0% found this document useful (0 votes)
67 views32 pages

Multi Purpose 2

The document outlines the Detailed Engineering Design Plan for the construction of a multi-purpose building (admin building) in Barangay San Jose, Libona, Bukidnon for the year 2025. It includes various sections such as architectural, structural, plumbing, and electrical plans, along with a bill of quantities. The project is submitted and recommended by several officials from the Department of Public Works and Highways.

Uploaded by

jian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views32 pages

Multi Purpose 2

The document outlines the Detailed Engineering Design Plan for the construction of a multi-purpose building (admin building) in Barangay San Jose, Libona, Bukidnon for the year 2025. It includes various sections such as architectural, structural, plumbing, and electrical plans, along with a bill of quantities. The project is submitted and recommended by several officials from the Department of Public Works and Highways.

Uploaded by

jian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 32

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
DICKLUM, MANOLO FORTICH, BUKIDNON

C.Y. 2025 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION OF MULTI-PURPOSE BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE , LIBONA, BUKIDNON

SUBMITTED: RECOMMENDED: APPROVED:

RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C. PAHANG, AEr.


OIC - PLANNING AND DESIGN SECTION CHIEF OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER

DATE: DATE DATE


GENERAL
BILL OF QUANTITIES

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RONALD D. NACASABOG
CONSTRUCTION OF MULTI-PURPOSE ENGINEERING ASSISTANT
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE BILL OF QUANTITIES
PREPARED :
MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
G 1
DICKLUM, MANOLO FORTICH, BUKIDNON
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 1 35
JOVEL K.PANGAN
ARCHITECT II DATE: DATE: DATE: DATE:
ARCHITECTURAL
P E R S P E C T I V E
TABLE OF CONTENTS
GENERAL ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL ELECTRONICS
G-1 BILL OF QUANTITIES A-1 PERSPECTIVE, TABLE OF CONTENTS S-1 STRUCTURAL NOTES P-1 LOCATION MAP E-1 GENERAL NOTES EO-1 LOCATION MAP
A-2 DISTRICT MAP S-2 SPLICING REQUIREMENTS OF REINFORCING BARS "Ls" OR "Ld" PLUMBING SPEC'S LEGEND AND SYMBOLS GROUND FLOOR FIRE ALARM SYSTEM PLAN
VICINITY MAP AND OTHER IMPORTANT NOTES WATERLINE PLUMBING LAYOUT POWER RISER DIAGRAM SECOND FLOOR FIRE ALARM SYSTEM PLAN
LOCATION PLAN S-3 TYPICAL MASONRY ELEVATION W/ LINTEL BEAMS & STIFFINER SANITARY PLUMBING LAYOUT E-2 LOCATION MAP FDAS SYSTEM LAY-OUT PLAN
A-3 LOCATION MAP GROUND FLOOR LIGHTING LAYOUT FIRE ALARM RISER DIAGRAM
COLUMNS REFLECTING REINF. STEEL BARS AND LEGENDS
SITE DEVELOPMENT PLAN SECOND FLOOR LIGHTING LAYOUT FIRE ALARM ASSORTED DETAILS
OTHER IMPORTANT NOTES P-2 LOCATION MAP
A-4 GROUND FLOOR PLAN ASSORTED DETAILED DRAWINGS ELECTRICAL LEGEND & SYMBOLS
S-4 FOUNDATION PLAN S-11 RAMP DETAILS PLUMBING SPEC'S
SECOND FLOOR PLAN ELECTRICAL LEGEND & SYMBOLS
ELEVATIONS UPPER BEAM ISOMETRIC VIEW E-3 GROUND FLOOR POWER LAYOUT
FLOOR FINISHES LOWER BEAM LEGENDS SECOND FLOOR POWER LAYOUT
SCHEDULE OF FINISHES S-5 FOUNDATION PLAN P-3 LOCATION MAP GROUNDING DETAILED DRAWINGS
A-5 SECTIONS TYPICAL FOOTING PLAN PLUMBING SPEC'S ELECTRICAL LEGEND & SYMBOLS
SCHEDULE OF DOORS TYPICAL FOOTING SECTION SEPTIC TANK DETAIL, E-4 ELECTRICAL SCHEDULE OF LOADS MECHANICAL
SCHEDULE OF WINDOWS COLUMN SCHEDULE GREASE TRAP DETAIL SINGLE LINE DIAGRAM
SCHEDULE OF FINISHES FOOTING SCHEDULE CATCH BASIN DETAIL E-5 ELECTRICAL ANALYSIS M-1 LOCATION MAP
A-6 REFLECTED CEILING PLANS ELECTRICAL ASSORTED DETAILED GROUND FLOOR AIR-CONDITION LAYOUT
CEILING DETAILS SECTION
S-6 FOUNDATION PLAN P-TRAP DETAIL
E-6 LIGHTNING PROTECTION SYSTEM PLAN SECOND FLOOR AIR-CONDITION LAYOUT
PERSPECTIVE(CEILING DETAILS) FOOTING TIE BEAM DETAILS AND LAY-OUT ELECTRICAL LEGEND & SYMBOLS
A-7 ROOF PLANS WALL FOOTING DETAILS LIGHTNING ARRESTER DETAILS AIR-CONDITION CALCULATION
ROOF SECTION DETAILS S-7 ROOF FRAMING PLAN
A-8 RAMP PLAN S-8 SECOND FLOOR BEAM PLAN
RAMP SECTION DETAILS
MAIN STAIR PLAN
SCHEDULE OF BEAM
MAIN STAIR SECTION DETAILS BEAM DETAILS
A-9 FIRE ESCAPE STAIR PLAN STEEL DECK FRAMING PLAN
FIRE ESCAPE ELEVATIONS S-9 MAIN STAIRS DETAILS
FIRE ESCAPE DETAILS
FIRE ESCAPE STAIR DETAILS
A-10 BALCONY RAILING DETAILS
A-11 PWD/MALE TOILET PLAN DETAILS
S-10 ROOF DETAILS
GIRT DETAILS
FASCIA FRAME DETAILS
S-10 ROOF DETAILS
GIRT DETAILS
FASCIA FRAME DETAILS

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PERSPECTIVE RONALD D. NACASABOG
CONSTRUCTION OF MULTI-PURPOSE
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE
TABLE OF CONTENTS PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
A 2
DICKLUM, MANOLO FORTICH, BUKIDNON
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 12 35
JOVEL K.PANGAN
ARCHITECT II DATE: DATE: DATE: DATE:
PROJECT BILLBOARD DETAILS
NOTE : THE EXPENSES INCURRED IN THE INSTALLATION OF BILLBOARD
IS INCLUDED IN THE OCM PER DO. 11, SERIES 2021 2400 (8 ft.)

2440mm
NO
ON
SI

IS

A
COMMISSION ON AUDIT

U
M

DI
CO M
210

T
210 210 (PROVINCE AND CITY)

R EPU

E S
50 50

I N
BL
I

P
80 80

P
I
O

L
F
T
H E

I
P H

50
Project: Cost:
WHITE BACKGROUND
Fund
210

BLACK TEXT

Location: Source:
60 50
20

THIS IS WHERE YOUR TAXES GO Implementing Agency:


50

Development Partner:
HELVETICA 3"

NAME OF PROJECT:
1220 mm

60
50

LOCATION: Contractor/Supplier: 2400 (8 ft)


50 50 50 50 50 50 50
20 20 30 30 30 30 30 30

NAME OF CONTRACTOR: Brief Description of Project:


DATE STARTED:
CONTRACT COMPLETION DATE: Project Details:
CONTRACT COST: Project Date Project Status
IMPLEMENTING OFFICE: Duration Started
Target Date of Percentage of As of Cost Incurred
to Date
Date Remarks
Completion Completion (Date) Completed
SOURCE OF FUND: HELVETICA 1"
20 30

Department of Public Works and Highways


20

Text 2920 or call (02) 165-02 for any concern on this project
www.dpwh.gov.ph
20
10

For Particulars or complaints about this project, please contact the Regional Office or Cluster which has
audit jurisdiction on this project.
NOTE :
*For Source of Fund, state if DPWH Regular Budget, Priority Development
HELVETICA 1" COA Regional Office No./Cluster: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Assistance Fund, DepEd/ DA/ DAR Budget, Calamity Fund, MVUC Fund, etc. Address: _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
*Color Shade Combination for the Yellow Background: Contact No.: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ or Text COA Citizen's Desk at 0915-539-1957
CYAN : 0
MAGENTA : 7
YELLOW : 78
KEY : 0
2400 (8 ft.)

2440
DISPLAY AREA
45°
50 X 50 HORIZONTAL FACE OF BILLBOARD
COCO LUMBER
DISPLAY AREA DISPLAY AREA
1220 (1200 X 2400 X 12 MARINE PLYWOOD) 1220 EDGE OF ROAD
(TARPAULIN ON 2400 X 2400 X 5 MARINE PLYWOOD)

2400 2400

50 X 50 HORIZONTAL 50 X 50 HORIZONTAL
TRAFFIC COCO LUMBER COCO LUMBER
DIRECTION
50 X 50
WOODEN STAKE 50 X 75 VERTICAL
COCO LUMBER
1000 1000
ROAD

GROUND LEVEL
50 X 50
WOODEN STAKE
500 500
ORIENTATION 1000 1000

GROUND LEVEL
1000 2440
500 500
TYPICAL FRAME ELEVATION
FRONT ELEVATION
( OPTION 1 )
SCALE 1 : 25 M.
1000 2400

STANDARD PROJECT BILLBOARD TYPICAL FRAME ELEVATION FRONT ELEVATION


(DPWH and COA)

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RONALD D. NACASABOG
CONSTRUCTION OF MULTI-PURPOSE
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE STANDARD BILLBOARD PROJECT
PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
A 3
DICKLUM, MANOLO FORTICH, BUKIDNON
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2 12 35
JOVEL K.PANGAN
ARCHITECT II DATE: DATE: DATE: DATE:
TO PUERTO Maitum
TO CDOC
Indahag Alae
Alae Br. (Old & New)
Guisok K1438+013)
Pualas Napawa
Cabula Limay 10
Lunocan
Sto.
Gango Tagiptip Batingtingan
Lunocan Br.
Niño
Maasin Sandayong San MiguelK1441+375
Nicdao Palabukan Camp
Baungon
Kamatayan Camp 18 12 Damilag
Dicklum Br.
K1444+657
New Baungon
Liboran Camp 17 Dicklum
Camp
Lingating Cawayanon
Kinawe 14
Sta. Fe
Langaon Latid LIBONA
Kiliog
TO CDOC Sinalagao Br.
K1473+230
Camp Phillips
Sta. Fe Br.
BAUNGON Sinaplotan K1463+819 Agusan Canyon Br.
Danatag Imbatug Laturan Crossing Agusan
K1460+740
Uguiaban Br. (new)
Donatog Canyon
K1467+(-892) Buenavesta Camp 9
Daco Patpat
Nangka Lindaban
Inambakan San
Lacolac San Salimbalan Tigbao
Pongol Jose
Miguel Mabuhay San
Mabunga Isidro
Maambong
San Isidro Balintad
Malinao Kalilangan San Kalasuyan Monsing
945 TALAKAG Vicente Tomusan
San Jose Capihan
Sil-ipon
San
Antonio
Wangilan

Sto. Nino Lingion


Babagulohan Sagaran
Tal-uban Br.
Cabadiangan
K1485+1460
Dagumbaan
Basak Liguron
Malunong

VICINITY MAP
SCALE NDS.

THIS
SITE

1 REGION MAP
A 3 N O T T O S C A L E

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RONALD D. NACASABOG
CONSTRUCTION OF MULTI-PURPOSE
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE
REGION MAP
MINDANAO MAP
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
A 4
DICKLUM, MANOLO FORTICH, BUKIDNON
LIBONA, BUKIDNON
VICINITY MAP ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 3 12 35
DATE: DATE: DATE: DATE:
N
THIS

N
N

E
SITE W E

E
w

S
9.50 6.85
FENCE ROOF LINE
1.00 THIS S
PWD/MALE
2%
SLO
PE
FT-1
+0.40m
SITE
CR TO
F.D BRGY.
FT-3
.
PANTRY
D5 CAPTAIN

TO LINGATING
FT-3 D3
+0.40m
FT-1
OFFICE
+0.40m

ROOF LINE
D 4 EXIT
EXISTING
D2
TRIBAL

FENCE
WAITING

7.00
AREA BUILDING

10.20
D6 1
FT-1

U P
2
+0.40m D2
3 FT-1
PEBBLES FT-3

R A M P
+0.40m
-0.35m 4
FEMALE 5
W4 CR
6

STAGE FT-4

FT-1
+0.40m
TREASURER
STORAGE D7
D1

ROOF LINE PORCH


FT-2
+0.40m
W2

ROOF LINE 1
ROOF LINE
FRONT
2
ROOF LINE

ROOF LINE
EXISTING COVERED COURT

ROOF LINE ROOF LINE

1 SITE DEVELOPMENT PLAN


A 4 SCALE: NTS

2 LOCATION MAP
N D S
A 4

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RONALD D. NACASABOG
CONSTRUCTION OF MULTI-PURPOSE
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE
SITE DEVELOPMENT PLAN
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
A 5
DICKLUM, MANOLO FORTICH, BUKIDNON LOCATION MAP
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 4 12 35
DATE: DATE: DATE: DATE:
FLOOR AREA: SCHEDULE OF WALL FINISHES : FLOOR FINISH LEGEND:
FT-1 GLAZED 0.60M X 0.60MFLOOR TILES
MARK WALL DESCRIPTION
GROUND FLOOR = 73.08 SQ.M. FT-2 UNGLAZED 0.60M X 0.60M FLOOR TILES
A B C D 100mm THICK CHB WALL SMOOTH PLASTERED
A SECOND FLOOR = 66.50 SQ.M.
EWF - 1 AND PAINTED WALL FINISHED (COLOR WHITE)
TOTAL FLOOR AREA = 139.58 SQ.M. FT-3 UNGLAZED 0.40M X 0.40M FLOOR TILES
2.80 9.50
1.40 1.40 2.50 3.50 3.50 100mm THICK CHB WALL SMOOTH PLASTERED FT-4 CONCRETE FLOOR W/ GROOVE
EWF - 2
AND PAINTED WALL FINISHED (COLOR GRAY)
1.21

0.92
W4 EWF-1 W3 EWF-1 W2 EWF-1 EWF - 3 100mm x 200mm MANGIMA STONE
1
1 1.60 IWF-1 IWF-1 IWF-1
1.60

FT-1
LANDING 2% IWF-2 IWF-1 100mm THICK THICK CHB WALL SMOOTH PLASTERED
2.05

SL
OP +0.40m EWF-1
FT-3
+0.40m
EWF-1
E TO
F.D.
PANTRYWa1 IWF - 1 AND PAINTED WALL FINISHED (COLOR GRAY)
2.90

PWD/MALE
CR IWF-2 OFFICE
3.50

FT-3 D3 IWF-1
IWF-2 FT-1 W2
B D5 IWF-1 +0.40m
.20m X 0.40m GLAZED GRANITE WALL TILES
IWF - 2
1.90

D4 EXIT IWF-1 IWF-1 OFF WHITE FINISHED TYPICAL ON ALL WALL TOILETS
D2
HALLWAY WAITING
7.00

IWF-1
2 D6 1
AREA USE .40mm THK. RIB-TYPE G.I.
USE .40mm THK. RIB-TYPE G.I.
FT-1 LONG SPAN PRE-PAINTED ROOFING
LONG SPAN PRE-PAINTED ROOFING
1.60

U P

EWF-1
5.50

W4 2 +0.40m
SECRETARY
1.95

FT-3 3
-0.35m
A B C D 3 2 1
R A M P

EWF-1 FEMALE 4
CR 100mm THICK CHB WALL SMOOTH PLASTERED 100mm THICK CHB WALL SMOOTH PLASTERED
3.50

5
AND PAINTED WALL FINISHED (COLOR WHITE) AND PAINTED WALL FINISHED (COLOR WHITE)
6
FT-4
W2
FT-1
FT-1 +0.40m 100mm THICK CHB WALL SMOOTH PLASTERED 100mm THICK CHB WALL SMOOTH PLASTERED
+0.40m
1.20

EWF-1 AND PAINTED WALL FINISHED (COLOR GRAY) AND PAINTED WALL FINISHED (COLOR GRAY)
EWF-1 IWF-1
STORAGE EWF-1
D7
D1 IWF-1
ROOF APEX LINE ROOF APEX
3
PORCH EWF-1 W2 ROOF APEX LINE ROOF APEX
1.88

FT-2

1.51
+0.40m

1.44
1
EWF-3
2
TOP OF ROOF BEAM TOP OF ROOF BEAM EWF-3
CEILING LINE CEILING LINE

2.50 3.50 3.50 F F F F


1.15

3.00

3.00
F F F F

2.70

2.70
9.50
1.00 W1
W2 W2 W2 W2

8.45

8.45
1.00
6.40

6.40
SECOND FLOOR LINE
CEILING LINE CEILING LINE

EWF-1
100mm x 200mm MANGIMA STONE
800mm Ø BRGY SEAL

GROUND FLOOR PLAN


IN ALUMINUM FINISH

3.00

3.00
2.70

2.70
1
3D LETTER SIGNAGE
IN STAINLESS STEEL FINISH EWF-1
DANATAG TULUGAN
1.40 BUILDING D 1 W2 W2 W2

1.45
A 5
BARANGAY ,DANATAG BAUNGON, BUKIDNON

SCALE: 1:100 MTRS.

0.90
0.40

0.40
FINISH FLOOR LINE FINISH FLOOR LINE
NATURAL GRADE LINE NATURAL GRADE LINE

NATURAL GROUND LINE NATURAL GROUND LINE

A B A C D

1.13
2.50
9.50
3.50 3.50
3 FRONT ELEVATION 5 RIGHT-SIDE ELEVATION
1.25 1.25 A 5 SCALE: 1:100 MTRS. A 5 SCALE: 1:100 MTRS.

W4 W4 W2 W2
USE .40mm THK. RIB-TYPE G.I.
1 LONG SPAN PRE-PAINTED ROOFING USE .40mm THK. RIB-TYPE G.I.
FEMALE Wa1
1.60

MALE LONG SPAN PRE-PAINTED ROOFING


CR CR
IWF-1
FT-3 FT-3
-0.05m -0.05m OFFICE
100mm THICK CHB WALL SMOOTH PLASTERED
1 2 3 D C B A
3.50

D6 D6 AREA W2 AND PAINTED WALL FINISHED (COLOR WHITE)


B LANDING
FT-2
FT-1
100mm THICK CHB WALL SMOOTH PLASTERED
D 3 EXIT
1.90

-0.05m
AND PAINTED WALL FINISHED (COLOR GRAY)
17 DN HALLWAY
16 0.40mm x 2.44 mm 100mm THICK CHB WALL SMOOTH PLASTERED
FT-1
15 PRE PAINTED SPANISH GUTTER AND PAINTED WALL FINISHED (COLOR WHITE)
7.00

14 9.50
2 13
16
15 1
FT-1 ROOF APEX ROOF APEX LINE
+0.40m
12
14 2
11 ROOF APEX ROOF APEX LINE
DN
2.30

13 3
10
IWF-1 12 4
1.44

1.44
9 EWF-1 0.40mm x 2.44 mm
11 5
3.50

8 PRE PAINTED SPANISH GUTTER


10 6
7
IWF-1 W2
9 7 100mm THICK CHB WALL SMOOTH PLASTERED
6 TOP OF ROOF BEAM TOP OF ROOF BEAM AND PAINTED WALL FINISHED (COLOR GRAY)
5
IWF-1 CEILING LINE CEILING LINE
1.20

4
8
3

2
Wa1 EWF-3 1.15
3
3.00

3.00
1
2.70

2.70
W1 W2 W2
D3 W2 W2 W5 W5 1.00
1.88

8.45

8.45
0.30 1.00

0.30 1.00
7.31

6.40

6.40
SECOND FLOOR LINE
CEILING LINE CEILING LINE

2.50 3.50 3.50


3.00

3.00
2.70

2.70
9.50 EWF-1
D4
EWF-1 W3
W5
1.20
W2
W5

0.90
1.55

0.40

0.40
FINISH FLOOR LINE FINISH FLOOR LINE

0.40
NATURAL GROUND LINE NATURAL GROUND LINE

2.09

2 SECOND FLOOR PLAN 4 LEFT-SIDE ELEVATION 6 REAR ELEVATION


A 5 SCALE: 1:100 MTRS. A 5 SCALE: 1:100 MTRS. A 5 SCALE: 1:100 MTRS.

