Inspection and Acceptance

The document includes a Certificate of Acceptance confirming the delivery of services by Jamal Cabugnason, which were inspected and found satisfactory. An Inspection Report details the inspection of work done by carpenters, affirming that it meets the specifications outlined in the project agreement. The project involved the improvement of school grounds and fabrication of a canal cover.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views2 pages

Inspection and Acceptance

The document includes a Certificate of Acceptance confirming the delivery of services by Jamal Cabugnason, which were inspected and found satisfactory. An Inspection Report details the inspection of work done by carpenters, affirming that it meets the specifications outlined in the project agreement. The project involved the improvement of school grounds and fabrication of a canal cover.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

Department of Education
REGION VII - CENTRAL VISAYAS
SCHOOLS DIVISION OF NEGROS ORIENTAL
STA. CATALINA DISTRICT II

Date: _______________

CERTIFICATE OF ACCEPTANCE

I/WE hereby certify to have accepted each and every article delivered/service
rendered by JAMAL CABUGNASON listed in the attached invoice no. ______________ dated
________________ which has been inspected and was/were found to be in accordance with the
specification stipulated under the approved Program of Works dated ______________.

ABELL R. MAMIGO
Head of Agency of Authorized Representative
Republic of the Philippines
Department of Education
REGION VII - CENTRAL VISAYAS
SCHOOLS DIVISION OF NEGROS ORIENTAL
STA. CATALINA DISTRICT II

Date: ___________

INSPECTION REPORT

The Inspector Team inspected the accomplishment job/service rendered by a group of


Carpenters represented by JAMAL CABUGNASON and found correct, complete and in
accordance with the specification stated in the signed Negotiated “Pakyaw” Agreement and the
Approved Program of Works of the Project.

Name of the Project: IMPROVEMENT OF SCHOOL GROUNDS AND FABRICATION OF


CANAL COVER

INSPECTORATE COMMITTEE

ARNEL A. ESONG
CHAIRMAN
JERRAH S. AMARANTE PIA A. TABORADA
MEMBER MEMBER