Cross Sections Along Highway: C/S Along 390M Chainage C/S Along 360M Chainage
Cross Sections Along Highway: C/S Along 390M Chainage C/S Along 360M Chainage
N
SCALE:- V=1:100
H=1:100
Datum= 691
Datum= 692
2.42
1.32
1.04
1.44
2.72
2.88
2.62
3.12
3.05
1.6
Depth of filling in (m) Depth of filling in (m)
699.800
696.335 699.950
RL of formation level in RL of formation level in
in (m) in (m)
696.735
697.385
697.075
698.265
696.97
698.22
697.07
698.2
698.1
RL of ground level in (m) RL of ground level in (m)
390
360
2
4
4
2
2
4
4
Chainage in (m) Chainage in (m)
Datum= 691
3.26
3.76
3.51
3.46
RL of formation level in
in (m)
696.335
696.285
696.285
696.295
BATCH=A2
410
2
2
4
Chainage in (m)
ALL DIMENSION ARE IN M