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR PLAN RONALD D. NACASABOG
CONSTRUCTION OF MULTI-PURPOSE
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE
SECOND FLOOR PLAN PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
A 6
DICKLUM, MANOLO FORTICH, BUKIDNON ELEVATIONS
LIBONA, BUKIDNON
SCHEDULE OF FINISHES
ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 5 12 35
JOVEL K.PANGAN
ARCHITECT II DATE: DATE: DATE: DATE:
NOTE: SCHEDULE OF FLOOR FINISHES:
ALL TILE EDGES SHOULD TERMINATE W/ TILE TRIM. FT-1 GLAZED 0.6M X 0.6M FLOOR TILES A B C D
START ALL TILE LAY-OUT AT CENTERLINE (CL) OR FT-2 UNGLAZED 0.6M X 0.6M FLOOR TILES
START LINE (SL). FINAL LAYOUT SHALL BE VERIFIED BY 2.80 9.50
THE DESIGNER BASED ON ACTUAL MEASUREMENT AT
FT-3 UNGLAZED 0.4M X 0.4M FLOOR TILES
1.40 1.40 2.50 3.50 3.50
SITE BEFORE INSTALLATION/IMPLEMENTATION.
1.21
FT-4 CONCRETE FLOOR W/ GROOVE
VERIFY WITH THE END-USER THE FINAL TILE COLOR
PRIOR TO INSTALLATION/IMPLEMENTATION. 1
1

1.60
1.60
FT-1

2.05
+0.40m
FT-3
+0.40m

2.90
3.50
FT-3
FT-1
+0.40m

1.90
7.00
2 1
FT-1

1.60

U P
5.50
2 +0.40m

1.95
FT-3 3
-0.35m

R A M P
4

3.50
5
6
FT-4
FT-1
FT-1 +0.40m
+0.40m

1.20
3

25 100 25
1.88
FT-2
+0.40m

SCHEDULE OF FINISHES PLAN


150
NO. DESIGNATIONS FLOOR FINISH WALL FINISH CEILING ROOFING
25 100 25
GROUND FLOOR
MAIN BUILDING
GROUND FLOOR LEVEL
1 FLOOR FINISHES
A 6 SCALE: 1:100 MTRS.
1 RAMP GROOVE FINISH SEMI-GLOSS PAINT FINISH - -
400mm X 400mm CERAMIC FLOOR - - -
2 RAMP LANDING
UNGLAZED TILES OFF WHITE
600mm X 600mm CERAMIC FLOOR TILES
3 PLANT BOX - SEMI-GLOSS PAINT FINISH - - (GLAZED TILES) WHITE COLOR

0.40mm THK. RIB-TYPE G.I. A B C D


4 PORCH SEMI-GLOSS PAINT FINISH
600MM X 600MM NON-SKID LONG SPAN PRE-PAINTED ROOFING
400mm X 400mm CERAMIC FLOOR
5 STEPS (OUTDOOR) CERAMIC FLOOR TILE - - UNGLAZED TILES 1.13 9.50
2.50 3.50 3.50
6 STEPS (FIRE EXIT STAIRS) 2mm THICK CHECKERED PLATE - 1.25 1.25
7 WAITING AREA -

8 MAIN STAIR -
1
4.5MM FIBER CEMENT BOARD

1.60
9 OFFICE AREA 600MM X 600MM GLOSS -
CERAMIC FLOOR TILE SEMI-GLOSS PAINT FINISH ON LIGHT METAL FRAMING FT-3 FT-3 100mm THICK CHB WITH
-0.05m -0.05m

10 SYSTEM, FLAT FINISH - 1" THK (MIN) PLASTER


BRGY. CAPTAIN OFFICE

3.50
FT-1
FINISH
FT-2
11 PANTRY -

1.90
-0.05m
17

16

12 STORAGE - 15
FT-1

7.00
14
2 13
16
15 1
FT-1
13 HALLWAY - 12
14 2
+0.40m

11

2.30
13 3
10
14 PWD/MALE CR - 9
12 4
400mm X 400mm CERAMIC FLOOR 200mm X 400mm CERAMIC WALL 8
11 5

3.50
10 6
UNGLAZED TILES OFF WHITE GLAZED TILES OFF WHITE - 7
15 FEMALE CR 6 9 7

1.20
4

SECOND FLOOR LEVEL 3


8

600mm X 600mm CERAMIC FLOOR 3 1

16 FIRE EXIT LANDING - -


UNGLAZED TILES OFF WHITE

1.88
17 STEPS (FIRE EXIT STAIRS) 2mm THICK CHECKERED PLATE - 600mm X 600mm CERAMIC FLOOR SECTION
UNGLAZED TILES
HEAVY-DUTY PEARL WHITE COLOR
(AT STAIRS)
18

19
MAIN STAIR

OFFICE AREA
3.5mm THICK CHECKERED PLATE
(FIRE SCAPE STAIRS LANDING)

2.50 3.50 3.50


Wa1
600MM X 600MM, GLOSS
SEMI-GLOSS PAINT FINISH
20 HALLWAY CERAMIC FLOOR TILE

600MM X 600MM, GLOSS


4.5MM FIBER CEMENT BOARD
ON LIGHT METAL FRAMING
0.40mm THK. RIB-TYPE G.I.
LONG SPAN PRE-PAINTED
ROOFING
9.50 3 PARTITION WALL DETAIL
21 CONFERENCE
CERAMIC FLOOR TILE SYSTEM, FLAT FINISH A 6 SCALE: 1:100 MTRS.
22 MALE CR
400mm X 400mm CERAMIC FLOOR 200mm X 400mm CERAMIC WALL
23 UNGLAZED TILES OFF WHITE GLAZED TILES OFF WHITE
FEMALE CR SECOND FLOOR
2 FLOOR FINISHES
A 6 SCALE: 1:100 MTRS.

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FLOOR FINISHES RONALD D. NACASABOG
CONSTRUCTION OF MULTI-PURPOSE
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE
PARTITION WALL DETAILS PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
A 7
DICKLUM, MANOLO FORTICH, BUKIDNON
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 6 12 35
JOVEL K.PANGAN
ARCHITECT II DATE: DATE: DATE: DATE:
1 2 3 A B C D A B C
100mm THICK CHB WALL SMOOTH PLASTERED
AND PAINTED WALL FINISHED (COLOR WHITE)
100mm THICK CHB WALL SMOOTH PLASTERED
9.50
AND PAINTED WALL FINISHED (COLOR WHITE)
9.50
100mm THICK CHB WALL SMOOTH PLASTERED
AND PAINTED WALL FINISHED (COLOR WHITE)
6.00
100mm THICK CHB WALL SMOOTH PLASTERED
7.00 100mm THICK CHB WALL SMOOTH PLASTERED
2.50 3.50
AND PAINTED WALL FINISHED (COLOR WHITE)
7.00 AND PAINTED WALL FINISHED (COLOR WHITE) 4.65 1.21
1.00 1.00 1.00
ROOF APEX ROOF APEX LINE

ROOF APEX ROOF APEX LINE


D3
A B

1.51
1.44

1.90
D5
1.20

1.42
SEE TRUSS DETAILS

0.90
D 4 EXIT

N
TOP OF ROOF BEAM TOP OF ROOF BEAM
HALLWAY 2.50

I
CEILING LINE CEILING LINE

I
FT-1 WAITING
1.15
IWF-1 IWF-1
2 1.25 1.25

L
AREA

L
D6
FF-1
3.00

3.00
+0.40m
CEILING HT. 2.60

2.30
1.00 IWF-1

Y
W2 W2 D6 D6 W2 W2
8.45

8.45

3.50
1

1.00
IWF-1

R
D1

1.60
A
OFFICE CONFERENCE ROOM OFFICE OFFICE

A
6.40

6.40

1.20
CEILING LINE

D
D7

0.30
CEILING LINE D6 D6

3.50
ENTRANCE

N
3
3.00

3.00
D 3 EXIT

1.90
U
CEILING HT. 2.60

U
1.40 HALLWAY

1.88
D2 D1 D5 D3 W2

O
IWF-1 IWF-1 IWF-1 FT-1

0.90
B

B
PANTRY WAITING AREA ENTRY WAITING AREA BRGY. CAPTAIN OFFICE 2
0.40

0.40
FINISH FLOOR LINE FINISH FLOOR LINE

NATURAL GROUND LINE NATURAL GROUND LINE

GROUND FLOOR SECOND FLOOR PLAN


1 CROSS SECTION(A) 2 LONGITUDINAL SECTION(B)
A 7 SCALE: 1:100 MTRS. A 7 SCALE: 1:100 MTRS. 3 ENTRANCE AND HALLWAYS
A 7 SCALE: 1:100 MTRS.

2.15
2.00
0.50
1.80 1.80 0.60

0.60
1.20
2.65
2.50

1.60
2.10

2.10

2.10
1.50
0.90
0.50
FINISHED FLOOR
SECOND FLOOR LINE LINE
W1 W2 W3 W4
AWNING WINDOW - 1 SET
SLIDING GLASS WINDOW - 10 SETS SLIDING GLASS WINDOW - 1 SET AWNING GLASS WINDOW - 4SET
6mm THICK TINTED GLASS 6mm THICK TINTED GLASS 6mm THICK TINTED GLASS 6mm THICK TINTED GLASS
AWNING WINDOW ON ANALOK SLIDING WINDOW ON ANALOK SLIDING WINDOW ON ANALOK SLIDING WINDOW ON ANALOK
FRAMING POWDER COATED FRAMING POWDER COATED FRAMING POWDER COATED FRAMING POWDER COATED

3.35
0.80 0.83 0.85 0.83
1.80 CEILING LINE
0.80 0.90 0.90 0.60
0.55

0.90 0.90 FIXED GLASS FIXED GLASS FIXED GLASS FIXED GLASS

0.60
2.70
2.15

2.15

2.15

2.15

2.15

2.15
2.10

2.10

2.10

2.10

2.10

2.10
FIXED GLASS FIXED GLASS FIXED GLASS STAINLESS STEEL STAINLESS STEEL

1.30
KICKING PLATE KICKING PLATE

1.25
D 2
FINISHED FLOOR LINE

D 1 D 2 D 3 D 4 D 5 D 6 D 7
MAIN DOOR- 1 SET
OFFICE- 1 SET PANTRY/EXIT DOOR - 2 SETS EXIT DOOR(GF) - 1 SET PWD/MALE CR - 1 SET MALE/FEMALE CR - 3 SETS STORAGE - 1 SET
6mm THICK TINTED GLASS
DOUBLE SWING DOOR ON ANALOK 6mm THICK TINTED GLASS HOLLOW CORE FLUSH TYPE
FRAMING POWDER COATED SOLID WOOD PANEL SWING DOOR ON SOLID WOOD PANEL SWING DOOR ON SOLID WOOD PANEL SWING DOOR ON FLUSH DOOR ON DOOR JAMB(COATED
SWING DOOR ON ANALOK FRAMING SWING DOOR ON
DOOR JAMB(COATED WITH PAINT) DOOR JAMB(COATED WITH PAINT) DOOR JAMB(COATED WITH PAINT) WITH PAINT)
POWDER COATED DOOR JAMB(COATED WITH PAINT)

4 SCHEDULE OF DOORS AND WINDOWS


A 7 SCALE: 1:50 MTRS.

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RONALD D. NACASABOG
CONSTRUCTION OF MULTI-PURPOSE
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE
SECTIONS
ENTRANCE AND HALLWAYS PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
A 8
DICKLUM, MANOLO FORTICH, BUKIDNON
LIBONA, BUKIDNON SCHEDULE OF DOORS ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 7 12 35
AND WINDOWS JOVEL K.PANGAN
ARCHITECT II DATE: DATE: DATE: DATE:
A B C D A B C D

9.50 1.40 1.40 9.50


1.25 1.25 12MM X 38MM X 5MM X 0.80MM THK, 0.60
12MM X 38MM X 5MM X 0.80MM THK, 2.50 METAL FURRING CHANNEL(CEILING JOIST) 1.20
METAL FURRING CHANNEL(CEILING JOIST) 0.60
AT 1200MM ON CENTER AT 1200MM ON CENTER
(SEE BLOW-UP DETAIL) (SEE BLOW-UP DETAIL)
0.60
1
1 1
0.60 1.20

1.45
1.45

FT-3
+0.40m

1.75
1.75

17

16

6.85
15
6.85

2
14

13
16 2
15 1

U P
12
14 2

2.10
11
DN 13 3

R A M P
10
12 4
9
11 5
8

7
10 6 FT-4
9 7 1. 0
6

5
20 0.6

1.25
4
8
3

2 0
3 1 3 0.6

0
1. 0.6
20
2.35 3.35 0
0.6
3.50 3.50
NOT TO SCALE

SECOND FLOOR GROUND FLOOR


1 REFLECTED CEILING PLAN 3 REFLECTED CEILING PLAN
A 8 SCALE: 1:100 MTRS. A 8 SCALE: 1:100 MTRS. 5 PERPECTIVE(CEILING)
A 8 SCALE: NTS

1.20
0.10

0.05

0.05
0.10

0.10
0.30
A B C D A B C D

0.10
4.65
PREFORMED PRE-PAINTED G.I. GUTTER 1.00
0.25

1.00 2.65 1.00

0.90 0.25
PREFORMED PRE-PAINTED G.I. GUTTER PREFORMED PRE-PAINTED G.I. GUTTER

1.20
0.90

CEILING VENT(SEE DETAILS)

1 1

0.10
CEILING VENT(SEE DETAILS)
PRE-PAINTED ROOFING G.I FLASHING
PRE-PAINTED ROOFING G.I FLASHING

17 12MM X 38MM X 5MM X 0.80MM THK, 17

16 METAL FURRING CHANNEL(CEILING JOIST) 16


12MM X 38MM X 5MM X 0.80MM THK,
0.10
15
AT 1200MM ON CENTER 15
9.50
7.15

METAL FURRING CHANNEL(CEILING JOIST)


2
14
(SEE BLOW-UP DETAIL) 2
14

13
16
15 1
13
16
15 1
AT 1200MM ON CENTER
(SEE BLOW-UP DETAIL)
0.30
12
14 2
12
14 2
ANGLE 20 X 20 X 2 ATTACHED TO

A B
11
DN 11
DN CHB WALL Q/ TOKS SCREWS @ 600mm
10

9
13
12
3
4
10

9
13
12
3
4 6
8
11 5
8
11 5
A 8 ROD SUSPENSION HANGER
10 6 10 6
7
9 7
7
9 7
WITH ADJUSTMENT SPRING
6 6
CEILING VENT(SEE DETAILS)
5

4
5

4
CEILING VENT(SEE DETAILS) METAL DOUBLE FURRING CHANNEL(NAILER)
8 8
3 3 12mm x 38mm x 5m x 0.8mm THK. AT 400mm O.C.
3
2

3
2
0.25 METAL CARRYING CHANNEL(CEILING 0.25
1 1
JOIST)
1.28
1.20

12mm x 38mm x 5m x 0.8mm THK. @ 1200mm


4.5MM THK. FIBER CEMENT BOARD
IN 38mm x 38mm x 6mm
TOP OF BEAM
ANGLE BAR FASCIA FRAME

0.10 0.35

0.10 0.35
4.5MM THK. FIBER CEMENT BOARD
IN 38mm x 38mm x 6mm
ANGLE BAR FASCIA FRAME
CEILING LINE
B-1
UPPER ROOF CEILING EAVES B-1
LOWER ROOF CEILING EAVES
CHB WALL
2 REFLECTED CEILING PLAN 4 REFLECTED CEILING PLAN
4.5MM THK. FIBER CEMENT CEILING BOARD

A 8 SCALE: 1:100 MTRS.


A 8 SCALE: 1:100 MTRS.
7 CEILING DETAIL(SECTION)
A 8

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REFLECTED CEILING PLANS RONALD D. NACASABOG
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE
CEILING DETAILS SECTION
PERSPECTIVE(CEILING DETAILS)
PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
A 9
DICKLUM, MANOLO FORTICH, BUKIDNON
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 8 12 35
JOVEL K.PANGAN
ARCHITECT II DATE: DATE: DATE: DATE:
A B C D 3 2 1
4.65
1.00 2.65 1.00

0.25
PREFORMED PRE-PAINTED G.I. GUTTER
3" Ø DOWNSPOUT 4.5MM THK. FIBER CEMENT BOARD IN 38mm x 9.31
38mm x 6mm ANGLE BAR FASCIA FRAME Hi-Rib PRE-PAINTED ROOFING G.I SHEET

0.90
1 SEE TRUSS DETAILS

0.40
Hi-Rib PRE-PAINTED ROOFING G.I SHEET

0.5
PRE-PAINTED ROOFING G.I FLASHING

5
0.40mm x 2.44 mm
17
PRE PAINTED SPANISH GUTTER
16

2.05
15 0.25
9.50

7.15

14
2 13
16

1.51

0.30
15 1
12
14 2
11

10

9
SLOPE
DN 13
12
3
4

7
11
10
5
6
4.5MM THK. FIBER
6

5
9 7
CEMENT FACIA BOARD
4

3
8
TOP OF BEAM 3" Ø PVC
2

3 ELBOW 90°
RB RB
1

0.90
1.20

3"Ø PVC PIPE DOWN SPOUT


UPPER ROOF

4.5MM THK. FIBER CEMENT CEILING BOARD IN 4-10mmØ x 300mm ANCHOR BOLT
METAL CARRYING CHANNEL(CEILING JOIST) W/ NUTS and WASHERS ON
12mm x 38mm x 5m x 0.8mm THK. @ 1200mm 12mm THK. BASE PLATE
UPPER ROOF
1 ROOF PLAN
A 9 SCALE: 1:100 MTRS. 3 ROOF SECTION
A 9 SCALE: 1:30 MTRS.

A B C

9.95
D
3 2 1
8.95 1.00
0.25

PREFORMED PRE-PAINTED G.I. GUTTER


3" Ø DOWNSPOUT
9.31
0.90

1
Hi-Rib PRE-PAINTED ROOFING G.I SHEET
4.5MM THK. FIBER CEMENT BOARD IN 38mm x
38mm x 6mm ANGLE BAR FASCIA FRAME Hi-Rib PRE-PAINTED ROOFING G.I SHEET
PRE-PAINTED ROOFING G.I FLASHING
SEE TRUSS DETAILS
0.40
17

16

15
0.5
7.15
9.50

2
14
16
5 0.40mm x 2.44 mm
1.44

13
15 1
12
14 2 PRE PAINTED SPANISH GUTTER
11
DN 13 3
SLOPE 0.25
0.89

10
12 4
9
11 5
8
10 6
7

0.30
6 9 7

4
8 TOP OF BEAM
3

3
2

1
RB RB 4.5MM THK. FIBER
1.20

CEMENT FACIA BOARD


1.20
3" Ø PVC
ELBOW 90°
4.5MM THK. FIBER CEMENT CEILING BOARD IN 4-10mmØ x 300mm ANCHOR BOLT 0.90
METAL CARRYING CHANNEL(CEILING JOIST) W/ NUTS and WASHERS ON 3"Ø PVC PIPE DOWN SPOUT
12mm x 38mm x 5m x 0.8mm THK. @ 1200mm 12mm THK. BASE PLATE
LOWER ROOF
2 ROOF PLAN LOWER ROOF
A 9 SCALE: 1:100 MTRS.
4 ROOF SECTION
A 9 SCALE: 1:30 MTRS.

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROOF PLANS RONALD D. NACASABOG
CONSTRUCTION OF MULTI-PURPOSE
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE
ROOF SECTION DETAILS PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
A 10
DICKLUM, MANOLO FORTICH, BUKIDNON
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 9 12 35
JOVEL K.PANGAN
ARCHITECT II DATE: DATE: DATE: DATE:
B C 3 1
USE .40mm THK. PRE-PAINTED END FLASHING

USE .40mm THK. RIB-TYPE G.I.


LONG SPAN PRE-PAINTED ROOFING
ROOF APEX LINE

ROOF APEX LINE


100mm THICK CHB WALL SMOOTH PLASTERED

1.44
AND PAINTED WALL FINISHED (COLOR GRAY)
CONCRETE CANOPY
75mm THICK CONCRETE CANOPY

0.075
TOP OF ROOF BEAM TOP OF BEAM TOP OF ROOF BEAM
CEILING LINE RB RB CEILING LINE

F EXPOSED REINFORCED 1.15

0.60 CONCRETE BOTTOM


OF BEAM
3.00

3.00
F
2.75

2.75
100mm THICK CHB WALL SMOOTH PLASTERED
AND PAINTED WALL FINISHED (COLOR WHITE) W2 W2 W2
8.45

100mm THICK CHB WALL SMOOTH


CONCRETE CANOPY PLASTERED AND PAINTED WALL
FINISHED (COLOR WHITE)

0.075
CONFERENCE
OFFICE AREA
6.40

6.40
SECOND FLOOR LINE ROOM SECOND FLOOR LINE
CEILING LINE CEILING LINE

100mm x 200mm MANGIMA STONE 0.60 EXPOSED REINFORCED


3.00

3.00
2.75

2.75
CONCRETE BOTTOM
OF BEAM
D 1 D1
100mm THICK CHB WALL SMOOTH
100mm THICK CHB WALL SMOOTH PLASTERED PLASTERED AND PAINTED WALL
AND PAINTED WALL FINISHED (COLOR WHITE) FINISHED (COLOR WHITE)
WAITING
ENTRY AREA PANTRY
0.40

0.40
FINISH FLOOR LINE FINISH FLOOR LINE

NATURAL GROUND LINE NATURAL GROUND LINE

DETAIL BAY ELEVATION DETAIL BAY SECTION DETAIL BAY SECTION


1 @ FRONT, ALONG GRID-3 BETWEEN GRIDS B-C 2 @ FRONT, BETWEEN GRIDS B-C, ALONG GRID C 3 @ REAR, BETWEEN GRIDS B-C, ALONG GRID C
A 10 SCALE: 1:60 MTRS. A 10 SCALE: 1:60 MTRS. A 10 SCALE: 1:60 MTRS.

0.2 0.2 0.2


3 2

0 0 0
9
2.5

0.90
1.20 2.10
0.12
16 SECOND FLOOR LINE
TREADS@300mm 1.20 15

BARANGAY SAN JOSE

0.15
14
A 13
3D LETTER SIGNAGE
IN STAINLESS STEEL FINISH
2ND FLOOR

12
0.90
2.7
1.21

ADMINISTRATIVE BUILDING
11
2
DN

0.30 10
LANDING

9
10
11
12
13
14
15
16

0.05
9

LANDING 8 25mm Ø STAINLESS PIPE


LIBONA, BUKIDNON
2.50
8

7 50mm Ø STAINLESS PIPE


6
7
6
5

3
4

2
1

LANDING 5 0.04
1.21

1.50

BEAM
4
5 SIGNAGE DETAIL

0
STORAGE 3

0.2
A A A 10 SCALE 1:25MTS.

0
2

0.2
0
1
0.2
B FFL
PLAN
ELEVATION "A-A"
4 STAIR PLAN
A 10 SCALE: 1:30 M

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL BAY ELEVATION RONALD D. NACASABOG
CONSTRUCTION OF MULTI-PURPOSE
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE
DETAIL BAY SECTIONS PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
A 11
DICKLUM, MANOLO FORTICH, BUKIDNON STAIR PLAN
LIBONA, BUKIDNON
SIGNAGE DETAIL
ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 10 12 35
JOVEL K.PANGAN
ARCHITECT II DATE: DATE: DATE: DATE:
0.28 0.28
50mm x 150mm x 6mm 4-10mmØ X 200mm

1.05

1.00
RECTANGULAR TUBE EXPANSION BOLT W/

DN
0.20 NUTS AND WASHERS

12mm THK. BASE PLATE 2.50

11
17

16

15

14

13

12

10

1
1.16 4.48 1.25 1.25
2
0.30

5.64 8"X16" GLAZED GRANITE GLAZE


PLAN WALL TILES OFF WHITE FINISHED
WITH PLASTIC TILES TRIM AT EDGE
8"X16" GLAZED GRANITE WALL TILES FINISHED
EXPANSION BOLT DETAIL WITH PLASTIC TILES TRIM AT EDGE
2ND FLOOR
1.06 TOP OF ROOF BEAM
2-50mm x 150mm x 2mm CEILING LINE

0.30
RECTANGULAR TUBE
0.50
1.00

50mm x 150mm x 2mm


0.20

0.20 5.4 RECTANGULAR TUBE


0.35

12mm THK. BASE PLATE


4-10mmØ x 300mm
ANCHOR BOLT 0.30
1 50mmØ STAINLESS FEMALE
W4 W4

3.00
W/ NUTS and WASHERS
STEEL PIPE

3.00
4.35

CR

0.20

2.75
1
0.4
STAIR RAILINGS
0.30

50mm x 150mm x 6mm

2
0.1
RECTANGULAR TUBE

2.10
3.00

1.93
5.2

1.60
3

1.50
1.40
1.21
SECTION

0.025
BASE PLATE DETAIL

1.00

0.75
WATER CLOSET

5
0.2
NGL
0.40

0.20
FFL +0.40m FFL -0.35m CR FFL CR FFL SECOND FLOOR FFL

1 FIRE ESCAPE STAIRS DETAILS 1.95


SCALE: 1:30 MTRS. SECTION SECTION
A 11
0.90 A B
2.50
2 1.25 1.25
DOORKNOBS
LATCHES
1.80
2.15
2.10

STAINLESS STEEL
KICKING PLATE W4 W4
0.90

FF-3
1

1.06
D6
0.30

-0.35m FEMALE
CR
200mm MAX. FROM 0.20 A A WATER CLOSET
MALE FEMALE

1.60
LATCH SIDE OF DOOR
ELEVATION A CR
FT-3
CR
FT-3
400mm X 400mm
CERAMIC FLOOR
UNGLAZED TILES
0.55 0.59 0.66 -0.05m -0.05m OFF WHITE
LAVATORY
PLAN
0.92

D6 D6
DOOR JAMB
FACE OF DOOR
920mm-1200mm
FROM FLOOR
FFL 3 TOILET DETAILS
CLEAR WIDTH
PLAN A 11 SCALE: 1:30 MTRS.
0.90
(SWING DOOR FULLY
OPEN IN 90° POSITION)

2 DOOR DETAIL(PWD) SWITHCES FOR PWD


A 11 SCALE: 1:30 MTRS. SCALE: 1:20 MTRS.

