This document outlines the planned preventive maintenance tasks for electrical assets, emphasizing safety protocols such as disconnecting power and using PPE. It includes a checklist of maintenance activities to be performed quarterly, such as inspecting equipment, cleaning, and checking for abnormalities. Additionally, it specifies the items needed for maintenance and provides details on the technicians involved and their working hours.

Uploaded by

diskhard91
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views2 pages

BMC DB-1 PPM Report - Quarterly

This document outlines the planned preventive maintenance tasks for electrical assets, emphasizing safety protocols such as disconnecting power and using PPE. It includes a checklist of maintenance activities to be performed quarterly, such as inspecting equipment, cleaning, and checking for abnormalities. Additionally, it specifies the items needed for maintenance and provides details on the technicians involved and their working hours.

Uploaded by

diskhard91
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Al

Asset. No
Deghaither DB # 01
Project
Center Location
Level 01
BMC
Sheet No
Client BMC
Aug 8th, 2024
Date
PLANNED PREVENTIVE MAINTENANCE TASK SHEET

1.You must disconnect and lock out the electrical supply before commencing any Electrical work on this asset, unless
directed differently in the instructions below.
2.You must ensure that proper PPE (personal protective equipment) is worn at while working and that safety
procedures are followed at all times.
3.You must set up appropriate SAFETY BARRIERS & SIGNS when performing any work.

ONLY NON-CONDUCTIVE LADDERS TO BE USED


SCHEDULE OF FREQUENCY Quarterly
EQUIPMENT DESCRIPTION MDB/ SMDB / EMDB/ DB/ EDB

✓ Clean panel using a blower.


✓ Visually inspect equipment for unusual conditions, overheating, etc.
✓ Check for burnt wires.
✓ Check for presence of vermin’s and / or combustible materials.
✓ Clean the switchboard surface to remove debris and dust.
✓ Check lighting, sockets, emergency lighting of the room.
✓ Check for correct labeling of circuit, fuses, switches, and terminals.
✓ Check and re-tighten any loose bolts, screws and nuts in proper sequence.
✓ Check for presence of diagrams, instructions, and other similar information.
✓ Check the earth loop impedance of the earthing system.
✓ Check for unusual noise, hum or vibration.
✓ Check for adequacy of maintenance space.
✓ Note for abnormal under-voltage, over-voltage, three phase unbalance of current, etc. and rectify as appropriate.
✓ Inspect metal components for corrosion and if found, wire brush to clean metal and paint with an approved anti-
corrosion paint system.
✓ Record major operational parameters, including current, voltage, power factor, meter readings. Ensure that the
operating parameters correlate with the operating conditions.

GENERAL:
✓ Check all earth cables for tightness.
✓ Check if two fire extinguishers are available in the plant room and they are not out of service date. (CO2 & Powder)

Note: If values recorded are harmful to life or equipment contact supervisor


REPORT ALL DEFECTS TO DUTY SUPERVISOR AND IF THERE IS ANY DOUBT, PLEASE REFER TO THE MANUFACTURERS’ INSTRUCTION MANUAL.
PPM SCHEDULE DATE Aug 8th, 2024

ITEMS NEEDED TO CARRY OUT THE MAINTENANCE


1. Lock-out tag 5. PPEs
2. Tools 6. Tightener
3. Multi-meter 7. Pen
4. Vacuum / Blower 8. Notebook

SPECIFICATIONS
Voltage 221 220 220
Amperage

SPECIAL INSTRUCTIONS / REMARKS


Every found normal and working.

Consumables & Spares Used Information Specialist Tools Used


Null Discipline: Electrical Handtools
Category: DB
Average Time: 40 mins
No. of Men: 2
Priority: 3

Name of Technicians
Task Reference PPM 1. Talib Laddan 4.
2. M. Hatim 5.
Total working 3. 6.
hours