at
which the results are presented to the customer.
Review project

Assess what went right and what went wrong, what was done well and what needs to be
improved.

 Experience documentation - Summarise important experience gained during the project.


For example, any pitfalls you encountered, misleading approaches, or hints for selecting
the best suited data mining techniques in similar situations could be part of this
documentation. In ideal projects, experience documentation also covers any reports that
have been written by individual project members during previous phases of the project.

Predictive analytics – what can you do with


your results?

I talked in my last blog post about the confusion that often emerges around how much data is
enough to effectively deploy predictive analytics. I argued that sample selection is much more
important than sample size when it comes to ensuring accurate results. As an example I talked
about two political polls from the 1936 US presidential election. The Literary Digest used a large
(2.4 million) but heavily biased sample and got the prediction badly wrong. George Gallup, by
comparison, got to within 1% of the actual election result using a much smaller sample (only
50,000) but that was much more representative. Sometimes, when it comes to predictive power,
less is more.
Having considered the value of data samples (or ‘data extracts’, as we often call samples when
talking with clients) and their impact on prediction, I wanted to expand on the next and crucial
step in the process. What is to be done with the results? How should they be deployed?

There is always a point at which a carefully developed and useful predictive model and its
outputs run up against the practical realities of how they are to be used in day-to-day business
operations. We think about this as deployment, a theme we have visited before in this
blog. Planning for deployment is as important as planning your data sample or extract.

Organisations that are using predictive analytics will need a scalable technology platform to
effectively support, manage and automate the predictive models that are being used to inform
organisational decision making. In the deployment stage of a predictive analytics project the
actual mode of deployment can take many forms and different organisations will use different
deployment options, depending on their situation. A few common forms of deployment are as
follows:

 A list ranked by the likelihood of an individual to respond to a campaign (a propensity


score) that is then given to the marketing team to inform campaign execution.
 A risk score which indicates how likely each customer is to default on a loan or similar
financial commitment, derived from data captured during the loan application process.
 A suggestion of a next best action to take or recommendation of what information to
present to a customer next based on their recent online activity and transactions, to be
written to a field in the data warehouse.
 A prompt or recommendation for a customer service agent (CSA), delivered to their
screen, based on the specific details of the call that the CSA is currently handling.

In short the specific function of an analytical output and the way it will be used can vary
significantly dependent on the operational context. But whatever the operational backdrop, this
derived value and the insight it embodies, will need to be available at the individual level and
across an entire customer base and often will be required to activate mid-transaction with a
customer or prospect. Often it is this step that requires integration with ‘big data’ infrastructure
and other complex operational systems.

Consider also that an organisation, certainly a larger organisation, is likely to have a very wide
array of models running, supporting many different decision activities. In this context the use
and management of the models must be treated with the same respect and governance afforded to
any other organisational asset. The nuggets of predictive insight, developed from a carefully
considered data extract, need to be effectively deployed and actively monitored and managed in
order that the benefits can be fully realised.

A truly valuable predictive model is almost always based on an intelligently structured sample
taken from the data population, suitable for the specific question being addressed. When the
output of that model is deployed it needs to be done in a way that enables your organisation to
use it efficiently, effectively and potentially intensively whilst keeping a close eye on its ongoing
performance.