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FIRE ESCAPE STAIRS DETAILS RONALD D. NACASABOG
CONSTRUCTION OF MULTI-PURPOSE
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE
DOOR DETAIL
TOILET DETAILS
PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
A 12
DICKLUM, MANOLO FORTICH, BUKIDNON
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 11 12 35
JOVEL K.PANGAN
ARCHITECT II DATE: DATE: DATE: DATE:
0.09 6mm GROOVE LINE

1 2 3 10mm DIA. RSB

0.01
GRAVEL BEDDING
A

0.10
A D4

2.40
1.40
0.20m X 0.40m GLAZED GRANITE WALL TILES OFF WHITE FINISHED

1
WITH PLASTIC TILES TRIM AT EDGE

0.10
NON-SKID CEMENT FLOOR
ROUGH FINISH W/ GROOVE LINE BOTTOM OF BEAM 2ND FLOOR LINE
2.80

LANDING CEILING LINE


R A M P U P
2.40
1.40

FF-3
+0.40m
FF-4 SECTION

1.60 5.50 SPOT DETAIL W4


PWD/MALE

3.05
NDTS CR

2.75
7.10

0.50
PLAN

1.50
TOP OF LAVATORY

1.40
TOP OF WATER CLOSET
/GRAB BAR/MOVABLE
1 2 3
100mm x100mm

0.80
CONCRETE SKIRTING

0.75
10mmØ MATT BARS SPACED @ 0.30m GRAB BAR
BOTHWAYS ON CENTER
0.10

0.10

2% SLOPE TO F.D
FFL +0.40m

0.10

0.10
FFL
0.40

LAVATORY
NGL NGL URINAL
100mm THK. GRAVEL BEDDING 38mmØ STAINLESS STEEL GRAB BAR

1.00
38mmØ STAINLESS STEELMOVABLE GRAB BAR
SECTION
WATER CLOSET
50 mm Ø STAINLESS PIPE HANDRAIL HEIGHT @900mm,
50 mm Ø STAINLESS PIPE HANDRAIL HEIGHT@700mm, 38mmØ STAINLESS STEEL GRAB BAR
50 mm Ø STAINLESS PIPE HEIGHT @350mm,
50 mm Ø STAINLESS PIPE VERTICAL
SUPPORT (SPACED AS SHOWN)
1 2 3
0.28
A B
1.60 5.43
2.50
0.90

0.20
SEE MOVABLE GRAB BAR DETAIL
1.30

WATER CLOSET

0.90
FFL 0.70 SEE GRAB BAR DETAIL
0.40

0.35

URINAL
NGL NGL
100mm CHB WITH PLAIN CEMENT
PLASTER(painted finish)
NON-SKID CEMENT FLOOR
W4 LAVATORY
1.25 1.25 1.50 1.50 ROUGH FINISH W/ GROOVE LINE

1.60 5.50 300mm


1
ELEVATION 7.10

0.80
SEE GRAB BAR DETAIL
1.20
50mm Ø STAINLESS PIPE HANDRAIL (1@900mm, 1 @700MM HIGH WHITE GRAPHICS

2.05
FROM RAMP/LANDING FLOOR LEVEL) FULLY WELDED ON NON-SKID CEMENT
FLOOR ROUGH FINISH

1.50
50mmØ STAINLESS VERTICAL PIPE RAILING
0.70 0.20

UNITED NATION

300mm
0.90

BLUE BACKGROUND FT-3


100X100 CONCRETE SKIRTING 400mm X 400mm CERAMIC FLOOR
12mm STEEL DOWEL (PAINT FINISH) UNGLAZED TILES OFF WHITE
0.10

RAMP FINISH FLOOR LINE


WHITE BORDER
0.40

D5
NGL

SECTION
RAMP DETAILS 3 TOILET DETAILS(MALE/PWD)
1
A 12 SCALE: 1:50 MTRS.
2 PWD LOGO A 12 SCALE: 1:30 MTRS.
A 12 SCALE: NDTS

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RONALD D. NACASABOG
CONSTRUCTION OF MULTI-PURPOSE RAMP DETAILS
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
BUILDING (ADMIN BUILDING)
BARANGAY SAN JOSE
PWD LOGO PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
A 13
DICKLUM, MANOLO FORTICH, BUKIDNON TOILET DETAIL
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 12 12 35
JOVEL K.PANGAN
ARCHITECT II DATE: DATE: DATE: DATE:
GENERAL
1.0 GENERAL
NOTES:
1.1 REFERENCE TO OTHER DRAWINGS 3.5 LOAD COMBINATIONS
- SEE ARCHITECTURAL DRAWINGS AND OTHER RELEVANT DRAWINGS FOR FLOOR FINISHES, CONSIDERING THAT EARTHQUAKE LOAD, E, IS AS SPECIFIED UNDER SECTION 208.6.1 WHICH IS EQUAL TO: 4.3.4 ALL SHOP AND FIELD WELDING SHALL BE IN ACCORDANCE WITH AWS D.1.1 - 2000 AND PERFORMED BY QUALIFIED WELDERS.
OPENINGS IN WALLS AND SLABS, INTERIOR PARTITIONS, LOCATION OF CHB WALLS, ETC. E = ρEh + Ev, (E = 1.0Eh + 0.22D)
4.3.5 UNLESS INDICATED OTHERWISE, WELDING ELECTRODES SHALL BE E70XX. MINIMUM THICKNESS OF WELD SHALL BE 4mm.
1.2 DIMENSIONS
- DIMENSIONS SHOWN ARE IN MILLIMETERS UNLESS OTHERWISE NOTED IN THE ULTIMATE LOAD COMBINATION AS PER SECTION 203.3 OF THE NSCP 2015 7th EDITION
INTERPRETATION OF THESE DRAWINGS. INDICATED DIMENSIONS SHALL GOVERN AND 1.4 DEAD LOAD (203-1) 4.4 CONCRETE MASONRY UNITS
DISTANCES OR SIZE SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. 1.2 DEAD LOAD + 1.6 LIVE LOAD (203-2)
1.2 DEAD LOAD + 1.0 WIND LOAD + 1.0 LIVE LOAD (203-4) 4.4.1 CMU USED IN THIS WORK SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH AT 28 DAYS, 2.4 MPa (350 psi) FOR NON-LOAD
1.3 DISCREPANCIES 1.42 DEAD LOAD + 1.0 EARTHQUAKE LOAD + 1.0 LIVE LOAD (203-5) BEARING CMU WHILE 3.5 MPa (500 psi) FOR LOAD BEARING CMU.
- THE CONTRACTOR SHALL COMPARE THE STRUCTURAL DRAWINGS TO THE
ARCHITECTURAL DRAWINGS IN REFERENCE TO THE LAYOUT. DIMENSIONS AND ELEVATIONS SERVICE LOAD COMBINATION AS PER SECTION 203.3 OF THE NSCP 2015 7th EDITION 4.4.2 ALL CELLS SHALL BE SOLIDLY FILLED WITH GROUT. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 17.20 MPa
SHALL BE CONSULTED TO THE DESIGN ENGINEER IN CASE OF DISCREPANCIES IN THE DEAD LOAD + LIVE LOAD (203-9) (2500 psi) AT 28 DAYS.
ISSUED DRAWINGS. DEAD LOAD + LIVE LOAD + 0.6 WIND LOAD (203-17)
DEAD LOAD + LIVE LOAD + 0.714 EARTHQUAKE LOAD (203-18) 4.4.3 ALL WALLS SHALL BE CONSTRUCTED IN CONVENTIONAL RUNNING BOND.
1.4 CONSTRUCTION DRAWINGS
4.0 MATERIALS 4.4.4 OPENING FOR DOORS, WINDOWS AND OTHER GAPS ON CMU WALLS SHALL BE PROVIDED WITH REINFORCED CONCRETE LINTEL BEAM
- ALL DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE SHOWN ON PLANS, SECTION OR
4.1. CONCRETE AT EVERY 10 LAYERS OF CHB.
DETAILS. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL
NOTES AND TYPICAL DETAILS. 4.1.1 COMPRESSIVE STRENGTH
4.4.5 IF WORK IS STOPPED ONE (1) HOUR OR LONGER, PROVIDE CONSTRUCTION JOINTS BY STOPPING THE GROUT 50mm BELOW THE TOP OF
FOOTING SLAB AND WALL, f'c = 20.7 MPa (3000 psi) THE BLOCK.
- TYPICAL DETAILS AND GENERAL NOTES ON STRUCTURAL PLANS APPLY TO ALL PARTS OF
THE JOB UNLESS OTHERWISE SHOWN ON THE DRAWINGS. COLUMN AND BEAMS, f'c = 20.7 MPa (3000 psi)
4.4.6 UNLESS INDICATED OTHERWISE, CMU REINFORCEMENT SHALL BE 10mmØ HOR. BARS AT 600mm AND 10mmØ VERT. BARS AT 400mm.
- THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED 4.1.2 ALL CONCRETE SHALL BE DEPOSITED, VIBRATED AND CURED IN ACCORDANCE WITH
ACI 318-89. 4.4.7 GROUT MASONRY IN 2.4M MAXIMUM LIFTS, REINFORCING SHALL BE SECURED AGAINST DISPLACEMENT PRIOR TO GROUTING BY WIRE
STRUCTURES. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION UNLESS SO
POSITIONERS AT INTERVALS NOT EXCEEDING 200 BAR DIAMETERS NOR 3M.
STATED. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY MEASURES TO PROTECT THE
PERSONS DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY 4.1.3 MINIMUM CONCRETE COVER FOR REINFORCING BARS SHALL BE AS FOLLOWS:
- FOOTINGS = 75mm (CAST AGAINST EARTH) 5.0 CONSTRUCTION JOINTS
NOTIFY THE OWNER AND/OR THE ENGINEER OF ANY CONDITION WHICH IN HIS OPINION
MIGHT DISTRESS THE STRUCTURE. - BEAMS AND COLUMNS = 40mm (TO STIRRUPS AND TIES) 5.1. CONSTRUCTION JOINT BOT INDICATED ON PLANS SHALL BE MADE SO AS TO LEAST IMPAIR THE STRENGTH OF THE STRUCTURE AND
- SLABS AND WALLS = 20mm (CAST AGAINST FORMS) SHALL BE SUBJECT TO APPROVAL OF THE ENGINEER.
1.5 OTHERS
4.1.4 BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO ENSURE PROPER 5.2. UNLESS SHOWN OTHERWISE, SLAB ON GRADE SHALL HAVE CONTROL JOINTS AT 6m MAXIMUM ON CENTER.
- CONSTRUCTION MATERIALS SHALL NOT BE STORED ON POURED FLOORS. IT IS THE PLACEMENT OF ALL OPENINGS, SLEEVES, CURB, CONDUITS, ETC., RELATING TO THE
WORKS. 6.0 GRANULAR BASE
GENERAL CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE SUB-CONTRACTORS ARE
INFORMED AND DO NOT VIOLATE THE IMPORTANT REQUIREMENT. 6.1. THE GRANULAR BASE MATERIALS SHALL CONFORM TO AASHTO M147 GRADING A.
4.1.5 WHEN CONCRETE WILL BE EXPOSED TO EXTERNAL SOURCES OF CHLORIDES IN
- IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TEMPORARY ERECTION BRACINGS SERVICES, SUCH AS DEICING SALTS, BRACKISH WATER, SEAWATER OR SPRAY FROM 6.2. GRANULAR BASE SHALL BE PLACED IN THE POSITIONS OF THE REQUIRED THICKNESS AS SHOWN ON THE DRAWINGS.
AND SHORINGS FOR ALL THE STRUCTURAL MEMBERS AS REQUIRED FOR STABILITY DURING THESE SOURCES, CONCRETE MUST BE PROPORTIONED TO SATISFY THE SPECIAL
ALL PHASES OF THE CONSTRUCTION. EXPOSURE REQUIREMENTS OF ACI 318-95. 6.3. WHEN THE REQUIRED THICKNESS IS MORE THAN 150mm, THE BASE MATERIAL SHALL BE SPREAD AND COMPACTED INTO TWO OR
MORE LAYERS OF APPROXIMATELY EQUAL THICKNESS AND THE MAXIMUM COMPACTED THICKNESS OF ANY ONE LAYER SHALL NOT
2.0 STANDARDS AND REFERENCES 4.1.6 ALL CONCRETE MUST BE KEPT MOIST FOR A MINIMUM OF 7 CONSECUTIVE DAYS EXCEED 150mm.
THE FOLLOWING SHALL GOVERN THE DESIGN, FABRICATION AND CONSTRUCTION OF THE IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP.
6.4. COMPACTED DRY DENSITY OF EACH LAYER SHALL NOT BE LESS THAN 100% OF THE MAXIMUM DRY DENSITY DETERMINED
PROJECT.
2.1 4.2. REINFORCING BARS ACCORDING TO ASTM D 1557.
AMERICAN CONCRETE INSTITUTE (ACI PUBLICATION)
ACI 318-99 BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE 4.2.1 UNLESS OTHERWISE SPECIFIED ON PLANS, ALL REINFORCING BARS SHALL BE DEFORMED 7.0 FOUNDATIONS
ACI SP-17 DESIGN HANDBOOK, VOL. 1, SECOND EDITION WITH A MINIMUM YIELD STRENGTH OF Fy = 414 MPa FOR Ø16mm AND HIGHER, AND Fy = 278
ACI SP-17A DESIGN HANDBOOK, VOL. 2 MPa FOR Ø10mm AND Ø12mm. 7.1. FOOTINGS WERE DESIGNED USING AN ACTUAL ALLOWABLE SOIL BEARING CAPACITY OF 123.75 KPa (2585 PSF) AND A SUBGRADE
ACI 315 MANUAL OF STANDARD PRACTICE FOR DETAILS AND DETAILING OF CONCRETE MODULUS OF 4950 AT DEPTHS INDICATED IN THE DRAWING. SOIL INVESTIGATION SHALL BE CARRIED PRIOR TO CONSTRUCTION AND THE
REINFORCEMENT. 4.2.2 ALL REINFORCING BARS SHALL BE CLEAN OF RUST, GREASE OR OTHER DELETERIOUS STRUCTURAL ENGINEER SHALL BE FURNISHED A COPY OF THE SOIL'S REPORT.
2.2 AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) PUBLICATION: MANUAL OF STEEL MATERIALS WHICH TEND TO IMPAIR BOND.
CONSTRUCTION, 9TH EDITION. "ALLOWABLE STRESS DESIGN" (ASD). 7.2. FILL / BACKFILL SHALL BE PLACED IN 200mm LAYERS AND EACH LAYERS SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY (ASTM
2.3 AMERICAN IRON AND STEEL INSTITUTE (AISC) PUBLICATION: 4.2.3 ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED BEFORE D1557) BEFORE SUBSEQUENT LAYERS ARE LAID.
COLD FORMED STEEL DESIGN MANUAL, 1983 EDITION. POURING CONCRETE OR APPLYING MORTAR OR GROUT.
2.4 AMERICAN WELDING SOCIETY PUBLICATION D.1.1 - 2000 7.3. WHERE SOFT AND/OR LOOSE MATERIALS ARE ENCOUNTERED AT DEPTH OF FOOTING EMBEDMENT INDICATED, EXCAVATE TO FIRM LAYER
2.5 AMERICAN SOCIETY OF TESTING MATERIALS (ASTM) 4.2.4 LAPPED SPLICES SHALL BE STAGGERED WHERE POSSIBLE. AND REPLACE MATERIAL UNDERNEATH THE FOOTING. COMPACT SELECTED BACKFILL TO 95% OF MAXIMUM DRY DENSITY (ASTM D1557).
2.6 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES 2015, (NSCP 2015) VOLUME 1
4.2.5 SPLICING OF THE REINFORCEMENTS SHALL BE IN ACCORDANCE WITH ACI 318. 7.4. ALL FOOTINGS SHALL REST ON 50mm THICK COMPACTED BASE COURSE.
2.7 ASSOCIATION OF STRUCTURAL ENGINEERS OF THE PHILIPPINES (ASEP) HANDBOOK OF
STRUCTURAL STEEL SHAPES AND SECTIONS, 2004
2.8 UNIFORM BUILDING CODE (UBC) VOL. 2 1997 EDITION 4.2.6 UNLESS SHOWN OTHERWISE ON PLNS, SPLICES SHALL BE AS FOLLOWS:
COLUMNS: SPLICES WHEN PERMITTED SHAL BE MADE WITHIN THE CENTER HALF OF THE
2.9 DPWH DESIGN GUIDELINES, CRITERIA AND STANDARDS (DGCS) VOLUME 6 – BUILDING DESIGN COLUMN HEIGHT. LAP SPLICE SHALL NOT BE LESS THAN 40 BAR DIAMETERS. THE USE OF
2.10 DPWH STANDARD SPECIFICATIONS FOR PUBLIC WORKS STRUCTURES (BUILDINGS, PORTS AND APPROVED MECHANICAL DEVICES MAY BE PERMITTED PROVIDED THAT NO MORE THAN
HARBORS, FLOOD CONTROL AND DRAINAGE STRUCTURES AND WATER SUPPLY SYSTEMS), 33% OF MAIN BARS SHALL BE SPLICED WITHIN THE LAP LENGTH.
VOLUME III, 2019 EDITION B E A M S C O L U M N S F L O O R S L A B
NOTE :
3.0 BASIC DESIGN LOADS BEAMS: TOP AND BOTTOM BARS SHALL NOT BE SPLICED WITHIN THE COLUMN OR WITHIN SINGLE & TWO (2) BAR BUNDLE THREE (3) BAR BUNDLE VERTICAL REINFORCEMENT Ld = DEVELOPMENT LENGTH OF
SINGLE & TWO (2)
A DISTANCE OF TWICE THE MEMBER DEPTH FROM THE FACE OF THE COLUMN. AT LEAST BAR SIZE BAR SIZE BAR SIZE RE-BARS ABOVE VALUES SHALL BE THE
3.1 DEAD LOAD BOTTOM
TOP BARS
BOTTOM TOP SINGLE & TWO (2) BAR THREE (3) BAR BUNDLE BAR BUNDLE MINIMUM SPLICE OR DEVELOPMENT LENGTH.
CONCRETE 23.544 KN/m³ TWO EXTRA STIRRUPS SHALL BE PROVIDED AT ALL SPLICES. THE SPLICE LENGTH SHALL BARS BARS BARS BUNDLE ADDITIONAL MODIFICATION FACTORS OF ACI
100 MM THK CHB 2.44 KN/m per meter height NOT BE LESS THAN 40 x DIAMETER. 16 mm Ø 600 mm 750 mm 800 mm 925 mm 20 mm Ø 1000 mm 10 mm Ø 400 mm ( CHAPTER 12 ) SHALL BE USED WHEREVER
APPLICABLE. 36mm Ø BARS FOR BEAMS
150 MM THK CHB 3.30 KN/m per meter height 20 mm Ø 750 mm 950 mm 900 mm 1200 mm 25 mm Ø 1500 mm 12 mm Ø 500 mm SHALL NOT BE BUNDLED.
100 MM THK Concrete 2.35 KPa CMU WALLS: VERTICAL BARS SHALL BE SPLICED AT THE TOP OF WALL FOOTING AND AT
25 mm Ø 925 mm 1200 mm 1100 mm 1450 mm
FLOOR FINISH 1.10 KPa THE BOTTOM OF RC LINTEL BEAMS OR MAIN BEAMS. SPLICE LENGTH SHALL BE MINIMUM
CEILING 0.15 KPa OF 600mm.
MEP 0.10 KPa REMOVAL OF FORMS AND SHORING CAMBER REQUIREMENT
INTERIOR PARTITION 1.00 KPa 4.2.7 ALL BEAMS TERMINATING AT THE COLUMN SHALL HAVE TOP AND BOTTOM BARS
METAL DECK 0.14 KPa EXTENDING TO THE FAR FACE OF THE COLUMN, TERMINATING IN A STANDARD 90% HOOK STRUCTURAL ELEMENTS CLEAR SPAN BET. SUPPORTS MINIMUM TIME PERIOD DAYS ELEMENT MINIMUM CAMBER
3.2 LIVELOADS LENGTH OF ANCHORAGE SHALL NOT BE LESS THAN 600mm. WALLS, COLUMNS, BEAMS,
OFFICE (OTHER) 2.4 KPa GIRDER SIDES & SLAB ON - 1 REINFORCED CONCRETE BEAMS 6 mm FOR EVERY 4.50 m SPAN
4.2.8 SHOP DRAWINGS FOR BENDING AND CUTTING OF REINFORCEMENT BARS SHALL BE GRADE
ROOF 0.6 KPa
3.3 WINDLOAD SUBMITTED FOR APPROVAL OF THE ENGINEER PRIOR TO FABRICATION. UNDER 3.00 m 7
JOIST, BEAMS, & GIRDER CANTILEVER REINFORCED CONCRETE BEAMS 18 mm FOR EVERY 3.00 m SPAN
3.00 m TO 6.00 m 14
SOFFIT
WIND VELOCITY, V 280 KPH OVER 6.00 m 21
4.2.9 SPLICE LENGTH OF REINFORCING BARS SHALL BE AS SHOWN IN THE TABLE. UNDER 3.00 m 4
REINFORCED CONCRETE SLAB 3 mm FOR EVERY 3.00 m SHORTER SPAN
BUILDING CATEGORY CATEGORY IV - STANDARD OCCUPANCY STRUCTURES
ONE-WAY FLOOR SLABS 3.00 m TO 6.00 m 7
EXPOSURE CATEGORY EXPOSURE B 4.3 STRUCTURAL STEEL / BOLTS / WELDS & WELDMENTS, BASE PLATE, GUSSET PLATE, SAG ROD OVER 6.00 m 10
ENCLOSURE CLASSIFICATION ENCLOSED BUILDING AND CROSS TIES
3.4 EARTHQUAKE LOAD 4.3.1 ALL STRUCTURAL STEEL SHALL HAVE A MINIMUM YIELD STRENGTH Fy = 248 MPa (36 ksi)
SPLICING REQUIREMENTS OF REINFORCING BARS
DESIGN BASE SHEAR, V 189.51 KN
IMPORTANCE FACTOR, I 1.0 AND SHALL CONFORM TO ASTM A36 SPECIFICATIONS "Ls" OR "Ld"
SEISMIC ZONE FACTOR, Z 0.40
SEISMIC RESPONSE MODIFICATION FACTOR, R 8.5 4.3.2 NO STEEL SHALL BE FABRICATED OR ERECTED UNTIL SHOP DRAWINGS HAVE BEEN
NEAR SOURCE FACTOR, Nv 1.0 APPROVED BY THE STRUCTURAL ENGINEER AND SHALL CONFORM IN ACCORDANCE WITH
NEAR SOURCE TYPE, Na 1.0 THE AISC SPECIFICATIONS (9TH EDITION) AND CODE OF STANDARD PRACTICE AS
SEISMIC RESPONSE COEFFICIENT, Ca 0.44 Na AMENDED TO DATE.
SEISMIC RESPONSE COEFFICIENT, Cv 0.64 Nv
SOIL TYPE PROFILE S 4.3.3 ALL COLD FORMED STEEL SHALL HAVE A MINIMUM YIELD STRENGTH OF
DAMPING (FOR RESPONSE SPECTRUM) 0.05 Fy = 248 MPa (36 ksi).
D

