Sap PP Manual Step Step Instructions For End Users
Sap PP Manual Step Step Instructions For End Users
User Manual - PP
Table of Contents
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
1 Introduction.....................................................................................................................3
2 SAP Logon......................................................................................................................3
3 Master Data....................................................................................................................4
3.1 Material Master............................................................................................................4
3.2 Bill of Material............................................................................................................13
3.3 Work Center..............................................................................................................31
3.4 Routing......................................................................................................................45
3.5 Production Version....................................................................................................56
3.6 Reference Operation Set...........................................................................................59
3.7 Product Group...........................................................................................................62
4 Can Manufacturing Process..........................................................................................65
4.1 Planned Independent Requirements - Creation........................................................65
4.2 Planned Independent Requirements - Change.........................................................69
4.3 MRP Run – Single Item, Multi level...........................................................................71
4.4 Stock / Requirements List.........................................................................................72
4.5 Production Order – Change......................................................................................79
4.6 Production Order – Confirmation (Partial - Pallet wise).............................................82
4.7 Production Order – Entry of Cup count and Spoilage Can posting...........................83
4.8 Goods Issue..............................................................................................................84
4.9 Transfer Posting........................................................................................................89
4.10 Production Order Confirmation – Cancel...............................................................91
5 Scrap Process...............................................................................................................93
5.1 Production Order – Creation.....................................................................................93
5.2 Production Order – Confirmation (For Order)............................................................97
6 Rework Process..........................................................................................................100
6.1 Production Order – Creation...................................................................................100
6.2 Production Order – Confirmation (Partial - Pallet wise)...........................................105
7 Annual Planning..........................................................................................................107
7.1 Planned Independent Requirements - Creation......................................................107
7.2 Planning Scenario - Creation..................................................................................108
7.3 LTP Run – Single Item, Multi Level.........................................................................113
7.4 LTP Run – Stock/Requirements List.......................................................................113
7.5 Planning Situation Material......................................................................................113
7.6 Long-Term Requirement - Display..........................................................................114
8 Reports.......................................................................................................................115
8.1 Stock Overview.......................................................................................................115
8.2 Order Information System.......................................................................................118
8.3 Material Document List............................................................................................123
8.4 Material Document - Display...................................................................................126
8.5 Material List.............................................................................................................128
2
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
1 Introduction
This document intends for the training of Production Planning process for CCMC – SAP
implementation.
The scenario adopted here is the Production planning for Can manufacturing process and execution
with Production Orders. Other scenarios covered are Scrap processing, Rework process and Annual
planning in simulation.
Details covered here are Master Data Creation and Transaction Processing.
2 SAP Logon
3
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
3 Master Data
4
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
The material master For PP Module, in material master the following views have to be
maintained.
MRP1
MRP 2
MRP 3
MRP 4,
Work Scheduling
Select the above Views. Then enter the organizational data, and enter the plant and storage location as
below
5
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In MRP 1 view:
MRP1 view is having attributes, which trigger the system to propose the Planning logic.
6
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In MRP 2 View:
MRP2 view is having attributes, which trigger the system to plan the procurement proposal.
7
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In MRP 3 View:
MRP3 view is having attributes, which defines the strategy for planning of a product.
8
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In MRP 4 View:
MRP4 view is having attributes, which defines BOM explosion pattern during Material Requirement
Planning.
9
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
10
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Select the required fields and organizational data and then change the data’s and Save the
Changes made.
11
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Select the required fields and organizational data and then view it, no changes will be allowed.
12
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
13
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
14
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
15
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
If the same material code is entered for BOM creation, it will ask for “Alternative 2 added to BOM”
Press enter.
16
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
If you enter the parent material itself in the component item, it will ask for recursive allowed.
So put tick mark as Recursive allowed box.
17
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Select the component and click item box, to enter the details
18
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In the details of that item component, select the Status/Lng Text tab
In that remove the Costing Relevancy (Remove the X mark and make it blank)
And Go back.
