0% found this document useful (0 votes)
105 views3 pages

Troubleshooting Procedure - HMI Communication Error With PLC

The document outlines a troubleshooting procedure for resolving HMI communication errors with PLCs. It includes checking the DP connector and dial switch settings, verifying the IP addresses of the HMI panels, and restarting the system after making necessary adjustments. The solution is provided by the R&D department of Headway after sales support.

Uploaded by

Alex Adrian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views3 pages

Troubleshooting Procedure - HMI Communication Error With PLC

The document outlines a troubleshooting procedure for resolving HMI communication errors with PLCs. It includes checking the DP connector and dial switch settings, verifying the IP addresses of the HMI panels, and restarting the system after making necessary adjustments. The solution is provided by the R&D department of Headway after sales support.

Uploaded by

Alex Adrian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Troubleshooting procedure

HMI communication Error With PLC

1. Check the DP connector on the HMI & PLC is firm, the wire between the
connector is reliable and firm connection

Check the dial switch on the DP connector :


dial switch on PLC connector: ON
dial switch on Local HMI connector: OFF
dial switch on Remote HMI connector: ON

2.

DP connector to PLC: ON

Check the IP address of the HMI panel:


Local HMI:192.168.0.8
Remote HMI:192.168.0.9

*Follow the steps below to set the IP address:


a. Start the control unit and wait a moment for the “Start Center” to appear as
bellow;

3.

b. Start the Control Pane by press the “Control Panel” or “Settings” button;
c. Start the “Transfer settings” by press the “Transfer” button;
d. Then follow the steps below:
4. Then restart the system and test.

Solution supply by R&D.AS-BWMS


Headway R&D after sales department

You might also like