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RONALD D. NACASABOG
GENERAL NOTES
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING) PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
S 14
DICKLUM, MANOLO FORTICH, BUKIDNON IN BARANGAY SAN JOSE
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 9 35
RUBEN A. ABA-A JR.
ENGINEER II DATE: DATE: DATE: DATE:
GENERAL
1.0 GENERAL
NOTES:
1.1 REFERENCE TO OTHER DRAWINGS 3.5 LOAD COMBINATIONS
- SEE ARCHITECTURAL DRAWINGS AND OTHER RELEVANT DRAWINGS FOR FLOOR FINISHES, CONSIDERING THAT EARTHQUAKE LOAD, E, IS AS SPECIFIED UNDER SECTION 208.6.1 WHICH IS EQUAL TO: 4.3.4 ALL SHOP AND FIELD WELDING SHALL BE IN ACCORDANCE WITH AWS D.1.1 - 2000 AND PERFORMED BY QUALIFIED WELDERS.
OPENINGS IN WALLS AND SLABS, INTERIOR PARTITIONS, LOCATION OF CHB WALLS, ETC. E = ρEh + Ev , (E = 1.0Eh + 0.22D)
4.3.5 UNLESS INDICATED OTHERWISE, WELDING ELECTRODES SHALL BE E70XX. MINIMUM THICKNESS OF WELD SHALL BE 4mm.
1.2 DIMENSIONS
- DIMENSIONS SHOWN ARE IN MILLIMETERS UNLESS OTHERWISE NOTED IN THE ULTIMATE LOAD COMBINATION AS PER SECTION 203.3 OF THE NSCP 2015 7th EDITION
INTERPRETATION OF THESE DRAWINGS. INDICATED DIMENSIONS SHALL GOVERN AND 1.4 DEAD LOAD (203-1) 4.4 CONCRETE MASONRY UNITS
DISTANCES OR SIZE SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. 1.2 DEAD LOAD + 1.6 LIVE LOAD (203-2)
1.2 DEAD LOAD + 1.0 WIND LOAD + 1.0 LIVE LOAD (203-4) 4.4.1 CMU USED IN THIS WORK SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH AT 28 DAYS, 2.4 MPa (350 psi) FOR NON-LOAD
1.3 DISCREPANCIES 1.42 DEAD LOAD + 1.0 EARTHQUAKE LOAD + 1.0 LIVE LOAD (203-5) BEARING CMU WHILE 3.5 MPa (500 psi) FOR LOAD BEARING CMU.
- THE CONTRACTOR SHALL COMPARE THE STRUCTURAL DRAWINGS TO THE
ARCHITECTURAL DRAWINGS IN REFERENCE TO THE LAYOUT. DIMENSIONS AND ELEVATIONS SERVICE LOAD COMBINATION AS PER SECTION 203.3 OF THE NSCP 2015 7th EDITION 4.4.2 ALL CELLS SHALL BE SOLIDLY FILLED WITH GROUT. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 17.20 MPa
SHALL BE CONSULTED TO THE DESIGN ENGINEER IN CASE OF DISCREPANCIES IN THE DEAD LOAD + LIVE LOAD (203-9) (2500 psi) AT 28 DAYS.
ISSUED DRAWINGS. DEAD LOAD + LIVE LOAD + 0.6 WIND LOAD (203-17)
DEAD LOAD + LIVE LOAD + 0.714 EARTHQUAKE LOAD (203-18) 4.4.3 ALL WALLS SHALL BE CONSTRUCTED IN CONVENTIONAL RUNNING BOND.
1.4 CONSTRUCTION DRAWINGS
4.0 MATERIALS 4.4.4 OPENING FOR DOORS, WINDOWS AND OTHER GAPS ON CMU WALLS SHALL BE PROVIDED WITH REINFORCED CONCRETE LINTEL BEAM
- ALL DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE SHOWN ON PLANS, SECTION OR
4.1. CONCRETE AT EVERY 10 LAYERS OF CHB.
DETAILS. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL
NOTES AND TYPICAL DETAILS. 4.1.1 COMPRESSIVE STRENGTH
4.4.5 IF WORK IS STOPPED ONE (1) HOUR OR LONGER, PROVIDE CONSTRUCTION JOINTS BY STOPPING THE GROUT 50mm BELOW THE TOP OF
FOOTING SLAB AND WALL, f'c = 20.7 MPa (3000 psi) THE BLOCK.
- TYPICAL DETAILS AND GENERAL NOTES ON STRUCTURAL PLANS APPLY TO ALL PARTS OF
THE JOB UNLESS OTHERWISE SHOWN ON THE DRAWINGS. COLUMN AND BEAMS, f'c = 20.7 MPa (3000 psi)
4.4.6 UNLESS INDICATED OTHERWISE, CMU REINFORCEMENT SHALL BE 10mmØ HOR. BARS AT 600mm AND 10mmØ VERT. BARS AT 400mm.
- THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED 4.1.2 ALL CONCRETE SHALL BE DEPOSITED, VIBRATED AND CURED IN ACCORDANCE WITH
ACI 318-89. 4.4.7 GROUT MASONRY IN 2.4M MAXIMUM LIFTS, REINFORCING SHALL BE SECURED AGAINST DISPLACEMENT PRIOR TO GROUTING BY WIRE
STRUCTURES. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION UNLESS SO
POSITIONERS AT INTERVALS NOT EXCEEDING 200 BAR DIAMETERS NOR 3M.
STATED. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY MEASURES TO PROTECT THE
PERSONS DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY 4.1.3 MINIMUM CONCRETE COVER FOR REINFORCING BARS SHALL BE AS FOLLOWS:
- FOOTINGS = 75mm (CAST AGAINST EARTH) 5.0 CONSTRUCTION JOINTS
NOTIFY THE OWNER AND/OR THE ENGINEER OF ANY CONDITION WHICH IN HIS OPINION
MIGHT DISTRESS THE STRUCTURE. - BEAMS AND COLUMNS = 40mm (TO STIRRUPS AND TIES) 5.1. CONSTRUCTION JOINT BOT INDICATED ON PLANS SHALL BE MADE SO AS TO LEAST IMPAIR THE STRENGTH OF THE STRUCTURE AND
- SLABS AND WALLS = 20mm (CAST AGAINST FORMS) SHALL BE SUBJECT TO APPROVAL OF THE ENGINEER.
1.5 OTHERS
4.1.4 BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO ENSURE PROPER 5.2. UNLESS SHOWN OTHERWISE, SLAB ON GRADE SHALL HAVE CONTROL JOINTS AT 6m MAXIMUM ON CENTER.
- CONSTRUCTION MATERIALS SHALL NOT BE STORED ON POURED FLOORS. IT IS THE PLACEMENT OF ALL OPENINGS, SLEEVES, CURB, CONDUITS, ETC., RELATING TO THE
WORKS. 6.0 GRANULAR BASE
GENERAL CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE SUB-CONTRACTORS ARE
INFORMED AND DO NOT VIOLATE THE IMPORTANT REQUIREMENT. 6.1. THE GRANULAR BASE MATERIALS SHALL CONFORM TO AASHTO M147 GRADING A.
4.1.5 WHEN CONCRETE WILL BE EXPOSED TO EXTERNAL SOURCES OF CHLORIDES IN
- IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TEMPORARY ERECTION BRACINGS SERVICES, SUCH AS DEICING SALTS, BRACKISH WATER, SEAWATER OR SPRAY FROM 6.2. GRANULAR BASE SHALL BE PLACED IN THE POSITIONS OF THE REQUIRED THICKNESS AS SHOWN ON THE DRAWINGS.
AND SHORINGS FOR ALL THE STRUCTURAL MEMBERS AS REQUIRED FOR STABILITY DURING THESE SOURCES, CONCRETE MUST BE PROPORTIONED TO SATISFY THE SPECIAL
ALL PHASES OF THE CONSTRUCTION. EXPOSURE REQUIREMENTS OF ACI 318-95. 6.3. WHEN THE REQUIRED THICKNESS IS MORE THAN 150mm, THE BASE MATERIAL SHALL BE SPREAD AND COMPACTED INTO TWO OR
MORE LAYERS OF APPROXIMATELY EQUAL THICKNESS AND THE MAXIMUM COMPACTED THICKNESS OF ANY ONE LAYER SHALL NOT
2.0 STANDARDS AND REFERENCES 4.1.6 ALL CONCRETE MUST BE KEPT MOIST FOR A MINIMUM OF 7 CONSECUTIVE DAYS EXCEED 150mm.
THE FOLLOWING SHALL GOVERN THE DESIGN, FABRICATION AND CONSTRUCTION OF THE IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP.
6.4. COMPACTED DRY DENSITY OF EACH LAYER SHALL NOT BE LESS THAN 100% OF THE MAXIMUM DRY DENSITY DETERMINED
PROJECT.
2.1 4.2. REINFORCING BARS ACCORDING TO ASTM D 1557.
AMERICAN CONCRETE INSTITUTE (ACI PUBLICATION)
ACI 318-99 BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE 4.2.1 UNLESS OTHERWISE SPECIFIED ON PLANS, ALL REINFORCING BARS SHALL BE DEFORMED 7.0 FOUNDATIONS
ACI SP-17 DESIGN HANDBOOK, VOL. 1, SECOND EDITION WITH A MINIMUM YIELD STRENGTH OF Fy = 414 MPa FOR Ø16mm AND HIGHER, AND Fy = 278
ACI SP-17A DESIGN HANDBOOK, VOL. 2 MPa FOR Ø10mm AND Ø12mm. 7.1. FOOTINGS WERE DESIGNED USING AN ACTUAL ALLOWABLE SOIL BEARING CAPACITY OF 123.75 KPa (2585 PSF) AND A SUBGRADE
ACI 315 MANUAL OF STANDARD PRACTICE FOR DETAILS AND DETAILING OF CONCRETE MODULUS OF 4950 AT DEPTHS INDICATED IN THE DRAWING. SOIL INVESTIGATION SHALL BE CARRIED PRIOR TO CONSTRUCTION AND THE
REINFORCEMENT. 4.2.2 ALL REINFORCING BARS SHALL BE CLEAN OF RUST, GREASE OR OTHER DELETERIOUS STRUCTURAL ENGINEER SHALL BE FURNISHED A COPY OF THE SOIL'S REPORT.
2.2 AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) PUBLICATION: MANUAL OF STEEL MATERIALS WHICH TEND TO IMPAIR BOND.
CONSTRUCTION, 9TH EDITION. "ALLOWABLE STRESS DESIGN" (ASD). 7.2. FILL / BACKFILL SHALL BE PLACED IN 200mm LAYERS AND EACH LAYERS SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY (ASTM
2.3 AMERICAN IRON AND STEEL INSTITUTE (AISC) PUBLICATION: 4.2.3 ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED BEFORE D1557) BEFORE SUBSEQUENT LAYERS ARE LAID.
COLD FORMED STEEL DESIGN MANUAL, 1983 EDITION. POURING CONCRETE OR APPLYING MORTAR OR GROUT.
2.4 AMERICAN WELDING SOCIETY PUBLICATION D.1.1 - 2000 7.3. WHERE SOFT AND/OR LOOSE MATERIALS ARE ENCOUNTERED AT DEPTH OF FOOTING EMBEDMENT INDICATED, EXCAVATE TO FIRM LAYER
2.5 AMERICAN SOCIETY OF TESTING MATERIALS (ASTM) 4.2.4 LAPPED SPLICES SHALL BE STAGGERED WHERE POSSIBLE. AND REPLACE MATERIAL UNDERNEATH THE FOOTING. COMPACT SELECTED BACKFILL TO 95% OF MAXIMUM DRY DENSITY (ASTM D1557).
2.6 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES 2015, (NSCP 2015) VOLUME 1
4.2.5 SPLICING OF THE REINFORCEMENTS SHALL BE IN ACCORDANCE WITH ACI 318. 7.4. ALL FOOTINGS SHALL REST ON 50mm THICK COMPACTED BASE COURSE.
2.7 ASSOCIATION OF STRUCTURAL ENGINEERS OF THE PHILIPPINES (ASEP) HANDBOOK OF
STRUCTURAL STEEL SHAPES AND SECTIONS, 2004
2.8 UNIFORM BUILDING CODE (UBC) VOL. 2 1997 EDITION 4.2.6 UNLESS SHOWN OTHERWISE ON PLNS, SPLICES SHALL BE AS FOLLOWS:
COLUMNS: SPLICES WHEN PERMITTED SHAL BE MADE WITHIN THE CENTER HALF OF THE
2.9 DPWH DESIGN GUIDELINES, CRITERIA AND STANDARDS (DGCS) VOLUME 6 – BUILDING DESIGN COLUMN HEIGHT. LAP SPLICE SHALL NOT BE LESS THAN 40 BAR DIAMETERS. THE USE OF
2.10 DPWH STANDARD SPECIFICATIONS FOR PUBLIC WORKS STRUCTURES (BUILDINGS, PORTS AND APPROVED MECHANICAL DEVICES MAY BE PERMITTED PROVIDED THAT NO MORE THAN
HARBORS, FLOOD CONTROL AND DRAINAGE STRUCTURES AND WATER SUPPLY SYSTEMS), 33% OF MAIN BARS SHALL BE SPLICED WITHIN THE LAP LENGTH.
VOLUME III, 2019 EDITION B E A M S C O L U M N S F L O O R S L A B
NOTE :
3.0 BASIC DESIGN LOADS BEAMS: TOP AND BOTTOM BARS SHALL NOT BE SPLICED WITHIN THE COLUMN OR WITHIN SINGLE & TWO (2) BAR BUNDLE THREE (3) BAR BUNDLE VERTICAL REINFORCEMENT Ld = DEVELOPMENT LENGTH OF
SINGLE & TWO (2)
A DISTANCE OF TWICE THE MEMBER DEPTH FROM THE FACE OF THE COLUMN. AT LEAST BAR SIZE BAR SIZE BAR SIZE RE-BARS ABOVE VALUES SHALL BE THE
3.1 DEAD LOAD BOTTOM
TOP BARS
BOTTOM TOP SINGLE & TWO (2) BAR THREE (3) BAR BUNDLE BAR BUNDLE MINIMUM SPLICE OR DEVELOPMENT LENGTH.
CONCRETE 23.544 KN/m³ TWO EXTRA STIRRUPS SHALL BE PROVIDED AT ALL SPLICES. THE SPLICE LENGTH SHALL BARS BARS BARS BUNDLE ADDITIONAL MODIFICATION FACTORS OF ACI
100 MM THK CHB 2.44 KN/m per meter height NOT BE LESS THAN 40 x DIAMETER. 16 mm Ø 600 mm 750 mm 800 mm 925 mm 20 mm Ø 1000 mm 10 mm Ø 400 mm ( CHAPTER 12 ) SHALL BE USED WHEREVER
APPLICABLE. 36mm Ø BARS FOR BEAMS
150 MM THK CHB 3.30 KN/m per meter height 20 mm Ø 750 mm 950 mm 900 mm 1200 mm 25 mm Ø 1500 mm 12 mm Ø 500 mm SHALL NOT BE BUNDLED.
100 MM THK Concrete 2.35 KPa CMU WALLS: VERTICAL BARS SHALL BE SPLICED AT THE TOP OF WALL FOOTING AND AT
25 mm Ø 925 mm 1200 mm 1100 mm 1450 mm
FLOOR FINISH 1.10 KPa THE BOTTOM OF RC LINTEL BEAMS OR MAIN BEAMS. SPLICE LENGTH SHALL BE MINIMUM
CEILING 0.15 KPa OF 600mm.
MEP 0.10 KPa REMOVAL OF FORMS AND SHORING CAMBER REQUIREMENT
INTERIOR PARTITION 1.00 KPa 4.2.7 ALL BEAMS TERMINATING AT THE COLUMN SHALL HAVE TOP AND BOTTOM BARS
METAL DECK 0.14 KPa EXTENDING TO THE FAR FACE OF THE COLUMN, TERMINATING IN A STANDARD 90% HOOK STRUCTURAL ELEMENTS CLEAR SPAN BET. SUPPORTS MINIMUM TIME PERIOD DAYS ELEMENT MINIMUM CAMBER
3.2 LIVELOADS LENGTH OF ANCHORAGE SHALL NOT BE LESS THAN 600mm. WALLS, COLUMNS, BEAMS,
OFFICE (OTHER) 2.4 KPa GIRDER SIDES & SLAB ON - 1 REINFORCED CONCRETE BEAMS 6 mm FOR EVERY 4.50 m SPAN
4.2.8 SHOP DRAWINGS FOR BENDING AND CUTTING OF REINFORCEMENT BARS SHALL BE GRADE
ROOF 0.6 KPa
3.3 WINDLOAD SUBMITTED FOR APPROVAL OF THE ENGINEER PRIOR TO FABRICATION. UNDER 3.00 m 7
JOIST, BEAMS, & GIRDER CANTILEVER REINFORCED CONCRETE BEAMS 18 mm FOR EVERY 3.00 m SPAN
3.00 m TO 6.00 m 14
SOFFIT
WIND VELOCITY, V 280 KPH OVER 6.00 m 21
4.2.9 SPLICE LENGTH OF REINFORCING BARS SHALL BE AS SHOWN IN THE TABLE. UNDER 3.00 m 4
REINFORCED CONCRETE SLAB 3 mm FOR EVERY 3.00 m SHORTER SPAN
BUILDING CATEGORY CATEGORY IV - STANDARD OCCUPANCY STRUCTURES
ONE-WAY FLOOR SLABS 3.00 m TO 6.00 m 7
EXPOSURE CATEGORY EXPOSURE B 4.3 STRUCTURAL STEEL / BOLTS / WELDS & WELDMENTS, BASE PLATE, GUSSET PLATE, SAG ROD OVER 6.00 m 10
ENCLOSURE CLASSIFICATION ENCLOSED BUILDING AND CROSS TIES
3.4 EARTHQUAKE LOAD 4.3.1 ALL STRUCTURAL STEEL SHALL HAVE A MINIMUM YIELD STRENGTH Fy = 248 MPa (36 ksi)
SPLICING REQUIREMENTS OF REINFORCING BARS
DESIGN BASE SHEAR, V 189.51 KN
IMPORTANCE FACTOR, I 1.0 AND SHALL CONFORM TO ASTM A36 SPECIFICATIONS "Ls" OR "Ld"
SEISMIC ZONE FACTOR, Z 0.40
SEISMIC RESPONSE MODIFICATION FACTOR, R 8.5 4.3.2 NO STEEL SHALL BE FABRICATED OR ERECTED UNTIL SHOP DRAWINGS HAVE BEEN
NEAR SOURCE FACTOR, Nv 1.0 APPROVED BY THE STRUCTURAL ENGINEER AND SHALL CONFORM IN ACCORDANCE WITH
NEAR SOURCE TYPE, Na 1.0 THE AISC SPECIFICATIONS (9TH EDITION) AND CODE OF STANDARD PRACTICE AS
SEISMIC RESPONSE COEFFICIENT, Ca 0.44 Na AMENDED TO DATE.
SEISMIC RESPONSE COEFFICIENT, Cv 0.64 Nv
SOIL TYPE PROFILE S 4.3.3 ALL COLD FORMED STEEL SHALL HAVE A MINIMUM YIELD STRENGTH OF
DAMPING (FOR RESPONSE SPECTRUM) 0.05 Fy = 248 MPa (36 ksi).
D

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RONALD D. NACASABOG
GENERAL NOTES
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING) PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
S 14
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 9 35
RUBEN A. ABA-A JR.
ENGINEER II DATE: DATE: DATE: DATE:
CONSTRUCTION NOTES:

SEE BEAM SCHED.


NOTES ON REINFORCED CONCRETE BEAMS & GIRDERS
2D

GENERAL NOTES: A. UNLESS OTHERWISE NOTED IN THE SPECIFICATIONS, CAMBER ALL BEAMS AND GIRDERS AT LEAST 6MM 2D ( NO PIPE SHALL BE ALLOWED
FOR EVERY 4.6M OF EXCEPT CANTILEVERS FOR WHICH CAMBERS SHALL BE NOTED IN THE PLANS OR W/ IN THIS ZONE TYP.))