19
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
20
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the material of which BOM to be changed with plant and BOM usage. And Press Enter.
21
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
It will show as above if there is more than one BOM, double click the line which BOM you want to
change.
22
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
It will show the component screen, Make changes if necessary and save it.
23
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the material for which BOM to be displayed with plant and BOM usage. And Press Enter.
24
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the Material to be exploded, Plant, Alternative BOM and BOM Application PP01.
25
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Item:
If the details of a component in the BOM are to be seen, place the cursor on the component, and
select the option Go to Item data.
Detail:
If the material master views of any of the components in this plant are to be viewed, place the cursor
on the component and select the option Environment Detail.
Where-used list:
To get a where-used list, place cursor on the component and select the option Environment
Where-used list.
26
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
The selection fields are the same as for the BOM level-by-level reporting. It will be in the different
display format which will be used for Multi Level BOM explosion.
27
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the material where it is used; enter tick mark in Selection field ‘direct’ and ‘Material BOM’
And click next screen.
28
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the required quantity, Check the plant, mark a tick mark in Multi-level and execute.
29
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Layout format can be changed; and the list can be converted into Excel file for reference.
30
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Specify the material, plant and BOM usage in the fields and press Enter. The next screen is
displayed.
In this screen, specify the date from which the changes are to be viewed. By default, the system
displays a date.
Click on the Document overview button, or select the option Go to Document overview. The
following screen is displayed.
31
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
32
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
33
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
34
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In Capacities Tab:
35
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
36
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
No of individual capacity
In Scheduling Tab:
In Costing Tab:
37
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Screen shot
Enter plant and work center number, for the work center which is to be changed.
After changing, click on “Save” icon to save & exit.
As the same as change work center, Enter plant and work center number to display the work center.
38
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the name of the plant and execute , All the Work Centers in the plant views.
39
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
If further want to see the details of particular work center, select the work center and click choose.
That particular work center is viewed.
40
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Fill the Work Center, Plant and Task List type (N – Routing)
41
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
42
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In which task list this work center is used will be displayed, by selecting the work center box and
click the choose or details button, it will display the task list and the details.
43
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Update the New Work Center with the work center to be replaced with Plant, Task list Type and
Material Number. Then click execute.
44
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Select the operation where you want to replace the Work Center and Press F8 (Replace)
And Work Center is updated in the task list.
45
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
3.4 Routing
46
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Press enter after the above entries are made. Click on the operations button.
47
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
48
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
49
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
It will list the components for the material from the BOM, Select the component item and click New
assignment and assign the operation and save.
50
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Update the Material and plant. Routing will be opened for further changes.
Make changes and save it, routing is changed.
51
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Update the Material and plant to create alternative routing. Press enter.
.
Alternative routing is generated with same group but with different group counter.
52
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Existing Task list will be there, from the tool box, click new entries to create new routing.
53
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Alternative routing is generated with same group but with different group counter as shown in the
box.
Press enter after the above entries are made. Click on the operations button.
54
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
55
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
And click the Component Allocation tab to set the component allocation for the operation.
Check it by Transaction Routing Change CA02. Both routing with same group will be displayed.
View according the group counter you want.
56
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
57
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
58
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
59
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
60
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
61
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the Work Center, description, base quantity and the Machine time as mentioned in routing.
And Save.
62
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the Product group, description, Plant and base unit of measure
63
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In the next screen, enter the member numbers and plant for the product group 355ml and save.
64
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
65
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the Product group, plant and the date range for which to be planned with planning period
D – Day.
Note: In the version field, it should be 00 version – Active version. (It will come as default)
66
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
67
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
68
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In the production version option, right click or press F4 to get the options. From that select the line in
which the material to process. (Line 1 or Line 2)
69
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
70
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In the next screen make changes and save. (Follow the steps as above from the PIR creation)
71
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
72
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
73
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
List of Procurement proposals are seen with the Stocks of the Material.
