Unit 31 - Project Management Assignment - .PDF - Crdownload

This document outlines the assessment criteria and requirements for a coursework assignment in Project Management for the BTEC HND Quantity Surveying program at The Institute of Business Engineering & Technology. The assignment involves applying project management principles to a hypothetical hospital construction project, with specific tasks including project charter development, scheduling, budget analysis, and risk management. Key dates for submission and policies regarding academic integrity and plagiarism are also included.

Uploaded by

yasir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views8 pages

Unit 31 - Project Management Assignment - .PDF - Crdownload

This document outlines the assessment criteria and requirements for a coursework assignment in Project Management for the BTEC HND Quantity Surveying program at The Institute of Business Engineering & Technology. The assignment involves applying project management principles to a hypothetical hospital construction project, with specific tasks including project charter development, scheduling, budget analysis, and risk management. Key dates for submission and policies regarding academic integrity and plagiarism are also included.

Uploaded by

yasir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

COURSEWORK

ASSESSMENT

CENTRE NAME: THE INSTITUTE OF BUSINESS ENGINEERING & TECHNOLOGY PVT.

LTD. CENTRE NUMBER: 92556

PROGRAMME: BTEC HND QUANTITY

SURVEYING FRAMEWORK: RQF

MODULE: PROJECT

MANAGEMENT UNIT: 31

UNIT CODE: Y/615/1410

ACADEMIC YEAR:

2022/23 LEARNER:

STUDENT NO:

1
Unit / Module 31/PROJECT MANAGEMENT
Assessment PROJECT MANAGEMENT
Lecturer Mr. P.W.D.S. Abeygunawardane

Student Name No.

Hand Out Date 31st August 2023 Hand In Date 30th September 2023

Initial Submission Date Re-Submission Date 25th OCTOBER 2023

Criteria Met
Attempted
Student to
Tick if

Grading
On Assessor Feedback
Opportunity Initially Resubmission

P.1

P.2

P.3

P.4

P.5

P.6

P.7

P.8

M1

M2

M3

M4

D1

D2
D3

D4

P.W.D.S.
Assessed By Abeygunawardana

Signature: Date:

2
Assignment cover sheet
Note: (1) The attention of students is drawn to: the Regulations, the Honesty Policy and the Assessment
Policy, all of which are available in the hand book.
(2) A de-identified copy of your assignment may be retained for Institute quality (audit) processes, benchmarking or
moderation.

Student Number/s: Student Surname/s: Given name/s:

School: Engineering
Course: BTEC HND QUANTITY SURVEYING

Unit code: Y/615/1410 Unit title: Project Management (RQF)

Hand Out Date: 31st August 2023 Hand In Date: 30th September 2023

Lecturer-in-Charge: P.W.D.S. Abeygunawardana Module Leader: Thushara Indika

Assignment Title and/or number: Project Management

DECLARATION OF ORIGINALITY
By submitting this assignment for assessment, I acknowledge and agree that:
1. This assignment is submitted in accordance with the Institute Academic Regulations, Assessment Policy
and Honesty Policy. I also understand the serious nature of academic dishonesty (such as plagiarism) and
the penalties attached to being found guilty of committing such offences.
2. No part of this assignment has been copied from any other source without acknowledgement of the source.
3. No part of this assignment has been written by any other person, except to the extent
of collaboration and/or group work as defined in the unit outline.
4. This assignment has not been recycled, using work substantially the same as work I have completed
previously and which has been counted towards satisfactory completion of another unit of study or
credited towards another qualification, unless the Lecturer in Charge has granted prior written consent
to do so.
5. A copy of the original assignment is retained by me and that I may be required to submit
the original assignment to the Lecturer in Charge upon request.
6. The Lecturer-in-Charge may, for the purpose of assessing this assignment:
6.1. Reproduce this assignment.
6.2. Authorize the reproduction of this assignment;
6.3. Provide a copy of this assignment to another member of the University; and/or
6.4. Communicate, or authorize communication of, a copy of this assignment to a plagiarism checking
service, such as the “Turnitin” service operated by I Paradigms LLC (or such other service utilized
by the University at its absolute discretion). I acknowledge that a plagiarism checking service
provider may then retain a copy of this assignment on its database for the purpose of future
plagiarism checking.

Signature of student: ……………………………….. Date: …………………..

3
Coursework Assessment Brief
BTEC HND Quantity Surveying

Student Name / ID Number


Unit Number and Title 31 – Project Management

Academic year Year 2022-2023

Assignment Report - Maximum 3000 words excluding referencing

Unit Tutor P.W.D.S. Abeygunawardana

Hand Out Date 31st August 2023


Assignment Due Date 30th September 2023
Submission Method: Hardcopy / e mail submission

Assessment Weighting 100 % on assignment


A student who, for the first assessment opportunity, has failed to achieve a Pass
for that unit specification shall be expected to undertake a reassessment. Only
Attempts and late submission one opportunity for reassessment of the unit shall be permitted. A student who
undertakes a reassessment will have their grade capped at a Pass for that unit.

Refer to the Student Handbook on matters of cheating and plagiarism related to


coursework, group assignments, class tests and examinations. Both cheating and
plagiarism are completely unacceptable, and the TIBET Campus maintains a
strict policy against those misconducts. It is the responsibility of each student
to be aware of this policy and to act accordingly.

By submitting coursework, either physically or electronically, you are


confirming that it is your own work. TIBET Campus requires the following
statement to be included within your assignment submission.