B
SCH. 40 G.I PIPE SLEEVE
AS ORDERED BY THE DESIGNER BUT IN THAN 20MM FOR EVERY 3M OF SPAN. TOP BARS
A. IN THE INTERPRETATION OF THESE DRAWINGS, INDICATED DIMENSIONS SHALL GOVERN AND DISTANCES OR SIZES SHALL B. TYPICAL BAR BENDING AND CUTTING DETAILS FOR INTERMEDIATE BEAMS AND GIRDERS ARE SHOWN IN
NOT BE SCALED FOR CONSTRUCTION PURPOSES. PROPOSED

0.4
FIGURE 4 AND RESPECTIVELY. MAIN REINFORCED BARS SHALL HAVE A STANDARD HOOK OF 90 DEGREE PIPE SLEEVE
B. REINFORCING BARS FOR CONCRETE EXPOSED TO WEATHER SHALL BE PROTECTED WITH AT LEAST 75MM CLEAR

D
BEND PLUS 12 TIMES THE OF THE BAR EXTENSION AT ITS FREE END. LOCATION
DISTANCE AND IN NO CASE LESS 40MM CONCRETE. THESE CONDITIONS MAY BE WAIVED WHEN ADEQUATE

D/5
WATERPROOFING IS PROVIDED. C. IF BEAM REINFORCEMENT ENDS IN A WALL, THE CLEAR DISTANCE FROM THE BAR TO THE FARTHEST

0.4
C. REINFORCING BARS SHALL BE DEFORMED CONFORMING TO ASTM A615 BILLET STEEL AS FOLLOWS: FACE OF THE WALL NOT BE LESS THAN 50MM. MINIMUM EMBEDMENT LENGTH SHALL BE AS SHOWN IN W

B
BOTTOM BARS
16MMØ BARS AND LARGER SHALL BE HIGH GRADE WITH MINIMUM Fy = 414 MPA (60,000PSI) TABLE 2. Ø 16 EXTRA BARS EF
FACE SUPPORT
12MMØ BARS AND SMALLER SHALL BE INTERMEDIATE GRADE WITH Fy = 278 MPA (40,000PSI) D. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USE SEPARATORS OF SIZE EQUAL TO THE L/4 L/2 L/4
IF BENDING AND WELDING ARE IMPORTANT, DEFORMED BAR SHALL CONFORM TO ASTM A706 LOW ALLOY GRADE 414 STEEL BAR. BAR DIAMETER BUT LESS THAN 25MM SPACED AT 900MM ON CENTERS. IN NO CASE SHALL BE LESS THAN
D. ALL CONCRETE WORKS SHALL BE DONE IN ACCORDANCE ACI-318-95 BUILDING CODE FOR REINFORCED CONCRETE AND TWO SEPARATORS BETWEEN LAYERS
ALL STRUCTURAL STEEL WORKS SHALL BE DONE IN ACCORDANCE WITH THE AISC SPECIFICATIONS AS IT DOES NOT
CONFLICT WITH THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (NSCP-C101-1) REQUIREMENTS. E. WHEN BEAM CROSSES A GIRDER, REST BEAM BARS ON TOP OF THE GIRDER BARS. REINFORCING BARS
6 db
E. SLAB ON FILL MUST NOT BE PLACED UNLESS FILL HAS BEEN PROPERLY COMPACTED. ALL SLAB ON FILL SHALL BE SHALL BE ABOUT THE CENTERLINE WHENEVER POSSIBLE, UPPER BARS SHALL BE PLACED DIRECTLY 10 db B DETAIL "B" EXTENSION
PROVIDED WITH 100MM THICK WELL COMPACTED CLEAN COARSE SAND BED EXCEPT IN DRIVEWAYS WHERE IT SHALL BE ABOVE THOSE BARS IN THE EXTENSION
150MM. BACK FILL OF ALL EXCAVATED AREAS AND THE PREPARATION OF SUB-BASE SHALL BE WELL COMPACTED AT NOTES:
F. NO SPLICE SHALL BE PERMITTED ON BEAMS WHERE CRITICAL BENDING OCCURS. LENGTH OF LAP SPLICE
LEAST 95% OF THE STANDARD PROCTOR DENSITY BEFORE WELL COMPACTED CLEAN COARSE SAND ARE LAID. WHERE PERMITTED BE AS SHOWN IN TABLE 2. WELD SPLICE SHALL BE DEVELOP IN TENSION AT LEAST 1. PIPES OR PIPE SLEEVES SHALL NOT BE LARGER
F. THE CONTRACTOR SHALL COORDINATE WITH THE AR, ME, SE, AND EE PLAN AS TO THE EXACT SIZES AND LOCATION OF A A A C C IN DIAMETER THAN 13 THE OVERALL DEPTH OF
125% OF THE SPECIFIED YIELD STRENGTH BAR. NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION BEAM OR GIRDER.
THE HOLES THRU FLOOR SLABS AND WALLS. SHALL BE ALLOWED TO SPLICE THEREIN. A TYPICAL WELDED SPLICE DETAIL IS SHOWN IN FIGURE 7. 2. THEY SHALL NOT BE SPACED CLOSER THAN 3
DIAMETERS ON CENTER.
NOTES ON CONCRETE MIXES & PLACING: DETAIL "A" DETAIL "C" 3. THEY SHALL NOT IMPAIR SIGNIFICANTLY THE
G. FOR ALL BEAMS, ALWAYS FIT THE REINFORCEMENTS IN ONE LAYER WHENEVER POSSIBLE. WHENEVER STRENGTH OF CONSTRUCTION.
A. UNLESS OTHERWISE INDICATED IN PLANS OR NOTED IN THE STRUCTURAL SPECIFICATIONS, THE MINIMUM 28 DAYS COMPRESSIVE CYLINDER BEAM IS SUPPORTING COLUMN, BOTTOM BAR AT MID SPAN OF THE BEAM SHALL CONTINUE UP TO THE 4. SUBMIT TO STRUCTURAL ENGINEER FOR
SUPPORTS. APPROVAL THE LOCATION OF EMBEDDED PIPE OR
STRENGTH OF CONCRETE SHALL BE AS FOLLOWS: PIPE SLEEVE PRIOR TO INSTALLATION.
1. FOR BEAMS 20.7 MPA (3,000 PSI) H. FOR GIRDERS, HOOPS SHALL BE USED WITHIN THE DISTANCE TWICE OF THE GIRDER DEPTH. BEYOND IT, NOTES ON REINFORCED CONCRETE COLUMN:
2. FOR COLUMNS 20.7 MPA (3,000 PSI) STIRRUPS WITH SEISMIC HOOKS MAY BE USED. WITHIN THE SPLICED LENGTH, 10MMØ HOOPS SHALL BE
3. FOR SUSPENDED SLAB 20.7 MPA (3,000 PSI) PROVIDED AT 0.10MCC. A. BEAM-COLUMN JOINTS SHALL BE PROVIDED BY A HOOP AT 0.1MOC. THE NUMBER OF SETS FOR SUCH HOOPS SHALL BE THE
4. FOR SLAB ON GRADE 20.7 MPA (3,000 PSI) SAME IN THE CONFINED REGION AS SCHEDULED.
I. INDIVIDUAL BARS WITHIN A BUNDLE SHALL TERMINATE AT DIFFERENT POINTS WITH AT LEAST 40 TIMES
B. WHERE COLUMN CHANGES IN SIZE, VERTICAL REINFORCEMENT SHALL BE OFFSET AT A SLOPE OF NOT MORE THAN 1:6 AND
B. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGREGATION, REHANDLING OR FLOWING. PLACING SHALL BE DONE THE BAR DIAMETER
EXTRA 10MMØ HOOPS AT 0.10MOC SHALL BE PROVIDED THROUGHOUT THE OFFSET REGION.
PROPERLY WITH BUGGIES, BUCKETS OR WHEEL-BORROWS. NO CHUTES SHALL EXCEED SIX (6) METERS AGGREGATE LENGTH.
J. LONGITUDINAL REINFORCING BARS SHALL BE PLACED SYMMETRICALLY ABOUT THE VERTICAL CENTER C. SPLICE SHALL BE ALLOWED ONLY WITHIN THE CENTER HALF OF THE CLEAR COLUMN HEIGHT. SPLICE LENGTH SHALL BE
C. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS UNLESS AUTHORIZED BY THE DESIGNER IN WRITING. LINE OF THE BEAM OR GIRDER SECTION WHERE POSSIBLE WITH UPPER BARS PLACED DIRECTLY ABOVE PROVIDED WITH A HOOP SPACED AT 0.10MOC. SPLICE LENGTH SHALL BE CONSIDERED AS TENSION SPLICE AS PRESENTED
THOSE IN THE BOTTOM LAYER. IN TABLE 2.
D. COLUMN TIES AND SPIRAL SHALL BE PROVIDED WITH MINIMUM CLEAR CONCRETE COVER OF 40MM. VERTICAL BARS SHALL
NOTES ON CONCRETE SLABS: HAVE A CLEAR DISTANCE OF 1.5 TIMES BAR DIAMETER OR 40MM WHICHEVER IS LARGER.

90 DEGREE BEND PLUS 12

90 DEGREE BEND PLUS 12


TIMES BAR DIAMETER

TIMES BAR DIAMETER


E. CONFINED REGION SHALL BE EQUAL TO THE LARGER OF THE FOLLOWING:
A. ALL REINFORCEMENTS SHALL BE PROVIDED WITH 20MM CLEAR CONCRETE COVER EXCEPT FOR SLAB ON GRADE WHERE SEE TABLE 'B' OF FIG. 5
LENGTH OF LAP SPLICE
1.0 450MM
REINFORCEMENT SHOULD BE PLACED AT THE CENTER OF THE SLAB THICKNESS. 2.0 BIGGER COLUMN DIMENSION
B. UNLESS OTHERWISE DETAILED IN CONTINUOUS SLABS HAVING SAME REINFORCEMENTS RUNNING IN ONE DIRECTION, 3.0 (CLEAR COLUMN HEIGHT)/16
REINFORCING BARS SHALL BE BENT UP OR EXTENDED AS SHOWN IN FIGURE 1. F. UNLESS OTHERWISE DETAILED, TYPICAL BAR DETAILS FOR TIED COLUMNS ARE AS SHOWN IN FIGURE 11 AND 12.
C. FOR TWO-WAY SLABS, BARS ALONG THE SHORTER SPAN SHALL BE PLACED BELOW THE LONGER SPAN BARS AT
CENTER AND ABOVE THE LONGER SPAN BARS AT THE SUPPORTS. THE SPACING OF BARS AT THE COLUMN STRIP
SHALL BE 1.5 TIMES THE SPACING IN THE MIDDLE STRIP, BUT IN ANY CASE GREATER THAN 2.5 THE SLAB THICKNESS PROVIDE 12 Ø EXTRA TIES
OR 450MM. @ 100 O.C.
EXTERIOR SUPPORT INTERIOR SUPPORT INTERIOR SUPPORT EXTERIOR SUPPORT
D. TEMPERATURE BARS OF SUSPENDED SLABS SHALL BE PLACED ABOVE THE MAIN REINFORCEMENT AT MIDSPAN AND STEEL RATIO AT ANY
SHALL BE BELOW THE MAIN REINFORCEMENT AT THE SUPPORTS. SECTION WITHIN THIS CLASS B TENSION PIPE
E. UNLESS OTHERWISE NOTED, ALL BENDS SHALL BE REINFORCED WITH 10MMØ AT 0.25 MOC EW AT CENTER OF SLAB. REGION SHOULD NOT

90 DEGREE BEND PLUS 12 TIMES


SLAB CONSTRUCTION JOINTS SHALL NOT BE MORE THAN 3.0M. EXCEED 8%
F. WHENEVER REQUIRED, DROP SLAB SHALL BE ADDITIONALLY REINFORCED AS SHOWN IN FIGURE 2.

BAR DIAMETER
G. EXTRA REINFORCEMENTS SHALL BE PROVIDED AT CORNER SLAB AS SHOWN IN FIGURE 3. WHEN USED LOCATE LAP

Lo
H. UNLESS NOTED IN THE PLAN, ALL OPENINGS SHALL BE REINFORCED ALL AROUND BY 2-16MMØ BAR AT THE TOP SPLICE NEAR MID

Sh
AND BOTTOM OF THE SLAB. HEIGHT OF COLUMN BUT

Sh/2

Lj
NOT CLOSER THAN MAX.

Sj
COLUMN DIMENSION
FROM FACE TO JOINT

Sh/2

Lo
EXTERIOR COLUMN INTERIOR COLUMN INTERIOR COLUMN EXTERIOR COLUMN
MINIMUM STAGGERED
SPACING WHEN WELDED

Lv
SPLICES OR MECHANICAL
TABLE 2. DEVELOPMENT LENGTH CONNECTOR ARE USED
BAR IN TENSION BAR IN COMPRESSION

MIN.
BAR

MIN.
SIZE FOR Fy = 275 MPA FOR Fy = 414 MPA FOR Fy = 275 MPA FOR Fy = 414 MPA Sw = SPACING INIDICATED ON

40mm
ASTM f'c = 21 MPA f'c = 28 MPA f'c = 28 MPA f'c = 35 MPA f'c = 41 MPA COLUMN SCHEDULE

Sh/2
f'c = 35 MPA f'c = 41 MPA f'c = 21 MPA f'c = 21 f'c = 28 f'c = 35 f'c = 41 f'c = 21 f'c = 28 f'c = 35 f'c = 41 90° HOOK

Lo
A615 CASE 1 CASE 2 CASE 1 CASE 2 CASE 1 CASE 2 CASE 1 CASE 2 CASE 1 CASE 2 CASE 1 CASE 2 CASE 1 CASE 2 CASE 1 CASE 2
MPA MPA MPA MPA MPA MPA MPA MPA

10mmØ 300 450 250 375 250 350 175 300 450 650 400 575 350 500 300 425 200 200 200 200 250 200 200 200 Sh = ONE FORTH OF THE MIN.
COLUMN DIMENSION BUT BUNDLED COLUMN REINF.
FIG. 1. TYPICAL DETAIL OF SLAB 12mmØ 350 550 300 450 300 400 250 375 550 800 475 700 425 625 400 550 200 200 200 200 300 250 250 225

16mmØ 475 750 425 600 375 550 300 500 750 1050 650 925 575 825 500 700 250 250 250 200 350 350 300 275 NOT MORE THAN 100MM CONSISTING OF PLANTED

Lo
50mm
20mmØ 600 900 525 750 475 700 350 600 900 1300 800 1150 700 1025 625 900 300 300 250 225 450 400 350 350 REINF. CUT - OFF BUNDLED
DROP SLAB BAR REINF. AS SHOWN.
t = 10mmØ ADDT'L TIES @ 200mm O.C 4-10mmØ 25mmØ 900 1375 800 1200 700 1050 550 800 1375 2050 1200 1800 1050 1600 875 1300 400 350 300 300 550 500 450 425
40mm COVER TO
t BUNDLED COLUMN REINF. CONSISTING
28mmØ 1025 1550 900 1325 800 1200 600 900 1550 2300 1325 2000 1200 1800 1000 1500 450 400 350 325 650 550 500 475
COLUMN TIES OF PLANTED REINF. CUT-OFF BUNDLED
32mmØ 1175 1750 1000 1525 900 1350 700 1025 1750 2625 1525 2275 1350 2050 1125 1650 500 450 400 375 750 650 550 525
TYPICAL BAR REINF. AS SHOWN
NOTES
1. FOR REINFORCING BARS IN TENSION WITH STANDARD HOOK AT ITS END, DEVELOPMENT LENGTH MAY BE DIVIDED BY 2.50.
2. CASE 1 IS FOR BARS WITH CLEAR SPACING NOT LESS THAN THE BAR DIAMETER OR EITHER LESS THAN 25MM OTHERWISE, CASE 2 SHALL BE USED. COLUMN VERT. REINF.
L/5 t 300 L/5

NOTES ON STRUCTURAL STEEL:


A. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE LATEST EDITION OF AMERICAN INSTITUTE OF STEEL CONSTRUCTION
9-10mmØ @ 300 O.C MANUAL UNLESS OTHERWISE SHOWN OR NOTED.
B. ALL STRUCTURAL STEEL INCLUDING THAT OF GUSSET PLATES SHALL BE ASTM A36 STEEL WITH YIELD STRENGTH OF Fy = 248 MPA
5-10mmØ @ 300 O.C
C. ALL BOLTS AND THREADED FASTENERS SHALL BE ASTM A325.
D. ALL WELDS SHALL BE E70XX ELECTRODE AND SHALL DEVELOP AT LEAST 100% OF THE STRENGTH OF THE CONNECTED MEMBERS.
E. THE CONTRACTOR SHALL SUBMIT TO THE STRUCTURAL ENGINEER THE SHOP/FABRICATION DRAWINGS FOR APPROVAL BEFORE
BEAM ANY WORKS SHALL COMMENCE.
F. ALL DOUBLE ANGLE STRUCTURAL MEMBERS MUST BE PROVIDED WITH FILLER PLATES AT 0.30MOC MAXIMUM SPACING.
G. ALL EXPOSED STRUCTURAL STEEL MEMBERS SHALL HAVE AT LEAST TWO COATS OF RED LEAD OR ZINC CHROMATE PRIMER PAINT.
FIG. 6. TYPICAL SECTION OF BEAM FIG. 7. TYPICAL WELD SPLICE DETAIL H. ALL TRUSSES, BEAMS, AND GIRDERS, MUST BE PROVIDED WITH A CAMBER AT THE RATE OF 3MM FOR EVERY 3.0M OF CLEAR
SPAN IN A PARABOLIC LAYOUT.

PDS-BUK3RD: 2024
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RONALD D. NACASABOG
CONSTRUCTION NOTES
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING) PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
S 15
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2 9 35
RUBEN A. ABA-A JR.
ENGINEER II DATE: DATE: DATE: DATE:
200 200 NOTES ON REINFORCING STEEL BARS:
NOTES ON CHB WALLS: (MIN) (MIN)

C
A. ALL REINFORCING STEEL BARS SHALL BE NEW BILLET, HOT ROLLED, WELDABLE, DEFORMED BARS
FOR SIZE AND SPACING CONFORMING TO THE SPECIFICATIONS OF PNS 49: 1986 (ASTM 615), AND ASTM A706 (GR. 60, WELDABLE)
A. ALL CHB WALLS SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 450 PSI AND SHALL BE REINFORCED AS
OF HOR. & VERT. BARS WHOSE GRADE IS SHOWN ON TABLE 5.
PRESENTED IN TABLE 3. (SEE CONST. NOTES)
B. MINIMUM LAP LENGTH OF SPLICE SHALL BE 250MM.
C. PROVIDE RIGHT ANGLED REINFORCEMENT AT CORNERS, 900MM LONG. DOWEL BARS TO MATCH TABLE-5
CHB VERT. BARS
D. PROVIDE BEAMS BLOCKS AT EVERY 10TH LAYER OF CHB AND A POST AT EVERY 3.0M. SEE FIGURES 13, 14 AND 15.

(DOWEL)
GRADE BAR DIAMETER
E. WHERE CHB WALLS ADJOIN COLUMNS, RC BEAMS, AND RC WALLS, DOWELS WITH THE SAME SIZE AS THE VERTICAL OR

400
C
HORIZONTAL REINFORCEMENTS SHALL BE PROVIDED. GRADE 414 (FY= 60 ksi) 16, 20, 25, 28, 32 MMØ
GRADE 276 (FY= 40 ksi) 10, 12 MMØ
TABLE 3. SCHEDULE OF CHB REINFORCEMENTS
BLOCK THICKNESS HORIZONTAL REINFORCEMENTS VERTICAL REINFORCEMENTS GRADE 230 (FY= 33 ksi) SMALLER THAN 10MMØ
CHB WALL CHB WALL 2-12 Ø TOP BARS
100mm 10mm Ø 600mm O.C 10mm Ø 600mm O.C

200
125mm 10mm Ø 600mm O.C 10mm Ø 600mm O.C B. THE SUPPLEMENTARY REQUIREMENTS OF WELDABLE DEFORMED REINFORCING BARS SHALL BE AS FOLLOWS:
150mm 10mm Ø 400mm O.C 10mm Ø 400mm O.C 2-12 Ø TOP BARS
200mm 10mm Ø 400mm O.C 10mm Ø 400mm O.C B.1 THE MAXIMUM YIELD STRENGTH OF WELDABLE BARS = 540 MPa
SECTION C - C B.2 THE TENSILE STRENGTH SHALL NOT BE LESS THAN 1.25 TIMES THE ACTUAL YIELD STRENGTH.
2-12MMØ BARS W/ 10MMØ
STIRRUPS @ 300 O.C. C. ALL CONCRETE REINFORCEMENT SHALL BE DETAILED, FABRICATED, LABELED, SUPPORTED AND SPACED IN FORMS,
LINTEL BEAM (TYP) FINISH FLOOR LINE FINISH FLOOR LINE SECURED IN THE REQUIRED LOCATION IN ACCORDANCE WITH THE PROCEDURES AND REQUIREMENTS OUTLINED IN
LOCATE AT MID-HEIGTH THE LATEST EDITION OF THE BUILDING CODE AND THE MANUAL OF STANDARD PRACTICE FOR DETAILING
BEAM LOCK @ OF EVERY CHB WALL OR
EVERY 9TH COARSE
REINFORCED CONCRETE STRUCTURES, ACI - 315.
OR FLOOR LEVEL 2-12Ø STR.
SPACE A MAXIMUM OF 38mm CLEAR 38mm CLEAR
BARS 3000mm O.C ELEVATION D. ALL REINFORCING BARS SHALL BE CLEANED THOROUGHLY OF ALL LOOSE RUST, SOIL OR OTHER MATERIAL
CHB WALL 10ØTIES IMMEDIATELY PRIOR TO PLACING CONCRETE.
@ 300 O.C.