From this List Planned order can be converted into Production Order
74
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Double click the planned order and in the pop up screen, click Prod.Ord for conversion.
75
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In the Additional tab enter the customer number for the product by taking from the customer list.
77
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In the component overview, change the special indicatior as 3 for the ink
78
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In the Order, you can view the list of Components, Operations. Material list for the order quantities
will be displayed. In that you can add or delete the Materials with quantities for the Production order.
79
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Click the refresh button, you can see the Production order which is created in the
Stock/Requirements list.
SAP R/3 Menu Logistic Production Shop Floor Control Order Change
Transaction code CO02
80
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
81
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In the change mode, you can change the quantity, dates, component quantity, and operations.
82
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the Production Order number and the shift in which the order should be processed.
You can see the details of the Production order like, Material, Can size, Customer, Order quantity,
Target quantity, to be confirmed quantity, Unit of measure, Date, Time and Production line.
And you will have the buttons for Good and HFI. If the pallet is good one, click the good button, it will
generate the pallet ticket with bar code and the confirmation is done partially for 1 pallet and posted
in the finished storage location. If HFI button is pressed, it will generate the HFI pallet ticket without
barcode and posted in the HFI storage location.
If good button is pressed, the target quantity will get reduced without any change in the Order
quantity. If HFI button is pressed, the target quantity will not get reduced, but it will increase the
Order quantity.
83
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
4.7 Production Order – Entry of Cup count and Spoilage Can posting
Enter the date, shift, Can size, Line and enter the Cupper count, Bright Can in and Bright Can out for
the particular shift.
Then press enter you can get the first production order number in which this figures will get post as
below:
84
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Then execute.
In background the Cupper count, Bright can in, Bright can out, Spoilage can (It will be calculated
automatically) entries are updated for the 010 operation for the mentioned production order
corresponding to the date and shift. Bright cans and Spoilage cans will be posted in their respective
storage locations.
And then click the ‘To Order’ tab from the top
85
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the Production order number for which goods to be issued, and click Adopt+Details.
86
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
For example, For Steel Tin Plate – enter ‘a*’ in the field batch, it will list out the all the batch (Coil
Number) of it. From that you can choose the quantity, also according to the manufacturing date.
87
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
From the Default value tab, you can choose according to FIFO, LIFO, Shelf expiry and choose the
Batch (Serial number) of the material with respect to the quantity.
88
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
As the same select the other raw materials if batch is there. Finally you will get the full list screen
after picking the batches as below:
Goods Issued for the Production order and you will get the Material document.
This document is the reference for posting with material and accounting entries for the Goods Issue
of raw materials for the Production order.
89
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Additional quantity can also be issued against the same production order for excess consumption.
And entries can be reversed with 262 movement type in the same transaction for reverse (if wrong
entries)
To transfer the finished material to spoilage can, Enter the movement type 309 – Transfer posting
Material to Material, Plant and press enter.
90
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the receiving plant, receiving storage location and receiving material & in the item list enter the
material which is to be transferred with the quantity and the storage location from where it has to be
transferred.
And Post
91
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
92
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Select the operation of the production order which is to be cancelled and press save button.
Enter reason for cancellation if required. Then come back and save.
93
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
5 Scrap Process
Enter the scrap material – Class 1, plant and order type CC02 – CCMC Scrap Production order.
94
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the quantity to be produced and the start date and time and press enter.
95
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
96
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Changes can be done in the component over view, if necessary. And come back.
And Save
97
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
98
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Check all the entries of Yield, Shift, posting date and timings. Then change the confirmation type
from Partial confirmation to Final confirmation.
Here you can see the finished goods is having 101 – movement type (for goods receipt) and raw
materials is having 261 – movement type (for issue)
99
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the Pallet ticket number in the batch field, and post
100
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
6 Rework Process
Enter the material which is to be reworked, plant, and the order type CC03 – CCMC Rework Order
and press enter.