“I have read and understand the TIBET Handbook on plagiarism and cheating.
By submitting any work for assessment, I confirm that the assignment is my own
Plagiarism work (or, in the case of a group submission, that it is the result of joint work
undertaken by members of the group that I represent) and that it contains no
unreferenced material from another source. I confirm that I have kept a copy of
this assignment and will provide this copy to TIBET Campus if required. I
understand that I and/or members of my group may be subject to disciplinary
action if an allegation of academic misconduct is upheld in relation to this
assessment.”

Students should be aware that, at the discretion of the module leader, coursework
shall be submitted to an electronic detection system in order to help ascertain if
any plagiarized material is present. The evidence shall be annexed to the
assignment.

4
Referencing Harvard Referencing system must be strictly followed throughout the
assignment.

This assessment addresses the following outcomes.

1 Compare project management theories, practices and standards; and their


appropriateness for different types of project
Learning Outcomes
2 Discuss the roles of the major stakeholders in a construction project and how
their needs are managed by the project management team
3 Specify the attributes and competencies of a project manager in leading
Complex construction works
4 Develop a project strategy plan that defines the key policies, procedures and
priorities for a complex construction project.

5
Assignment:

1. Description
In this assignment, you will be applying the principles and concepts of Project Management to a real or
hypothetical engineering project scenario.
The assignment is designed to assess your understanding of Project Management theories and your ability to
apply them in a practical project management context.

2. Scenario
You have been selected as a member of the project management team for a 5-storey hospital building
construction project. The project involves designing and constructing a facility that aligns with the latest
industry standards and requirements. The project has a significant scope, involves multiple stakeholders, and is
subject to various constraints and risks and is required to be completed within a 12-month period starting from
1st October 2023.

3. Assignment Tasks

A. Explain what a project is and describe main constraints of a project. List five different types of projects
and explain the type of the project described in the scenario. (P1, M1)

B. Develop a project charter that outlines the project's objectives, stakeholders, and high-level scope. (P7
& P8, M1, D2)

C. Define the project scope by limiting it to about 15 main tasks and prepare the Work Breakdown
Structure (WBS). (P7 & P8)

D. Create the project schedule in a Gantt chart (in Excel) by considering the WBS created above. Assume
reasonable durations for each task in the WBS and appropriate predecessors and relationships. (You
may consider only the Finish – Start (FS) relationship) (P7 & P8)

E. Create the Network Diagram for the same tasks as defined in the item 2 and derive the Critical Path
and define Critical Activities. (P7 & P8)

F. Assume that the project budget is USD 3.0 million and the actual expenses after 5 months as; Labour –
USD 525,000, Material – USD350,000, Machinery – USD225,000, other expenses – USD140,000.
The planned and actual progress after 5 months are 42% and 35% respectively.

Carry out the Earned Value analysis for the project at the end of 5th month and derive the followings;
E.1. Cost variance
E.2. Schedule variance
E.3. Cost Performance Index
E.4. Schedule Performance Index
E.5. Give your opinion on the performance of the project at the end of 5 months. (P7 & P8)

G. Discuss the importance of implementing a Quality Management system within the project. Define the
roles and responsibilities of; (P7 & P8, D2)
F.1. The Project Manager

6
F.2. The Contractor

H. Identify potential risks to the project's success (minimum 5), assess their impact and probability, and
create a risk management plan. (P7 & P8, D2)

I. Identify and prepare a list of Stakeholders (minimum 5) for the project. Define a RACI Matrix for
those identified Stakeholders for the project activities; Scope definition, project design, project
implementation, Risk Management, Final Acceptance. (P3 & P4, M2)

J. Write a brief note (min 250 words) about the Project Manager to be appointed for this project showing
the required skills he must possess and his key roles. (P5 & P6)

K. Explain how the Project Manager’s professional qualifications in Project Management contribute for
the success of a complex project. (P2, M1, M3, D1)

Your assignment should be submitted addressing all the tasks above. The report shall include a cover page
consisting of the Title, Student name & registration number, date of submission.
Note: Font: Times New Roman Font size 12

7
Learning Outcomes and Assessment Criteria
Pass Merit Distinction
LO1 Compare project management theories, practices and standards; and
their appropriateness for different types of project

LO1 and LO2


P1 Discuss the types of projects and
project management in the context of
M1 Explore the development of D1 Analyze the theories that
construction activities.
project management as a underpin project
discipline within the management for different
P2 Discuss the need for professional
construction industry types of complex
recognition and standards for project
construction projects.
management.

LO2 Discuss the roles of the major stakeholders in a construction project


and how their needs are managed by the project management team

P3 Review key stakeholder


relationships and their influence on a
complex construction project.
M2 Evaluate stakeholder
decision-making processes in
P4 Assess the importance of
complex construction projects
stakeholder communications and
collaboration to achieve project
success.

LO3 Specify the attributes and competencies of a project manager in


leading complex construction works
P5 Discuss the role and key LO3 and LO4
M3 Compare the duties and
responsibilities of a construction D2 Present a Project
qualities of a project manager for
project manager. Execution Plan that includes
different types of complex
the scope, objectives, human
construction projects
P6 Assess the attributes, competencies and resource planning, and
and managerial skills of a construction key priorities for a complex
project manager. project

LO4 Develop a project strategy plan that defines the key policies,
procedures and priorities for a complex construction project
P7 Examine the key project
management processes and social
responsibilities in a complex M4 Critically evaluate the
construction project. adoption of Building Information
Modelling in complex
P8 Prepare a project strategy plan, construction projects
noting how sustainability will be
managed