400
E. THE REQUIRED LENGTH OF LAP FOR TENSION SPLICES IS BASED ON THE DEVELOPMENT LENGTH, Ld, SHOWN
2-12Ø STR. IN THE TABLE 2 FOR RC BEAMS AND GIRDERS, ON THE FOLLOWING CLASSIFICATIONS :
BARS
TENSION SPLICE CLASSIFICATION SPLICE LENGTH
NOTES ON CONCRETE WALLS: CLASS A 1.0 Ld
CLASS B 1.3 Ld
6-12mm Ø VERT.BARS W/ A. ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE OF WALL REINFORCEMENT UNLESS
2-12mmØ HOR. STR. BARS OTHERWISE INDICATED IN THE PLANS. (REFER TO TABLE - 4) F. A FULL WELDED SPLICES SHALL HAVE BARS BUTTED AND WELDED TO DEVELOP IN TENSION AT LEAST 125
10mmØ TIES @ 400mm O.C WITH 6mmØ TIES AT 300mm PERCENT OF THE SPECIFIED YIELD STRENGTH fy, OF THE BAR. (SEE FIGURE 7)
O.C. B. REINFORCING BARS SHALL HAVE 25mm MINIMUM CLEAR DISTANCE FROM WALL FACE EXCEPT FOR WALLS
DEPOSITED AGAINST THE GROUND WHERE A MINIMUM OF 63mm SHALL BE PROVIDED AND FOR EXPOSED FACES OF G. ALL WELDING OF REINFORCEMENT SHALL CONFORM TO THE PROVISIONS OF THE STRUCTURAL WELDING
BEAM LOCK FORMED WALLS WHERE THE MINIMUM SHALL BE 50mm, CLEAR FOR BARS LARGER THAN 16mm, AND 38mm FOR 16mm CODE - REINFORCING STEEL, AWS D1.4
@ EVERY BARS OR SMALLER.
1-16 Ø VERTICAL BARS 9TH
C. CARRY VERTICAL BARS AT LEAST 600mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES WHEN NECESSARY. STOP H. A FULL MECHANICAL CONNECTION (REBAR SPLICER) SHALL DEVELOP IN TENSION OR COMPRESSION, AS
COURSE
AT 50mm BELOW TOP OF THE SLAB OR SOLID BAND WHERE THE WALLS END. HORIZONTAL AND VERTICAL BARS REQUIRED, 125 PERCENT OF THE SPECIFIED YIELD STRENGTH fy, OF THE BAR. IF USED, SUBMIT SAMPLE FOR
12 THK. EXPANSION JOINT APPROVAL OF THE STRUCTURAL ENGINEER.
WITH MASTIC FILLER
SHALL BE SPLICED BY LAPPING A DISTANCE EQUAL TO 40 DIAMETER AND WIRED SECURELY WITH NO. 15 G.I. WIRE
PROVIDED THAT SPLICES IN ADJACENT BARS ARE STAGGERED AT LEAST 1520mm ON CENTER. (See FIGURE 24)
I. CLEAR CONCRETE COVER FOR REINFORCING BARS SHALL BE AS FOLLOWS:
1) CONCRETE CAST AGAINST EARTH - 75 mm
D. UNLESS OTHERWISE NOTED IN THE PLANS,ALL OPENINGS IN WALLS 250mm OR THICKER SHALL BE REINFORCED 2) CONCRETE EXPOSED TO EARTH OR WEATHER
AROUND WITH 2-20mm BARS, FOR 225mm -, 200mm -, 175mm-, 150mm THICK WALLS, USE 2-16mm BARS. FOR 125mm 20 mm TO 36 mm BARS - 50 mm
(DOWEL)

THICK WALLS, USE 2-12mm BARS. (See FIGURE 24)


400

16 mm BARS AND SMALLER - 40 mm


E. ALL WALL OPENING SHALL HAVE VERTICAL REINFORCEMENT BENT TO A U-FORM LIKE STIRRUPS AND SPACED 3) CONCRETE NOT EXPOSED TO EARTH OR WEATHER
12 THK. EXPANSION JOINT ACCORDING TO THE SCHEDULE UNLESS OTHERWISE NOTED. (REFER TO SECTION 1 ON FIGURE 24) SLABS, WALL, JOINTS - 20 mm
FOR SIZE AND SPACING WITH MASTIC FILLER
OF HOR. & VERT. BARS
BEAMS AND COLUMNS - 40 mm
F. ALL CONCRETE WORKS SHALL BE REINFORCED WITH BARS OF AREA AT LEAST EQUAL TO THAT SPECIFIED IN
ACI 318-89 BUILDING CODE.
CHB WALL 214 MIN
(DOWEL)

DOWEL BARS TO MATCH CHB


400

HOR. BARS
1-16mmØ CORNER VERT. BAR
TABLE - 4 STANDARD HOOKS AND BENDS 6 d 10mm THRU 16mm
FOR PRIMARY REINFORCEMENTS 12 d 20mm THRU 25mm
TIES AND STIRRUPS
FOR SIZE AND SPACING OF CLASS "B" LAP
HOR. & VERT. BARS NOTES:
(SEE CONSTRUCTION NOTES) 1) d = BAR DIAMETER
400 2) FOR STANDARD HOOKS AND BENDS
12 THK. EXPANSION
JOINT WITH MASTIC (DOWEL) D = 6 d FOR 10mm THRU 25mm
CHB WALL OFFSET SPLICE LAP SPLICE D = 8 d FOR 28mm THRU 36mm
FILLER WIRE TIES 3)
WIRE TIES
FOR TIES AND STIRRUPS
D = 4 d FOR 10mm THRU 16mm

FLR. SLAB AND BEAM FOR SIZE SPACING OF


CHB WALL HOR. & VERT. BARS
(SEE CONSTRUCTION NOTES ON FOUNDATIONS:
(DOWEL)

DOWEL BARS NOTES) A. FOOTINGS WERE DESIGNED USING AN ACTUAL ALLOWABLE SOIL BEARING CAPACITY OF 123.75 KPa (2585 psf)
200

TO MATCH VERT. BARS AND A SUBGRADE MODULUS OF 4950 AT DEPTHS INDICATED IN THE DRAWING. SOIL INVESTIGATION SHALL BE
1 CARRIED PRIOR TO CONSTRUCTION AND THE STRUCTURAL ENGINEER SHALL BE FURNISHED A COPY OF THE
S-1 SOIL'S REPORT.
NOTE:
1. ALL JOINTS AND CELLS B. NO FOOTING SHALL REST ON FILL. FOOTING FOR CHB WALLS AND OTHER MINOR STRUCTURES SHALL BE
CONTAINING REINFORCING EMBEDDED AT LEAST 800mm FROM THE NATURAL GRADE LEVEL.
BARS SHALL BE FILLED WITH
CONCRETE GROUT C. PROVIDE TEMPORARY REMOVAL OF WATER FROM ANY SOURCE DURING CONSTRUCTION. DEWATERING
2. FOR REINFORCEMENTS SHALL BE CAREFULLY AND PROPERLY PERFORMED TO AVOID DISTURBING THE FOUNDATIONS AND SLAB
SEE CONSTRUCTION NOTES BEARING SURFACES.
550

4-16Ø VERT.BARS
550
(DOWEL)

D. CONTRACTOR SHALL DESIGN, INSTALL AND MONITOR EXCAVATIONS RETENTION SYSTEMS, AS REQUIRED
PROTECTION OF ADJACENT PROPERTIES AND PROVIDE ALL MEASURES AND PRECAUTIONS NECESSARY TO
400

1-16Ø CONT. HOR. BARS FOR


FLOOR SLAB ONLY MINIMIZE SETTLEMENT AND PREVENT DAMAGE TO ADJACENT EXISTING OR NEW CONSTRUCTION.

E. PREPARE CONDITIONS OF CONCRETE SUPPLY AND PLACEMENT TO THE COMPLETE FOUNDATION FOR THE
550
FULL THICKNESS AS A CONTINUOUS MONOLITHIC CASTING.

F. DO NOT BACKFILL AGAINST BASEMENT WALLS UNTIL GROUND FLOOR SLAB HAVE BEEN PLACED AND THE
1 SECTION CONCRETE HAS ATTAINED THE REQUIRED STRENGTH.

S-1

PDS-BUK3RD: 2024
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RONALD D. NACASABOG
CONSTRUCTION NOTES
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING) PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
S 16
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 3 9 35
RUBEN A. ABA-A JR.
ENGINEER II DATE: DATE: DATE: DATE:
SCHEDULE OF COLUMN
SCHEDULE OF FOOTING LEVEL C1 C2
A B C D
REINFORCEMENT REMARKS

TO ROOF TRUSS LEVEL


FOOTING FOOTING DIMENSIONS (MM) 350

ROOF BEAM LEVEL


2.50 3.50 3.50

LOC: GRID 1,2,3


F1C1 F1C1 F1C1 F1C1 MARK LENGTH WIDTH DEPTH THICKNESS SPACING
REBARS

250
(L) (W) (D) (T) (BOTHWAYS)
BAR-X BAR-Y
1
MAIN BARS 6-16MMØ
F1 1500 1500 1200 300 180 B.W. 9-16MMØ 9-16MMØ ISOLATED FOOTING TIE BARS 10MMØ
3.50

3.50
F2 1150 1000 800 200 180 B.W. 6-16MMØ 7-16MMØ ISOLATED FOOTING

TO ROOF BEAM LEVEL


350
F1C1 F1C1 F1C1

2ND FLR. LEVEL


ELEV.-1.50M

SF-1 ELEV.-0.60M

250
2

F1C1 ELEV.-1.50M MAIN BARS 6-16MMØ


N.G.L N.G.L TIE BARS 10MMØ
3.50

3.50
F2C2ELEV.-1M

F1C1 F1C1 F1C1 F1C1 350

GROUND FLR. LEVEL


TO 2ND FLR. LEVEL
ELEV.-1.50M

250
SF-2ELEV.-0 .25M
N.G.L.

1.20
COMPACTED COMPACTED
EARTH FILL EARTH FILL MAIN BARS 8-16MMØ

1.50
TIE BARS 10MMØ

TO GROUND FLR. LEVEL


350 300

0.80

FOUNDATION LEVEL
COMPACTED COMPACTED

1.00
EARTH FILL EARTH FILL
TYPICAL FOOTING

250

200
1 FOUNDATION PLAN

0.30

0.30
0.05

0.05
S 4 SCALE: 1:100 MTRS. MAIN BARS 8-16MMØ

0.20
16-12mmØ DSB W/ TIE BARS 10MMØ
MAIN BARS 4-16MMØ
TIE BARS 10MMØ
10mmØ TIES
SPACE 3 @ 0.05M.
2 @ 0.10M, 50mm THK. GRAVEL BEDDING
@ REST 0.15M O.C. 6- 16mmØ MATTING BARS ROOF BEAM

0.30
(LONGITUDINAL BAR)
A B D
6PCS- 16mmØ MATTING
C
BARS (CROSS BAR)

LAP SPLICE
2.50 3.50 3.50 0.10m THK CONC. 1.50

0.60M
2.80 SLAB-ON-GRADE W/ 10mm Ø
1.00

3.00
RSB REBAR AT EVERY 0.55 0.35 0.55
0.40m O.C. B.W. ON
50mm THK GRAVEL FILL
0.35 0.30 0.35

10MMØ @ 100MM O.C.


1 EXTRA TIES

0.22
WF1 FTB FTB

0.20
0.60

WF1
1.60

ELEV.@ ELEV.@
+0.40m
WF1

ELEV.@ +0.40m 2ND FLR. LN.


FTB

0.35
+0.375m
FTB

ELEV.@
3.50

3.50
WF1

+0.40m
WF1
WF1

WF1 WF1

0.75
ELEV.@ ELEV.@
+0.40m

1.15
0.25

+0.40m

1.50

LAP SPLICE
SF-1 ELEV.-0.60M

WF1

0.60M
2 ELEV.@
+0.40m

3.00
WF1

WF1

-0.35m ELEV.@
0.60

0.20
3.50

3.50

+0.40m
FTB

WF1 10MMØ TIES SPACED @ 5-0.05M,


WF1

8-0.075 AND THE REST IS 0.15M UP


0.18
FTB

TO MIDDLE LENGTH.

6- 16mmØ MATTING BARS


0.04
ELEV.@
+0.40m 4"THK. CONCRETE FLOORING WITH

3 STB-1 (LONGITUDINAL BAR) F.F.L./TIE BEAM LEVEL


TILE FINISHED WITH 10MMØ RSB
AT EVERY 0.60M. O.C. BOTH WAYS

FTB FTB ELEV.@


+0.40m FTB
0.18 0.04

VARIES
F1C1 7PCS- 16mmØ MATTING COMPACTED COMPACTED

0.55 0.40 0.55 GRANULAR GRANULAR

BARS (CROSS BAR) MATERIALS MATERIALS

NATURAL GROUND LINE

WF1

5 FOOTING ON GRADE (F2C2)

D
S 4 SCALE: 1:20 MTRS.

FOOTING TIE BEAM/ WALL FOOTING/STAIR FOOTING

T
2 FOUNDATION PLAN 4 FOOTING (F1C1)
S 4 SCALE: 1:100 MTRS.
S 4 SCALE: 1:20 MTRS. 6 FOOTING SECTION (FIC1)
S 4 SCALE: NDTS

PDS-BUK3RD: 2023
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FOUNDATION PLAN RONALD D. NACASABOG
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING)
TYPICAL FOOTING PLAN
TYPICAL FOOTING SECTION
PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
S 17
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE
LIBONA, BUKIDNON COLUMN SCHEDULE ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 4 9 35
FOOTING SCHEDULE IVY L. AMOMONPON DATE: DATE: DATE: DATE:
ENGINEER II
SCHEDULE OF FOOTING
FOOTING FOOTING DIMENSIONS (MM) REINFORCEMENT REMARKS
MARK LENGTH WIDTH DEPTH THICKNESS SPACING
REBARS

(L) (W) (D) (T) (BOTHWAYS)


BAR-X BAR-Y
SF-1 1200 1000 400 200 180 O.C 6-12MMØ 7-12MMØ FOOTING ON FFL
SF-2 1100 1000 250 240 B.W. 10-10mmØ 10-10mmØ FOOTING ON GRADE
WF-1 500 250 100 O.C 3-10MMØ WF ON FFL
WF-2 400 400 200 300 O.C 3-10MMØ WF ON GRADE

1.00
1

0.18
FINISH FLOOR LINE

0.40
COMPACTED COMPACTED

0.10
EARTH FILL EARTH FILL

0.25
0.20

0.15
0.15 0.10


0.25

HOOK LENGTH FOR 90° BEND


1.00 D
0.15 0.20m 0.15 db (mm) ℓ (mm)
SECTION 10
12
105
111
db

1 WALL FOOTING (WF2)


SCALE: NTS 90° HOOK
16 144
S 5 1.00
0.20
D
HOOK LENGTH FOR 135° BEND
db

db (mm) ℓ (mm)
10 105


12 111
135° HOOK 16 144
1.20
VARIES

1.10

D

HOOK LENGTH FOR 180° BEND


db (mm) ℓ (mm)
10 95
0.40

db
12 108
PLAN 180° HOOK 16 144
0.20

1.00

0.40
3 FOOTING ON FFL (STF-1)
SCALE: 1:20 MTRS. 4 FOOTING ON GRADE (STF-2) 5 HOOK LENGTH DETAILS
SCALE: 1:5M.
S 5 SCALE: 1:15 MTRS. S 5
S 5

2 WALL FOOTING (WF1)


SCALE: NTS
S 5

PDS-BUK3RD: 2025
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROSANNO GABRIEL D. SANICO
ARCHITECT I
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING)
FOOTING SCHEDULE PREPARED :
MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
S 18
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE WALL FOOTING DETAILS
LIBONA, BUKIDNON HOOK LENGTH DETAILS
ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 5 6 35
IVY L. AMOMONPON DATE: DATE: DATE: DATE:
ENGINEER II
BEAM SCHEDULE
A B C D
BEAM S T E E L R E I N F O R C E M E N T S
SEE STEEL DECK DIMENSIONS
2.50 3.50 DETAIL 3.50 FLOOR BEAM
IN/MM LEFT MIDSPAN RIGTH 16MMØ STIRRUPS
LEVEL MARK REBAR WEB BAR 10MMØ
1 (MMØ) (UNLESS NOTED OTHERWISE)
B1 B1 B1 B H TOP BOTTOM TOP BOTTOM TOP BOTTOM

3.50
CB1
2ND FLOOR LEVEL B1 250 350 16 4 3 3 4 4 3 5@50, 10@100, REST@175
B1 B1 B1 B1
CB1

CB1
B1 B1 B1 CANTILEVER BEAM CB-1 250 350 16 5 3 5 3 5 3 5@50, 10@100, REST@175
2
DN
ROOF LEVEL RB 200 300 16 2 2 2 2 2 2 3@50, 10@100, REST@150
STAIR LANDING
SLB-1 150 200 16 2 2 2 2 2 2 3@50, 10@100, REST@150
3.50

OPEN
B1 TO B1 B1 B1 BEAM
BELOW
FOOTING TIE BEAM FTB 300 200 16 4 2 2 4 4 2 5@50, 4@100,3@150, REST@200
B1 B1 B1
3 200 200 250 250
150 250 250 200
B1 B1
0.075m. THICK SLAB W/ 0.075m. THICK SLAB W/
10mmØ MATT BARS B1 10mmØ MATT BARS
DISTANCE @ 0.15m. BW OC DISTANCE @ 0.15m. BW OC

300

300

350

350

350

350
200

300
FTB FTB STAIRBEAM CB-1 CB-1
TYPICAL FLOOR BEAM/STEEL DECK/CONCRETE CANOPY
BEAM(B1) BEAM(B1) ROOF BEAM(RB)
(LEFT/RIGHT) MIDSPAN (LEFT/RIGHT) MIDSPAN (STB-1) (LEFT/RIGHT) MIDSPAN
1 SECOND FLOOR FRAMING PLAN L

S 6 SCALE: 1:100 MTRS. L/4 L/2 L/4

10MMØ STIRRUPS SPACE 3 @


0.05M, 10 @ 0.10M, REST @
0.15M O.C.
A B C D
0.15
2.50 3.50 3.50
2-16MMØ 2 1 MM 2 1 MM
1

0.20
RB RB RB
2-12MMØ 2 1 MM 2 1 MM
3.50

SUPPORT MIDSPAN SUPPORT


RB RB RB RB

4 LANDING BEAM(LB) DETAIL


2 SCALE: NTS
RB RB RB S 6
DN
L
3.50

RB RB RB RB NGL L/4 L/2 L/4

SECTION

RB RB RB
0.30

3
10MMØ STIRRUPS SPACE
0.075m. THICK SLAB W/ 5 @0.05M,
10mmØ MATT BARS
DISTANCE @ 0.15m. BW OC 4 @ 0.10M,
3 @ 0.15M REST
0.20
@ 0.20M O.C.
0.20

SECTION 4 1 MM 2 1 MM 4 1 MM

0.30
TYPICAL ROOF BEAM/ CONCRETE CANOPY 3 2 1 MM 4 1 MM 2 1 MM
FOOTING TIE BEAM (FTB) DETAIL
2 ROOF BEAM PLAN S 6 SCALE 1:15M SUPPORT MIDSPAN SUPPORT

S 6 SCALE: 1:100 MTRS. FOOTING TIE BEAM

5 FOOTING TIE BEAM(FTB) DETAIL


S 6 SCALE: 1:20 MTRS.

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SECOND FLOOR FRAMING PLAN RONALD D. NACASABOG
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING)
ROOF BEAM PLAN PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
S 19
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE BEAM DETAILS
LIBONA, BUKIDNON FOOTING TIE BEAM DETAILS
ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 6 9 35
IVY L. AMOMONPON DATE: DATE: DATE: DATE:
ENGINEER II
16mm Ø CHAIR BARS
SPACED @ 0.20m. OC STEEL DECK
0.30
16mm Ø NOSING BARS 3 2 12mmØ DSB TOP BARS SPACED @ 0.20m. O.C
B C 12mmØ DSB TEMP. BARS SPACED @ 0.20m. O.C
16mm Ø MAIN BARS
TOP AND BOTTOM
SPACED @ 0.15m. OC 3.50
0.1875

16mm Ø TEMP. BARS A


2 SPACED AS SHOWN

0.15
1

2.50
2nd FLOOR BEAM-1

SLB
BEAM
STEEL DECK WELDED
TO STIRRUPS
STEELDECK

2nd FLOOR BEAM-1

2nd FLOOR BEAM-1


150mm THICK STEELDECK
SPOT DETAIL B STEEL DECK DETAIL

3.50
SCALE: 1:10 MTRS. STAIR LANDING BEAM PLAN NDS

SCALE: 1:50 MTRS.


0.15
ST S S CE SECTION
C T S

2 2nd FLOOR BEAM-1 0.15 m. DEPTH Ø12mm.Ø DSB MATTING


SPACED @ 0.20M. O.C. B.W.

B E L O W
0.15

2nd FLOOR BEAM-1

2nd FLOOR BEAM-1


CONCRETE SLAB H: 0.15M.

3.50
ST ED E E DET L E

T O
SLAB

O P E N

DECK SLAB SECTION


16 SECOND FLOOR LINE
EDGE BEAM 15 3 2nd FLOOR BEAM-1 STEELDECK

14

STEELDECK
GAUGE 22
0.15

BEAM SEE BEAM DETAIL


13

1.88
5

1.20
0.1

12
TYPICAL STEEL DECK
11 12mm Ø NOSING BARS

10 12mm Ø STEP BARS CANOPY BEAM-1


3 ISOMETRIC
9
SPACED @ 0.20m. OC
16mm Ø MAIN BARS
A B S 7 SCALE: NTS

LANDING 8 TOP AND BOTTOM


3.00

7
SPACED @ 0.10m. OC
16mm Ø TEMP. BARS
2.50 4 SLAB DETAIL
0.30 3.50 NDS
6 SPACED AS SHOWN S 7
0.1875

5
TYPICAL STEEL DECK
4 2 16
STEEL DECK FRAMING PLAN
1.50

0.15 15 1 2
3
14 2 S 7 SCALE: 1:50MTRS.
2
5

EDGE BEAM

EDGE BEAM

EDGE BEAM
EDGE BEAM
TREADS@300mm
0.1

13 3
1
2.10

12 4
FINISH FLOOR LINE
11 5 6 mm x 50mm NON-SKID METAL
3.50
0.40

10 6 NOSING STRIP
9 7
0.25

1.20

LONGITUDINAL SECTION 8
6-16mmØ FOOTING BARS B.W
0.05m. GRAVEL BIDDING
1 MAIN STAIR DETAILS 3
S 7 SCALE: 1:25 MTRS. SPOT DETAIL SECTION OF STAIR STEP
1.20
ST ED E E L E 5 (NOSING STRIP)
S 7 SCALE 1 : 10 M.