101
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the quantity, start date and time, then press enter.
System will ask for the selection of line (production version selection), Select RWK2, since it was
reworked in the line 2 and click choose button.
102
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
103
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Components list is viewed. In that the default storage location for the finished product which is to be
reworked will be as 1100 (finished storage location), from the storage location field right click or
press F4 to the select the options. From the options of stock, select the storage location from where
the material is to be issued for rework. (Here, from HFI area the materials are taken for rework)
105
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the Production Order number and the shift in which the order should be processed.
You can see the details of the Production order like, Material, Can size, Customer, Order quantity,
Target quantity, to be confirmed quantity, Unit of measure, Date, Time and Production line.
And you will have the buttons for Good and HFI. If the pallet is good one, click the good button, it will
generate the pallet ticket with bar code and the confirmation is done partially for 1 pallet and posted
in the finished storage location. If HFI button is pressed, it will generate the HFI pallet ticket without
barcode and posted in the HFI storage location.
106
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Press good, Pallet ticket will be printed and 1 pallet will be posted finished storage location, creating
a material document for the posting in the background.
In the next screen, press print. The print out put will be as below:
107
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
7 Annual Planning
108
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the product group for LTP, Version YP – Year plan, the planning horizon according to the
planning and press enter.
109
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
110
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
111
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
112
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
113
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
114
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Planning Scenario 100 is saved and Planning file entries are created.
115
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
And enter the MRP control parameters as above and press enter.
Check all the input parameters and press enter. LTP run saved.
116
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
117
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Select the options according to the requirement as shown and press enter.
118
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
119
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the Planning Scenario as 100 and the other selection options as 001 – MRP Controller and
Plant as 1000. Then press enter, you can display the plan for the planning scenario.
120
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
8 Reports
121
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
122
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the Material and plant for which the stock has to be checked. Then execute
In this screen, you can see the stocks of the particular material with storage location.
123
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
You can change the unit of measure to pallet to see the stock in pallets. To do this, from the unit of
measure you select the other unit pallet and press enter.
124
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
This report has many combinations in the lists and the selection options in the inputs and you can
set and save your own output layout according to the requirements.
125
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In the output, from the tool bar you can change the option to change the layouts according to our
requirements and the layout can be saved and it can be used for our future reference.
126
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
In the options, changes can be done in the displayed list and save the layout.
127
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Like the in the initial list have many options to select as displayed below:
129
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
All the inventory postings will have material document. From this report we can know the quantity of
the material posted on particular period.
130
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the Material number, plant, movement type and Posting date. Then execute.
The out put will display as above with the quantities posted in that period for the material. For
details, select the Material document number and click ‘choose detail’ tab for detailed information.
131
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Or double clicking the document number you can the material document itself as below:
Note:
List of Movement types:
101 – Goods Receipt (Finished goods posting and Raw materials purchasing)
261 – Goods Issue (Goods Issued for Production)
262 – Reversal Goods Issue
531 – Receipt of By-Product (Posting Steel tin scrap, Spoilage can, Bright cans coming out from
Production)
261 K – Goods Issue from Consignment (For Inks)
262 K – Reversal Goods Issue from Consignment
309 – Transfer posting from one Material to another (Posting Finished Product Material as Spoilage
can)
310 – Transfer posting reverse from one material to another
311 – Transfer posting Material from one storage location to another within the plant.
312 – Transfer posting reverse from one storage location to another within the plant.
132
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
Enter the material document number which is generated while material postings
133
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
134
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
It will list all the material of the Material type in the plant.
135
CCMC - SAP Project
User Manual - PP
Created By: V.Rengarajan
Created : 5-Mar-25
3/5/2025
Document : 858825298.doc UPDATED :
From that it can be downloaded to excel file and print out can be taken.