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MAIN STAIR DETAILS RONALD D. NACASABOG
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING)
STEEL DECK FRAMING PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
S 20
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE SLAB DETAILS
LIBONA, BUKIDNON ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 7 9 35
IVY L. AMOMONPON DATE: DATE: DATE: DATE:
ENGINEER II
A B C D A B C D
TOP CHORD, BOTTOM CHORD AND WEB MEMBER
PREFORMED PRE-PAINTED G.I. GUTTER PREFORMED PRE-PAINTED G.I. GUTTER 38mm x 38mm x 3.5mm ANGLE BAR
4.65 3.50 3.50 1.00
1.00 2.65 1.00

0.25

0.25
G U T T E R L I N E
FASCIA FRAME-2 @GUTTER LINE FASCIA FRAME-2 @GUTTER LINE
G U T T E R L I N E
0.55 0.55 0.55 0.55 0.55 0.55

78
TOP AND BOTTOM CHORD & TOP AND BOTTOM CHORD &

0.
WEB 38mm x 38mm x WEB 38mm x 38mm x
0.90

0.90
6mm ANGLE BAR 6mm ANGLE BAR
GIRT GIRT GIRT GIRT
1 1
12mm x .30 m. TURN BUCKLE 12mm x .30 m. TURN BUCKLE

0.55
FASCIA FRAME-2 @ SIDE FLASHING FASCIA FRAME-2 @ SIDE FLASHING
TOP AND BOTTOM CHORD & TOP AND BOTTOM CHORD &
WEB 38mm x 38mm x WEB 38mm x 38mm x
6mm ANGLE BAR 6mm ANGLE BAR
SWAY BRACE SWAY BRACE
17 17

16
SAG ROD SAG ROD 16
TRUSS-1

TRUSS-1

TRUSS-2

TRUSS-2

TRUSS-2
15 2"x4"x2mm C-PURLINS 2"x4"x2mm C-PURLINS 15
7.15

7.15
9.50

9.50
14 14
2 13
16
15 1
2 13
16
15 1 UPPER AND LOWER ROOF
12 12

FASCIA FRAME-1 DETAIL


14 2 14 2
11 11
DN DN FASCIA FRAME-2 @ SIDE FLASHING
10

9
13
12
3
4
10

9
13
12
3
4 TOP AND BOTTOM CHORD & 7
11 5 11 5 WEB 38mm x 38mm x
8

7
10 6
8

7
10 6 6mm ANGLE BAR S 8 SCALE: 1:25 MTRS.
6 9 7 6 9 7
TOP AND BOTTOM CHORD &
5 TOP AND BOTTOM CHORD & 5
WEB 38mm x 38mm x
4 WEB 38mm x 38mm x 4
8 6mm ANGLE BAR 8
3 6mm ANGLE BAR @ FRONT FASCIA FRAME-1 3
@ FRONT FASCIA FRAME-1
2 2 TOP AND BOTTOM CHORD & WEB MEMBER
3 1
GIRT 3 1
GIRT GIRT GIRT 0.30 38mm x 38mm x 3.5mm ANGLE BAR
1.20

1.20

0.30
UPPER AND LOWER ROOF
UPPER ROOF LOWER ROOF
1 ROOF FRAMING PLAN 2 ROOF FRAMING PLAN 8 FASCIA FRAME-2 DETAIL
S 8 SCALE: 1:25 MTRS.
S 8 SCALE: 1:100 MTRS. S 8 SCALE: 1:100 MTRS.

3 2 1 0.40mm x 2.44 mm
TOP AND BOTTOM CHORD
38mm x 38mm x 6mm ANGLE BAR
PRE PAINTED SPANISH GUTTER 0.30 2
4.5MM THK. FIBER CEMENT BOARD IN 2-38mm x 38 mm x 6mm, 0.4 38mm x 38mm x 6mm
0.29 38mm x 38mm x 6mm ANGLE BAR FASCIA FRAME TOP CHORD, BOTTOM CHORD 0.25 ANGLE BAR WEB MEMBER
1.00
1.00 & WEB MEMBER DISTANCE @ 0.60 BW. OC.
1.00
1.00 9.32 2" x 4" x 2mm C-PURLINS

0.30

0.30
1.00
1.00 Hi-Rib PRE-PAINTED ROOFING G.I SHEET
0.40

1.00
1.00
4.5MM THK. FIBER
0.5

1.00
5

SEE BLOW-UP DETAILS CEMENT FACIA BOARD


1.44

0.60
0.60
0.60 UPPER AND LOWER ROOF
3" Ø PVC
0.89

0.60 0.25

GIRT DETAIL
0.60

ELBOW 90° 9
0.30

TOP OF BEAM
RB RB 3"Ø PVC PIPE DOWN SPOUT S 8 SCALE: 1:25 MTRS.
1.20

UPPER AND LOWER ROOF


0.90
4.5MM THK. FIBER CEMENT CEILING BOARD IN 4-10mmØ x 300mm ANCHOR BOLT
METAL CARRYING CHANNEL (CEILING JOIST)
12mm x 38mm x 5m x 0.8mm THK. @ 1200mm
W/ NUTS and WASHERS ON
12mm THK. BASE PLATE(SEE SPOT DETAILS)
LOWER ROOF
5 ROOF GUTTER DETAIL .35
5mm THICK STEEL PLATE
S 8 SCALE: 1:30 MTRS. .25
3 TRUSS-2 DETAIL
38mm x 38mm x 6mm ANGLE BAR
S 8 SCALE: 1:50 MTRS.

.25
.20
FULL WELDED TO Hi-Rib PRE-PAINTED ROOFING G.I SHEET 0.40 m x 1090mm x LS
STEEL PLATE 4-16mmØ X 10" BOLTS 2.5" STEEL TEKSREW
3 2 1 W/ NUTS AND WASHERS
0.30 M.
2-38mm x 38 mm x 6mm,
0.29
4.5MM THK. FIBER CEMENT BOARD IN
38mm x 38mm x 6mm ANGLE BAR FASCIA FRAME TOP CHORD, BOTTOM CHORD 0.25 2 mm. X 12 mm. X 50mm. X 100 mm. CEE- PURLINS
1.00
& WEB MEMBER DISTANCE @ 0.60 BW. OC. 12mm THK. BASE PLATE
1.00
1.00 4-10mmØ x 300mm SLOPE >
1.00 9.32 2" x 4" x 2mm C-PURLINS ANCHOR BOLT 12 MM Ø PLAIN BARS WITH STANDARD NUT AND
1.00 38mm x 38mm x 6mm ANGLE BAR
1.00 Hi-Rib PRE-PAINTED ROOFING G.I SHEET W/ NUTS and WASHERS WASHER
0.40

1.00
1.00
0.5

1.00
5

0.35

SEE BLOW-UP DETAILS 5mm THICK STEEL PLATE


0.60
0.60
0.60 0.25 ROOF BEAM 50mm. X 50 mm. CLIP ANGLE WELDED TO
2.05

0.60
0.60 PURLINS & TOP CHORD
RB COLUMN
1.51

0.30

10 CONNECTION OF G.I SHEET ROOFING TO PURLINS


TOP OF BEAM BASE PLATE DETAIL
RB RB 0.90
S 8 SCALE: NTS

STEEL RAFTER TO ROOF BEAM


4-10mmØ x 300mm ANCHOR BOLT
4.5MM THK. FIBER CEMENT CEILING BOARD IN
METAL CARRYING CHANNEL(CEILING JOIST) W/ NUTS and WASHERS ON UPPER ROOF
6 CONNECTION DETAIL
12mm x 38mm x 5m x 0.8mm THK. @ 1200mm 12mm THK. BASE PLATE(SEE SPOT DETAILS)
4 TRUSS-1 DETAIL S 8 SCALE: NDS.
S 8 SCALE: 1:50 MTRS.

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES ROOF FRAMING PLAN


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TRUSS-1 DETAIL RONALD D. NACASABOG
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING)
FASCIA FRAME DETAIL
ROOF GUTTER DETAIL PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.


S 21
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE GIRT DETAIL
LIBONA, BUKIDNON STEEL RAFTER TO ROOF BEAM ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 8 9 35
CONNECTION DETAIL IVY L. AMOMONPON DATE: DATE: DATE: DATE:
ENGINEER II
12mm THK. BASE PLATE 1.00 1.00
2-50mm x 150mm x 2mm
RECTANGULAR TUBE

0.40
4-10mmØ x 20mm
ANCHOR BOLT 2MM x 50MM X 100MM
W/ NUTS and WASHERS C-PURLINS SPACED AT
1000MM ON CENTER

0.20
PLAN 12mm Ø SAGROD THREADED BOTH
ENDS WITH NUTS AND WASHERS
12mm THK. BASE PLATE
2-50mm x RECTANGULAR
150mm x 2mm
4-10mmØ x 20mm
TUBE 0.30
ANCHOR BOLT
COLORED ROOF
W/ NUTS and WASHERS
3 SAGROD DETAIL (TOP VIEW)
SCALE: 1:5M.
S 9 6MMØ J-BOLTS W/ FELT & CYCLONIC
SAGROD
WASHER SPACED @0.20m OC

SECTION
BOTTOM CHORD OF TRUSS

1 BASE PLATE DETAIL


SCALE: 1:5M.
50mmx100mm THICKx2mm C-PURLINS

TOP CORD OF TRUSS


S 9
50mm. X 50 mm. CLIP ANGLE WELDED TO
PURLINS & TOP CHORD

20
0m
CROSS BRACING

m
12mm THICK GUSSET PLATE
BUCKLE PLATE
5 ROOFING TO PURLIN CONNECTION DETAIL
SCALE: 1:5M.
S 9

10
100mm

0m
m
4.5 MM THK. SPLICE PLATE
50mm
C-PURLINS

25
100mm 100mm

0m
m

m
m
50

TOP VIEW
12
50mm
100mm

76

PROVIDE EYE ON BOLT


50mm

FOR TURNBUCKLE HOOK


12

50
TURNBUCKLE 12mm Ø DSB
CROSS BRACING
2 PURLIN SECTION W/ SPLICING
SCALE: 1:5M.
DETAIL
S 9

4 CROSS BRACING W/ TURN BUCKLE DETAIL


SCALE: 1:5M.
S 9

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BASE PLATE DETAIL RONALD D. NACASABOG
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING)
PURLIN SECTION W/ SPLICING
SAGROD DETAIL (TOP VIEW) PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
S 22
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE CROSS BRACING W/ TURN BUCKLE DETAIL
LIBONA, BUKIDNON
ROOFING TO PURLIN CONNECTION DETAIL ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 9 9 35
RUBEN A. ABA-A JR.
ENGINEER II DATE: DATE: DATE: DATE:
PLUMBING SPECIFICATIONS:
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL CONFORMED TO THE 9. ROOF DRAIN
LATEST EDITION OF 'THE PHILIPPINE PLUMBING CODE". "NATIONAL - RAINWATER PIPING SHALL NOT BE USED AS SOIL, WASTE &
SOIL PIPE 4"Ø FROM GROUND FLOOR
BUILDING CODE", AND THE RULES AND REGULATIONS OF THE LOCAL VENT PIPES
VTR 2"Ø TO SECOND FLOOR AUTHORITY.
3"Ø DOWNSPOUT - ROOF DRAINS SHALL BE EQUIPPED WITH STRAINERS
TO SECOND FLOOR 4"Ø 4"Ø
2. ALL SLOPE FOR ALL HORIZONTAL WASTE LINE SHALL MOUNTAIN 2% EXTENDING NOT LESS THAN 102MM ABOVE THE SURFACE OF
CB CB 4"Ø CB CB
F 1
2"Ø PPR PIPE SDR WATER LINE
D.S. c.o. SOIL PIPE 4"Ø SOIL PIPE 4"Ø
MINIMUM UNLESS OTHERWISE SPECIFIED. THE ROOF IMMEDIATELY ADJACENT TO THE DRAIN
2"Ø D.S. D.S. D.S.
3. ALL SEWER PIPELINES EMBEDDED ON GROUND AND BELOW
W.C.
3"Ø DOWNSPOUT LAV. CONCRETE SLAB HAD BEEN PROVIDED WITH SAND BEDDING WASTE - SOIL PIPE LINE

2"Ø
W.C. URI. LAV. F.D. URI.

F MATERIALS. ▬ SOIL PIPE LINE - 4" Ø PVC PIPE SERIES - 1000


F
ST 4. ALL SOIL PIPE & WASTE PIPE LINES SHALL BE PVC PIPE AND SHALL BE ▬ WASTE PIPE LINE (FLOOR DRAIN) - 4" Ø PVC PIPE SERIES - 1000

2"Ø

SOIL PIPE 4"Ø


PROPERLY JOINTED WITH PVC SOLVENT CEMENT ▬ WASTE PIPE LINE (LAVATORY) - 2" Ø PVC PIPE SERIES - 1000

4"Ø
2"Ø
1
5. WASTE PIPE LINES SHALL BE A MINIMUM OF 100MMØ PVC PIPE (S -1000) ▬ MAIN VENT PIPE - 2" Ø PVC PIPE SERIES - 1000

PPR PIPE SDR WATER LINE


FOR MAIN PIPE , WATER CLOSET AND FLOOR DRAIN; 50MMØ PVC PIPE ▬ DOWNSPOUT OR ROOF LEADER - 3" Ø PVC PIPE SERIES - 1000
(S-1000) FOR MAIN VENT AND BRANCH VENT, 75MMØ (S -1000)FOR SINK
1 1
DRAIN WATER SUPPY LINE
U P

U P
2 2
F LAV. 3 3 6. VENT THRU ROOF SHALL BE 0.30M FROM ANY OPENNING ▬ SUPPLY LINE - 1" Ø PE PIPE SDR
R A M P

LAV.

R A M P
4 4
7. ALL FLOOR DRAIN & SINK SHALL BE WITH ITS RESPECTIVE P-TRAPS ▬ DISTRIBUTION PIPE - 21" Ø PE PIPE SDR

4"Ø
F 5 F.D.
5

W.C
6

W.C
6
8. CHANGES IN DIRECTION:
HORIZONTAL DRAINAGE LINES TO VERTICAL STACK

TO PUBLIC SEWER
c.o.
– 45 OR 60 WYE BRANCHES LEGEND:
– COMBINATION OF WYE AND 1/8 BEND BRANCHES

TO PUBLIC SEWER
– SANITARY TEE SOIL PIPE LINE

G.V.
HORIZONTAL DRAINAGE LINES TO ANOTHER HORIZONTAL DRAINAGE
WASTE PIPE LINE

WATER SOURCE
LINES

POTABLE
TAP TO
- 45 WYE BRANCHES WATER SUPPLY PIPE LINE
- COMBINATION WYE AND 1/8 BEND BRANCHES GATE VALVE
VERTICAL DRAINAGE LINES CONNECTING TO HORIZONTAL DRAINAGE
LINE F FAUCET
- 45 BRANCHES W.C. WATER CLOSET
FD FLOOR DRAIN
LAV. FLOOR DRAIN
PIPE LINE PLUMBING LAYOUT PIPELINE PLUMBING LAYOUT C.O. CLEAN OUT
1 GROUND FLOOR WATER LINE 3 GROUND FLOOR SANITARY LINE THIS VTR VENT TRU ROOF
P 1 SCALE: 1:100 MTRS. P 1 SCALE: 1:100 MTRS.
SITE CB
ST
CATCH BASIN
SEPTIC TANK

9.50 6.85
SOIL PIPE 4"Ø FROM GROUND FLOOR
FENCE ROOF LINE
VTR 2"Ø TO SECOND FLOOR 1.00
FROM GROUND FLOOR PWD/MALE
CR
2%
SLO
PE
TO
F.D.
FT-1
+0.40m
BRGY.
FT-3 PANTRY
FT-3
D5
D3 CAPTAIN
+0.40m
FT-1
+0.40m OFFICE

ROOF LINE
N
c.o. D 4 EXIT
EXISTING
D2
TRIBAL

FENCE
WAITING

7.00
W.C. W.C. FD FD AREA BUILDING

10.20
W.C W.C. D6 1
FT-1

U P
2
2"Ø

2"Ø
+0.40m D2
F F PEBBLES FT-3
3 FT-1

R A M P
+0.40m
4

W
-0.35m

N
F
FEMALE 5

F LAV. W4

N
LAV.

E
-0.05m -0.05m LAV.
-0.05m LAV.
-0.05m
CR
6

STAGE FT-4

W
FT-1

E
+0.40m
TREASURER
STORAGE D7
D1

ROOF LINE PORCH W2

s
FT-2

E
w
+0.40m

S
ROOF LINE 1
ROOF LINE
FRONT
2

S
DN DN

ROOF LINE

ROOF LINE
EXISTING COVERED COURT

PIPE LINE PLUMBING LAYOUT PIPE LINE PLUMBING LAYOUT


2 SECOND FLOOR WATER LINE 4 SECOND FLOOR SANITARY LINE
P 1 SCALE: 1:100 MTRS. P 1 SCALE: 1:100 MTRS.

ROOF LINE ROOF LINE

5 SITE DEVELOPMENT PLAN


SCALE: NTS
P1

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


LOCATION MAP RONALD D. NACASABOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
PLUMBING SPEC'S
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING) WATERLINE PLUMBING LAYOUT PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
P 23
DICKLUM, MANOLO FORTICH, BUKIDNON IN BARANGAY SAN JOSE SANITARY PLUMBING LAYOUT
LIBONA, BUKIDNON LEGENDS
ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 5 35
RACIEL JOYCE L. DELA CRUZ DATE: DATE: DATE: DATE:
ENGINEER I
PLUMBING SPECIFICATIONS:
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL CONFORMED TO THE 9. ROOF DRAIN
LATEST EDITION OF 'THE PHILIPPINE PLUMBING CODE". "NATIONAL - RAINWATER PIPING SHALL NOT BE USED AS SOIL, WASTE &
SOIL PIPE 4"Ø FROM GROUND FLOOR BUILDING CODE", AND THE RULES AND REGULATIONS OF THE LOCAL VENT PIPES
VTR 2"Ø TO SECOND FLOOR AUTHORITY.
3"Ø DOWNSPOUT - ROOF DRAINS SHALL BE EQUIPPED WITH STRAINERS
TO SECOND FLOOR 4"Ø 4"Ø
2. ALL SLOPE FOR ALL HORIZONTAL WASTE LINE SHALL MOUNTAIN 2% EXTENDING NOT LESS THAN 102MM ABOVE THE SURFACE OF
CB CB 4"Ø CB CB
F 1
2"Ø PPR PIPE SDR WATER LINE
c.o. SOIL PIPE 4"Ø SOIL PIPE 4"Ø
MINIMUM UNLESS OTHERWISE SPECIFIED. THE ROOF IMMEDIATELY ADJACENT TO THE DRAIN
D.S.
2"Ø D.S. D.S. D.S.
3. ALL SEWER PIPELINES EMBEDDED ON GROUND AND BELOW
W.C.
3"Ø DOWNSPOUT LAV. CONCRETE SLAB HAD BEEN PROVIDED WITH SAND BEDDING WASTE - SOIL PIPE LINE

2"Ø
W.C. URI. LAV. F.D. URI.

F MATERIALS. ▬ SOIL PIPE LINE - 4" Ø PVC PIPE SERIES - 1000


F
ST 4. ALL SOIL PIPE & WASTE PIPE LINES SHALL BE PVC PIPE AND SHALL BE ▬ WASTE PIPE LINE (FLOOR DRAIN) - 4" Ø PVC PIPE SERIES - 1000

2"Ø

SOIL PIPE 4"Ø


PROPERLY JOINTED WITH PVC SOLVENT CEMENT ▬ WASTE PIPE LINE (LAVATORY) - 2" Ø PVC PIPE SERIES - 1000

4"Ø
2"Ø
1
5. WASTE PIPE LINES SHALL BE A MINIMUM OF 100MMØ PVC PIPE (S -1000) ▬ MAIN VENT PIPE - 2" Ø PVC PIPE SERIES - 1000

PPR PIPE SDR WATER LINE


FOR MAIN PIPE , WATER CLOSET AND FLOOR DRAIN; 50MMØ PVC PIPE ▬ DOWNSPOUT OR ROOF LEADER - 3" Ø PVC PIPE SERIES - 1000
(S-1000) FOR MAIN VENT AND BRANCH VENT, 75MMØ (S -1000)FOR SINK
1 1
DRAIN WATER SUPPY LINE
U P

U P
2 2
F LAV. 3 3 6. VENT THRU ROOF SHALL BE 0.30M FROM ANY OPENNING ▬ SUPPLY LINE - 1" Ø PE PIPE SDR
R A M P

R A M P
4 LAV.
4
7. ALL FLOOR DRAIN & SINK SHALL BE WITH ITS RESPECTIVE P-TRAPS ▬ DISTRIBUTION PIPE - 21" Ø PE PIPE SDR

4"Ø
F 5 F.D.
5

W.C
6

W.C
6
8. CHANGES IN DIRECTION:
HORIZONTAL DRAINAGE LINES TO VERTICAL STACK

TO PUBLIC SEWER
c.o.
– 45 OR 60 WYE BRANCHES LEGEND:
– COMBINATION OF WYE AND 1/8 BEND BRANCHES
– SANITARY TEE

TO PUBLIC SEWER
SOIL PIPE LINE

G.V.
HORIZONTAL DRAINAGE LINES TO ANOTHER HORIZONTAL DRAINAGE
WASTE PIPE LINE

WATER SOURCE
LINES

POTABLE
TAP TO
- 45 WYE BRANCHES WATER SUPPLY PIPE LINE
- COMBINATION WYE AND 1/8 BEND BRANCHES GATE VALVE
VERTICAL DRAINAGE LINES CONNECTING TO HORIZONTAL DRAINAGE
LINE F FAUCET
- 45 BRANCHES W.C. WATER CLOSET
FD FLOOR DRAIN
LAV. FLOOR DRAIN
PIPE LINE PLUMBING LAYOUT PIPELINE PLUMBING LAYOUT C.O. CLEAN OUT
1 GROUND FLOOR WATER LINE 3 GROUND FLOOR SANITARY LINE THIS VTR VENT TRU ROOF
P 1 SCALE: 1:100 MTRS. P 1 SCALE: 1:100 MTRS.
SITE CB
ST
CATCH BASIN
SEPTIC TANK

9.50 6.85
SOIL PIPE 4"Ø FROM GROUND FLOOR
FENCE ROOF LINE
VTR 2"Ø TO SECOND FLOOR 1.00
FROM GROUND FLOOR PWD/MALE
CR
2%
SLO
PE
TO
F.D.
FT-1
+0.40m
BRGY.
FT-3 PANTRY
FT-3
D5
D3 CAPTAIN
+0.40m
FT-1
+0.40m OFFICE

ROOF LINE
N
c.o. D 4 EXIT
EXISTING
D2
TRIBAL

FENCE
WAITING

7.00
W.C. W.C. FD FD AREA BUILDING

10.20
W.C W.C. D6 1
FT-1

U P
2
2"Ø

2"Ø
+0.40m D2
F F PEBBLES FT-3
3 FT-1

R A M P
+0.40m

W
-0.35m 4

N
F
FEMALE 5
F LAV.

N
W4

E
-0.05m LAV.
-0.05m LAV.
-0.05m LAV.
-0.05m
CR
6

STAGE FT-4

W
FT-1

E
+0.40m
TREASURER
STORAGE D7
D1

ROOF LINE PORCH W2

s
FT-2

E
w
+0.40m

S
ROOF LINE 1
ROOF LINE
FRONT
2

S
DN DN

ROOF LINE

ROOF LINE
EXISTING COVERED COURT

PIPE LINE PLUMBING LAYOUT PIPE LINE PLUMBING LAYOUT


2 SECOND FLOOR WATER LINE 4 SECOND FLOOR SANITARY LINE
P 1 SCALE: 1:100 MTRS. P 1 SCALE: 1:100 MTRS.

ROOF LINE ROOF LINE

5 SITE DEVELOPMENT PLAN


SCALE: NTS
P1

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


LOCATION MAP RONALD D. NACASABOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
PLUMBING SPEC'S
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING) WATERLINE PLUMBING LAYOUT PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
P 23
DICKLUM, MANOLO FORTICH, BUKIDNON SANITARY PLUMBING LAYOUT
BARANGAY SAN JOSE
LIBONA, BUKIDNON LEGENDS
ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 5 35
RACIEL JOYCE L. DELA CRUZ DATE: DATE: DATE: DATE:
ENGINEER I
PLUMBING SPECIFICATIONS:
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL CONFORMED TO THE
LATEST EDITION OF 'THE PHILIPPINE PLUMBING CODE". "NATIONAL
BUILDING CODE", AND THE RULES AND REGULATIONS OF THE LOCAL
AUTHORITY.
2. ALL SLOPE FOR ALL HORIZONTAL WASTE LINE SHALL MOUNTAIN 2%
MINIMUM UNLESS OTHERWISE SPECIFIED.
3. ALL SEWER PIPELINES EMBEDDED ON GROUND AND BELOW
CONCRETE SLAB HAD BEEN PROVIDED WITH SAND BEDDING
MATERIALS.
4. ALL SOIL PIPE & WASTE PIPE LINES SHALL BE PVC PIPE AND SHALL BE
.
D.S PROPERLY JOINTED WITH PVC SOLVENT CEMENT
A B C D 5. WASTE PIPE LINES SHALL BE A MINIMUM OF 100MMØ PVC PIPE (S -1000)
2.80 9.50 FOR MAIN PIPE , WATER CLOSET AND FLOOR DRAIN; 50MMØ PVC PIPE
.
D.S (S-1000) FOR MAIN VENT AND BRANCH VENT, 75MMØ (S -1000)FOR SINK
1.40 1.40 2.50 3.50 5.50 DRAIN
1.21 6. VENT THRU ROOF SHALL BE 0.30M FROM ANY OPENNING
D.S
. 7. ALL FLOOR DRAIN & SINK SHALL BE WITH ITS RESPECTIVE P-TRAPS
8. CHANGES IN DIRECTION:
.
HORIZONTAL DRAINAGE LINES TO VERTICAL STACK
D.S E – 45 OR 60 WYE BRANCHES
PIP T
C OU – COMBINATION OF WYE AND 1/8 BEND BRANCHES
PV P
75mmØ DOWNSPOUT
mØ WNS – SANITARY TEE
m O
CB 100mmØ PVC PIPE
CB 100mmØ PVC PIPE
CB 100mmØ PVC PIPE
CB 75 D HORIZONTAL DRAINAGE LINES TO ANOTHER HORIZONTAL DRAINAGE
D.S. LINES
D.S. D.S.
1 D.S.
- 45 WYE BRANCHES
75mmØ DOWNSPOUT - COMBINATION WYE AND 1/8 BEND BRANCHES
1.60
1.60

2.05

100mmØ PVC PIPE


VERTICAL DRAINAGE LINES CONNECTING TO HORIZONTAL DRAINAGE
2.90

LINE
3.50

- 45 BRANCHES
9. ROOF DRAIN
1.90

E - RAINWATER PIPING SHALL NOT BE USED AS SOIL, WASTE &


PIP T IPET
C OU C P OU VENT PIPES
PV P PV P
7.00

2 mØ WNS Ø NS m - ROOF DRAINS SHALL BE EQUIPPED WITH STRAINERS


mmDOW
05
-0.

m O EXTENDING NOT LESS THAN 102MM ABOVE THE SURFACE OF


75 D
1
75
m
05
-0.
1.60

U P
5.50

2
THE ROOF IMMEDIATELY ADJACENT TO THE DRAIN

100mmØ PVC PIPE


2.30

3
R A M P

4
3.50

5
6 DN WASTE - SOIL PIPE LINE
▬ SOIL PIPE LINE - 100mm THICK Ø PVC PIPE SERIES - 1000
▬ WASTE PIPE LINE (FLOOR DRAIN) - 100mm THICK Ø PVC PIPE SERIES
1.20

- 1000
E ▬ WASTE PIPE LINE (LAVATORY) - 50mm Ø PVC PIPE SERIES - 1000
3 PIP T
C OU ▬ MAIN VENT PIPE - 50mm Ø PVC PIPE SERIES - 1000

TO PUBLIC SEWER
PVNSP ▬ DOWNSPOUT OR ROOF LEADER - 75mm Ø PVC PIPE SERIES - 1000
1.88

mmØOW
75 D
IPE
CB WATER SUPPY LINE
P
UT PVC 10 ▬ SUPPLY LINE - 1" Ø PE PIPE SDR
PO 00mmØ D.S. 0m

W NS 1

PV
▬ DISTRIBUTION PIPE - 21" Ø PE PIPE SDR
Ø DO C PIP
E

75mm B .
IPEC D.S 10
0m
CP mØ
PV
mØ PV
0m CP
10 IPE

PV CP
IPECB
D.S
. TO
PU
BL
LEGEND:
mØ IC
0m SE
10 WE
CB.S. R
1 STORM DRAINAGE LAYOUT PLAN D
SOIL PIPE LINE
WASTE PIPE LINE
P 2 SCALE: 1:100 MTRS.
1
2
3
4
WATER SUPPLY PIPE LINE
5
6

GATE VALVE
P
U
P
F FAUCET
M
A
R
W.C. WATER CLOSET
FD FLOOR DRAIN
LAV. FLOOR DRAIN
C.O. CLEAN OUT
VTR VENT TRU ROOF
STORM DRAINAGE LAYOUT PLAN CB CATCH BASIN

2 ISOMETRIC VIEW ST SEPTIC TANK

P 2 SCALE: 1:100 MTRS.

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES -STORM DRAINAGE LAY-OUT PLAN


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STORM DRAINAGE LAY-OUT PLAN RONALD D. NACASABOG
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING)
-ISOMETRIC VIEW
-LEGEND
-PLUMBING SPECIFICATIONS
DESIGNED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
P 24
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE
LIBONA, BUKIDNON
ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2 5 35
RACIEL JOYCE DELA L. CRUZ DATE: DATE: DATE: DATE:
ENGINEER I / MASTER PLUMBER
PLUMBING SPECIFICATIONS:
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL CONFORMED TO THE
LATEST EDITION OF 'THE PHILIPPINE PLUMBING CODE". "NATIONAL
BUILDING CODE", AND THE RULES AND REGULATIONS OF THE LOCAL
AUTHORITY.
2. ALL SLOPE FOR ALL HORIZONTAL WASTE LINE SHALL MOUNTAIN 2%
MINIMUM UNLESS OTHERWISE SPECIFIED.
3. ALL SEWER PIPELINES EMBEDDED ON GROUND AND BELOW
CONCRETE SLAB HAD BEEN PROVIDED WITH SAND BEDDING
MATERIALS.
.
D.S 4. ALL SOIL PIPE & WASTE PIPE LINES SHALL BE PVC PIPE AND SHALL BE
PROPERLY JOINTED WITH PVC SOLVENT CEMENT
5. WASTE PIPE LINES SHALL BE A MINIMUM OF 100MMØ PVC PIPE (S -1000)
D.S. FOR MAIN PIPE , WATER CLOSET AND FLOOR DRAIN; 50MMØ PVC PIPE
(S-1000) FOR MAIN VENT AND BRANCH VENT, 75MMØ (S -1000)FOR SINK
DRAIN
O R
LO .S.
6. VENT THRU ROOF SHALL BE 0.30M FROM ANY OPENNING
F D
ND 7. ALL FLOOR DRAIN & SINK SHALL BE WITH ITS RESPECTIVE P-TRAPS
OU 8. CHANGES IN DIRECTION:
GR D.S
.
O M HORIZONTAL DRAINAGE LINES TO VERTICAL STACK
FR – 45 OR 60 WYE BRANCHES
– COMBINATION OF WYE AND 1/8 BEND BRANCHES
.
F OR – SANITARY TEE
W.C
V.
F F LO HORIZONTAL DRAINAGE LINES TO ANOTHER HORIZONTAL DRAINAGE
W.C
. -0.
LmA
05
ND
F A-0.V
.m
05
E CO LINES
FL OS - 45 WYE BRANCHES
ØT
R2" - COMBINATION WYE AND 1/8 BEND BRANCHES
VT
VERTICAL DRAINAGE LINES CONNECTING TO HORIZONTAL DRAINAGE
DN
LINE
- 45 BRANCHES
OR
LO 9. ROOF DRAIN
DF OR
UN F LO . FD2"Ø - RAINWATER PIPING SHALL NOT BE USED AS SOIL, WASTE &
RO . ND W.C
MG .oO
cC LmA
V. VENT PIPES
FR
O
O SE D 2 W.C -0.
05

- ROOF DRAINS SHALL BE EQUIPPED WITH STRAINERS


"Ø "ØT
F "Ø -0.V
05
m.
IP4E TR2
LA
EXTENDING NOT LESS THAN 102MM ABOVE THE SURFACE OF
IL P V
SO THE ROOF IMMEDIATELY ADJACENT TO THE DRAIN
DN
WASTE - SOIL PIPE LINE
▬ SOIL PIPE LINE - 4" Ø PVC PIPE SERIES - 1000
UT ▬ WASTE PIPE LINE (FLOOR DRAIN) - 4" Ø PVC PIPE SERIES - 1000
S PO ▬ WASTE PIPE LINE (LAVATORY) - 2" Ø PVC PIPE SERIES - 1000
O UT T WN
SP OU DO ▬ MAIN VENT PIPE - 2" Ø PVC PIPE SERIES - 1000
WN SP 3"Ø
DO WN UT
▬ DOWNSPOUT OR ROOF LEADER - 3" Ø PVC PIPE SERIES - 1000
3"Ø DO PO
3"Ø S
WN T CB WATER SUPPY LINE
DO
3"Ø
WN
SP
OU ST ▬ SUPPLY LINE - 1" Ø PE PIPE SDR
OR INE
4"Ø .
1
2 "Ø 4E"Ø D.S
O PIP
DISTRIBUTION PIPE - 21" Ø PE PIPE SDR
LO TER L PE
PIP E 3" ØD SO
IL 4"Ø ▬
N SD DF RW
A ES
DR EP
IP
WA ST CB
CO PIPE
.
F TER WA D.S

SE1 2"Ø PE 2"Ø


4"Ø
LIN 2"Ø
E 4E"Ø
TO 4"Ø IL PIP
SO TO
F
UR
CE
SO BLE G.V
TER TA TO
.
OR
FLO OR
CB D.S
. TO
PU
PU

BL
BL
IC
SE
LEGEND:
A V. WA POTAP
ND LO 4"Ø . IC WE
UR
I. L
OU D F .
2"Ø LAV SE
WE
R
.
M GR CON CB.S. c.o . .UR
I. R SOIL PIPE LINE
W.C O E W.C F.D
FR O S
D
F
"Ø "ØT SO WASTE PIPE LINE
IP4E TR2 2"Ø IL P
IL P V
IP4E
1 "Ø
2
3 S O 1
2 WATER SUPPLY PIPE LINE
4 3
V. 5 4
FLA 6 5
6
F W.C V.
LA .D.
GATE VALVE
F .
W.C c.o
OR F FAUCET
P
U P

LO
P U

DF
M P
A M
W.C. WATER CLOSET
R A
N
R

CO
O SE FD FLOOR DRAIN
ØT
R2" LAV.
VT FLOOR DRAIN
C.O. CLEAN OUT
VTR VENT TRU ROOF
WATER LINE PLUMBING LAYOUT SANITARY LINE PLUMBING LAYOUT CB CATCH BASIN

1 ISOMETRIC VIEW 2 ISOMETRIC VIEW ST SEPTIC TANK

P 3 SCALE: 1:100 MTRS. P 3 SCALE: 1:100 MTRS.

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


PLUMBING SPEC'S RONALD D. NACASABOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
ISOMETRIC VIEW
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING) LEGENDS PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
P 25
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE
LIBONA, BUKIDNON
ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 3 5 35
RACIEL JOYCE L. DELA CRUZ DATE: DATE: DATE: DATE:
ENGINEER I
PLUMBING SPECIFICATIONS:
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL CONFORMED TO THE
LATEST EDITION OF 'THE PHILIPPINE PLUMBING CODE". "NATIONAL
BUILDING CODE", AND THE RULES AND REGULATIONS OF THE LOCAL
AUTHORITY.
2. ALL SLOPE FOR ALL HORIZONTAL WASTE LINE SHALL MOUNTAIN 2%
MINIMUM UNLESS OTHERWISE SPECIFIED.
3. ALL SEWER PIPELINES EMBEDDED ON GROUND AND BELOW
CONCRETE SLAB HAD BEEN PROVIDED WITH SAND BEDDING
3.102 0.600 MATERIALS.
4. ALL SOIL PIPE & WASTE PIPE LINES SHALL BE PVC PIPE AND SHALL BE
1.550 0.750 0.750 0.400 PROPERLY JOINTED WITH PVC SOLVENT CEMENT
5. WASTE PIPE LINES SHALL BE A MINIMUM OF 100MMØ PVC PIPE (S -1000)
FOR MAIN PIPE , WATER CLOSET AND FLOOR DRAIN; 50MMØ PVC PIPE
150mm THK. CONCRETE WALL
(S-1000) FOR MAIN VENT AND BRANCH VENT, 75MMØ (S -1000)FOR SINK
DRAIN

0.350
6. VENT THRU ROOF SHALL BE 0.30M FROM ANY OPENNING
150mm THK. 7. ALL FLOOR DRAIN & SINK SHALL BE WITH ITS RESPECTIVE P-TRAPS
500 500 500
CONCRETE WALL 8. CHANGES IN DIRECTION:
CO HORIZONTAL DRAINAGE LINES TO VERTICAL STACK
– 45 OR 60 WYE BRANCHES
– COMBINATION OF WYE AND 1/8 BEND BRANCHES
– SANITARY TEE

0.700

1.400
100mm THICK CONCRETE

500

500

500
TOP SLAB W/ OUTLET HORIZONTAL DRAINAGE LINES TO ANOTHER HORIZONTAL DRAINAGE
10mmØ BARS LINES
@ 0.20 M. O.C. BW - 45 WYE BRANCHES
CO - COMBINATION WYE AND 1/8 BEND BRANCHES
MANHOLE MANHOLE MANHOLE VERTICAL DRAINAGE LINES CONNECTING TO HORIZONTAL DRAINAGE
LINE

0.350
150mm THK. CONCRETE WALL - 45 BRANCHES
9. ROOF DRAIN
- RAINWATER PIPING SHALL NOT BE USED AS SOIL, WASTE &
VENT PIPES
100mm THICK CONCRETE - ROOF DRAINS SHALL BE EQUIPPED WITH STRAINERS
PLAN 500
150mm THK.
TOP SLAB W/
10mmØ BARS 0.60
EXTENDING NOT LESS THAN 102MM ABOVE THE SURFACE OF
THE ROOF IMMEDIATELY ADJACENT TO THE DRAIN
INLET

150mm THK. 150mm THK. @ 0.20 M. O.C. BW


CONCRETE WALL
100mm THICK CONCRETE CONCRETE WALL 500 CONCRETE WALL PARTITION 0.10
500 PARTITION WASTE - SOIL PIPE LINE
TOP SLAB W/ PARTITION ▬ SOIL PIPE LINE - 100mm THICK Ø PVC PIPE SERIES - 1000
10mmØ BARS 150 MANHOLE 150 MANHOLE 150 MANHOLE 150 150 150mm THK. ▬ WASTE PIPE LINE (FLOOR DRAIN) - 100mm THICK Ø PVC PIPE SERIES
SPACED @ 0.20 M. O.C. BW CO CO CHECKERED PLATE 100MM Ø PVC PIPE - 1000
▬ WASTE PIPE LINE (LAVATORY) - 50mm Ø PVC PIPE SERIES - 1000
100

▬ MAIN VENT PIPE - 50mm Ø PVC PIPE SERIES - 1000


ACTIVATED CARBON ▬ DOWNSPOUT OR ROOF LEADER - 75mm Ø PVC PIPE SERIES - 1000
0.300

AIR SPACE AIR SPACE UPFLOW

0.60
0.40
100mm THK. TO CANAL

0.650
INLET WATER LEVEL WATER LEVEL FILTER WATER SUPPY LINE
INLET PIPE
50mmtHK. CONC. SLAB ▬ SUPPLY LINE - 1" Ø PE PIPE SDR
WATER LEVEL W/ 15mm HOLES ▬ DISTRIBUTION PIPE - 12" Ø PE PIPE SDR
12mmØ BARS @ 50mm O.C.
SPACED 150mm THK.
@ 0.20 M. O.C. CONCRETE WALL TOP VIEW

1.700
PARTITION

350
100mmØ PVC OUTLET PIPE
TO DRAINAGE SYSTEM 100mm THICK CONCRETE
12mmØ BARS 12mmØ BARS TOP AND BOTTOM SLAB W/
1.400

SPACED SPACED LEACHING 10mmØ BARS 0.25

250
@ 0.20 M. O.C. OUTLET
@ 0.20 M. O.C. SPACED @ 0.20 M. O.C. BW
WELL 0.10 EWFG
DIGESTIVE CHAMBER 10MM Ø HANDLE BAR W/
150mm THK.
12mmØ BARS REMOVABLE CONC. COVER
CONCRETE WALL
SPACED 4-100mmØ

450

0.10
@ 0.20 M. O.C. WEEP HOLES 18mmØ GRAVEL FILTER NAT. GROUND LINE
120

INLET PIPE TO CANAL


100

50mm GRAVEL BEDDING 10mmØ BARS @ 0.30 M. O.C.


120mm THICK CONCRETE COMPACTED 100mm THICK THK. CHB
BOTTOM SLAB W/ EARTH FILL 12mmØ BARS @ 0.20 M. O.C.

0.10
12mmØ BARS 12mmØ BARS @ 0.20 M. O.C
SPACED @ 0.20 M. O.C. BW
SECTION 0.40
10MM Ø DSB BARS
SPACED @ 0.20M O.C.
SECTION

1 SEPTIC VAULT DETAIL 2 CATCH BASIN DETAILS


P 4 SCALE: 1:100 MTRS. P 4 SCALE: 1:25 MTS.

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


SEPTIC VAULT DETAIL RONALD D. NACASABOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CATCH BASIN DETAILS
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING)
PLUMBING SPECIFICATIONS DESIGNED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
P 26
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE
LIBONA, BUKIDNON
ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 4 5 35
RACIEL JOYCE DELA L. CRUZ DATE: DATE: DATE: DATE:
ENGINEER I / MASTER PLUMBER
PLUMBING SPECIFICATIONS:
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL CONFORMED TO THE
LATEST EDITION OF 'THE PHILIPPINE PLUMBING CODE". "NATIONAL
BUILDING CODE", AND THE RULES AND REGULATIONS OF THE LOCAL
AUTHORITY.
2. ALL SLOPE FOR ALL HORIZONTAL WASTE LINE SHALL MOUNTAIN 2%
MINIMUM UNLESS OTHERWISE SPECIFIED.
3. ALL SEWER PIPELINES EMBEDDED ON GROUND AND BELOW
CONCRETE SLAB HAD BEEN PROVIDED WITH SAND BEDDING
MATERIALS.
4. ALL SOIL PIPE & WASTE PIPE LINES SHALL BE PVC PIPE AND SHALL BE
PROPERLY JOINTED WITH PVC SOLVENT CEMENT
5. WASTE PIPE LINES SHALL BE A MINIMUM OF 100MMØ PVC PIPE (S -1000)
FOR MAIN PIPE , WATER CLOSET AND FLOOR DRAIN; 50MMØ PVC PIPE
(S-1000) FOR MAIN VENT AND BRANCH VENT, 75MMØ (S -1000)FOR SINK
2ND FLOOR LINE FLOOR DRAIN
DRAIN
6. VENT THRU ROOF SHALL BE 0.30M FROM ANY OPENNING
SEAL 7. ALL FLOOR DRAIN & SINK SHALL BE WITH ITS RESPECTIVE P-TRAPS
8. CHANGES IN DIRECTION:
HORIZONTAL - HORIZONTAL HORIZONTAL DRAINAGE LINES TO VERTICAL STACK
50MMDIA. VENT
AT 45-degree WYE – 45 OR 60 WYE BRANCHES
HORIZONTAL - HORIZONTAL – COMBINATION OF WYE AND 1/8 BEND BRANCHES
WYE 1/8 BEND VERTICAL - HORIZONTAL – SANITARY TEE
WYE 1/8 BEND HORIZONTAL DRAINAGE LINES TO ANOTHER HORIZONTAL DRAINAGE
PIPE LINES
- 45 WYE BRANCHES
HORIZONTAL - VERTICAL PIPE HANGER
- COMBINATION WYE AND 1/8 BEND BRANCHES
SANITARY TEE P - TRAP
SECTION VERTICAL DRAINAGE LINES CONNECTING TO HORIZONTAL DRAINAGE
LINE
- 45 BRANCHES
9. ROOF DRAIN
- RAINWATER PIPING SHALL NOT BE USED AS SOIL, WASTE &
1 3 VENT PIPES
- ROOF DRAINS SHALL BE EQUIPPED WITH STRAINERS
P 5 P 5 EXTENDING NOT LESS THAN 102MM ABOVE THE SURFACE OF
THE ROOF IMMEDIATELY ADJACENT TO THE DRAIN

WASTE - SOIL PIPE LINE


▬ SOIL PIPE LINE - 4" Ø PVC PIPE SERIES - 1000
▬ WASTE PIPE LINE (FLOOR DRAIN) - 4" Ø PVC PIPE SERIES - 1000
▬ WASTE PIPE LINE (LAVATORY) - 2" Ø PVC PIPE SERIES - 1000
▬ MAIN VENT PIPE - 2" Ø PVC PIPE SERIES - 1000
▬ DOWNSPOUT OR ROOF LEADER - 3" Ø PVC PIPE SERIES - 1000

WATER SUPPY LINE


▬ SUPPLY LINE - 1" Ø PE PIPE SDR
▬ DISTRIBUTION PIPE - 21" Ø PE PIPE SDR

2
P 5

4
P 5

PDS-BUK3RD: 2025
DRAFTED :
PROJECT AND LOCATION : SHEET CONTENTS : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHT. NO.

REPUBLIC OF THE PHILIPPINES


PLUMBING SPEC'S RONALD D. NACASABOG
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PIPE CONNECTIONS
REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MULTI-PURPOSE
BUILDING (ADMIN BUILDING)
FLOOR CLEANOUT DETAILS
P-TRAP DETAIL
PREPARED :
ENGINEERING ASSISTANT

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ISMAEL R. ALAJID RONALDO C.PAHANG, AEr.
P 27
DICKLUM, MANOLO FORTICH, BUKIDNON BARANGAY SAN JOSE FLOOR DRAIN DETAILS
LIBONA, BUKIDNON
ENGINEER II ENGINEER II
OIC- PLANNING AND DESIGN SECTION CHIEF
OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 5 5 35
RACIEL JOYCE L. DELA CRUZ DATE: DATE: DATE: DATE:
ENGINEER I